CN101879932B - Method for lengthening and lading steel piles of large deepwater jacket - Google Patents

Method for lengthening and lading steel piles of large deepwater jacket Download PDF

Info

Publication number
CN101879932B
CN101879932B CN 200910083696 CN200910083696A CN101879932B CN 101879932 B CN101879932 B CN 101879932B CN 200910083696 CN200910083696 CN 200910083696 CN 200910083696 A CN200910083696 A CN 200910083696A CN 101879932 B CN101879932 B CN 101879932B
Authority
CN
China
Prior art keywords
piling bar
spreading
steel
hull
piling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200910083696
Other languages
Chinese (zh)
Other versions
CN101879932A (en
Inventor
李淑民
宋峥嵘
李林
王勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Offshore Oil Engineering Qingdao Co Ltd
Original Assignee
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Offshore Oil Engineering Qingdao Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, Offshore Oil Engineering Co Ltd, Offshore Oil Engineering Qingdao Co Ltd filed Critical China National Offshore Oil Corp CNOOC
Priority to CN 200910083696 priority Critical patent/CN101879932B/en
Publication of CN101879932A publication Critical patent/CN101879932A/en
Application granted granted Critical
Publication of CN101879932B publication Critical patent/CN101879932B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a method for lengthening and lading steel piles of a large deepwater jacket, which comprises the following steps of: firstly, cutting and blanking a steel plate and curling into a plurality of small curled pipe sections, and welding and lengthening the plurality of small curled pipe sections to form a 1/3 subsection of a whole steel pile 1; secondly, welding and lengthening three subsections of the steel piles to form a whole steel pile; thirdly, transferring the whole steel piles one by one to a stacking area by adopting two large crawling cranes for storage; fourthly, arranging the two large crawling cranes at the rear part of a wharf apron, wherein the main hook of each large crawling crane is connected with the steel pipe through a lifting belt, and the two large crawling cranes carry out a steel pile lading operation in an interworking way; fifthly, rolling the steel piles on a ship; and sixthly, fixing the steel piles on the ship. The invention can save the investment on the steel pile lengthening and transportation production line and a pile follower, has low requirement on the field, reduces the influence of the resource shortage of large floating derricks on the steel pipe lading, greatly reduces the cost on lading and improves the lading efficiency.

Description

The piling bar spreading of large-sized deep water jacket and the method for shipment
Technical field
The present invention relates to a kind of method of shipment of jacket piling bar, relate in particular to a kind of piling bar spreading of large-sized deep water jacket and the method for shipment, belong to the Offshore Engineering field.
Background technology
Along with China's marine petroleum development constantly to the striding forward of deep water field, the large-sized deep water jacket has obtained using more and more widely.At present, the domestic jacket depth of water has reached 216 meters.The piling bar length of deep water jacket is generally more than 100 meters, and adopts the whole section method of squeezing into the seabed, and weight can reach more than 500 ton.The piling bar of shallow water jacket usually is divided into several sections and carries out spreading and shipment, and behind the marine jacket launching, piling bar is squeezed into the seabed one by one by conduit.Generally speaking, the first paragraph piling bar is the longest and weight is larger, but weight adopts small-sized floating crane just can load onto ship generally in 100 tons.During the shipment of the piling bar of deep water jacket, because deep water jacket piling bar length is generally more than 100 meters, and weight reaches more than 500 tons, needs the special shipment passage of design to load onto ship.
The piling bar spreading of existing large-sized deep water jacket and the method for shipment, generally adopt following steps:
1, piling bar 1 segmentation in the tubulation workshop rolls, and piling bar 1 adopts steel plate materials to make.At first, steel plate is cut in the tubulation workshop, blanking and roll into several little pipeline sections (each little pipeline section that rolls into is generally less than 3 meters);
2, adopt overhead traveling crane with several tubule section handlings to piling bar spreading automatic job line, carry out more than the integral solder spreading to 100 meter of piling bar;
3, after the piling bar spreading was finished, the automatic job line was transported to outside the workshop piling bar storage area with piling bar and deposits;
When 4, loading onto ship, the employing pile follower is transported to piling bar near the harbour;
5, then, adopt large-scale floating crane that piling bar is lifted shipment.
Mainly there are following shortcoming in above-mentioned this piling bar spreading and shipment method:
1. need the special shipment passage of design: namely: piling bar spreading and transportation manufacturing line, pile follower and special piling bar storage area, investment is large, and the place demand is large;
2. because the Deep Water Jacket Fabrication cycle is long, and some jackets only production cycle just surpass 1 year, and the Production requirement of piling bar is relatively very little, this causes the waste in equipment and place just so that custom-designed shipment passage is in idle state for a long time;
3. because deep water jacket piling bar weight is large, generally all need large-scale floating crane to load onto ship, and domestic utilizable large-scale floating crane resource pretty nervous;
4. the appropriate litigation fees that adopts large-scale floating crane to load onto ship is high;
5. the deep water jacket piling bar is very long, and the stressing conditions of piling bar is bad during large-scale floating crane shipment;
6. the piling bar shipment cycle is subjected to the impact of large-scale floating crane very large.
Summary of the invention
Main purpose of the present invention is to overcome the above-mentioned shortcoming that existing shipment method exists, and the method that the piling bar that a kind of improved large-sized deep water jacket is provided is loaded onto ship, the investment that it can be saved the piling bar spreading and transport manufacturing line, pile follower has reduced the inner space, workshop; Simultaneously, saved the design of special piling bar storage area, the place demand is little.Solve the problem of piling bar segmentation transportation and integral solder spreading outside the workshop, reduced large-scale floating crane resource anxiety to the impact of piling bar shipment, reduced greatly the expense of shipment, improved shipment efficient.
The objective of the invention is to be realized by following technical scheme.
A kind of piling bar spreading of large-sized deep water jacket and the method for shipment may further comprise the steps:
The first step, rolls and the segmentation spreading segmentation of piling bar:
With steel plate cutting stock and roll into several rouleau tubulation sections in the tubulation workshop, it is characterized in that: every piling bar integral body is comprised of three segmentations, and several rouleau tubulation sections are welded 1/3 segmentation that spreading becomes whole piling bar 1;
Second step, the whole spreading of piling bar:
Adopting transport trolley that three segmentations of piling bar are transported near the appointment place the harbour and be placed on the positioner, carry out the integral solder spreading of piling bar 1, is whole piling bar with three segmentations welding spreadings of piling bar;
The 3rd step, the stacking of piling bar:
After the whole spreading of piling bar is finished, adopt two large-scale crawler cranes that whole piling bar is moved to the stacking zone by root and deposit;
The 4th step, the lifting of piling bar:
At the rear, wharf apron, arrange two large-scale crawler cranes, each large-scale crawler crane main hook is connected with piling bar by hanging belt, and two large-scale crawler cranes cooperatively interact and carry out the piling bar ship-loading operation;
The 5th step: piling bar aboard ship rolls:
Roll the dress suspension centre what hull arranged piling bar, after piling bar lifted to the hull, the shackle by steel rope one end was connected with suspension centre, and utilizes the auxiliary hook of two large-scale crawler cranes upwards to promote, and makes the rolling of piling bar on hull;
The 6th step: piling bar is fixing aboard ship:
Piling bar lift to hull and roll in place after, adopt steel structure frame to carry out the fixing of piling bar.
Described the 3rd step, the stacking of piling bar: stack successively piling bar according to layout and the shipping sequence of piling bar on hull, that is: successively pile up by order from top to bottom.
The lifting ship-loading operation of described the 4th step piling bar: fill first a side piling bar, then turn the hull direction and refill the opposite side piling bar.
In described the 4th step, the type of attachment of each large-scale crawler crane main hook and piling bar is: the hanging belt pocket draws piling bar.
In described the 6th step, steel structure frame is for adopting I-beam section, steel pipe or steel plate to make, and fixed form is: steel structure frame is weldingly fixed on the hull.
Described the 5th step arranges a temporary supporting at hull, piling bar can be rolled at hull put in place.
Beneficial effect of the present invention: the investment that the present invention can save the piling bar spreading and transport manufacturing line, pile follower, reduced the inner space, workshop; Simultaneously, saved the design of special piling bar storage area, the place demand is little.Solve the problem of piling bar segmentation transportation and integral solder spreading outside the workshop, reduced large-scale floating crane resource anxiety to the impact of piling bar shipment, reduced greatly the expense of shipment, improved shipment efficient.
Description of drawings:
Fig. 1 is that schematic diagram is arranged in whole spreading and the stacking of piling bar of the present invention.
Fig. 2 is the cross-sectional schematic of A-A among Fig. 1 of the present invention.
Fig. 3 is the cross-sectional schematic of B-B among Fig. 2 of the present invention.
Fig. 4 is the cross-sectional schematic of C-C among Fig. 2 of the present invention.
Fig. 5 is the cross-sectional schematic of D-D among Fig. 2 of the present invention.
Fig. 6 is that piling bar shipment hoisting crane of the present invention and hull are arranged schematic diagram.
Fig. 7 is that piling bar shipment hoisting crane of the present invention and hull are arranged schematic diagram.
Fig. 8 is piling bar of the present invention at the hull schematic diagram that rolls.
Fig. 9 is piling bar of the present invention at the hull schematic diagram that rolls.
Major label description in figure:
1 piling bar, 2 positioners, 3 harbours, 4, hoisting crane, 5 hulls, 6 suspension centres, 7 shackles, 8 steel ropes, 9 temporary supportings, 10 auxiliary hooks.
The specific embodiment
Consult Fig. 1---shown in Figure 9, the present invention is applicable to spreading and the shipment of the piling bar of all large-scale depth of water jackets, the present invention includes following steps:
The first step, rolls and spreading the segmentation of piling bar 1:
Piling bar 1 is segmented in the tubulation workshop and rolls and carry out spreading, and piling bar 1 adopts steel plate materials to make.At first, with steel plate in the tubulation workshop, cut, blanking and roll into several rouleau tubulation sections (each rouleau tubulation section is generally less than 3 meters), every piling bar 1 is comprised of three segmentations, several rouleau tubulation sections are welded spreading becomes 1/3 section of whole piling bar 1, and every section is about more than 40 meters.
Second step, the whole spreading of piling bar 1:
After piling bar 1 soldered spreading is three segmentations, adopts transport trolley that three segmentations of piling bar 1 are transported near the harbour 3 appointment place, and be placed on the integral solder spreading that carries out piling bar 1 on the positioner 2, is whole piling bar 1 with three segmentations welding spreadings of piling bar;
The present embodiment: heavily approximately 390 tons of piling bar 1 integral body are about 130 meters; Transport trolley: be 270 tons of flat bed transport vehicles.
The 3rd step, the stacking of piling bar:
After piling bar 1 whole spreading is finished, adopt two large-scale crawler cranes that every whole piling bar 1 is moved to the stacking zone by root and deposit; Depositing order is: put successively piling bar 1 according to layout and the shipping sequence of piling bar on hull.That is: successively pile up by order from top to bottom.(such as Fig. 1-shown in Figure 5)
The present embodiment: large-scale crawler crane adopts 600 tons of crawler cranes.
The 4th step, the lifting of piling bar 1:
At the rear, wharf apron, arrange two large-scale crawler cranes 4, each 600 tons of crawler crane 4 main hook is connected with piling bar 1 by hanging belt, type of attachment is that the hanging belt pocket draws piling bar, two 600 tons of crawler cranes 4 cooperatively interact and carry out the piling bar ship-loading operation, fill first the piling bar of a side, then turn hull direction dress opposite side piling bar; (such as Fig. 6, shown in Figure 7) that is: presses from top to bottom, vertical order lifting.The present embodiment is: fill first A1-1, A2-1, B1-1, B2-1, B2-3, B1-3, A1-3, A2-3 (not with pile clamping device); Then turn the direction of hull 5, refill A1-2, A2-2, B1-2, B2-2 (band pile clamping device).
The 5th step: piling bar 1 rolls at hull 5:
Roll dress suspension centre 6 what hull 5 arranged piling bar 1, after piling bar lifts to the hull 5, utilize the auxiliary hook 10 of two large-scale crawler cranes 4 to promote and finish the rolling of piling bar on hull 5.
The present embodiment is: at hull 5 suspension centre 6 is set, the shackle 7 by steel rope 8 one ends is connected with suspension centre 6, and upwards promotes by the auxiliary hook 10 of large-scale crawler crane 4, makes the rolling of piling bar 1 on hull 5.At hull 5 temporary supporting 9 is set, makes the piling bar 1 can be in hull 5 put in place (such as Fig. 8, shown in Figure 9) of rolling.
The 6th step: piling bar 1 is fixing at ship 5:
Piling bar lift to hull 5 and roll in place after, adopt steel structure frame to carry out the fixing of piling bar.Steel structure frame is for adopting I-beam section, steel pipe or steel plate to make, and fixed form is: steel structure frame is weldingly fixed on the hull.
Advantage of the present invention:
1 does not need the input of the equipment such as special shipment channels designs, piling bar spreading, transportation manufacturing line and pile follower;
2. save the demand in space and the place in workshop, improved the degree of utilization in place;
3. eliminated in the situation that the uncertainty of large-scale floating crane resource anxiety large-sized deep water jacket piling bar shipment.
3. reduced greatly the expense of piling bar spreading and shipment.
5 can not be subjected to the restriction of large-scale floating crane, save the time of shipment.
6 owing to adopting two large-scale crawler cranes to lift the piling bar more reasonable stress.
Positioner 2, hoisting crane 4, suspension centre 6, temporary supporting 9 are prior art, and the technology of not specified (NS) is prior art.
The above, it only is preferred embodiment of the present invention, be not that the present invention is done any pro forma restriction, every foundation technical spirit of the present invention all still belongs in the scope of technical solution of the present invention any simple modification, equivalent variations and modification that above embodiment does.

Claims (6)

1. the piling bar spreading of a large-sized deep water jacket and the method for shipment may further comprise the steps:
The first step, rolls and the segmentation spreading segmentation of piling bar:
With steel plate cutting stock and roll into several rouleau tubulation sections in the tubulation workshop, it is characterized in that: every piling bar integral body is comprised of three segmentations, and several rouleau tubulation sections are welded 1/3 segmentation that spreading becomes whole piling bar (1);
Second step, the whole spreading of piling bar:
Adopting transport trolley that three segmentations of piling bar are transported near the appointment place the harbour and be placed on the positioner, carry out the integral solder spreading of piling bar (1), is whole piling bar with three segmentations welding spreadings of piling bar;
The 3rd step, the stacking of piling bar:
After the whole spreading of piling bar is finished, adopt two large-scale crawler cranes that whole piling bar is moved to the stacking zone by root and deposit;
The 4th step, the lifting of piling bar:
At the rear, wharf apron, arrange two large-scale crawler cranes, each large-scale crawler crane main hook is connected with piling bar by hanging belt, and two large-scale crawler cranes cooperatively interact and carry out the piling bar ship-loading operation;
The 5th step: piling bar aboard ship rolls:
Roll the dress suspension centre what hull arranged piling bar, after piling bar lifted to the hull, the shackle by steel rope one end was connected with suspension centre, and utilizes the auxiliary hook of two large-scale crawler cranes upwards to promote, and makes the rolling of piling bar on hull;
The 6th step: piling bar is fixing aboard ship:
Piling bar lift to hull and roll in place after, adopt steel structure frame to carry out the fixing of piling bar.
2. the piling bar spreading of large-sized deep water jacket according to claim 1 and the method for shipment, it is characterized in that: described the 3rd step, the stacking of piling bar: stack successively piling bar according to layout and the shipping sequence of piling bar on hull, that is: successively pile up by order from top to bottom.
3. the piling bar spreading of large-sized deep water jacket according to claim 1 and the method for shipment is characterized in that: the lifting ship-loading operation of described the 4th step piling bar: fill first a side piling bar, then turn the hull direction and refill the opposite side piling bar.
4. the piling bar spreading of large-sized deep water jacket according to claim 1 and the method for shipment is characterized in that: in described the 4th step, the type of attachment of each large-scale crawler crane main hook and piling bar is: the hanging belt pocket draws piling bar.
5. the piling bar spreading of large-sized deep water jacket according to claim 1 and the method for shipment, it is characterized in that: described the 6th step, steel structure frame is for adopting I-beam section, steel pipe or steel plate to make, and fixed form is: steel structure frame is weldingly fixed on the hull.
6. the piling bar spreading of large-sized deep water jacket according to claim 1 and the method for shipment is characterized in that: described the 5th step, at hull one temporary supporting is set, and piling bar can be rolled at hull put in place.
CN 200910083696 2009-05-08 2009-05-08 Method for lengthening and lading steel piles of large deepwater jacket Expired - Fee Related CN101879932B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200910083696 CN101879932B (en) 2009-05-08 2009-05-08 Method for lengthening and lading steel piles of large deepwater jacket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200910083696 CN101879932B (en) 2009-05-08 2009-05-08 Method for lengthening and lading steel piles of large deepwater jacket

Publications (2)

Publication Number Publication Date
CN101879932A CN101879932A (en) 2010-11-10
CN101879932B true CN101879932B (en) 2013-03-06

Family

ID=43052107

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200910083696 Expired - Fee Related CN101879932B (en) 2009-05-08 2009-05-08 Method for lengthening and lading steel piles of large deepwater jacket

Country Status (1)

Country Link
CN (1) CN101879932B (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102653275A (en) * 2012-04-25 2012-09-05 中国海洋石油总公司 Portable yard carrier trolley and application method thereof
CN102888842B (en) * 2012-10-29 2015-01-07 中国海洋石油总公司 Lengthening and shifting process of large-sized deepwater jacket steel pile
CN103879795B (en) * 2014-03-20 2016-01-13 中国海洋石油总公司 Tubular structure thing rolling shipment method
CN104453249A (en) * 2014-09-28 2015-03-25 中国海洋石油总公司 Super-long steel pipe transfer technology
CN104499477B (en) * 2014-11-27 2016-05-11 中国海洋石油总公司 Large-sized deep water jacket piling bar precasting process
CN107685835A (en) * 2017-03-21 2018-02-13 南通蓝岛海洋工程有限公司 A kind of wind-powered electricity generation steel-pipe pile hoisting transportation technique
CN106957007A (en) * 2017-04-24 2017-07-18 中国葛洲坝集团第工程有限公司 A kind of super-large diameter penstock equipment for supporting patient with burn and turn-over method
CN107628201A (en) * 2017-08-25 2018-01-26 中国海洋石油总公司 The technics of shipment of large-sized deep water piling bar
CN109515629A (en) * 2018-10-24 2019-03-26 海洋石油工程(青岛)有限公司 The shipment method of jacket piling bar
CN109436190A (en) * 2018-11-16 2019-03-08 海洋石油工程(青岛)有限公司 Ship tail leans on the piling bar entirety technics of shipment under state
CN109436192A (en) * 2018-11-16 2019-03-08 海洋石油工程(青岛)有限公司 The piling bar entirety technics of shipment under state is leaned in ship side
CN111483570B (en) * 2020-03-27 2022-05-03 海洋石油工程(青岛)有限公司 Novel process for prefabricating and shipping suction anchor piles
CN115258056B (en) * 2022-09-19 2022-12-09 南通泰胜蓝岛海洋工程有限公司 Integrated transportation overturning process for offshore steel pipe pile

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4106302A (en) * 1976-05-17 1978-08-15 Maschinenfabrik Augsburg-Nurnberg Aktiengesellschaft Off-shore drilling and production platform and method of building same
US4781497A (en) * 1987-02-02 1988-11-01 Conoco Inc. Tension-restrained articulated platform tower
US4854779A (en) * 1987-12-14 1989-08-08 Shell Offshore Inc. Installation of multipiece jackets using mating pins
CN1974936A (en) * 2006-12-08 2007-06-06 大连船舶重工集团有限公司 Assembling method for large truss type pile leg structure
CN101298765A (en) * 2007-08-27 2008-11-05 天津市海王星海上工程技术有限公司 Novel single pillar structure and mounting method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4106302A (en) * 1976-05-17 1978-08-15 Maschinenfabrik Augsburg-Nurnberg Aktiengesellschaft Off-shore drilling and production platform and method of building same
US4781497A (en) * 1987-02-02 1988-11-01 Conoco Inc. Tension-restrained articulated platform tower
US4854779A (en) * 1987-12-14 1989-08-08 Shell Offshore Inc. Installation of multipiece jackets using mating pins
CN1974936A (en) * 2006-12-08 2007-06-06 大连船舶重工集团有限公司 Assembling method for large truss type pile leg structure
CN101298765A (en) * 2007-08-27 2008-11-05 天津市海王星海上工程技术有限公司 Novel single pillar structure and mounting method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李林等.大型深水导管架钢桩装船新工艺.《第十三届中国科协年会第13分会场-海洋工程装备发展论坛论文集》.2011,第1-6页. *

Also Published As

Publication number Publication date
CN101879932A (en) 2010-11-10

Similar Documents

Publication Publication Date Title
CN101879932B (en) Method for lengthening and lading steel piles of large deepwater jacket
CN101492140B (en) Aluminum alloy catamaran whole-boat afloat process
CN201224866Y (en) Floating pier steel bridge approach floating type elevating system
CN103061264B (en) Method and device for pre-pressing high-position support single column in water
CN207346050U (en) A kind of onshore terminals are to barge, the device of transferring of barge to barge
CN202358280U (en) Special ship for transporting large-diameter steel pipe piles and assisting in pile hoisting construction
CN101417693A (en) Oceanography engineering module integral hoisting method
CN102602712A (en) Method for shipping of segments of steel box girders by rolling
CN201864449U (en) Cement joint-row pressing block hoisting frame
CN104555493A (en) Wharf transportation and loading/unloading process for slender structure
CN101858059A (en) Construction method of erecting prestressed concrete beam on river
CN102888842B (en) Lengthening and shifting process of large-sized deepwater jacket steel pile
CN103213654B (en) A kind of method of construction of platform
CN206634166U (en) A kind of working ship
CN104724518B (en) Long piled wharf bulk goods self-unloading platform
CN202368767U (en) Detachable device for platform construction, shipment and launching
CN103129984A (en) Overlaying, fixing and transporting process for elongate structure modules
CN201132941Y (en) Self floating lower carrying pole beam of moveable formwork
CN202765875U (en) Oversized rail gauge crane transportation equipment
CN202187313U (en) Split type dock reinforcing and improving structure
CN101249879A (en) Caisson carrying vessel
CN204916101U (en) Jack -up construction platform of fixed point floating
CN104627326A (en) Special lifting and vibration-driving ship for integrated driving of cell type steel sheet pile large cylinders and vice cells
CN204355983U (en) The land erecting equipment of water conservancy project prefabricated components
CN105926466A (en) Device and construction method for steel truss bridge integral transporting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee after: OFFSHORE OIL ENGINEERING (QINGDAO) Co.,Ltd.

Patentee after: CHINA NATIONAL OFFSHORE OIL Corp.

Co-patentee after: OFFSHORE OIL ENGINEERING Co.,Ltd.

Address before: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee before: OFFSHORE OIL ENGINEERING (QINGDAO) Co.,Ltd.

Patentee before: CHINA NATIONAL OFFSHORE OIL Corp.

Co-patentee before: OFFSHORE OIL ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130306

CF01 Termination of patent right due to non-payment of annual fee