CN109559101A - Construction monitoring system and method - Google Patents
Construction monitoring system and method Download PDFInfo
- Publication number
- CN109559101A CN109559101A CN201811585087.8A CN201811585087A CN109559101A CN 109559101 A CN109559101 A CN 109559101A CN 201811585087 A CN201811585087 A CN 201811585087A CN 109559101 A CN109559101 A CN 109559101A
- Authority
- CN
- China
- Prior art keywords
- construction
- user
- monitoring
- construction equipment
- equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F21/00—Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F21/30—Authentication, i.e. establishing the identity or authorisation of security principals
- G06F21/31—User authentication
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Computer Security & Cryptography (AREA)
- Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Quality & Reliability (AREA)
- Economics (AREA)
- Operations Research (AREA)
- Marketing (AREA)
- Data Mining & Analysis (AREA)
- Computer Hardware Design (AREA)
- Software Systems (AREA)
- General Engineering & Computer Science (AREA)
- Telephonic Communication Services (AREA)
Abstract
The invention discloses a kind of construction monitoring methods, including authenticate to user's identity information;After certification passes through, the long-range construction equipment that controls can be used;The geographical location of acquisition construction equipment and operating status are simultaneously sent to monitoring center;The operation consumption for calculating construction equipment notifies user when construction equipment operation consumption reaches preset threshold;The geographical location and working condition for obtaining user are sent to monitoring center;Any user shares the geographical location of other users and the geographical location of other construction equipments, operating status thereto.The violation operation of irrelevant personnel or lack of competence personnel is avoided, constructing operation safety is enhanced;Facilitate running position and operating condition that monitoring center understands construction equipment, can quickly, targetedly be coped with when needed.The geographical location of user is monitored, the construction safety of user is enhanced, and the working condition of any other users of offer thereto, the exchange and cooperation convenient for users between.
Description
Technical field
The present invention relates to construction monitorings, more specifically, it relates to a kind of construction monitoring system and method.
Background technique
Constructing tunnel is the very common situation of engineering construction field, for example, in order to alleviate traffic pressure, each big city is all striven
Mutually construction subway, and the core content of subway is tunneling.In addition, important lifeblood-railway of national economy, due to its spy
The flexible and superiority having, plays other means of transportation irreplaceable roles, and the important composition portion of railway engineering structure
/ mono- is also tunnel.With the continuous development of technology, tunnel construction scale is increasing, and length is increasingly longer.However tunnel
Scale is bigger, and technical difficulty also accordingly increases, and due to its construction environment complexity, risk is relatively high, and management difficulty is larger, therefore
Monitoring to construction equipment and construction personnel is the most important thing of constructing tunnel forever.
Currently in order to the condition of construction in real time monitoring tunnel, usually the somewhere installation monitor in tunnel, but for
For constructing tunnel, video monitoring is only carried out, the situation of construction equipment and construction personnel can not be well understood that, it is difficult to
Accomplish more comprehensively to monitor.
Summary of the invention
In view of the deficienciess of the prior art, the first object of the present invention is to provide a kind of construction monitoring method, have
Monitor more comprehensive advantage.
To achieve the above object, the present invention provides the following technical scheme that
A kind of construction monitoring method, including
User's identity information is authenticated;
After certification passes through, the long-range construction equipment that controls can be used;
The geographical location of acquisition construction equipment and operating status are simultaneously sent to monitoring center, and the operating status includes construction equipment
Whether run and operational mode;
The operation consumption for calculating construction equipment notifies user when construction equipment operation consumption reaches preset threshold;
The geographical location and working condition for obtaining user are sent to monitoring center, and the working condition includes audio-frequency information and view
Frequency information;
Any user shares the geographical location of other users and the geographical location of other construction equipments, operation shape thereto
State.
By adopting the above technical scheme, user's identity is verified first, is verified and construction equipment just can be used, keeps away
Exempt from the violation operation of irrelevant personnel or lack of competence personnel, enhances constructing operation safety;Obtain the geographical location of construction equipment
And operating status, facilitate monitoring center understand construction equipment running position and operating condition, when needed can quickly, have needle
To coping with for property.The operation for calculating construction equipment is consumed and is monitored, the prompting when operation consumption reaches preset threshold
User carry out reply.In addition, the geographical location to user is monitored, enhance the construction safety of user, and to
It is any that the working condition of other users, the exchange and cooperation convenient for users between are provided.
Further, described includes that construction equipment is authenticated and monitored to user's identity information to user's authentication
Center authenticates user's identity information.
By adopting the above technical scheme, it is verified again through monitoring center after construction equipment is verified, double verification is more complete
Face safety.
Further, the operating status further includes the operation load of construction equipment.
Further, when monitoring that operation load is more than baseline threshold, long-range control construction equipment is out of service.
By adopting the above technical scheme, construction equipment is monitored, guarantees its safe operation.
Further, it includes that monitoring center is controlled and be possessed of control power limit that remotely control construction equipment is out of service
Other users.
By adopting the above technical scheme, the management and cooperation convenient for users between.
In view of the deficienciess of the prior art, the second object of the present invention is to provide a kind of construction monitoring system, have
Monitor more comprehensive advantage.
A kind of construction monitoring system is based on construction monitoring method as described above, including
Equipment monitoring apparatus is set on construction equipment, and is electrically connected with construction equipment, for obtaining the geographical position of construction equipment
It sets and operating status, and is sent to monitoring center, and the operation of control construction equipment;
Personnel monitoring's device obtains the geographical location of user, audio-frequency information, video information and is sent to monitoring center, cooperates with
Equipment monitoring apparatus verifies user's identity information, and control construction equipment;
Monitoring center, while being communicated with equipment monitoring apparatus and personnel monitoring's equipment, for verifying user's identity information, to applying
Construction equipment is monitored, and calculates the operation consumption of construction equipment and notice makes when construction equipment operation consumption reaches preset threshold
User, and any user shares the geographical location of other users and the geographical location of other construction equipments, operation thereto
State.
By adopting the above technical scheme, user's identity is verified first, is verified and construction equipment just can be used, keeps away
Exempt from the violation operation of irrelevant personnel or lack of competence personnel, enhances constructing operation safety;Obtain the geographical location of construction equipment
And operating status, facilitate monitoring center understand construction equipment running position and operating condition, when needed can quickly, have needle
To coping with for property.The operation for calculating construction equipment is consumed and is monitored, the prompting when operation consumption reaches preset threshold
User carry out reply.In addition, the geographical location to user is monitored, enhance the construction safety of user, and to
It is any that the working condition of other users, the exchange and cooperation convenient for users between are provided.
Further, the monitoring center again believes the user after equipment monitoring apparatus passes through user's Information Authentication
Breath is verified.
By adopting the above technical scheme, it is verified again through monitoring center after construction equipment is verified, double verification is more complete
Face safety.
Further, operating status further includes the operation load of construction equipment, and monitoring center is in the fortune for monitoring construction equipment
When row load is more than baseline threshold, long-range control construction equipment is out of service.
By adopting the above technical scheme, construction equipment is monitored, guarantees its safe operation.
Further, other users with permission can remotely control the operation of construction equipment by personnel monitoring's device.
By adopting the above technical scheme, the management and cooperation convenient for users between.
In conclusion the invention has the following advantages:
1. pair user's identity is verified, it is verified and construction equipment just can be used, avoid irrelevant personnel or lack of competence people
The violation operation of member enhances constructing operation safety;
2. obtaining geographical location and the operating status of construction equipment, facilitate the running position that monitoring center understands construction equipment
And operating condition, it can quickly, targetedly be coped with when needed;
3. the operation for calculating construction equipment is consumed and is monitored, user is reminded when operation consumption reaches preset threshold
Carry out reply;
4. the geographical location of couple user is monitored, enhance the construction safety of user, and thereto it is any provide other
The working condition of user, the exchange and cooperation convenient for users between.
Detailed description of the invention
Fig. 1 is the flow diagram of construction monitoring method in the present invention;
Fig. 2 is the functional block diagram of construction monitoring system in the present invention;
Fig. 3 is the functional block diagram of equipment monitoring apparatus in the present invention;
Fig. 4 is the functional block diagram of personnel monitoring's device in the present invention;
Fig. 5 is the functional block diagram of monitoring center in the present invention.
In figure: 1, equipment monitoring apparatus;2, personnel monitoring's device;3, monitoring center;11, the first GPS module;12, it detects
Module;13, switch module;14, first communication module;21, the second GPS module;22, voice module;23, video module;24, it obtains
Modulus block;25, second communication module;31, processor module;32, memory module;33, third communication module.
Specific embodiment
With reference to the accompanying drawings and embodiments, the present invention will be described in detail.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art
Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this
All by the protection of Patent Law in the scope of the claims of invention.
Embodiment 1
A kind of construction monitoring method, referring to Fig.1, including following below scheme step:
Step S101: user's identity information is authenticated.
Step S102: after certification passes through, the long-range construction equipment that controls can be used.
Step S103: it obtains the geographical location of construction equipment and operating status and is sent to monitoring center 3.
Step S104: calculating the operation consumption of construction equipment, the notice when construction equipment operation consumption reaches preset threshold
User.
Step S105: the geographical location and working condition for obtaining user are sent to monitoring center 3.
Step S106: any user shares the geographical location of other users and the geography of other construction equipments thereto
Position, operating status.
It include that construction equipment recognizes user's identity information to user's authentication in step S101 and S102
Card and monitoring center 3 authenticate user's identity information, prevent from juggling things to allow to construction equipment being verified, and guarantee special messenger
The job specfication that special train is responsible for specially, double authentication are more fully safe.
In step s 103, the geographical location of construction equipment and the operating status of construction equipment are obtained and is sent to monitoring
Center 3, wherein operating status include construction equipment whether run, operational mode, facilitate monitoring center 3 and understand construction equipment
Running position and operating condition, operating status further include operation load, when monitoring that operation load is more than baseline threshold, remotely
It is out of service to control construction equipment, control is quickly, targetedly.Specifically, it includes prison that remotely control construction equipment is out of service
Control center 3 is controlled and is possessed of control power other users of limit.
In step s105, also the geographical location of user and working condition are monitored, monitoring center 3 is facilitated to understand
The state of user, and enhance the construction safety of user.In addition, supporting the voice and video capability between user, increase
Exchanges and cooperation between strong.
In step s105, the geographical location in the geographical location of user and construction equipment, operating status are shared,
Exchange and cooperation convenient for users between.
Embodiment 2
A kind of construction monitoring system, referring to Fig. 2, including equipment monitoring apparatus 1, personnel monitoring's device 2 and simultaneously and Supervision
Control device 1, the monitoring center 3 that personnel monitoring's device 2 communicates.
Equipment monitoring apparatus 1 is set on construction equipment, referring to Fig. 3, including for obtaining construction equipment geographical location letter
First GPS module 11 of breath is electrically connected the detection module 12 for obtaining construction equipment operating status with construction equipment and supervises
The first communication module 14 that control center 3 communicates and the switch module 13 for controlling construction equipment operation.Detection module 12 with
The power supply of construction equipment connects, and whether detection construction equipment runs and payload size, and passes through first communication module 14
It is sent to monitoring center 3.First communication module 14 uses gsm module, and switch module 13 is the relay for controlling construction equipment power supply
Device circuit.
Referring to Fig. 4, personnel monitoring's device 2 includes the second GPS module 21, logical for voice of user's geographical location information
The voice modules 22 of words, the video screen module module of video calling, the acquisition module 24 for obtaining control command and in monitoring
The second communication module 25 that the heart 3 communicates.
Referring to Fig. 5, monitoring center 3, the third including communicating simultaneously with first communication module 14, second communication module 25 is logical
Believe that module 33, processor module 31 and memory module 32, memory module 32 are stored with instruction set and adjust for processor module 31
To realize: verifying user's identity information is monitored construction equipment, and the operation for calculating construction equipment is consumed and constructed
Equipment operation consumption notifies user when reaching preset threshold, and any user shares the geographical position of other users thereto
It sets and the geographical location of other construction equipments, operating status.It is right again after equipment monitoring apparatus 1 passes through user's Information Authentication
User's information is verified.
Operating status further includes the operation load of construction equipment, and monitoring center 3 is in the operation load for monitoring construction equipment
When more than baseline threshold, long-range control construction equipment is out of service.Other users with permission can be filled by personnel monitoring
Set the operation of 2 long-range control construction equipments.
The above is only a preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-mentioned implementation
Example, all technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art
Those of ordinary skill for, several improvements and modifications without departing from the principles of the present invention, these improvements and modifications
It should be regarded as protection scope of the present invention.
Claims (9)
1. a kind of construction monitoring method, it is characterised in that: including
User's identity information is authenticated;
After certification passes through, the long-range construction equipment that controls can be used;
The geographical location of acquisition construction equipment and operating status are simultaneously sent to monitoring center (3), and the operating status includes construction
Whether equipment runs and operational mode;
The operation consumption for calculating construction equipment notifies user when construction equipment operation consumption reaches preset threshold;
The geographical location and working condition for obtaining user are sent to monitoring center (3), and the working condition includes audio-frequency information
And video information;
Any user shares the geographical location of other users and the geographical location of other construction equipments, operation shape thereto
State.
2. construction monitoring method according to claim 1, it is characterised in that: described includes construction to user's authentication
Equipment is authenticated to user's identity information and monitoring center (3) authenticates user's identity information.
3. construction monitoring method according to claim 1, it is characterised in that: the operating status further includes construction equipment
Operation load.
4. construction monitoring method according to claim 3, it is characterised in that: monitoring that operation load is more than baseline threshold
When, long-range control construction equipment is out of service.
5. construction monitoring method according to claim 4, it is characterised in that: remotely control that construction equipment is out of service to include
Monitoring center (3) is controlled and is possessed of control power other users of limit.
6. a kind of construction monitoring system, it is characterised in that: be based on construction monitoring method as claimed in claim 1 to 5, packet
It includes
Equipment monitoring apparatus (1), is set on construction equipment, and be electrically connected with construction equipment, for obtaining the ground of construction equipment
Position and operating status are managed, and is sent to monitoring center (3), and the operation of control construction equipment;
Personnel monitoring's device (2) obtains the geographical location of user, audio-frequency information, video information and is sent to monitoring center
(3), cooperative device monitoring device (1) verifies user's identity information, and control construction equipment;
Monitoring center (3), while being communicated with equipment monitoring apparatus (1) and personnel monitoring's equipment, for verifying user's identity letter
Breath, is monitored construction equipment, calculates the operation consumption of construction equipment and reaches preset threshold in construction equipment operation consumption
Shi Tongzhi user, and any user shares the geographical location of other users and the geographical position of other construction equipments thereto
It sets, operating status.
7. construction monitoring system according to claim 6, it is characterised in that: the monitoring center (3) fills in monitoring of tools
It sets and user's information is verified again after (1) passes through user's Information Authentication.
8. construction monitoring system according to claim 6, it is characterised in that: operating status further includes the operation of construction equipment
Load, when the operation load for monitoring construction equipment is more than baseline threshold, the long-range construction equipment that controls stops monitoring center (3)
Operation.
9. construction monitoring system according to claim 6, it is characterised in that: other users with permission can pass through people
Member's monitoring device (2) remotely controls the operation of construction equipment.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811585087.8A CN109559101A (en) | 2018-12-24 | 2018-12-24 | Construction monitoring system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811585087.8A CN109559101A (en) | 2018-12-24 | 2018-12-24 | Construction monitoring system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109559101A true CN109559101A (en) | 2019-04-02 |
Family
ID=65871011
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811585087.8A Pending CN109559101A (en) | 2018-12-24 | 2018-12-24 | Construction monitoring system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109559101A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110852562A (en) * | 2019-09-26 | 2020-02-28 | 福建中通海创通信技术有限公司 | Project construction management system and method based on Internet of things |
CN114037299A (en) * | 2021-11-15 | 2022-02-11 | 广西科技大学 | Monitoring method for building bridge construction |
-
2018
- 2018-12-24 CN CN201811585087.8A patent/CN109559101A/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110852562A (en) * | 2019-09-26 | 2020-02-28 | 福建中通海创通信技术有限公司 | Project construction management system and method based on Internet of things |
CN114037299A (en) * | 2021-11-15 | 2022-02-11 | 广西科技大学 | Monitoring method for building bridge construction |
CN114037299B (en) * | 2021-11-15 | 2022-05-31 | 广西科技大学 | Monitoring method for building bridge construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104639624B (en) | A kind of method and apparatus for realizing mobile terminal remote access control | |
CN102279597B (en) | Simulation test system of train control system | |
ES2263031T3 (en) | TEST SYSTEM FOR THE CHECK OF TRANSMISSION PROCESSES WITHIN A MOBILE TELEPHONE NETWORK AS WELL AS A PROCEDURE FOR THE AUTHENTICATION OF A MOBILE PHONE USING A TEST SYSTEM OF THIS TYPE. | |
CN109559101A (en) | Construction monitoring system and method | |
CN110535923A (en) | A kind of automatic driving vehicle management platform | |
CN107197041A (en) | A kind of safe cloud computing system | |
CN102938768B (en) | A kind of roamer is cross-domain to be logged in, the cross-domain method and apparatus being monitored business | |
Zhu et al. | An integrated train–ground communication system using wireless network virtualization: Security and quality of service provisioning | |
CN107479574A (en) | A kind of unmanned plane management-control method and device based on mobile communication technology | |
CN113765874A (en) | Private network and dual-mode networking method based on 5G mobile communication technology | |
CN105025479B (en) | Vehicle-ground wireless communication of urban railway transport system authentication key configures system and method | |
CN209590904U (en) | Construction monitoring system | |
CN207164836U (en) | A kind of noninductive equipment of checking card based on building trade | |
CN102339483A (en) | Security system and method by integrating access control and information equipment | |
CN106302425A (en) | A kind of virtualization system communication method between nodes and virtualization system thereof | |
CN108986277A (en) | The control method that a kind of certification channel and Intelligent mobile equipment pass through certification channel | |
CN102571717A (en) | M2M (Machine-2-Machine) terminal communication method and system based on primitive | |
CN105142137B (en) | Vehicle-ground wireless communication of urban railway transport system authentication key configures system and method | |
CN206332699U (en) | Elevator Internet of Things smart box and system | |
CN205862388U (en) | Password smart lock long-distance management system based on Wi Fi Yu Bluetooth technology | |
CN103220157B (en) | A kind of method and system of mobile terminal automatic shutdown | |
CN108990133A (en) | A kind of wireless network access method and system | |
CN106027537B (en) | A kind of information backup method and system | |
CN210804549U (en) | Security system | |
CN104580997A (en) | Video monitoring management system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |