Emergency communication device for train and train control center Download PDFInfo
- Publication number
- CN105501260A CN105501260A CN201510969065.1A CN201510969065A CN105501260A CN 105501260 A CN105501260 A CN 105501260A CN 201510969065 A CN201510969065 A CN 201510969065A CN 105501260 A CN105501260 A CN 105501260A
- Authority
- CN
- China
- Prior art keywords
- train
- main frame
- data
- control center
- communication device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/40—Handling position reports or trackside vehicle data
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
- Train Traffic Observation, Control, And Security (AREA)
Abstract
The invention provides an emergency communication device for a train and a train control center. The emergency communication device comprises a host computer, a backup computer and a digital simulation interface; the host computer and the backup computer are integrated to two independent circuit boards and can be communicated with each other through a serial port and a parallel port; a transponder and a memory dump are directly connected with the train control center; the digital simulation interface is connected with peripheral devices such as a velocity sensor, a pressure sensor, a double-pointer velometer and a milometer which are arranged in the train and transmits velocity data, pressure data, the velocity of double pointers and mileage data to the host computer. According to the emergency communication device, the reliability of railway communication is improved, and the safety of train operation is effectively guaranteed.
Description
Technical field
The present invention relates to railway communication field, particularly relate to a kind of railway information and collect and the field communicated.
Background technology
The operation of railroad train be unable to do without train control center, train control center wish in real time can and adopt the mode of redundancy to communicate to train data, then by this system, the trackside performance element controlling the outdoor facilitys such as switch machine, signal, track circuit, cab signal is moved forward to the side of controlled device, realize distributed AC servo system by safe communication system.This system is made up of monitoring equipment, workover rig, interlocking main frame, trackside performance element, safe communication system, power supply and supply network etc.Trackside performance element is made up of power module, trackside communication extension set, switch machine module, signal module, rail module, cab signal module etc.Safe communication system is made up of communication host, trackside communication extension set and communication network.Interlocking main frame communicates with adopting redundancy Rs 1 bus mode between communication host; Communication host communicates with trackside between extension set and adopts point-to-point slack to communicate; Trackside communication extension set adopts dual CAN bus to communicate with asking of each control module.Power supply is provided by independently uplink and downlink bottle-neck section redundant power supply network to trackside performance element by power supply panel.This system has advantages such as saving cable, reduction construction costs, minimizing disconnection fault.
According to above problem, the present invention is compared to traditional approach in the past, and route table generates more succinct and accurately, generates with consumption of natural resource when calling less, start and response time almost nil, therefore, the present invention has more advantage in the generation of route table.
Summary of the invention
The technical problem to be solved in the present invention is: under high speed train runs.The complexity that more complicated signal and even more equipment communicate with train control center.
For solving the problem, the invention provides following technical scheme: a kind of train and train control center emergency communication device, comprise by main frame, backup machine, digital and analog interface; Main frame and backup machine are integrated in two independently on circuit card, communicate with parallel port by serial ports; Responser, dump device are directly connected with train control center; Digital and analog interface is connected with peripheral components such as the speed sensor in train, pressure sensor, crosspointer speed meter, mileage meters, speed data, and pressure data, crosspointer speed, mileage sends main frame to;
Terrestrial information is sent to receiver carried by automobile by wireless transceiver by responser, then delivers to main frame by interface.Various data during the train operation of dump device record, during for debugging locomotive and failure analysis, dump device is by interface data; Main frame carries out data exchange by CAN and locomotive;
Locomotive operating mode (as various button information, Brake feedback information, handle position and direction switch information etc.), is input to main frame by parallel port after level conversion.Main frame exports 3 way switch amount signals by parallel port, is respectively unloading, service braking, emergency braking.
Accompanying drawing explanation
Fig. 1 is system assumption diagram of the present invention;
Detailed description of the invention
In order to make technical matters to be solved by this invention, technical scheme and beneficial effect clearly understand, below in conjunction with drawings and Examples, the present invention will be described in detail.It should be noted that specific embodiment described herein only in order to explain the present invention, be not intended to limit the present invention, the product that can realize said function belongs to equivalent to be replaced and improves, and is all included within protection scope of the present invention.Concrete grammar is as follows:
Embodiment 1: as shown in Figure 1: a kind of train and train control center emergency communication device, comprise by main frame, backup machine, digital and analog interface; Main frame and backup machine are integrated in two independently on circuit card, communicate with parallel port by serial ports; Responser, dump device are directly connected with train control center; Digital and analog interface is connected with peripheral components such as the speed sensor in train, pressure sensor, crosspointer speed meter, mileage meters, speed data, and pressure data, crosspointer speed, mileage sends main frame to;
Locomotive operating mode (as various button information, Brake feedback information, handle position and direction switch information etc.), is input to main frame by parallel port after level conversion.Main frame exports 3 way switch amount signals by parallel port, is respectively unloading, service braking, emergency braking.
Train control center adopts two-node cluster hot backup redundancy of effort mode, identical by A, B two groups, independently control unit form, i.e. main frame and backup machine, be responsible for sampling to various extraneous information, and form the velocity mode curve between two ground dot-mode transponders according to the data of collection and the parameter of sets itself, when actual speed exceedes the limits value of modeling curve, export control signal and start corresponding brake equipment generation braking maneuver, speed is remained within the scope of requirement.If the CAN passage of main frame breaks down, can start the CAN for subsequent use of main frame, standby host still keeps standby host state, and when the two-way CAN of main frame all breaks down, standby host enters mode of operation as main frame immediately; When digital quantity I/O passage or the analog input/delivery channel fault of main frame, standby host can only be enabled.When main frame is in running order, standby host is in hot standby state, only has main frame to produce the control signal outputting to locomotive.Although standby host synchronized operation, it is the data that passive Receiving Host is sent, and according to the data of these Data Update oneself, it also produces control signal, but does not externally export.Namely main frame has control to system, and standby host does not have.Once main frame breaks down, standby host puts into operation immediately, becomes new main frame, and fault machine automatically exits host work state and keeps in repair; Train control center supports interface and the agreement of the communications such as RS485, CAN, MVB, carries out data exchange with the unit that tests the speed, ground dot-mode transponder.Terrestrial information is sent to receiver carried by automobile by wireless transceiver by ground dot-mode transponder, then delivers to main frame by RS485 interface.Various data during the train operation of dump device record, during for debugging locomotive and failure analysis, dump device is by RS485 interface data.System carries out data exchange by CAN and locomotive.Locomotive operating mode (as various button information, Brake feedback information, handle position and direction switch information etc.), is input to main frame by parallel port after level conversion.Main frame exports 3 way switch amount signals, is respectively unloading, service braking, emergency braking.Digital and analog interface, from the speed signal of vibration transmitter, a road braking reservoir pressure signal and road preserved signal input, also comprises train real-world operation speed, speed limit and mileage in addition.
The present invention designs train and mainly contains with the advantage of train control center emergency communication device: communicate with the state of various equipment with bursty state and according to the state of train according to actual operation, thus improves the reliability of driving.
Claims (1)
1. train and a train control center emergency communication device, is characterized in that:
Comprise by main frame, backup machine, digital and analog interface; Main frame and backup machine are integrated in two independently on circuit card, communicate with parallel port by serial ports; Responser, dump device are directly connected with train control center; Digital and analog interface is connected with peripheral components such as the speed sensor in train, pressure sensor, crosspointer speed meter, mileage meters, speed data, and pressure data, crosspointer speed, mileage sends described main frame to;
Terrestrial information is sent to receiver carried by automobile by wireless transceiver by responser, then delivers to main frame by interface.Various data during the train operation of dump device record, during for debugging locomotive and failure analysis, dump device is by interface data; Described main frame carries out data exchange by CAN and locomotive;
Locomotive operating mode (as various button information, Brake feedback information, handle position and direction switch information etc.), is input to main frame by parallel port after level conversion.Main frame exports 3 way switch amount signals by parallel port, is respectively unloading, service braking, emergency braking.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510969065.1A CN105501260A (en) | 2015-12-20 | 2015-12-20 | Emergency communication device for train and train control center |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510969065.1A CN105501260A (en) | 2015-12-20 | 2015-12-20 | Emergency communication device for train and train control center |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105501260A true CN105501260A (en) | 2016-04-20 |
Family
ID=55709681
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510969065.1A Pending CN105501260A (en) | 2015-12-20 | 2015-12-20 | Emergency communication device for train and train control center |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105501260A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108205305A (en) * | 2016-12-20 | 2018-06-26 | 比亚迪股份有限公司 | Train network control system and method based on CAN |
CN112298223A (en) * | 2020-11-06 | 2021-02-02 | 北京城建智控科技有限公司 | Safe train control system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1178894A (en) * | 1997-09-05 | 1999-03-23 | Toshiba Transport Eng Kk | Total traffic control device |
CN101941452A (en) * | 2010-09-03 | 2011-01-12 | 北京全路通信信号研究设计院 | Train operation control method, device, vehicle-mounted equipment and train operation control system |
CN102233886A (en) * | 2011-05-16 | 2011-11-09 | 铁道部运输局 | CTCS (China Train Control System)-2 train operation control system |
CN105083332A (en) * | 2015-03-20 | 2015-11-25 | 北京交通大学 | Train control vehicle-mounted system |
-
2015
- 2015-12-20 CN CN201510969065.1A patent/CN105501260A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1178894A (en) * | 1997-09-05 | 1999-03-23 | Toshiba Transport Eng Kk | Total traffic control device |
CN101941452A (en) * | 2010-09-03 | 2011-01-12 | 北京全路通信信号研究设计院 | Train operation control method, device, vehicle-mounted equipment and train operation control system |
CN102233886A (en) * | 2011-05-16 | 2011-11-09 | 铁道部运输局 | CTCS (China Train Control System)-2 train operation control system |
CN105083332A (en) * | 2015-03-20 | 2015-11-25 | 北京交通大学 | Train control vehicle-mounted system |
Non-Patent Citations (1)
Title |
---|
张维维等人: "CTCS-3级车载设备仿真测试平台的研究", 《铁路计算机应用》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108205305A (en) * | 2016-12-20 | 2018-06-26 | 比亚迪股份有限公司 | Train network control system and method based on CAN |
CN108205305B (en) * | 2016-12-20 | 2020-05-19 | 比亚迪股份有限公司 | Train network control system and method based on CAN |
CN112298223A (en) * | 2020-11-06 | 2021-02-02 | 北京城建智控科技有限公司 | Safe train control system |
CN112298223B (en) * | 2020-11-06 | 2021-08-03 | 北京城建智控科技有限公司 | Safe train control system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205186191U (en) | Train operation monitoring system | |
CN105128891B (en) | A kind of Locomotive Running Monitor System | |
CN107235052B (en) | The CBTC onboard system of compatible fixation and quasi-moving block | |
CN102233886B (en) | CTCS (China Train Control System)-2 train operation control system | |
CN201193041Y (en) | Traction control system based on TCN network | |
CN103738365B (en) | train temporary speed-limiting method and system | |
CN107161179A (en) | Suitable for the running control system of general fast railway | |
CN104960554B (en) | Station interval integrated system provided with double hosts based on functional allocation | |
CN104796356B (en) | Vehicle-mounted Ethernet switch and signal transmitting and receiving and train weight linked method used for rail vehicle | |
CN102632908B (en) | Track circuit reader | |
CN102069825A (en) | Method for improving safety of CTCS-3 (Chinese train control system-3) train control system | |
CN110435723A (en) | A kind of Distributed Area computer interlock system | |
CN109353378B (en) | Railway vehicle-mounted monitoring information transmission equipment and implementation method thereof | |
CN105523064A (en) | Interlocking host and trackside equipment communication device | |
CN207662983U (en) | A kind of Track circuit reader test system | |
CN202593565U (en) | Vehicle-mounted mainframe of wireless shunting locomotive signal and monitoring system | |
CN107097806B (en) | The electronic control system of AC drive locomotive braking system | |
CN104494649A (en) | Auxiliary driving equipment | |
CN105501260A (en) | Emergency communication device for train and train control center | |
CN201415689Y (en) | Hot-standby system structure of active standby control center | |
CN104627159A (en) | Urban rail vehicle brake monitoring system and method | |
CN207292035U (en) | Long-range isolation circuit and the brake fault shielding system for crewless train | |
CN105491177A (en) | Device address reconfiguration method based on MVB communication | |
CN102991538A (en) | Device and method for automatically switching point-to-point communication | |
CN104176094A (en) | Control unit for train running monitoring vehicle-mounted system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |