CN104555493A - Wharf transportation and loading/unloading process for slender structure - Google Patents
Wharf transportation and loading/unloading process for slender structure Download PDFInfo
- Publication number
- CN104555493A CN104555493A CN201410699711.2A CN201410699711A CN104555493A CN 104555493 A CN104555493 A CN 104555493A CN 201410699711 A CN201410699711 A CN 201410699711A CN 104555493 A CN104555493 A CN 104555493A
- Authority
- CN
- China
- Prior art keywords
- group
- jacking slide
- groups
- end trim
- jacking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G67/00—Loading or unloading vehicles
- B65G67/60—Loading or unloading ships
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G63/00—Transferring or trans-shipping at storage areas, railway yards or harbours or in opening mining cuts; Marshalling yard installations
Landscapes
- Engineering & Computer Science (AREA)
- Ocean & Marine Engineering (AREA)
- Aviation & Aerospace Engineering (AREA)
- Mechanical Engineering (AREA)
- Ship Loading And Unloading (AREA)
Abstract
The invention discloses a wharf transportation and loading/unloading process for a slender structure. The process comprises the following steps: I, placing a barge and the slender structure properly; II, arranging two groups of jacking slippage devices at the bottom of the slender structure, and arranging the other two groups on the barge; III, arranging H-shaped steel on the barge; IV, placing the two groups of jacking slippage devices at a higher position, jacking the slender structure, transporting the slender structure to the front edge of a wharf, and stopping advancing; V, performing a first weight transfer process on the slender structure; VI, continually transporting a jacking slippage device onto the barge for the slender structure, and stopping advancing; VII and VIII, performing a second weight transfer process on the slender structure; transporting the slender structure to a proper position on the barge; IX, dropping the slender structure on the H-shaped steel for fixing, and ending shipping. By adopting the wharf transportation and loading/unloading process, the influence on the loading and unloading transportation operation of the slender structure due to insufficient carrying force is avoided, and the problem of the dependence of the conventional marine engineering structures on floatation hoisting and ship unloading is solved.
Description
Technical field
The present invention relates to the quay transportation of works, handling technology, particularly relate to a kind of quay transportation, handling technology of slender structure thing.Belong to Offshore Engineering field.
Background technology
At present, in ocean engineering, the quay transportation for slender structure thing mainly adopts crane barge, and is characterized in: lower to the requirement of harbour and barge, uses more convenient, but costly, and the impact by crane barge sailing date is very large.And generally adopt crane barge lifting or multiple stage crawler crane to combine the method for lifting in shipment exit for the loading, unloading ship of slender structure thing.But due to the restriction by crawler crane Lifting Capacity, the module that weight is greater than 500 tons all can only adopt crane barge to complete its loading, unloading ship operation, this makes small modules or piling bar when the operation of loading, unloading ship, the dependence of large caterpillar or crane barge is increased greatly, this not only makes Large-scale Hoisting device resource more nervous, and, limit the cycle of small modules or piling bar loading, unloading ship, increase cost and incur loss through delay construction speed simultaneously.
Summary of the invention
Main purpose of the present invention is the above-mentioned shortcoming overcoming prior art existence, and a kind of quay transportation technique of slender structure thing is provided, it can not only by slender structure thing in loading, unloading ship process, avoid contacting with bearing capacity lower region, wharf apron, overcome the impact of Lack of support on the operation of slender structure thing loading, unloading Ship Transportation, solve the not enough problem that Conventional marine engineering structure relies on crane barge loading, unloading ship; And, greatly alleviate the nervous present situation of resource of crane barge and crawler crane, reduce the use cost of the medium-and-large-sized crane barge of traditional approach; Meanwhile, ensure that the shipment cycle of slender structure thing, guarantee its stability and safety.
The object of the invention is to be realized by following technical scheme:
The quay transportation of slender structure thing, a handling technology, is characterized in that: adopt following steps:
The first step: barge and slender structure thing are all completed in place perpendicular to harbour direction, and make slim-lined construction thing and barge line of centers point-blank;
Second step: be arranged in bottom slender structure thing by the 3rd, the 4th liang of group jacking slide device being parked in land, first, second two groups of jacking slide devices are arranged on barge in addition, and complete debugging efforts;
3rd step: arrange H profile steel on barge desired location;
4th step: while the 3rd, the 4th liang of group jacking slide device is placed in a high position, by slim-lined construction thing jack-up, and halt when being transported to bearing capacity lower region, wharf apron, now, first, second two groups of jacking slide devices are in low level armed state;
5th step: first group of jacking slide device jack-up is placed in high-end trim, and the 3rd group of jacking slide device decline is placed in low-end trim, then, the weight of slender structure thing is transferred to first group, the 4th group two groups of jacking slide devices from the 3rd group, the 4th group two groups of jacking slide devices, completes first time weight transfer process;
6th step: slim-lined construction thing continues to transport on barge by first group, the 4th group two groups of jacking slide devices, when the 4th group of jacking slide device closes on the 3rd group of jacking slide device, halts;
7th step: second group of jacking slide device jack-up is placed in high-end trim, 4th group of jacking slide device declines and is placed in low-end trim, the weight of slender structure thing is transferred on first group, second group two groups of jacking slide devices from first group, the 4th group two groups of jacking slide devices, completes second time weight transfer process;
8th step: by two groups of jacking slide devices (1A, 1B) slim-lined construction thing 2 is transported to the on-station position on barge 3;
9th step: synchronously declined by first, second two groups of two groups of jacking apparatus and be placed in low-end trim, then, falls to slim-lined construction thing in the H profile steel of layout in advance, and completes fixing, terminate shipment process.
The model of described jacking slide device is: SS650 type, and this jacking slide device can complete two actions usually: one is module jacking, and another is module slippage.
In described 5th step, the concrete steps of first time weight transfer are:
1. the 3rd group, the 4th group two groups of jacking slide devices being parked in land are placed in high-end trim, and first group, the second group two groups of jacking slide devices be arranged on barge are placed in low-end trim
2. the first group of jacking slide device being in low-end trim is adjusted to high-end trim, now, three groups of jacking slide devices are in high-end trim simultaneously, and form 6 supports;
3. the 3rd group of jacking slide device being in high-end trim is dropped to low-end trim, now, first group, the 4th group two groups of jacking slide devices are placed in high-end trim simultaneously, complete first time weight transfer process.
In described 7th step, the concrete steps of second time weight transfer are:
(1) first group, the 4th group two groups of jacking slide devices are in high-end trim, second group, the 3rd group two groups of jacking slide devices are in low-end trim;
(2) the second group of jacking slide device being in low-end trim is adjusted to high-end trim, now, first group, second group, the 4th group three groups of jacking slide devices are in high-end trim simultaneously, form 6 supports;
(3) the 4th group of jacking slide device being in high-end trim is dropped to low-end trim, now, first group, second group two groups of jacking slide devices are in high-end trim simultaneously, complete second time weight transfer process.
Beneficial effect of the present invention: the present invention is owing to adopting technique scheme, it can not only by slender structure thing in loading, unloading ship process, avoid contacting with bearing capacity lower region, wharf apron, overcome the impact of Lack of support on the operation of slender structure thing loading, unloading Ship Transportation, solve the not enough problem that Conventional marine engineering structure relies on crane barge loading, unloading ship; And, greatly alleviate the nervous present situation of resource of crane barge and crawler crane, reduce the use cost of the medium-and-large-sized crane barge of traditional approach; Meanwhile, ensure that the shipment cycle of slender structure thing, guarantee its stability and safety.
Accompanying drawing explanation
Fig. 1 is general arrangement of the present invention.
Fig. 2 is barge of the present invention and slender structure thing schematic diagram in place.
Fig. 3 is that jacking slide device of the present invention arranges schematic diagram.
Fig. 4 is that H profile steel of the present invention arranges schematic diagram on barge.
Fig. 5 is jacking slide device jack-up of the present invention, transport schematic diagram.
Fig. 6 is slender structure thing of the present invention first time weight transfer process schematic diagram.
Fig. 7 A is the transfer of slender structure thing of the present invention first time weight, high-order 4 the jacking schematic diagrams of 1C, 1D.
Fig. 7 B is the transfer of slender structure thing of the present invention first time weight, high-order 6 the jacking schematic diagrams of 1A, 1C, 1D.
Fig. 7 C is the transfer of slender structure thing of the present invention first time weight, high-order 4 the jacking schematic diagrams of 1A, 1D.
Fig. 8 is that slim-lined construction thing continues to transport schematic diagram on barge by jacking slide device of the present invention.
Fig. 9 is that the weight of slender structure thing of the present invention completes second time weight transfer process schematic diagram.
Figure 10 A is the transfer of slender structure thing of the present invention second time weight, high-order 4 the jacking schematic diagrams of 1A, 1D.
Figure 10 B is the transfer of slender structure thing of the present invention second time weight, high-order 6 the jacking schematic diagrams of 1A, 1B, 1D.
Figure 10 C is the transfer of slender structure thing of the present invention second time weight, high-order 4 the jacking schematic diagrams of 1A, 1B.
Figure 11 is the schematic diagram in place that slim-lined construction thing is transported on barge by jacking slide device of the present invention.
Figure 12 is slim-lined construction thing of the present invention schematic diagram in place.
Major label description in figure:
1A. jacking slide device, 1B. jacking slide device, 1C. jacking slide device, 1D. jacking slide device, 2. slender structure thing, 3. barge, 4.H shaped steel, 5. harbour edge, 6. bearing capacity lower region, 7. land.
Detailed description of the invention
As shown in Fig. 1-Figure 12, the present invention adopts following steps:
The first step: as shown in Figure 2, all completes in place perpendicular to harbour direction by barge 3 and slender structure thing 2, and makes slim-lined construction thing 2 and barge 3 line of centers point-blank;
The two groups of jacking slide devices (1C, 1D) be parked on land 7 are arranged in bottom slender structure thing 2 by second step: as shown in Figure 3, and other two groups of jacking slide devices (1A, 1B) are arranged on barge 3, and complete debugging efforts;
3rd step: as shown in Figure 4, barge 3 desired location arranges H profile steel 4;
4th step: as shown in Figure 5, by two groups of jacking slide device (1C, while 1D) being placed in a high position, by slim-lined construction thing 2 jack-up, and halt when transporting it into bearing capacity lower region 6, wharf apron, now two groups of jacking slide devices (1A, 1B) are in low level armed state;
5th step: as shown in Figure 6, jacking slide device 1A jack-up is placed in high-end trim, and jacking slide device 1C decline is placed in low-end trim, then, by the weight of slender structure thing 2 from two groups of jacking slide device (1C, 1D) transfer on two groups of jacking slide devices (1A, 1D), complete first time weight transfer process;
First time weight transfer detailed process: as shown in Fig. 7 A-Fig. 7 C, first, the two groups of jacking slide devices (1C, 1D) be parked on land 7 are placed in high-end trim, and the two groups of jacking slide devices (1A, 1B) be arranged on barge 3 are placed in low-end trim; Then, the jacking slide device 1A being in low-end trim is adjusted to high-end trim, now, three groups of jacking slide devices (1A, 1C, 1D) are in high-end trim simultaneously, and form 6 supports; Finally, the jacking slide device 1C being in high-end trim is dropped to low-end trim, and now two groups of jacking slide devices (1A, 1D) are placed in high-end trim simultaneously, complete first time weight transfer process;
6th step: as shown in Figure 8, slim-lined construction thing 2 continues to transport on barge 3 by two groups of jacking slide devices (1A, 1D), when jacking slide device 1D closes on jacking slide device 1C, halts;
7th step: as shown in Figure 9, jacking slide device 1B jack-up is placed in high-end trim, jacking slide device 1D declines and is placed in low-end trim, make the weight of slender structure thing 2 from two groups of jacking slide device (1A, two groups of jacking slide device (1A are transferred to 1D), 1B), complete second time weight transfer process;
Second time weight transfer detailed process: as shown in Figure 10 A-Figure 10 C, first, two groups of jacking slide devices (1A, 1D) are in high-end trim, two groups of jacking slide devices (1B, 1C) are in low-end trim; Then, the 1B group jacking slide device being in low-end trim is adjusted to high-end trim, now, three groups of jacking slide devices (1D, 1B, 1A) are in high-end trim simultaneously, form 6 supports; Finally the 1D group jacking slide device being in high-end trim is dropped to low-end trim, now, two groups of jacking slide devices (1A, 1B) are in high-end trim simultaneously, complete second time weight transfer process;
8th step: as shown in figure 11, to be transported to the on-station position on barge 3 by slim-lined construction thing 2 by two groups of jacking slide devices (1A, 1B);
Two groups of jacking apparatus (1A, 1B) are synchronously declined and are placed in low-end trim, then, fallen to by slim-lined construction thing 2 in the H profile steel 4 of layout in advance, and complete fixing, terminate shipment process by the 9th step: as shown in figure 12.
Above-mentioned jacking slide device is selected: model is the jacking slide device of SS650 type, and its jacking ability is: 650 tons/top, hydraulic stroke: 600mm.After jack-up module, the track sliding along jacking slide device moves on to desired location.This jacking slide device can complete two actions usually, and one is module jacking, and another is module slippage.
Above-mentioned barge, H profile steel, jacking slide device are prior art, and the technology of not specified (NS) is prior art, therefore repeats no more.
The above, it is only preferred embodiment of the present invention, not any pro forma restriction is done to the present invention, every above embodiment is done according to technical spirit of the present invention any simple modification, equivalent variations and modification, all still belong in the scope of technical solution of the present invention.
Claims (4)
1. quay transportation, the handling technology of slender structure thing, is characterized in that: adopt following steps:
The first step: barge and slender structure thing are all completed in place perpendicular to harbour direction, and make slim-lined construction thing and barge line of centers point-blank;
Second step: be arranged in bottom slender structure thing by the 3rd, the 4th liang of group jacking slide device being parked in land, first, second two groups of jacking slide devices are arranged on barge in addition, and complete debugging efforts;
3rd step: arrange H profile steel on barge desired location;
4th step: while the 3rd, the 4th liang of group jacking slide device is placed in a high position, by slim-lined construction thing jack-up, and halt when being transported to bearing capacity lower region, wharf apron, now, first, second two groups of jacking slide devices are in low level armed state;
5th step: first group of jacking slide device jack-up is placed in high-end trim, and the 3rd group of jacking slide device decline is placed in low-end trim, then, the weight of slender structure thing is transferred to first group, the 4th group two groups of jacking slide devices from the 3rd group, the 4th group two groups of jacking slide devices, completes first time weight transfer process;
6th step: slim-lined construction thing continues to transport on barge by first group, the 4th group two groups of jacking slide devices, when the 4th group of jacking slide device closes on the 3rd group of jacking slide device, halts;
7th step: second group of jacking slide device jack-up is placed in high-end trim, 4th group of jacking slide device declines and is placed in low-end trim, the weight of slender structure thing is transferred on first group, second group two groups of jacking slide devices from first group, the 4th group two groups of jacking slide devices, completes second time weight transfer process;
8th step: by two groups of jacking slide devices (1A, 1B) slim-lined construction thing 2 is transported to the on-station position on barge 3;
9th step: synchronously declined by first, second two groups of two groups of jacking apparatus and be placed in low-end trim, then, falls to slim-lined construction thing in the H profile steel of layout in advance, and completes fixing, terminate shipment process.
2. quay transportation, the handling technology of slender structure thing according to claim 1, it is characterized in that: the model of described jacking slide device is: SS650 type, this jacking slide device can complete two actions usually: one is module jacking, and another is module slippage.
3. quay transportation, the handling technology of slender structure thing according to claim 1, is characterized in that: in described 5th step, the concrete steps of first time weight transfer are:
1. the 3rd group, the 4th group two groups of jacking slide devices being parked in land are placed in high-end trim, and first group, the second group two groups of jacking slide devices be arranged on barge are placed in low-end trim
2. the first group of jacking slide device being in low-end trim is adjusted to high-end trim, now, three groups of jacking slide devices are in high-end trim simultaneously, and form 6 supports;
3. the 3rd group of jacking slide device being in high-end trim is dropped to low-end trim, now, first group, the 4th group two groups of jacking slide devices are placed in high-end trim simultaneously, complete first time weight transfer process.
4. quay transportation, the handling technology of slender structure thing according to claim 1, is characterized in that: in described 7th step, and the concrete steps of second time weight transfer are:
(1) first group, the 4th group two groups of jacking slide devices are in high-end trim, second group, the 3rd group two groups of jacking slide devices are in low-end trim;
(2) the second group of jacking slide device being in low-end trim is adjusted to high-end trim, now, first group, second group, the 4th group three groups of jacking slide devices are in high-end trim simultaneously, form 6 supports;
(3) the 4th group of jacking slide device being in high-end trim is dropped to low-end trim, now, first group, second group two groups of jacking slide devices are in high-end trim simultaneously, complete second time weight transfer process.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410699711.2A CN104555493A (en) | 2014-11-27 | 2014-11-27 | Wharf transportation and loading/unloading process for slender structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410699711.2A CN104555493A (en) | 2014-11-27 | 2014-11-27 | Wharf transportation and loading/unloading process for slender structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104555493A true CN104555493A (en) | 2015-04-29 |
Family
ID=53072739
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410699711.2A Pending CN104555493A (en) | 2014-11-27 | 2014-11-27 | Wharf transportation and loading/unloading process for slender structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104555493A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107628201A (en) * | 2017-08-25 | 2018-01-26 | 中国海洋石油总公司 | The technics of shipment of large-sized deep water piling bar |
CN108482586A (en) * | 2018-04-12 | 2018-09-04 | 南通润邦海洋工程装备有限公司 | Single pile jacking slides technique of going on board |
CN109515629A (en) * | 2018-10-24 | 2019-03-26 | 海洋石油工程(青岛)有限公司 | The shipment method of jacket piling bar |
CN109720510A (en) * | 2018-12-29 | 2019-05-07 | 武船重型工程股份有限公司 | A kind of double shipping loading systems |
CN109972603A (en) * | 2019-03-20 | 2019-07-05 | 海洋石油工程(青岛)有限公司 | The technique of jacket sectional construction |
CN111391979A (en) * | 2020-02-29 | 2020-07-10 | 华电曹妃甸重工装备有限公司 | Kiloton-level lifting type rolling equipment |
CN113536618A (en) * | 2021-05-21 | 2021-10-22 | 沪东中华造船(集团)有限公司 | Positioning method of large steel structure |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1359090A1 (en) * | 2002-05-01 | 2003-11-05 | Wijnne & Barends'Cargadoors- en Agentuurkantoren B.V. | Cargo transport including quick loading and unloading of a cargo ship |
KR20050088513A (en) * | 2004-03-02 | 2005-09-07 | 김정석 | Loading and unloading system of a container box |
JP2008007233A (en) * | 2006-06-28 | 2008-01-17 | Nippon Sharyo Seizo Kaisha Ltd | Carrier vehicle |
CN201092526Y (en) * | 2007-05-23 | 2008-07-30 | 上海国际港务(集团)股份有限公司军工路分公司 | Handling arm for fork lifter |
NL2004426C2 (en) * | 2010-03-18 | 2011-09-20 | U Sea Beheer B V | HATCH, SHIP AND METHOD FOR THIS. |
CN102849470A (en) * | 2012-09-06 | 2013-01-02 | 武船重型工程股份有限公司 | Shipping method for steel box girder section |
CN102602712B (en) * | 2012-03-29 | 2013-12-18 | 武船重型工程股份有限公司 | Method for shipping of segments of steel box girders by rolling |
CN102556691B (en) * | 2011-12-29 | 2014-01-15 | 武船重型工程股份有限公司 | Roll-on/roll-off shipping method for long large steel box girder segment across obstacles |
CN203568804U (en) * | 2013-09-27 | 2014-04-30 | 中国二十冶集团有限公司 | Jacking sliding supporting device for large equipment |
-
2014
- 2014-11-27 CN CN201410699711.2A patent/CN104555493A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1359090A1 (en) * | 2002-05-01 | 2003-11-05 | Wijnne & Barends'Cargadoors- en Agentuurkantoren B.V. | Cargo transport including quick loading and unloading of a cargo ship |
KR20050088513A (en) * | 2004-03-02 | 2005-09-07 | 김정석 | Loading and unloading system of a container box |
JP2008007233A (en) * | 2006-06-28 | 2008-01-17 | Nippon Sharyo Seizo Kaisha Ltd | Carrier vehicle |
CN201092526Y (en) * | 2007-05-23 | 2008-07-30 | 上海国际港务(集团)股份有限公司军工路分公司 | Handling arm for fork lifter |
NL2004426C2 (en) * | 2010-03-18 | 2011-09-20 | U Sea Beheer B V | HATCH, SHIP AND METHOD FOR THIS. |
CN102556691B (en) * | 2011-12-29 | 2014-01-15 | 武船重型工程股份有限公司 | Roll-on/roll-off shipping method for long large steel box girder segment across obstacles |
CN102602712B (en) * | 2012-03-29 | 2013-12-18 | 武船重型工程股份有限公司 | Method for shipping of segments of steel box girders by rolling |
CN102849470A (en) * | 2012-09-06 | 2013-01-02 | 武船重型工程股份有限公司 | Shipping method for steel box girder section |
CN203568804U (en) * | 2013-09-27 | 2014-04-30 | 中国二十冶集团有限公司 | Jacking sliding supporting device for large equipment |
Non-Patent Citations (2)
Title |
---|
王志斌等: "185m长大节段钢箱梁滚装上船及水上运输关键技术", 《中外公路》, 31 October 2012 (2012-10-31) * |
郑雄胜等: "重大件货物液压顶升与平移装船系统设计", 《起重运输机械》, 20 August 2009 (2009-08-20) * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107628201A (en) * | 2017-08-25 | 2018-01-26 | 中国海洋石油总公司 | The technics of shipment of large-sized deep water piling bar |
CN108482586A (en) * | 2018-04-12 | 2018-09-04 | 南通润邦海洋工程装备有限公司 | Single pile jacking slides technique of going on board |
CN108482586B (en) * | 2018-04-12 | 2020-07-14 | 南通润邦海洋工程装备有限公司 | Single-pile jacking, sliding and boarding process |
CN109515629A (en) * | 2018-10-24 | 2019-03-26 | 海洋石油工程(青岛)有限公司 | The shipment method of jacket piling bar |
CN109720510A (en) * | 2018-12-29 | 2019-05-07 | 武船重型工程股份有限公司 | A kind of double shipping loading systems |
CN109972603A (en) * | 2019-03-20 | 2019-07-05 | 海洋石油工程(青岛)有限公司 | The technique of jacket sectional construction |
CN111391979A (en) * | 2020-02-29 | 2020-07-10 | 华电曹妃甸重工装备有限公司 | Kiloton-level lifting type rolling equipment |
CN113536618A (en) * | 2021-05-21 | 2021-10-22 | 沪东中华造船(集团)有限公司 | Positioning method of large steel structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104555493A (en) | Wharf transportation and loading/unloading process for slender structure | |
CN101879932B (en) | Method for lengthening and lading steel piles of large deepwater jacket | |
CN102602712B (en) | Method for shipping of segments of steel box girders by rolling | |
CN102337736B (en) | Installation process of upper module on offshore oil platform | |
KR100770737B1 (en) | A water level transport of a land dryness vessel and launching process | |
CN104527940A (en) | Ocean platform block offshore double-boat integral migration method | |
CN203806103U (en) | Offshore buoyancy mounting device for ultra-large module | |
CN103661801A (en) | Auxiliary installation system and installation method of ocean engineering underwater propeller | |
CN203866772U (en) | Multipurpose shipping dock capable of being adapted to tidal level change | |
CN104802928A (en) | Semi-submersible platform building combining method | |
CN102849470B (en) | Shipping method for steel box girder section | |
CN102888842A (en) | Lengthening and shifting process of large-sized deepwater jacket steel pile | |
CN202642027U (en) | Floating fitting-out device | |
CN104310235B (en) | Maritime work accommodation platform complete superstructure lifting method | |
CN204212176U (en) | Fishing net can slide past formula underwater facility mud mat basis | |
CN103603318A (en) | Floating type bollard | |
CN204456106U (en) | Waters pile sinking mobile guide station keeping ship | |
CN103129984A (en) | Overlaying, fixing and transporting process for elongate structure modules | |
CN103171911B (en) | Ship loader installation technology | |
CN109747796A (en) | Large-scale floating dock is waterborne to widen remodeling method | |
CN109436190A (en) | Ship tail leans on the piling bar entirety technics of shipment under state | |
CN102837978B (en) | Shipment method combining large constructional element rolling and floating crane | |
CN203613513U (en) | Floating bollard | |
CN209836981U (en) | Lower suspension bridge crossing device for crossing river in canal | |
CN206204947U (en) | Hydraulic pressure is lifted off formula and plays stake flat nozzle hook |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150429 |
|
RJ01 | Rejection of invention patent application after publication |