CN104549860A - Baking varnish spraying equipment - Google Patents
Baking varnish spraying equipment Download PDFInfo
- Publication number
- CN104549860A CN104549860A CN201310513829.7A CN201310513829A CN104549860A CN 104549860 A CN104549860 A CN 104549860A CN 201310513829 A CN201310513829 A CN 201310513829A CN 104549860 A CN104549860 A CN 104549860A
- Authority
- CN
- China
- Prior art keywords
- section
- chain
- spraying
- heat cure
- unloading
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05B—SPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
- B05B13/00—Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
- B05B13/02—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
- B05B13/0221—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work characterised by the means for moving or conveying the objects or other work, e.g. conveyor belts
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05B—SPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
- B05B16/00—Spray booths
- B05B16/20—Arrangements for spraying in combination with other operations, e.g. drying; Arrangements enabling a combination of spraying operations
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D—PROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05D3/00—Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials
- B05D3/02—Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials by baking
Abstract
The invention discloses baking varnish spraying equipment. The baking varnish spraying equipment comprises a box body, and an air-inlet pipe and an exhausting pipe which are arranged on the box body, wherein the box body comprises a loading, unloading and dust-removing section, a spraying section and a preheating curing section, which are sequentially arranged together in a detachable way; a chain is arranged in the box body and penetrates through the loading, unloading and dust-removing section, the spraying section and the preheating curing section to convey a workpiece; a plurality of supporting wheels which are not on the same straight line are arranged in the preheating curing section at intervals; the chain is sequentially wound on the supporting wheels and are meshed to the supporting wheels, so that the chain conveys the workpiece in a snake-shaped moving way in the preheating curing section. The baking varnish spraying equipment is high in carrying speed and relatively small in size.
Description
Technical field
The present invention relates to a kind of surface processing equipment, particularly relate to a kind of spraying baking finish unit.
Background technology
Spraying baking vanish is widely used among the process of surface treatment of various electronic product workpiece, general spraying baking finish unit comprises loading and unloading and dedusting section, spraying section and pre-heat cure section, it often takes up an area that space is too huge and assembling is built on the spot in the scene that mostly is, just cannot move after having constructed, the demand in quick-replaceable place can not be met.
Summary of the invention
In view of foregoing, be necessary a kind of small volume is provided and movably sprays baking finish unit.
A kind of spraying baking finish unit, it comprises casing and the air inlet pipe that is arranged on this casing and blast pipe, this casing comprises loading and unloading and dedusting section, spraying section and pre-heat cure section, these loading and unloading and dedusting section, spraying section and pre-heat cure section are installed in together successively by removably, chain is provided with in this casing, this chain wears these loading and unloading and dedusting section, spraying section and pre-heat cure section are with conveying work pieces, not multiple support wheels are on the same line arranged at intervals with in this pre-heat cure section, this chain to be wrapped in successively on the plurality of support wheel and to engage with the plurality of support wheel, thus make this chain in this pre-heat cure section with snakelike move mode conveying work pieces.
Loading and unloading and dedusting section, spraying section and pre-heat cure section can be taken apart by spraying baking finish unit of the present invention successively, carry respectively, therefore make this spraying baking finish unit carry fast.In addition, due in this pre-heat cure section, this chain is snakelike move mode conveying work pieces, relative to overall orthoscopic load mode, which saves space.
Accompanying drawing explanation
Fig. 1 is the schematic perspective view of embodiment of the present invention spraying baking finish unit, and this spraying baking finish unit comprises casing and is in the framework in casing, and pre-heat cure section.
Fig. 2 is the schematic perspective view of the baking finish unit of spraying shown in Fig. 1 removing casing.
Fig. 3 is the schematic perspective view at another visual angle of the baking finish unit of spraying shown in Fig. 2 removing framework.
Fig. 4 is the schematic perspective view of the pre-heat cure section of the baking finish unit of spraying shown in Fig. 3.
Fig. 5 is the partial enlarged drawing at the V place of the baking finish unit of spraying shown in Fig. 4.
Main element symbol description
Spraying baking finish unit | 100 |
Casing | 10 |
Air inlet pipe | 11 |
Blast pipe | 13 |
Loading and unloading and dedusting section | 20 |
Between loading and unloading | 21 |
Between electrostatic precipitation | 23 |
Spraying section | 30 |
Between spraying | 31 |
Between isolation | 33 |
Pre-heat cure section | 50 |
Chain | 60 |
Housing | 51 |
Between infrared preheating | 511 |
Between leaving standstill | 513 |
Between solidification | 515 |
Framework | 52 |
Closure assemblies | 53 |
Shielded box | 531 |
Access cover | 533 |
Axle clamp | 535 |
Support wheel | 54 |
Tension assembly | 55 |
First support bar | 551 |
Adjustment hole | 5511 |
Second support bar | 552 |
Support member | 553 |
Regulating part | 554 |
Regulating wheel | 555 |
Regulating wheel | 556 |
Infrared lamp | 56 |
Cure lamp | 57 |
Locating piece | 61 |
Following detailed description of the invention will further illustrate the present invention in conjunction with above-mentioned accompanying drawing.
Detailed description of the invention
Refer to Fig. 1 to Fig. 3, the spraying baking finish unit 100 of embodiment of the present invention is coated with UV (Ultraviolet Rays) baking vanish for giving the hinge rotating shaft of notebook computer, it comprises casing 10, the air inlet pipe 11 be arranged on the upside of casing 10 is arranged at blast pipe 13 on the downside of casing 10, and is arranged at interior two the parallel chains 60 of casing 10.Casing 10 comprises the loading and unloading and dedusting section 20, spraying section 30 that removably connect successively, and pre-heat cure section 50.Loading and unloading and dedusting section 20, spraying section 30 and pre-heat cure section 50 are container structure, and can enter for operator.
Loading and unloading and dedusting section 20 to be separated between loading and unloading between 21 and electrostatic precipitation 23.Spraying section 30 to be divided between spraying 31 and be in 31 both sides between spraying isolation between 33.33 to be connected between 23 with contiguous isolation between electrostatic precipitation.Pre-heat cure section 50 comprises housing 51, housing 51 inside to form between infrared preheating 511 and to be between the leaving standstill of 511 both sides between infrared preheating between 513 and solidification 515, between infrared preheating 511 with leave standstill between 513 and 515 to be connected between solidify, 33 to be connected between 513 with adjoining isolation between standing.Baking vanish workpiece to be sprayed by chain 60 drive via between loading and unloading 21, between electrostatic precipitation 23, between isolation 33, between spraying 31, between isolation 33, leave standstill between 513, between infrared preheating 511 and solidification between 515, leave standstill with isolation after isolate before carrying out material loading operation, electrostatic precipitation, entering spraying, spray, entering spraying, levelling, pre-heating drying, UV solidify thus complete product and spray baking vanish.After this workpiece to drive between solidification 55 to be sent between loading and unloading 21 to carry out blanking operation via casing 10 bottom by chain 60.
See also Fig. 4 and Fig. 5, pre-heat cure section 50 also comprises framework 52, closure assemblies 53, the multiple support wheels 54 be arranged in housing 51, is arranged at the tension assembly 55 of between leaving standstill 513, the many groups infrared lamp 56 be arranged at intervals between infrared preheating in 511, and to be arranged between solidification the cure lamp 57 in 55.Framework 52 is arranged at the inside of housing 51.Closure assemblies 53 is arranged at the bottom of framework 52, and it comprises shielded box 531, the multiple access covers 533 be arranged at intervals on shielded box 531, and access cover 533 is fixed on the axle clamp 535 of shielded box 531.Shielded box 531 is accommodated part chain 60 and to be therefrom transmitted back between loading and unloading 21 for the workpiece processed.Multiple access hole (not shown) on shielded box 531 are closed by multiple access cover 533, and are removably fixed on shielded box 531 by axle clamp 535.
Multiple support wheels 54 are symmetricly set in the both sides of framework 52 respectively, and the multiple support wheels 54 being in framework 52 side are arranged at intervals at framework about 52 two ends respectively and form two rows.Chain 60 successively winding and be in upside support wheel 54 and be in downside support wheel 54 engage each other.The part of chain 60 between the support wheel 54 of upside and the support wheel 54 of downside and horizontal plane.Because chain 60 is set around on the support wheel 54 being in upside and the support wheel 54 being in downside successively, thus make chain 60 in pre-heat cure section 50 with snakelike, namely move back and forth up and down mode conveying work pieces, thus increase its walking distance in pre-heat cure section 50 and time.Be appreciated that the part of chain 60 between the support wheel 54 of upside and the support wheel 54 of downside also can be at an angle to the horizontal direction.
Between tension assembly 55 is arranged at and leaves standstill in 513 between contiguous isolation 33 side, it comprises the first support bar 551, second support bar 552, support member 553, regulating part 554, regulating wheel 555 and regulating wheel 556.The length direction that first support bar 551 is parallel to framework 52 is arranged on framework 52, and it offers the adjustment hole 5511 of bar shaped.Second support bar 552 and the first support bar 551 are arranged at an angle, and its two ends are individually fixed on framework 52 and the first support bar 551.Support member 553 adjustable ground is arranged on adjustment hole 5511, and with the first support bar 551 vertically framework 52 inside extend.Regulating part 554 is arranged on the first support bar 551 coaxially, and its one end is connected with support member 553, in order to pull support member 553.Regulating wheel 555 rotates and is arranged on support member 553.Regulating wheel 556 is arranged at the middle part of framework 52 rotationally, and its position is lower than the position of regulating wheel 555, in order to make chain 60 from isolation between 33 horizontal transmission mode change into the load mode up and down in pre-heat cure section 50.
Often organize the infrared lamp 563 that infrared lamp 56 comprises installing plate 561 and arranges from top to bottom successively.In the present embodiment, infrared lamp 56 is two groups, and is arranged at the both sides of between infrared preheating 51 respectively, in order to heated parts.
Multiple cure lamp 57 is mercury lamp, its to be arranged between solidification 55 away between infrared preheating 51 side, with the UV glue be heating and curing on workpiece.Two chains 60 are arranged at the both sides of casing 10 inside respectively, every bar chain 60 around tank 10 inside forms a closed loop, and it arrives pre-heat cure section 50 from upside via loading and unloading and dedusting section 20, spraying section 30 and arrive loading and unloading and dedusting section 20 from downside via pre-heat cure section 50, spraying section 30.On chain 60, uniform intervals to be provided with on polylith locating piece 61, two chains 60 corresponding locating piece 61 and to work in coordination the both sides of positioning workpieces, is beneficial to chain 60 and drives.
During assembling, loading and unloading and dedusting section 20, spraying section 30, pre-heat cure section 50 are connected to form casing 10 successively.Air inlet pipe 11 and blast pipe 13 are arranged at the both sides up and down of casing 10.Two chains 60 are installed in casing 10.Polylith locating piece 61 is arranged at intervals on chain 60.
When spraying baking finish unit 100 and working, air inlet pipe 11 sends into gas in casing 10, and the waste gas in casing 10 is discharged by blast pipe 13.Baking vanish workpiece to be sprayed clamps location by locating piece 61, and by chain 60 drive via between loading and unloading 21, between electrostatic precipitation 23, between isolation 33, between spraying 31, between isolation 33, leave standstill between 513, between infrared preheating 51 and solidification between 55, with before carrying out material loading operation, electrostatic precipitation, entering spraying between isolation, spray, enter spraying after isolation, levelling leave standstill, pre-heating drying, UV solidification thus complete the spraying paint baking of product.After this workpiece to drive between solidification 55 to be sent between loading and unloading 21 to carry out blanking via casing 10 bottom by chain 60.When spraying baking finish unit 100 need be carried, loading and unloading and dedusting section 20, spraying section 30 and pre-heat cure section 50 are taken apart successively, carries respectively.In addition, because chain 60 transmits up and down for snakelike in pre-heat cure section 50, relative to overall orthoscopic load mode, which save space, be conducive to the miniaturization of equipment.
Spraying baking finish unit 100 adopts when working two chains 60 to cooperatively interact conveying work pieces and can automatic cycle, and the continous way realizing workpiece advances produces, and improves efficiency.The global design of spraying baking finish unit 100 adopts syllogic, and be convenient to rapid-assembling and the carrying of equipment, connecting water power after only need being carried to destination can put into production.
Be appreciated that chain 60 may also be only one when locating piece 61 can fixedly positioning workpiece.
Be appreciated that the same side multiple support wheels 54 interval arrange and not on the same line.Now, chain 60 can with serpentine path conveying work pieces.
In addition, those skilled in the art also can do other change in spirit of the present invention, and certainly, these changes done according to the present invention's spirit, all should be included in the present invention's scope required for protection.
Claims (9)
1. a spraying baking finish unit, it comprises casing and the air inlet pipe that is arranged on this casing and blast pipe, this casing comprises loading and unloading and dedusting section, spraying section and pre-heat cure section, it is characterized in that: these loading and unloading and dedusting section, spraying section and pre-heat cure section are installed in together successively by removably, chain is provided with in this casing, this chain wears these loading and unloading and dedusting section, spraying section and pre-heat cure section are with conveying work pieces, not multiple support wheels are on the same line arranged at intervals with in this pre-heat cure section, this chain to be wrapped in successively on the plurality of support wheel and to engage with the plurality of support wheel, thus make this chain in this pre-heat cure section with snakelike move mode conveying work pieces.
2. spray baking finish unit as claimed in claim 1, it is characterized in that: these loading and unloading and dedusting section are separated between loading and unloading and between electrostatic precipitation, this spraying section is divided between spraying and is between two isolation of both sides between this spraying, be connected between this electrostatic precipitation with between this isolation, this pre-heat cure section comprises between infrared preheating and is between the leaving standstill of both sides between this infrared preheating and between solidification, this is connected with between contiguous isolation between leaving standstill.
3. spray baking finish unit as claimed in claim 1, it is characterized in that: this pre-heat cure section comprises housing and formed between infrared preheating in this enclosure interior and be between the leaving standstill of both sides between this infrared preheating and between solidification, between this infrared preheating respectively with this leave standstill between and be connected between this solidification, this pre-heat cure section also comprises the many groups infrared lamp be arranged at intervals in this infrared preheating, and the multiple cure lamp be arranged in this solidification, the plurality of support wheel is arranged in this housing.
4. spray baking finish unit as claimed in claim 3, it is characterized in that: this pre-heat cure section also comprises draws together framework and closure assemblies, this framework is arranged in this housing, the plurality of support wheel symmetry is installed in the both sides of this framework, this closure assemblies is fixed on the frame and is separated out segment space and accommodates this chain, therefrom sends back between these loading and unloading for this chain band workpiece.
5. spray baking finish unit as claimed in claim 4, it is characterized in that: this closure assemblies is arranged at the bottom of this framework, it comprises shielded box, the multiple access covers be arranged at intervals on this shielded box, and this access cover is fixed on the axle clamp of this shielded box, this shielded box collecting part chain.
6. spray baking finish unit as claimed in claim 4, it is characterized in that: this pre-heat cure section also comprises the tension assembly be installed on this framework, this tension assembly comprises the first support bar, second support bar, support member, regulating part and regulating wheel, this first support bar is fixed on this framework, this second support bar and this first support bar are arranged at an angle, its two ends are individually fixed on this framework and this first support bar, this support member adjustable ground and be vertically arranged on this first support member, this regulating wheel rotates and is arranged on this support member and engages each other with this chain, this regulating part is arranged on this first support bar and its one end coaxially and is connected with this support member, this regulating part can pull this support member to slide along on this first support bar, thus drive regulating wheel with this chain of tensioning by this support member.
7. spray baking finish unit as claimed in claim 6, it is characterized in that: this tension assembly also comprises the regulating wheel being arranged at this frame mid portion, this regulating wheel and this chain engage each other the direction of transfer changing this chain, and coordinate the plurality of support wheel to make this chain change into the snakelike mobile load mode in this pre-heat cure section from horizontal transmission mode.
8. spray baking finish unit as claimed in claim 1, it is characterized in that: this spraying baking finish unit comprises two chains, these two chains are arranged at the both sides of this box house respectively, each chain is a closed loop, its top from this box house is via these loading and unloading and dedusting section, spraying section arrives this pre-heat cure section, and from the below of this box house via this pre-heat cure section, spraying section arrives these loading and unloading and dedusting section, on each chain, uniform intervals is provided with polylith locating piece, locating piece corresponding on these two chains is worked in coordination with the both sides of positioning workpieces, thus by these two chain-driving workpiece.
9. spray baking finish unit as claimed in claim 1, it is characterized in that: these loading and unloading and dedusting section, spraying section and pre-heat cure section are container structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310513829.7A CN104549860B (en) | 2013-10-28 | 2013-10-28 | Baking varnish spraying equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310513829.7A CN104549860B (en) | 2013-10-28 | 2013-10-28 | Baking varnish spraying equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104549860A true CN104549860A (en) | 2015-04-29 |
CN104549860B CN104549860B (en) | 2017-05-10 |
Family
ID=53067553
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310513829.7A Active CN104549860B (en) | 2013-10-28 | 2013-10-28 | Baking varnish spraying equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104549860B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104588284A (en) * | 2015-02-13 | 2015-05-06 | 北京京诚之星科技开发有限公司 | Continuous powder coating production equipment and method of metal coils and sheets |
CN108355930A (en) * | 2018-05-15 | 2018-08-03 | 东莞市鑫欧金属科技有限公司 | A kind of automatic spraying technique of TV backboard |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4590884A (en) * | 1985-05-09 | 1986-05-27 | Nordson Corporation | Portable powder spray system |
CN2143755Y (en) * | 1992-10-17 | 1993-10-13 | 范振溢 | Multi-layer plate automatic spraying and drying apparatus |
JP2688982B2 (en) * | 1989-04-28 | 1997-12-10 | 曙ブレーキ工業株式会社 | Back pad processing device for disk pad |
US20050266171A1 (en) * | 2004-05-31 | 2005-12-01 | Toyoda Gosei Co., Ltd. | Process and plant for coating a molded article |
CN201352054Y (en) * | 2008-12-26 | 2009-11-25 | 冯星愿 | Hanging dryer |
CN102015120A (en) * | 2008-05-09 | 2011-04-13 | 卡特彼勒公司 | Modular paint line and method of operation therefor |
CN102349749A (en) * | 2011-09-14 | 2012-02-15 | 施向阳 | Fixed-point access dating cabinet |
WO2012167885A1 (en) * | 2011-06-07 | 2012-12-13 | Oerlikon Trading Ag, Trübbach | Painting plant |
-
2013
- 2013-10-28 CN CN201310513829.7A patent/CN104549860B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4590884A (en) * | 1985-05-09 | 1986-05-27 | Nordson Corporation | Portable powder spray system |
JP2688982B2 (en) * | 1989-04-28 | 1997-12-10 | 曙ブレーキ工業株式会社 | Back pad processing device for disk pad |
CN2143755Y (en) * | 1992-10-17 | 1993-10-13 | 范振溢 | Multi-layer plate automatic spraying and drying apparatus |
US20050266171A1 (en) * | 2004-05-31 | 2005-12-01 | Toyoda Gosei Co., Ltd. | Process and plant for coating a molded article |
CN102015120A (en) * | 2008-05-09 | 2011-04-13 | 卡特彼勒公司 | Modular paint line and method of operation therefor |
CN201352054Y (en) * | 2008-12-26 | 2009-11-25 | 冯星愿 | Hanging dryer |
WO2012167885A1 (en) * | 2011-06-07 | 2012-12-13 | Oerlikon Trading Ag, Trübbach | Painting plant |
CN102349749A (en) * | 2011-09-14 | 2012-02-15 | 施向阳 | Fixed-point access dating cabinet |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104588284A (en) * | 2015-02-13 | 2015-05-06 | 北京京诚之星科技开发有限公司 | Continuous powder coating production equipment and method of metal coils and sheets |
CN104588284B (en) * | 2015-02-13 | 2019-02-19 | 中冶京诚工程技术有限公司 | Metal coiled material and the continuous powder spray production equipment of plate and its production method |
CN108355930A (en) * | 2018-05-15 | 2018-08-03 | 东莞市鑫欧金属科技有限公司 | A kind of automatic spraying technique of TV backboard |
Also Published As
Publication number | Publication date |
---|---|
CN104549860B (en) | 2017-05-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203678741U (en) | Continuous double-box automatic spray rinsing cleaning machine | |
CN202207656U (en) | Drying device for aluminium alloy plate | |
CN108816579A (en) | A kind of construction timber equipment for spraying | |
CN104549860A (en) | Baking varnish spraying equipment | |
CN104492642B (en) | Guitar spraying processing line | |
CN205308654U (en) | Machine part paint spraying apparatus | |
CN207388626U (en) | A kind of automatic printing device of carton production | |
CN106217204B (en) | A kind of pipeline system self-acting grinding machine | |
CN202893626U (en) | Baking transmission system | |
CN209156192U (en) | A kind of conveyer automatic spraying conveying device | |
CN204544571U (en) | Plastic parts automatic coating production equipment | |
CN206084687U (en) | Pipelined automatic grinding machine | |
CN109550621A (en) | A kind of automatic flocking production line | |
CN106217182B (en) | A kind of intelligent multi-function grinding machine | |
CN206108295U (en) | Grinding machine that multi -functional area was detected | |
CN206185139U (en) | Dust exhaust device | |
CN205269987U (en) | A spraying plastics assembly line for processing casing | |
CN112489993A (en) | Typesetting paint dipping equipment and typesetting paint dipping method for choke coil | |
CN204429578U (en) | Guitar spray process line | |
CN106808026A (en) | Rotor cutter | |
CN207985992U (en) | A kind of accumulative and travel type pipeline | |
CN106181683B (en) | A kind of multifunctional grinder | |
CN206084665U (en) | Intelligent multi -functional grinding machine | |
CN206705080U (en) | Cylinder jacket conveying device | |
CN106276169A (en) | A kind of grinding machine of multifunctional belt detection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |