CN110852562A - Project construction management system and method based on Internet of things - Google Patents
Project construction management system and method based on Internet of things Download PDFInfo
- Publication number
- CN110852562A CN110852562A CN201910918955.8A CN201910918955A CN110852562A CN 110852562 A CN110852562 A CN 110852562A CN 201910918955 A CN201910918955 A CN 201910918955A CN 110852562 A CN110852562 A CN 110852562A
- Authority
- CN
- China
- Prior art keywords
- construction equipment
- user
- construction
- position information
- internet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009430 construction management Methods 0.000 title claims abstract description 23
- 238000000034 method Methods 0.000 title claims abstract description 19
- 238000010276 construction Methods 0.000 claims abstract description 204
- 238000012795 verification Methods 0.000 claims abstract description 17
- 238000007726 management method Methods 0.000 claims description 3
- 230000006855 networking Effects 0.000 claims 1
- 238000005516 engineering process Methods 0.000 abstract description 3
- 238000012544 monitoring process Methods 0.000 description 6
- 239000013589 supplement Substances 0.000 description 4
- 238000004891 communication Methods 0.000 description 3
- 230000007547 defect Effects 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F21/00—Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F21/30—Authentication, i.e. establishing the identity or authorisation of security principals
- G06F21/31—User authentication
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/02—Reservations, e.g. for tickets, services or events
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2221/00—Indexing scheme relating to security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F2221/21—Indexing scheme relating to G06F21/00 and subgroups addressing additional information or applications relating to security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F2221/2111—Location-sensitive, e.g. geographical location, GPS
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2221/00—Indexing scheme relating to security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F2221/21—Indexing scheme relating to G06F21/00 and subgroups addressing additional information or applications relating to security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F2221/2141—Access rights, e.g. capability lists, access control lists, access tables, access matrices
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Quality & Reliability (AREA)
- Computer Security & Cryptography (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Primary Health Care (AREA)
- General Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Biodiversity & Conservation Biology (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Health & Medical Sciences (AREA)
- Computer Hardware Design (AREA)
- Software Systems (AREA)
- General Engineering & Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a project construction management system and method based on the Internet of things, which relate to the Internet of things technology and comprise the steps of obtaining a use request of a user, wherein the use request carries user identity information and construction equipment identification information; verifying whether the user has the use authority of the construction equipment or not according to the user identity information and the construction equipment identification information; if the use authority passes the verification, acquiring the position information of the user and the position information of the construction equipment; verifying whether the user position information and the construction equipment position information belong to preset positions; and if the position is verified, unlocking the remote control construction equipment for the operation and use of a user. The realization only has the user of permission to the construction equipment and just allows the operation to use this construction equipment, avoids construction equipment's no permission personnel maloperation to arouse wrong problem, and only user and construction equipment just allow construction equipment's use in the preset position in addition further improve the standardization of construction.
Description
Technical Field
The invention relates to the technology of the Internet of things, in particular to a project construction management system and method based on the Internet of things.
Background
Tunnel construction is a common situation in the field of engineering construction, for example, in order to relieve traffic pressure, various major cities strive to build subways, and the core content of the subways is to excavate tunnels. In addition, the important life-line railway of national economy plays an irreplaceable role in other transportation modes due to the specific flexibility and superiority, and one of the important components of the railway engineering structure is also a tunnel. With the continuous development of the technology, the tunnel building is larger and longer in scale and length. However, the larger the tunnel scale is, the greater the technical difficulty is, and because the construction environment is complex, the risk is relatively high, and the management difficulty is relatively high, the monitoring of construction equipment and constructors is always the most important factor in tunnel construction.
In the construction process, the construction is carried out for a plurality of periods at the same time sometimes, because the construction range span is large, the construction monitoring difficulty is further increased, in the actual construction, the construction personnel do not use the construction equipment according to the regulations, the use condition of the construction equipment personnel without the use qualification appears, and the construction problem is easily caused.
Disclosure of Invention
Aiming at the defects in the prior art, the invention aims to provide the project construction management method based on the Internet of things, which has the advantages of strictly monitoring the use permission of users and construction equipment, avoiding unauthorized use and reducing error problems.
In order to achieve the purpose, the invention provides the following technical scheme:
a project construction management method based on the Internet of things comprises
Obtaining a use request of a user, wherein the use request carries user identity information and construction equipment identification information;
verifying whether the user has the use authority of the construction equipment or not according to the user identity information and the construction equipment identification information;
if the use authority passes the verification, acquiring the position information of the user and the position information of the construction equipment;
verifying whether the user position information and the construction equipment position information belong to preset positions;
and if the position is verified, unlocking the remote control construction equipment for the operation and use of a user.
By adopting the technical scheme, during construction, after the use request is obtained, the user identity information and the identification information of the construction equipment contained in the use request are analyzed, whether the user has the use authority of the construction equipment is firstly verified, after the use authority verification is passed, the user position information and the construction equipment position information are obtained, if the user position information and the construction equipment position information are consistent with the construction preset position information, the user can be allowed to operate and use the construction equipment, the construction equipment is allowed to be operated and used only by the user with the use authority of the construction equipment, the error problem caused by the misoperation of unauthorized personnel of the construction equipment is avoided, in addition, before the construction equipment is allowed to be operated and used, the positions of the user and the construction equipment are verified with the preset position, and the construction equipment is allowed to be used only at the preset position, further improving the construction standardization.
And further, acquiring the running state of the construction equipment, calculating the running consumption of the construction equipment, and informing a user when the running consumption of the construction equipment reaches a corresponding preset threshold value.
By adopting the technical scheme, the operation state of the construction equipment is monitored during construction, the operation consumption of the construction equipment is calculated based on the operation state, and when the operation consumption reaches a preset threshold value, a user is informed to perform early warning, so that the user can be helped to timely perform consumption supplement and maintenance on the construction equipment.
Further, the method also comprises the step of informing other users of the position information of the user and the construction equipment.
By adopting the technical scheme, the position information of other users and the construction equipment can be shared among the users, the users can conveniently search, and the communication cooperation among the users is enhanced.
And further, inquiring the use state of the construction equipment, verifying the identity information of the user when the construction equipment is idle, and accepting the reserved use of the user for the construction equipment if the use authority is verified.
By adopting the technical scheme, when a user has a use demand, the user is supported to inquire whether the use state of the construction equipment is idle, if the construction equipment is idle, the identity information of the user is verified, if the use authority passes the verification, the user is bound with the construction equipment, the reserved use of the user on the construction equipment is accepted, and convenience is provided for the user to use the construction equipment.
Aiming at the defects in the prior art, the second purpose of the invention is to provide a project construction management system based on the Internet of things, which has the advantages of strictly monitoring the use permission of users and construction equipment, avoiding unauthorized use and reducing error problems.
In order to achieve the purpose, the invention provides the following technical scheme:
an internet of things based project construction management system comprising a processor and a memory, the memory storing a set of instructions for the processor to invoke to implement:
obtaining a use request of a user, wherein the use request carries user identity information and construction equipment identification information;
verifying whether the user has the use authority of the construction equipment or not according to the user identity information and the construction equipment identification information;
if the use authority passes the verification, acquiring the position information of the user and the position information of the construction equipment;
verifying whether the user position information and the construction equipment position information belong to preset positions;
and if the position is verified, unlocking the remote control construction equipment for the operation and use of a user.
By adopting the technical scheme, during construction, after the use request is obtained, the user identity information and the identification information of the construction equipment contained in the use request are analyzed, whether the user has the use authority of the construction equipment is firstly verified, after the use authority verification is passed, the user position information and the construction equipment position information are obtained, if the user position information and the construction equipment position information are consistent with the construction preset position information, the user can be allowed to operate and use the construction equipment, the construction equipment is allowed to be operated and used only by the user with the use authority of the construction equipment, the error problem caused by the misoperation of unauthorized personnel of the construction equipment is avoided, in addition, before the construction equipment is allowed to be operated and used, the positions of the user and the construction equipment are verified with the preset position, and the construction equipment is allowed to be used only at the preset position, further improving the construction standardization.
Further, the set of instructions is also for the processor to call to implement:
and acquiring the running state of the construction equipment, calculating the running consumption of the construction equipment, and informing a user when the running consumption of the construction equipment reaches a corresponding preset threshold value.
By adopting the technical scheme, the operation state of the construction equipment is monitored during construction, the operation consumption of the construction equipment is calculated based on the operation state, and when the operation consumption reaches a preset threshold value, a user is informed to perform early warning, so that the user can be helped to timely perform consumption supplement and maintenance on the construction equipment.
Further, the set of instructions is also for the processor to call to implement:
and informing the position information of the user and the construction equipment to other users.
By adopting the technical scheme, the position information of other users and the construction equipment can be shared among the users, the users can conveniently search, and the communication cooperation among the users is enhanced.
Further, the set of instructions is also for the processor to call to implement:
and inquiring the use state of the construction equipment, verifying the identity information of the user when the construction equipment is idle, and accepting the reserved use of the user for the construction equipment if the use authority passes the verification.
By adopting the technical scheme, when a user has a use demand, the user is supported to inquire whether the use state of the construction equipment is idle, if the construction equipment is idle, the identity information of the user is verified, if the use authority passes the verification, the user is bound with the construction equipment, the reserved use of the user on the construction equipment is accepted, and convenience is provided for the user to use the construction equipment.
In conclusion, the invention has the following beneficial effects:
1. whether the user has the use authority of the construction equipment is verified, and the construction equipment can be used only through the use authority verification, so that the construction equipment is allowed to be operated and used only by the user with the use authority of the construction equipment, and the error problem caused by misoperation of an unauthorized person of the construction equipment is avoided;
2. the position information of the user and the position information of the construction equipment are obtained, if the position information of the user and the position information of the construction equipment are consistent with the information of the construction preset position, the user can be allowed to operate and use the construction equipment, the positions of the user and the construction equipment and the preset position are verified, the use of the construction equipment is allowed only at the preset position, and the construction standardization is further improved;
3. the method comprises the steps of monitoring the operation state of the construction equipment during construction, calculating the operation consumption of the construction equipment based on the operation state, and informing a user of early warning when the operation consumption reaches a preset threshold value, so that the user can be helped to timely supplement and maintain the consumption of the construction equipment;
4. when the user has the user demand, support the user to inquire whether the user state of construction equipment is idle, if there is construction equipment idle, then verify user's identity information, if the permission passes through, bind user and construction equipment, accept the reservation use of user to this construction equipment, provide convenience for the user to construction equipment's use.
Drawings
FIG. 1 is a schematic flow chart of a project construction management method based on the Internet of things in the invention;
fig. 2 is a schematic diagram of a project construction management system based on the internet of things in the invention.
In the figure: 1. a processor; 2. a memory.
Detailed Description
The present invention will be described in detail below with reference to the accompanying drawings and examples.
The present embodiment is only for explaining the present invention, and it is not limited to the present invention, and those skilled in the art can make modifications of the present embodiment without inventive contribution as needed after reading the present specification, but all of them are protected by patent law within the scope of the claims of the present invention.
Example 1
A project construction management method based on the Internet of things refers to FIG. 1 and includes steps S101 to S105.
Step S101: and obtaining a use request of a user, wherein the use request carries user identity information and construction equipment identification information.
In step S101, the user identification information uniquely corresponds to the user. The construction equipment identification information uniquely corresponds to the construction equipment, and as a specific example, when a user has a use demand for a certain construction equipment, the user sends the above use request to the service center.
Step S102: and verifying whether the user has the use authority of the construction equipment or not according to the user identity information and the construction equipment identification information.
In step S102, the service center stores a corresponding relationship between the user identification information and the construction equipment identification information, where the corresponding relationship is the usage right of the user, and if the user has the usage right of the construction equipment, the verification is passed. Whether the user has the use authority of the construction equipment is verified, the user can use the construction equipment only by verifying the use authority, and then the construction equipment is allowed to be operated and used only by the user with the use authority of the construction equipment, so that the problem that errors are caused by misoperation of the construction equipment by persons without the authority is avoided.
Step S103: and if the use authority passes the verification, acquiring the position information of the user and the position information of the construction equipment.
In step S103, after the verification of the usage right is passed, the user location information and the construction equipment location information are acquired by a positioning device such as a GPS positioning module.
Step S104: and verifying whether the user position information and the construction equipment position information belong to preset positions.
Step S105: and if the position is verified, unlocking the remote control construction equipment for the operation and use of a user.
In step S104 and step S105, the user position information and the construction equipment position information are obtained, and if the user position information and the construction preset position information are consistent, the user may be allowed to operate and use the construction equipment, the user and the position and the preset position of the construction equipment are verified, and the use of the construction equipment is allowed only at the preset position, so that the construction standardization is further improved.
The project construction management method based on the Internet of things further comprises the steps of obtaining the operation state of the construction equipment, calculating the operation consumption of the construction equipment, and informing a user when the operation consumption of the construction equipment reaches a corresponding preset threshold value.
The construction equipment management method comprises the steps of monitoring the operation state of the construction equipment during construction, calculating the operation consumption of the construction equipment based on the operation state, and informing a user of early warning when the operation consumption reaches a preset threshold value, so that the user can be helped to timely supplement and maintain the consumption of the construction equipment.
The project construction management method based on the Internet of things further comprises the step of informing other users of the position information of the user and the construction equipment. The position information of other users and construction equipment is shared among the users, so that the users can conveniently find the position information, and the communication cooperation among the users is enhanced.
The project construction management method based on the Internet of things further comprises the steps of inquiring the use state of the construction equipment, verifying the identity information of a user when the construction equipment is fed back to be idle, and accepting the reserved use of the user for the construction equipment if the use authority is verified to be passed.
When the user has the user demand, support the user to inquire whether the user state of construction equipment is idle, if there is construction equipment idle, then verify user's identity information, if the permission passes through, bind user and construction equipment, accept the reservation use of user to this construction equipment, provide convenience for the user to construction equipment's use.
Example 2
A project construction management system based on the Internet of things, referring to FIG. 2, comprises a processor 1 and a memory 2, wherein the memory 2 stores an instruction set for the processor 1 to call to realize:
obtaining a use request of a user, wherein the use request carries user identity information and construction equipment identification information;
verifying whether the user has the use authority of the construction equipment or not according to the user identity information and the construction equipment identification information;
if the use authority passes the verification, acquiring the position information of the user and the position information of the construction equipment;
verifying whether the user position information and the construction equipment position information belong to preset positions;
and if the position is verified, unlocking the remote control construction equipment for the operation and use of a user.
And acquiring the running state of the construction equipment, calculating the running consumption of the construction equipment, and informing a user when the running consumption of the construction equipment reaches a corresponding preset threshold value.
And informing the position information of the user and the construction equipment to other users.
And inquiring the use state of the construction equipment, verifying the identity information of the user when the construction equipment is idle, and accepting the reserved use of the user for the construction equipment if the use authority passes the verification.
The above description is only a preferred embodiment of the present invention, and the protection scope of the present invention is not limited to the above embodiments, and all technical solutions belonging to the idea of the present invention belong to the protection scope of the present invention. It should be noted that modifications and embellishments within the scope of the invention may occur to those skilled in the art without departing from the principle of the invention, and are considered to be within the scope of the invention.
Claims (8)
1. A project construction management method based on the Internet of things is characterized by comprising the following steps: comprises that
Obtaining a use request of a user, wherein the use request carries user identity information and construction equipment identification information;
verifying whether the user has the use authority of the construction equipment or not according to the user identity information and the construction equipment identification information;
if the use authority passes the verification, acquiring the position information of the user and the position information of the construction equipment;
verifying whether the user position information and the construction equipment position information belong to preset positions;
and if the position is verified, unlocking the remote control construction equipment for the operation and use of a user.
2. The project construction management method based on the internet of things of claim 1, characterized in that: the method further comprises the steps of obtaining the running state of the construction equipment, calculating the running consumption of the construction equipment, and informing a user when the running consumption of the construction equipment reaches a corresponding preset threshold value.
3. The project construction management method based on the internet of things of claim 1, characterized in that: and informing the position information of the user and the construction equipment to other users.
4. The project construction management method based on the internet of things of claim 1, characterized in that: the construction equipment management method further comprises the steps of inquiring the use state of the construction equipment, verifying the identity information of a user when the construction equipment is idle, and accepting the reserved use of the user for the construction equipment if the use authority is verified to pass.
5. The utility model provides a project construction management system based on thing networking which characterized in that: comprising a processor (1) and a memory 2, the memory 2 storing a set of instructions for the processor (1) to call to implement:
obtaining a use request of a user, wherein the use request carries user identity information and construction equipment identification information;
verifying whether the user has the use authority of the construction equipment or not according to the user identity information and the construction equipment identification information;
if the use authority passes the verification, acquiring the position information of the user and the position information of the construction equipment;
verifying whether the user position information and the construction equipment position information belong to preset positions;
and if the position is verified, unlocking the remote control construction equipment for the operation and use of a user.
6. The internet of things based project construction management system of claim 5, wherein: the instruction set is further for the processor (1) to call to implement:
and acquiring the running state of the construction equipment, calculating the running consumption of the construction equipment, and informing a user when the running consumption of the construction equipment reaches a corresponding preset threshold value.
7. The internet of things based project construction management system of claim 5, wherein: the instruction set is further for the processor (1) to call to implement:
and informing the position information of the user and the construction equipment to other users.
8. The internet of things based project construction management system of claim 5, wherein: the instruction set is further for the processor (1) to call to implement:
and inquiring the use state of the construction equipment, verifying the identity information of the user when the construction equipment is idle, and accepting the reserved use of the user for the construction equipment if the use authority passes the verification.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910918955.8A CN110852562A (en) | 2019-09-26 | 2019-09-26 | Project construction management system and method based on Internet of things |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910918955.8A CN110852562A (en) | 2019-09-26 | 2019-09-26 | Project construction management system and method based on Internet of things |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110852562A true CN110852562A (en) | 2020-02-28 |
Family
ID=69596063
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910918955.8A Pending CN110852562A (en) | 2019-09-26 | 2019-09-26 | Project construction management system and method based on Internet of things |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110852562A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115420263A (en) * | 2022-08-15 | 2022-12-02 | 中国建筑第二工程局有限公司 | Multifunctional measuring instrument for building |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20090034583A (en) * | 2007-10-04 | 2009-04-08 | 주식회사 두올테크 | Electric display board system based on web browser |
CN103390255A (en) * | 2013-07-30 | 2013-11-13 | 上海城建市政工程(集团)有限公司 | Construction site digital management system and application method thereof |
CN106022054A (en) * | 2016-05-26 | 2016-10-12 | 广东小天才科技有限公司 | Unlocking method and device of intelligent wearable device |
CN107835183A (en) * | 2017-11-20 | 2018-03-23 | 厦门卓讯信息技术有限公司 | Intelligent vehicle network safety control method and system |
CN109559101A (en) * | 2018-12-24 | 2019-04-02 | 中铁隧道集团三处有限公司 | Construction monitoring system and method |
-
2019
- 2019-09-26 CN CN201910918955.8A patent/CN110852562A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20090034583A (en) * | 2007-10-04 | 2009-04-08 | 주식회사 두올테크 | Electric display board system based on web browser |
CN103390255A (en) * | 2013-07-30 | 2013-11-13 | 上海城建市政工程(集团)有限公司 | Construction site digital management system and application method thereof |
CN106022054A (en) * | 2016-05-26 | 2016-10-12 | 广东小天才科技有限公司 | Unlocking method and device of intelligent wearable device |
CN107835183A (en) * | 2017-11-20 | 2018-03-23 | 厦门卓讯信息技术有限公司 | Intelligent vehicle network safety control method and system |
CN109559101A (en) * | 2018-12-24 | 2019-04-02 | 中铁隧道集团三处有限公司 | Construction monitoring system and method |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115420263A (en) * | 2022-08-15 | 2022-12-02 | 中国建筑第二工程局有限公司 | Multifunctional measuring instrument for building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105741126B (en) | Management method and management device of air conditioner, server, terminal and communication device | |
US9168936B2 (en) | System and method of transforming movement authority limits | |
CN102941866B (en) | Automatic train supervisor (ATS) system and method | |
CN105083339B (en) | A kind of two ends load the method for turning back automatically of the CBTC trains of mobile unit | |
CN114274981B (en) | Marshalling train management method, device, equipment and medium | |
CN103685534A (en) | Wireless communication based vehicle-mounted data intelligent and safe updating method | |
CN110435723A (en) | A kind of Distributed Area computer interlock system | |
CN102625339A (en) | Monitoring system for using state of integrated wireless communication equipment of railway locomotive | |
CN113022661A (en) | Temporary speed limit safety management method for multi-mode train control system | |
CN109398421B (en) | Static positioning recovery method and system after vehicle-mounted equipment is powered on | |
CN107554559A (en) | A kind of Train Approaching method for early warning and system | |
CN115503786B (en) | Processing method and system for improving usability of vehicle-mounted equipment | |
ES2352093T3 (en) | METHOD, MOBILE CONTROL UNIT AND SYSTEM FOR THE TRANSMISSION OF DATA TO AN ELEMENT OF RAILWAY ROAD CONTROL OF GUIDED TRANSPORT. | |
CN101722971B (en) | Portable temporary speed limit detecting terminal and maintenance method thereof | |
CN110852562A (en) | Project construction management system and method based on Internet of things | |
CN113771885B (en) | Train marshalling method and device, computer equipment and storage medium | |
CN102582665A (en) | Train positioning method, equipment and system | |
CN110682941B (en) | Railway construction protection method, server and railway construction protection system | |
CN202669861U (en) | Train operation monitoring device | |
CN203422772U (en) | Car driver identity classifying and recognizing and driving monitoring and recording system | |
CN110920692B (en) | Method and system for locally and manually screening and upgrading trains | |
JP2002002486A (en) | Train schedule control system | |
CN115366954B (en) | TACS and CBTC compatible operation system and method | |
Wang et al. | A Novel Space‐Time‐Speed Method for Increasing the Passing Capacity with Safety Guaranteed of Railway Station | |
KR101476740B1 (en) | Remote Monitoring System of Ship Equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200228 |