CN104570965A - Safety production operation control system for railway communication segment - Google Patents

Safety production operation control system for railway communication segment Download PDF

Info

Publication number
CN104570965A
CN104570965A CN201310483186.6A CN201310483186A CN104570965A CN 104570965 A CN104570965 A CN 104570965A CN 201310483186 A CN201310483186 A CN 201310483186A CN 104570965 A CN104570965 A CN 104570965A
Authority
CN
China
Prior art keywords
module
production plan
control system
production
auditing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310483186.6A
Other languages
Chinese (zh)
Inventor
陈永平
施迎春
黄峥嵘
刘云鹏
田小瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI SHENTIE INFORMATION ENGINEERING Co Ltd
Original Assignee
SHANGHAI SHENTIE INFORMATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI SHENTIE INFORMATION ENGINEERING Co Ltd filed Critical SHANGHAI SHENTIE INFORMATION ENGINEERING Co Ltd
Priority to CN201310483186.6A priority Critical patent/CN104570965A/en
Publication of CN104570965A publication Critical patent/CN104570965A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow

Abstract

The invention relates to a safety production operation control system for a railway communication segment. The system comprises an operation plan receiving module, an operation plan checking module, an operation plan displaying module, a storage module, an operation instruction issuing module and a control module, wherein the operation plan receiving module is used for receiving an operation plan request; the operation plan checking module is used for automatically checking the operation plan request; the operation plan displaying module is used for displaying the operation plan request and a checking result; the storage module is used for storing an operation plan passing the check; the operation instruction issuing module is used for issuing an operation instruction; the control module is connected with the operation plan receiving module, the operation plan checking module, the operation plan displaying module, the storage module and the operation instruction issuing module respectively and used for controlling running and data transmission of the modules. Compared with the prior art, the system has the advantages that the labor force of workers is reduced, the safety production efficiency is improved and the like.

Description

A kind of railway communication section safety in production operation-control system
Technical field
The present invention relates to railway operation control technology field, especially relate to a kind of railway communication section safety in production operation-control system.
Background technology
Railway communication is commander's train operation, organizes railway transport production, raises the efficiency, and ensures safety, transmits the critical facility of various information and public affair contact.Office of the Telecommunications Authority's constituent parts centered by modernization construction, will adhere to the policy for user's service, accomplishes that liaison is rapid, correct, maintains secrecy, stablizes.In recent years, along with railway signal centralized monitoring system continuous construction and come into operation, railway signal centralized monitoring system become signalling arrangement monitoring, safeguard and the important means of diagnosis, and in the maintenance of signalling arrangement, plays more and more important effect.
Safety is the lifeline of transportation by railroad, and be the eternal theme of transport production, safety of railway traffic not only affects production efficiency and the economic benefit of enterprise itself, also causes significant impact to social and economy.Railway communication has point more than long lines, layout becomes net, dispersing maintenance, the concentrated feature used, ever-increasing traffic requirements is met in order to communication facilities is done well, along with the development of railway freight heavy duty, train network upgrading and the reform of Railway Bureau's station segment body, more and more higher requirement is proposed to the safety of Railroad Communication System.
Summary of the invention
Object of the present invention be exactly in order to overcome above-mentioned prior art exist defect and provide a kind of railway communication section keep the safety in production operation-control system, each production plan auditing result of Real-time Feedback, decreases the labour of staff, improve safety in production efficiency.
Object of the present invention can be achieved through the following technical solutions:
A kind of railway communication section safety in production operation-control system, comprising:
Production plan receiver module, for receiving production plan application;
Production plan auditing module, for automatically auditing production plan application;
Production plan display module, for showing production plan application and auditing result;
Memory module, for storing the production plan of auditing and passing through;
Job command release module, for issuing job command according to production plan;
Control module, connects production plan receiver module, production plan auditing module, production plan display module, memory module and job command release module respectively, for controlling operation and the data transmission of each module.
The type of described production plan comprises maintenance schedule, construction plan, shutdown main points, Contingency plans and emergency.
Described comprises production plan type, application workshop, service line title and activity duration to the content that production plan application carries out automatically auditing.
Described production plan auditing module comprises one-level examination & verification unit and secondary examination & verification unit.
The job command that described job command release module issues is voice and/or visual information.
This control system also comprises remote information transceiver module, is connected with control module.
Compared with prior art, operation-control system dynamic of the present invention grasps the flow process of each production plan, and automatically audits production plan application, and each production plan auditing result of Real-time Feedback, decreases the labour of staff, improves the efficiency of safety in production.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is described in detail.The present embodiment is implemented premised on technical solution of the present invention, give detailed embodiment and concrete operating process, but protection scope of the present invention is not limited to following embodiment.
As shown in Figure 1, a kind of railway communication section safety in production operation-control system, the production plan receiver module 2, production plan auditing module 3, production plan display module 4, memory module 5 and the job command release module 6 that comprise control module 1 and be connected with control module 1 respectively, control module 1 controls operation and the data transmission of each module.Production plan receiver module 2 receives the production plan application that staff uploads, and notifies control module 1; After control module 1 receives and uploads settling signal, control production plan auditing module 3 and start, production plan application is audited automatically; Send examination & verification settling signal to control module 1 after having audited, control module 1 controls production plan display module 4 and shows production plan application and auditing result, is saved to memory module 5 by auditing the production plan passed through simultaneously; Control module 1 controls job command release module 6 and issues job command according to production plan.
The type of described production plan comprises maintenance schedule, construction plan, shutdown main points, Contingency plans and emergency.
Described comprises production plan type, application workshop, service line title and activity duration to the content that production plan application carries out automatically auditing.Described production plan auditing module comprises one-level examination & verification unit and secondary examination & verification unit, can carry out multistage auditing, improve the degree of accuracy of examination & verification to production plan application.
The job command that described job command release module issues is voice and/or visual information.
This control system also comprises remote information transceiver module 7, is connected with control module 1, for the command information of sending and receiving remote server.

Claims (6)

1. a railway communication section safety in production operation-control system, is characterized in that, comprising:
Production plan receiver module, for receiving production plan application;
Production plan auditing module, for automatically auditing production plan application;
Production plan display module, for showing production plan application and auditing result;
Memory module, for storing the production plan of auditing and passing through;
Job command release module, for issuing job command according to production plan;
Control module, connects production plan receiver module, production plan auditing module, production plan display module, memory module and job command release module respectively, for controlling operation and the data transmission of each module.
2. a kind of railway communication section safety in production operation-control system according to claim 1, it is characterized in that, the type of described production plan comprises maintenance schedule, construction plan, shutdown main points, Contingency plans and emergency.
3. a kind of railway communication section safety in production operation-control system according to claim 1, is characterized in that, described comprises production plan type, application workshop, service line title and activity duration to the content that production plan application carries out automatically auditing.
4. a kind of railway communication section safety in production operation-control system according to claim 1, is characterized in that, described production plan auditing module comprises one-level examination & verification unit and secondary examination & verification unit.
5. a kind of railway communication section safety in production operation-control system according to claim 1, it is characterized in that, the job command that described job command release module issues is voice and/or visual information.
6. a kind of railway communication section safety in production operation-control system according to claim 1, it is characterized in that, this control system also comprises remote information transceiver module, is connected with control module.
CN201310483186.6A 2013-10-15 2013-10-15 Safety production operation control system for railway communication segment Pending CN104570965A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310483186.6A CN104570965A (en) 2013-10-15 2013-10-15 Safety production operation control system for railway communication segment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310483186.6A CN104570965A (en) 2013-10-15 2013-10-15 Safety production operation control system for railway communication segment

Publications (1)

Publication Number Publication Date
CN104570965A true CN104570965A (en) 2015-04-29

Family

ID=53087301

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310483186.6A Pending CN104570965A (en) 2013-10-15 2013-10-15 Safety production operation control system for railway communication segment

Country Status (1)

Country Link
CN (1) CN104570965A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108108917A (en) * 2018-01-17 2018-06-01 中国铁路郑州局集团有限公司 Railway communication production scheduling command system

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101216909A (en) * 2008-01-16 2008-07-09 乐清市维信应用软件开发有限公司 An ERP production planning management based on process analysis
CN101630385A (en) * 2009-07-31 2010-01-20 福州星网视易信息系统有限公司 Implementation method for realizing multistage auditing workflow function by simple configuration items
CN101879909A (en) * 2010-06-07 2010-11-10 中铁信弘远(北京)软件科技有限责任公司 Railway station internal and external work control system
JP2011164729A (en) * 2010-02-05 2011-08-25 Fujitsu Ltd Program, on-board device, and information processing apparatus
CN102314457A (en) * 2010-06-30 2012-01-11 百度在线网络技术(北京)有限公司 Automatic information auditing method and system
CN102591286A (en) * 2012-02-20 2012-07-18 宝山钢铁股份有限公司 Online rolling plan dynamic pre-analysis and self-adjustment system and method
CN102616252A (en) * 2011-01-27 2012-08-01 铁道部运输局 Railway travelling operation control method and railway travelling operation control system
CN102637027A (en) * 2012-04-25 2012-08-15 深圳市速普瑞科技有限公司 Overhaul control system and method for railway signaling device
JP2012192825A (en) * 2011-03-16 2012-10-11 Railway Technical Research Institute Train run curve editing method and train run curve editing system
CN103188094A (en) * 2011-12-28 2013-07-03 中国移动通信集团贵州有限公司 Resource data verification system and resource data verification method

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101216909A (en) * 2008-01-16 2008-07-09 乐清市维信应用软件开发有限公司 An ERP production planning management based on process analysis
CN101630385A (en) * 2009-07-31 2010-01-20 福州星网视易信息系统有限公司 Implementation method for realizing multistage auditing workflow function by simple configuration items
JP2011164729A (en) * 2010-02-05 2011-08-25 Fujitsu Ltd Program, on-board device, and information processing apparatus
CN101879909A (en) * 2010-06-07 2010-11-10 中铁信弘远(北京)软件科技有限责任公司 Railway station internal and external work control system
CN102314457A (en) * 2010-06-30 2012-01-11 百度在线网络技术(北京)有限公司 Automatic information auditing method and system
CN102616252A (en) * 2011-01-27 2012-08-01 铁道部运输局 Railway travelling operation control method and railway travelling operation control system
JP2012192825A (en) * 2011-03-16 2012-10-11 Railway Technical Research Institute Train run curve editing method and train run curve editing system
CN103188094A (en) * 2011-12-28 2013-07-03 中国移动通信集团贵州有限公司 Resource data verification system and resource data verification method
CN102591286A (en) * 2012-02-20 2012-07-18 宝山钢铁股份有限公司 Online rolling plan dynamic pre-analysis and self-adjustment system and method
CN102637027A (en) * 2012-04-25 2012-08-15 深圳市速普瑞科技有限公司 Overhaul control system and method for railway signaling device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108108917A (en) * 2018-01-17 2018-06-01 中国铁路郑州局集团有限公司 Railway communication production scheduling command system

Similar Documents

Publication Publication Date Title
CN103707904B (en) Temporary speed-limiting method under the rail CBTC pattern of a kind of city and speed limiting system
CN203246468U (en) Digitized wireless train dispatching locomotive radio
CN104442933B (en) A kind of train is formed into columns and is run the method organized
CN108189860B (en) Driving permission control system suitable for general speed railway
EP3763598A1 (en) Centralized train dispatch control system and control method
CN104309652B (en) A kind of intelligent tramcar signal system
CN102267479A (en) Station autonomous machine for centralized traffic control system
CN113022661A (en) Temporary speed limit safety management method for multi-mode train control system
US20180086357A1 (en) System, Method, and Apparatus for Providing Backup of Electronic Instruction to a Locomotive or Train
CN110126886B (en) Hump safety protection information system
CN102358330B (en) Stub end track safety precaution method and device based on wireless shunting light-display system
CN104787087A (en) Portable digital communication station for railway train wireless dispatching
CN108769215A (en) A kind of transit information integrated system
CN104570965A (en) Safety production operation control system for railway communication segment
CN104742919A (en) Wireless-communication-based digital bimodule train tail system
CN210924923U (en) Traffic signal control and display system of tramcar
CN116639164A (en) Train temporary speed limiting control method suitable for common speed railway
RU123990U1 (en) TRACTION MANAGEMENT SYSTEM
CN105523064A (en) Interlocking host and trackside equipment communication device
RU77239U1 (en) SYSTEM FOR CONTROL OF LOCOMOTIVE PARK DISLOCATION
CN110852562A (en) Project construction management system and method based on Internet of things
RU2508217C2 (en) System for inspection and real-time control of locomotive stock
CN219007831U (en) Centralized control system for station dispatching remote terminal
CN105501260A (en) Emergency communication device for train and train control center
RU2555393C2 (en) Automated system for controlling operation of combined fleet of freight locomotives at handling yard

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150429

RJ01 Rejection of invention patent application after publication