CN104588284B - Metal coiled material and the continuous powder spray production equipment of plate and its production method - Google Patents
Metal coiled material and the continuous powder spray production equipment of plate and its production method Download PDFInfo
- Publication number
- CN104588284B CN104588284B CN201510081127.5A CN201510081127A CN104588284B CN 104588284 B CN104588284 B CN 104588284B CN 201510081127 A CN201510081127 A CN 201510081127A CN 104588284 B CN104588284 B CN 104588284B
- Authority
- CN
- China
- Prior art keywords
- sprayer
- powder
- coated
- substrate
- production equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Electrostatic Spraying Apparatus (AREA)
- Application Of Or Painting With Fluid Materials (AREA)
Abstract
The present invention discloses metal coiled material and the continuous powder spray production equipment of plate, including curing of coatings section unit.The unit includes the powder room with inlet and outlet, the more sprayer locomotives cooperated with powder room and the curing of coatings furnace being adjacently positioned with powder room.Wherein: the horizontal slots of connection inlet and outlet are provided in the one side wall that room body is parallel to production line direction;Room body be mounted on frame-type it is mobile trolley used on;Being located at exit in room body has end blow device, respectively has edge air curtain apparatus along substrate to be coated traffic direction width both sides;Line source electrode electrostatic powder coating device is installed on the cantilever beam of the mobile vehicle carriage of sprayer.Invention additionally discloses metal coiled materials and the continuous powder spraying production method of plate.The present invention, which has to cover, protects mechanization, unit time spray area big, and coated powder homogenization complements each other, at high speed continuous electrostatic powder coating, production run speed is improved to 120 ms/min, and coating quality is good the advantages that overhauling, is easy to maintain.
Description
Technical field
The present invention relates to a kind of powder spray, in particular to the continuous powder spray production equipment of metal coiled material and plate and its
Production method.
Background technique
Existing metal coiled material and the continuous powder spray production equipment of plate, comprising: that continuously arranges in the production line enters
Mouth section unit, curing of coatings section unit and outlet section unit.Curing of coatings section unit include: powder room, more cooperate with powder room
Sprayer locomotive and the curing of coatings furnace being adjacently positioned with powder room.Wherein:
Powder room is fixedly mounted in the production line, to enable substrate to be coated horizontally through perpendicular to production line direction
Room body two sidewalls on be respectively arranged with import, outlet;It is periodically cleaned for the powder to stick-down inside powder room, it is convenient to overhaul
Maintenance, is provided with door in the wherein one side wall in four side wall of room body;It is needed for production, is parallel to production line direction in room body
One side wall or two side walls on be provided with sprayer aperture compatible with sprayer locomotive face shaping.Sprayer is mobile
Vehicle is frame structure, is mounted on the transmission side of production line or the ground of fore side.
In addition, sprayer by it is multiple perpendicular to production line direction it is spaced apart it is more spray gun is constituted, it is continuous raw to meet
It produces, sprayer is parallel to production line direction arranged for interval multiple row, same to the substrate to be coated run in certain area in the unit time
Shi Jinhang electrostatic powder coating.For convenience of production, together by the input cable, tube cell and compressed air hose of each spray gun of sprayer
It is mounted on the frame of sprayer locomotive.
When spraying, multiple sprayers are located at the surface or lower section of substrate to be coated, and powdery paints is as substrate to be coated
Coating media, on the powder lotus that electrostatic generator sprays the spray gun for each sprayer being mounted on multiple sprayer locomotives
Negative electricity, positive electricity on metal base lotus, makes powder particle constantly fly to substrate to be coated surface and is formed by the attracting principle of positive negative electricity
It is continuous coated;In spraying, to guarantee product appearance quality, covering protection is carried out to the surface without spraying, it may be assumed that without spraying
Surface carry out artificial overlay film or paster, avoid being attached on the surface not sprayed because the excessive powder for being sprayed-on surface descends slowly and lightly.
After spraying, first artificial membrane removal or paster is torn, then curing of coatings furnace heats coating, dries.Its shortcoming exists
In:
1, powder room is not fully appropriate for high speed continuous metal coiled material and plate production
Due to powder room be it is fixed, substrate to be coated be horizontally continuous operation disengaging powder room.Operator is inconvenient in production
It is cleaned or is overhauled inside into room body, and shut down and cleaned or overhauled, because substrate to be coated is still in powder room, hamper behaviour
Make the work of personnel.
Since powder room can not leave production line, in continuous production, when a kind of product of color reaches certain batch needs
It when carrying out colour changing production, needs first to stop production about 30 minutes~40 minutes, carries out colour changing, it may be assumed that knock off between implementation continuous production
It makes, affects productivity.
2, manual overlay film, take off film, low efficiency
Due in spraying or after spraying, to the covering protection without sprayed surface be it is artificial carry out " in advance overlay film, subsequent take off
Film ", great work intensity, low efficiency affect the raising of the curing of coatings section unit speed of service.
3, the mobile bassinet structure of sprayer is fallen behind
Since sprayer locomotive is frame structure, a limited number of spray guns are carried on each frame structure, each spray gun is uniform
The spacing of Boulez is bigger, and the input cable of each spray gun, tube cell and compressed air hose are exposed, it is difficult to be arranged together, nothing
Method it is protected with it is dust-proof, can not integral demounting and replacement.
4, the powder spray amount of spray gun is small, coating quality is poor
Since in each sprayer, HV generator is mounted on inside the gun body of spray gun, go out in the nozzle of spray gun
Electrostatic field is generated at mouth electrode.Electrode is usually that a rectilinear wire stretching jet expansion is a little, and guidewire tip is sharp shape;
It is concentrated by the tip and a little generates high-voltage electrostatic field, referred to as " point source " discharges, and carries out to the powder that nozzle sprays charged.Because only
A little pass through " point source " electric discharge in guidewire tip and generates electric field, so electrostatic field intensity is weaker, it can be charged in the unit time
Powder it is fewer.Again because body of spray gun rifle is little, can only built-in power is relatively low, the lesser electrostatic generator of volume ratio, so,
Every electrostatic powder amount that spray gun is sprayed is few, causes every area that spray gun can be sprayed within the unit time smaller, influences
The raising of the curing of coatings section unit speed of service.Meanwhile being uniform Boulez between each spray gun, apart from bigger, in spraying
It is easy the non-dusty spray blank for occurring part within a certain area, affects the uniformity of coated powder.
It equally, is the spray gun of annular umbrella-like, powder spray for existing some use " line source " electrodes, its nozzle form
Although painting amount is bigger than above-mentioned spray gun.When carrying out continuous electrostatic powder coating to metal coiled material, adjacent column or adjacent row
The distance between two spray guns are not easy at a distance of closely, and there are two reasons: first, spray tip electrode has high-pressure electrostatic, when two
Nozzle distance is close, if if between two nozzles some nozzle because electric leakage or other reasons there are potential difference, can because away from
Electric discharge phenomena are generated from close, lose or reduce the potential of nozzle, charge capacity decline is influenced because the charged effect of powder is poor
Spraying;It discharges simultaneously and can cause dust-firing or explosion, make in spraying that there are security risks.Second, since its nozzle is annular
Umbrella, the powder morphology sprayed amplify shape at umbrella cone.When adjacent nozzle distance is close, powder sprays conical lower section
Edge can be assembled, intersects or interfere, and powder at this is made to concentrate, be measured greatly than other places;Cause substrate to be coated powder poly-
The coating layer thickness in collection region is greater than the region that powder is not assembled, affects the uniformity of coated powder.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of metal coiled materials and the continuous powder spray production equipment of plate
And its production method, the curing of coatings section unit speed of service is high, and coating quality is good.
The continuous powder spray production equipment of metal coiled material and plate of the present invention, including curing of coatings section unit.The coating is solid
Changing section unit includes: powder room, the more sprayer locomotives cooperated with powder room and the curing of coatings being adjacently positioned with the powder room
Furnace;The powder room includes: the room body with import, outlet, which is parallel to the one side wall or two side walls in production line direction
It is upper that there is sprayer aperture.Wherein:
Be provided in the one side wall that the room body is parallel to production line direction be connected to the inlet and outlet level lack
Mouthful, closing door is provided at the horizontal slots.The sprayer aperture is located at the above and or below of the horizontal slots;Institute
State room body be mounted on frame-type it is mobile trolley used on, the frame-type is mobile trolley used to be run on ground rail.
It is located at the exit in the room body and is provided with end blow device and along substrate to be coated traffic direction width two
While being each provided with edge air curtain apparatus;The end blow device and edge air curtain apparatus, which are mounted on, is connected to the room body side wall
Or being accordingly connected and fixed in structure on room body ground.
The sprayer locomotive includes: pedestal and the vehicle frame that is fixedly mounted on pedestal, is equipped on the vehicle frame outstanding
Arm beam, sprayer is equipped on the cantilever beam, and the sprayer is line source electrode electrostatic powder coating device, comprising: sprayer
Ontology, 2~100 tube cell pipe fittings are equipped on the sprayer ontology and compression positioned at tube cell pipe fitting two sides is empty
Gas-tpe fitting.It further include positioned at the sprayer nozzle of the sprayer ontology sprayed below cavity and positioned at the sprayer nozzle
The electrode of the electrode of lower section, each sprayer passes through the output for the electrostatic generator for being connected in parallel part and being placed in outside sprayer
Cable connection;Or the electrode of each sprayer is respectively connect with an electrostatic generator being placed in outside it.
The continuous powder spray production equipment of metal coiled material and plate of the present invention, in which: during the end blow device includes:
Empty long tube combination roof beam structure and row's compressed-air atomizer mounted thereto.The crossbeam of the hollow elongated tubular combination roof beam structure is multilayer
Hollow elongated tubular overlapping is fixedly connected with compositions, has hole to communicate between each pipe, or is one layer of single tube structure, closed at both ends and be provided with
Shaft, the shaft are mounted in revolute pair, and revolute pair is connect with stock is adjusted;The compressed-air atomizer is vertically installed in combination
The kernel of section of roof beam structure, perpendicular to combination roof beam structure length direction.
The continuous powder spray production equipment of metal coiled material and plate of the present invention, in which: during the edge air curtain apparatus includes:
Sky bending long tube combination roof beam structure and row's compressed-air atomizer mounted thereto.It is described bending long tube combination roof beam structure crossbeam be
The overlapping of multilayer hollow long tube is fixedly connected with composition, has hole to communicate between each pipe, or is one layer of single tube structure, closed at both ends,
Its both ends is each provided with active support, the active support include flexural pivot and with hinged support rod, the support
Bar is installed in the powder room revolute pair on powder room side wall or room body ground, and the installation axle of the flexural pivot is combined with curved hollow long tube
Roof beam structure connects, and is provided with retractable structure on the support rod;The compressed-air atomizer is vertically installed in cutting for combination roof beam structure
Face center, perpendicular to combination roof beam structure length direction.
The continuous powder spray production equipment of metal coiled material and plate of the present invention, in which: the compressed-air atomizer includes: outer
Layer casing, middle casing and center piston.The outer layer sleeve passes through combination roof beam structure and is fixedly mounted on thereon, the outer layer sleeve
Upper to have the one or more ventholes communicated with the outermost layer pipe for combining roof beam structure, the inner hole at the outer tube both ends respectively has in one section
There are hole in screw thread, the lower end of the middle casing, and upper end inner hole has internal screw thread, and there is external screw thread in both ends outer surface, with the outer layer
Casing threads connection;There is venthole corresponding with the venthole of the outer layer sleeve on the middle casing;The center
The upper end of piston has external screw thread, couples with middle casing tail portion internal screw thread, and the center piston protrudes into the middle layer set
The venthole lower part of pipe.The tail portion of above-mentioned middle casing and the center piston is equipped with locking nut, or described hollow
Circular hole is directly opened in long tube combination roof beam structure and the close side in substrate to be coated surface, or opens long hole.
The continuous powder spray production equipment of metal coiled material and plate of the present invention, in which: the spray orifice of the sprayer nozzle is
The splayed or tubaeform that both sides section is parallel lines or less entrance and bigger exit is stitched in one elongate linear spray seam, the spray,
The splayed both sides are straight line or curve, either splayed or tubaeform, and left and right is along sprayer center line pair
Claim setting.
The continuous powder spray production equipment of metal coiled material and plate of the present invention, in which: the hole of the tube cell pipe fitting and pressure
The hole of the efferent duct of contracting air engine first, second is adapted, the hole of the compressed air pipe fitting and the efferent duct of air compressor third
Hole be adapted.Each air compressor includes: gas tank, and the tank connected input pipe of gas and efferent duct, the gas tank it is upper
Portion is cylindrical body, and lower part is inverted cone;The input pipe is connect by the way that bending pipeline is vertical with the inverted cone, described defeated
Outlet pipe is multichannel, the top of the gas tank is symmetrically arranged in around tank body center line, the caliber of each road efferent duct is identical, entrance
Hold close to be arranged in the gas tank, close to the gas tank centerline, outlet end pass through the gas tank tank skin.
The continuous powder spray production equipment of metal coiled material and plate of the present invention, in which: the sprayer locomotive is mounted on
The frame-type is mobile trolley used upper or installs on the ground.The pedestal has wheel, and the shape of the vehicle frame is inverted " U "
Shape is set with the sliding support moved above and below along vehicle frame on two columns;The cantilever beam be mounted on the sliding support side or
Two sides are provided with screw elevator between two columns of vehicle frame on the base, the screw elevator with it is described
The drive rod being mounted in sliding pair support base is provided between cantilever beam, the sliding pair support base is mounted on inverted " U "
The inside of one column of shape vehicle frame.
The continuous powder spray production equipment of metal coiled material and plate of the present invention can carry out substrate to be coated monochromatic
Single side electrostatic powder coating can also carry out monochromatic two-sided electrostatic powder coating to substrate to be coated.
The step of carrying out single side spraying, comprising:
Step 1: unit preparation
1) the external electrostatic generator that the spraying production equipment floating coat solidifies each sprayer in section unit, control are adjusted
Power supply High voltage output value processed is between 30kV~100kV;
2) output pressure for adjusting air compressor in the spraying production equipment is 0.04MPa~0.5MPa, guarantees institute
There is each output pressure value in sprayer from air compressor identical;
3) position for adjusting each sprayer locomotive and powder room in the spraying production equipment, makes the outstanding of sprayer locomotive
Arm beam passes through the sprayer aperture in powder room, and the sprayer on cantilever beam is located at the surface of substrate to be coated;
4) powder room and sprayer locomotive move into quilt by the mobile trolley used carrying of frame-type in the spraying production equipment
Substrate production center line position is applied, is awaited orders;
5) igniting heating, curing of coatings furnace temperature are controlled at 180 DEG C~250 DEG C;
Step 2: feeding, cleaning
Substrate to be coated enters the entrance unit of the spraying production equipment, carries out degreasing to the upper and lower surface of substrate to be coated
Cleaning and chemical treatment;
Step 3: electrostatic powder coating and curing of coatings
1), substrate to be coated enters the powder room in the curing of coatings section unit of the spraying production equipment, and sprayer is to being applied
The upper surface of substrate or lower surface spray electrostatic powder;
2), in spraying, the edge air curtain apparatus that control is located at substrate to be coated traffic direction width both sides forms air curtain, with resistance
The powder on surface is sprayed-on in gear spraying to be adsorbed on another surface around the edge of substrate to be coated;End on the surface
Blow device is cleaned simultaneously;
3), substrate to be coated enters the curing of coatings furnace in the curing of coatings section unit of the spraying production equipment, to having sprayed
The coating for applying surface is dried, is solidified, and solidification temperature is at 180 DEG C~250 DEG C, and curing time was at 20 seconds~25 seconds;
4th step, product handling system
The substrate to be coated of coating enter the cooling device of outlet section unit of the spraying production equipment, outlet looping,
Protection or decoration membrane laminating machine, outlet cross cut shears and an at least coiling machine.
The step of carrying out two-sided while powder spray, including
Step 1: unit preparation
1) the external electrostatic generator that the spraying production equipment floating coat solidifies each sprayer in section unit, is adjusted,
Power supply High voltage output value is controlled between 30kV~100kV;
2) output pressure for, adjusting air compressor in the spraying production equipment is 0.04MPa~0.5MPa, guarantees institute
There is each output pressure value in sprayer from air compressor identical;
3) position for, adjusting each sprayer locomotive and powder room in the spraying production equipment, makes sprayer locomotive
Cantilever beam passes through the sprayer aperture in powder room, and the sprayer on cantilever beam is located at the surface of substrate to be coated;
4), powder room and sprayer locomotive move into quilt by the mobile trolley used carrying of frame-type in the spraying production equipment
Substrate production center line position is applied, is awaited orders;
5) it, closes or removes in powder room and purged along the edge air curtain apparatus on substrate to be coated traffic direction width both sides and end
Device;
6), igniting heating, curing of coatings furnace temperature control between 180 DEG C~250 DEG C;
Step 2: feeding, cleaning
Substrate to be coated enters the entrance unit of the spraying production equipment, carries out degreasing to the upper and lower surface of substrate to be coated
Cleaning and chemical treatment;
Step 3: electrostatic powder coating and curing of coatings
1), substrate to be coated enters the powder room in the curing of coatings section unit of the spraying production equipment, and sprayer is to being applied
The upper and lower surfaces of substrate spray the electrostatic powder of same color;
2), substrate to be coated enters the curing of coatings furnace in the curing of coatings section unit of the spraying production equipment, to having sprayed
The coating for applying surface is dried, is solidified;
4th step, product handling system
The substrate to be coated of coating enter the cooling device of outlet section unit of the spraying production equipment, outlet looping,
Protection or decoration membrane laminating machine, outlet cross cut shears and an at least coiling machine.
Either above-mentioned single side spraying either double-face spray painting, when the substrate to be coated for being sprayed with electrostatic powder reaches certain batch
Amount withdraws from the powder room on production line and sprayer locomotive engaged therewith when needing to carry out colour changing in continuous production, replaces
To be loaded with the offline standby powder room and sprayer locomotive engaged therewith that need the other colors sprayed, carry out repeatedly.
The continuous powder spray production equipment of metal coiled material and plate of the present invention has the following advantages and beneficial effects:
1, the horizontal slots in production line direction are parallel to due to devising in room body, the import of the horizontal slots and room body
With outlet be interconnected, and by room body be mounted on frame-type it is mobile trolley used on, to room body can either be made perpendicular to production line side
To shift-in, continuous production is met;Room body can again removed perpendicular to production line direction, facilitates operator offline to room body
Carry out dust cleaning and maintenance.
Due to devising closing door again at horizontal slots, closing door is closed in spraying production, horizontal slots is made to be in envelope
Close situation, it may be assumed that reduce channel or the flow area in powder room and extraneous circulation, to hinder to waft and brim with the ground excessive powder room of powder, reduce
Pollution on the environment.
In addition, if also designing more sprayer locomotives on frame-type is mobile trolley used, it may be assumed that powder room and engaged therewith
More sprayer locomotives are vehicle-mounted removable together, positioned at the transmission side of production.Designing in this way is advantageous in that: in production line
One spare powder room of outer in addition setting, the more spare sprayer locomotives cooperated with spare powder room.When a kind of product of color
Reach when centainly needing to carry out colour changing production in batches, can enable spare powder room, more with the spare sprayings of spare powder room cooperation
Device locomotive carries out continuous production and waits for duty in turn, colour changing can not be shut down on the production line of continuous spray, sprays product
Kind diversification, meets the market demand, high production efficiency.
2, due to devising end blow device in powder room exit, in spraying, the clean pressure of compressed-air atomizer blowout
Contracting air, can to flowed because of gas etc. factors cause to descend slowly and lightly be attached to carried out without the extra electrostatic powder on sprayed surface it is clear
It sweeps, keeps the clean surface without spraying relatively high.
Due to respectively devising edge air curtain apparatus along substrate to be coated traffic direction width both sides inside powder room, in spraying,
Its compressed-air atomizer blow out clean compressed air, formed air curtain, can not only block floated outside powder room, in air it is unknown
Particulate matter or dust, and can purge and be attached to the electrostatic powder of substrate to be coated edge because the factors such as gas flowing cause to descend slowly and lightly
End keeps the edge cleaning of substrate to be coated relatively high.
Above-mentioned cleaning is blocked and purging realizes mechanization, high-quality, high-efficient, and to realize, continuous spray is established at high speed
Basis is determined.
3, since sprayer locomotive has vehicle frame, cantilever beam is devised in the one or both sides of vehicle frame, the cantilever beam was both
Fixed sprayer can be installed, and when tool is there are two when cantilever beam, each sprayer interval is more compact, being capable of cloth in unit area
Set more sprayers;The concentrations such as the input cable, tube cell and compressed air hose of each sprayer can also be stored, in spraying also
With dustproof effect, and convenient to overhaul and replacement.Equally, to realize, continuous spray is laid a good foundation at high speed.
4, due to devising multiple tube cell pipe fittings and compressed air pipe fitting on sprayer ontology, it may be assumed that by existing skill
Art along substrate to be coated width direction interval be arranged side by side it is more gun design is integrated, the straight line elongate slot of sprayer nozzle
The length of gap is adapted with substrate to be coated width, is not only able to avoid non-powder spray local between two sprayer nozzles empty
It is white, it can also eliminate the powder aggregation between two sprayer nozzle spraying edges, cross or interfere with phenomenon, keep coated powder equal
Even property improves.
Meanwhile " line source " electrode that the electrode design below sprayer nozzle is an elongate linear will be located at, it is somebody's turn to do " line source "
The length of electrode is longer than prior art spray gun " point source " electrode, enhances the electric field strength between powder and substrate to be coated;And
The electric discharge phenomena between the prior art two " line source " nozzles are avoided, powder charge capacity is improved, the energy within the unit time
Enough charged more powder.
Also, the electrostatic generator of sprayer is designed as external, is able to use powerful electrostatic generator, makes to spray
The carrying capacity that device can carry increases, and provides guarantee to improve powder quantity for spray in the unit time.
5, gas tank is exported since the air compressor for conveying powder is designed as more branches with equably equivalent, it can
The relatively uniform compressed air of the states such as output pressure, flow can spray uniform, equivalent powder for sprayer and provide necessity
Condition.
6, since metal coiled material of the present invention and the continuous powder spray production equipment of plate primarily directed to giving birth in the prior art
The improvement that curing of coatings section unit in producing line carries out, so that the continuous powder spray of metal coiled material and plate in this present invention is raw
Producing equipment both can be used for the continuous electrostatic powder coating that substrate to be coated is the interrupted steel plate of plane, aluminium sheet, can be used for being applied
Substrate is the continuous electrostatic powder coating of coil of strip, aluminium volume, and a tractor serves several purposes, market is widely used.
In conclusion metal coiled material of the present invention and the continuous powder spray production equipment of plate and its production method, it can be right
Substrate to be coated upper surface or lower surface carry out continuously electrostatic powder coating and produce, or carry out to substrate to be coated upper and lower surfaces
Continuously electrostatic powder coating with color produces, and has to cover and protects mechanization, unit time spray area big, coated powder
Homogenization complements each other many advantages, such as overhauling, is easy to maintain, realizes continuous electrostatic powder coating at high speed, transports production
Scanning frequency degree is improved to 120 ms/min, and coating quality is good.
Detailed description of the invention
Fig. 1 is that the continuous powder spray production equipment of metal coiled material and plate of the present invention in the production line continuously show by arrangement
It is intended to, diagram is the continuous powder coating production line of coil of strip;
Fig. 2 is part curing of coatings section unit arrangement schematic diagram in the production line in Fig. 1, and is carry out colour changing offline standby
With production spraying group;
Fig. 3 is powder room structural schematic diagram in Fig. 2;
Fig. 4 is the end blow device and edge air curtain apparatus arrangement schematic diagram being located inside powder room in Fig. 2;
Fig. 4 a is the structural schematic diagram of the end blow device of Fig. 4 shown device;
Fig. 4 b is the structural schematic diagram of the edge air curtain apparatus of Fig. 4 shown device;
Fig. 4 c is the compressed-air atomizer structural representation of Fig. 4 shown device;
Fig. 4 d is the beam main pipe gradually flow dividing structure schematic diagram of Fig. 4 shown device;
Fig. 5 is the locomotive structural schematic diagram in Fig. 2 with sprayer;
Fig. 6 is sprayer structural schematic diagram in Fig. 5;
Fig. 7 is air compressor structural schematic diagram in Fig. 2;
Fig. 7 a is A-A cut-away view in Fig. 7, indicates efferent duct distribution schematic diagram;
Fig. 7 b is that air compressor and sprayer install connection schematic diagram;
Description of symbols:
1 entrance unit, 2 curing of coatings section units, 3 outlet section units, 4 uncoilers, 5 entrance transverse cutting units, 6 teaser or tails
Suture with or bonding machine, 7 chemical table tune slots, 8 cleaning by degreasing section equipment, 9 chemical roll coaters, 10 drying ovens, 13 sprayers, 14 apply
Layer curing oven, 15 cooling devices, 16 outlet loopings, 17 protections or decoration membrane laminating machine, 18 outlet cross cut shears, 19 coiling machines, 20 quilts
Apply substrate, 28 powder rooms, 33 sprayer locomotives;
301 room bodies, 302 closing doors, 303 horizontal slots, 304 imports, 306 sprayer apertures, 309 frame-type mobile stations
Vehicle, 310 ground rails, 311 outlets,
403 end blow devices, 405 substrate to be coated traffic directions, 406 edge air curtain apparatus, 407 compressed-air atomizers,
408 room body ground, 409 hollow elongated tubulars combine roof beam structure, and 410 shafts, 411 revolute pairs, 412 adjust stock, and 413 are connected and fixed knot
Structure, 414 curved hollow long tubes combination roof beam structure, 415 flexural pivots, 416 support rods, 417 powder room revolute pairs, 418 retractable structures, 419
Installation axle, 420 outer layer sleeves, 421 ventholes, 422 middle casings, 423 center pistons, 424 locking nuts, 425 compressed airs
Entrance, 426 nozzle vents;
502 cantilever beams, 503 drive rods, 504 screw elevators, 505 wheels, 507 sliding pair support bases, 520 bottoms
Seat, 521 inverted " u "-shaped vehicle frames, 522 sliding supports;
601 tube cells, 602 compressed air hoses, 603 tube cell pipe fittings, 604 compressed air pipe fittings, 605 spraying cavitys, 606
Venthole, 607 sprayer nozzles, 608 electrodes, 616 sprayer ontologies;
701 gas tanks, 702 inverted cones, 703 air compressor efferent ducts, 704 flow-disturbings combing part, 705 bending pipelines, 707
Venturi pump, 708 atomizer pipes, 709 boost motor pipes, 710 connecting tubes, 713 connecting tubes, 714 input pipes.
Specific embodiment
With reference to the accompanying drawing, the continuous powder spray production equipment of metal coiled material and plate of the invention is made furtherly
It is bright.
It is shown in Figure 1, it is metal coiled material of the present invention and the continuous powder spray production equipment of plate, comprising:
The entrance unit 1 continuously arranged, curing of coatings section unit 2 and outlet section unit 3 on 20 production line of substrate to be coated.Wherein:
Shown in Figure 2, the curing of coatings section unit is moved including powder room 28, more with the sprayer that powder room 28 cooperates
Motor-car 33 and the curing of coatings furnace 14 being adjacently positioned with the powder room 28.Wherein:
It is shown in Figure 3 to adapt to continuous electrostatic powder coating at high speed, the powder room 28 include: with import 304,
The room body 301 of outlet 311 and frame-type mobile trolley used 309 with driving mechanism;Production line side is parallel in the room body 301
To one side wall on be provided with and be connected to the horizontal slots 303 of the import 304 and outlet 311, be provided with envelope at the horizontal slots
Door 302 is closed, closing door is closed in spraying production, horizontal slots is made to be in closure state, hinder the excessive powder room of elegant ground powder, subtract
Few pollution on the environment.Spray is provided in the one side wall or two side walls that the room body 301 is parallel to production line direction
Apply device aperture 306, the quantity of sprayer aperture is identical with the quantity of sprayer locomotive 33, configure quantity number answer root
It is determined according to the speed of service of substrate to be coated, the width of substrate to be coated and coating layer thickness.The sprayer aperture 306 is located at described
The above and or below of horizontal slots 303.The room body 301 is mounted on frame-type mobile trolley used 309, and the frame-type is mobile
Trolley 309 is run on ground rail 310.In this way, powder room can not only meet continuous electrostatic powder coating production, and can
Production line is removed, provides wide space for maintenance.
According to the condition of production, the sprayer aperture layout in powder room has a variety of patterns, it may be assumed that except can be set in horizontal slots
303 top, lower section, can also the aperture simultaneously above and below.
In addition, above-mentioned curing of coatings section unit can carry out front, the back side and homochromy two-sided electrostatic powder to substrate to be coated
End spraying.But when a kind of spraying of color reaches certain batch, then stops production run and carry out colour changing work.To overcome
This is insufficient, above-mentioned powder room and more sprayer locomotives engaged therewith is installed along on frame-type mobile trolley used 309, position
In the fore side of production, and prepare two sets, duty is waited in implementation in turn.In this way, driving wherein a set of frame-type mobile when production
Trolley 309 makes powder room and its sprayer locomotive be moved into production line, sprayer on-line spray;When colour changing, maintenance, which is removed
Production line, while wherein another set of frame-type mobile trolley used 309 is driven, move another set of powder room and its sprayer locomotive
Into production line, another set of sprayer on-line spray.To realize the easily colour changing in continuous spray production, kind is sprayed
Diversification improves material production efficiency.
It is shown in Figure 4 to improve spraying effect, end, which is provided with, at the outlet 311 in the room body 301 blows
Sweeping device 403, and it is each provided with edge air curtain apparatus 406 along 20 traffic direction of substrate to be coated, 405 width both sides, the end is blown
Sweeping device 403 and edge air curtain apparatus 406, which are mounted on, is connected to accordingly connecting on 301 side wall of room body or room body ground 408
It connects on fixed structure 413.In this way, being cleaned in spraying to non-sprayed surface, using motorisation unit in quilt in spraying
The edge for applying substrate forms air curtain, blocks the unknown particulate matter floated outside powder room, in air or dust enters blocking, blow simultaneously
It sweeps and is attached to substrate to be coated edge electrostatic powder because the factors such as gas flowing cause to descend slowly and lightly, both ensure that the entirety of substrate to be coated was clean
Cleanliness, with improving substrate to be coated coating quality, and covering protection efficiency height, to realize, continuous spray has established base at high speed
Plinth.
Referring to fig. 4 shown in a, above-mentioned end blow device 403 includes: hollow elongated tubular combination roof beam structure 409 and mounted thereto
Row's compressed-air atomizer 407.The crossbeam of the hollow elongated tubular combination roof beam structure 409 is closed at both ends and is provided with shaft 410, should
Shaft 410 is mounted in revolute pair 411, and revolute pair 411 is connect with stock 412 is adjusted.The compressed-air atomizer 407 is vertical
It is set to the kernel of section of combination roof beam structure, perpendicular to combination roof beam structure length direction.In this way, rotation adjusts stock 412, make hollow length
Pipe combination roof beam structure 409 can either be moved up and down vertically on substrate to be coated surface, adjust compressed-air atomizer 407 and substrate to be coated
Distance;Also can make to adjust along its crossbeam length direction transverse shifting and compress empty nozzle 407 hanging down along substrate to be coated traffic direction
Histogram makes hollow elongated tubular combination roof beam structure 409 that can also rotate horizontally swing, adjusts compressed air to rotation both ends revolute pair 411
Nozzle 407 and 20 surface angle of substrate to be coated.To ensure that cleaning quality, efficient mechanical is realized.
Referring to fig. 4 shown in b, above-mentioned edge air curtain apparatus 406 includes: curved hollow long tube combination roof beam structure 414 and is mounted on
Row's compressed-air atomizer 407 thereon.The crossbeam of the bending long tube combination roof beam structure 414 is closed at both ends, respectively sets at its both ends
It is equipped with active support.The active support include flexural pivot 415 and with hinged support rod 416, the support rod 416
It is installed in the powder room revolute pair 417 on powder room side wall or room body ground, the installation axle 19 and curved hollow long tube of the flexural pivot
Combine roof beam structure connection.Retractable structure 418 is provided on the support rod 416.The compressed-air atomizer 407 is vertically installed in
The kernel of section for combining roof beam structure, perpendicular to combination roof beam structure length direction.In this way, rotation support rod 416, makes curved hollow long tube group
It closes roof beam structure 414 to go up and down, adjusts compressed-air atomizer 407 at a distance from substrate to be coated 20;Support rod 416 is rotated to put along shaft 419
It is dynamic, adjust compressed-air atomizer 407 and substrate to be coated surface angle;The stretching structure 418 on support rod 416 is rotated, pressure is adjusted
Contracting air nozzle 407 is at a distance from 20 edge of substrate to be coated.Quality is blocked and purged to ensure that, realizes efficient mechanical
Change.
A row can be respectively set in above-mentioned hollow elongated tubular combination roof beam structure 409 and curved hollow long tube combination roof beam structure 414.For into
One step guarantees to clean, block and purging effect, need to increase air pressure and blow and spray a little, can be along substrate to be coated traffic direction and in quilt
The number of rows that parallel direction within the scope of substrate width increases hollow bend pipe combination beam and hollow elongated tubular combination beam is applied, is at most added to 3
Row.As shown in figure 4d, the main structure of the combination roof beam structure 6,14 of the end blow device and edge air curtain apparatus is multilayer pipe
It is superimposed and to be formed, compressed air is passed through from outermost layer pipe one or both ends compressed air inlet 25, and arrow is pressure in figure
Contracting air flow trend.
C referring to fig. 4, above-mentioned compressed-air atomizer 407 are vertically installed in the kernel of section of combination roof beam structure 409 and 414, vertically
In combination roof beam structure length direction.The compressed-air atomizer 407 includes: outer layer sleeve 420, middle casing 422 and center piston
423.The outer layer sleeve 420 passes through combination roof beam structure and is fixedly mounted on thereon, generally takes welding or bonding, to guarantee that compression is empty
Gas is not revealed.There are one or more ventholes 421 for communicating with the outermost layer pipe for combining roof beam structure on the outer layer sleeve, it can be with
Enter the compressed air in outermost layer hollow tube.The inner hole at the outer tube both ends respectively has one section of internal screw thread.The middle casing
There are hole, as spout 426 in 422 lower end, and upper end inner hole has internal screw thread, and there is external screw thread in both ends outer surface, with outer layer sleeve 420
Thread connection;By rotating middle tube, realizes that compressed-air atomizer axially moves up and down and stretch, to adjust compressed air spray
Mouth spout 426 is apart from 20 surface distance of substrate to be coated.Meanwhile having and the outer layer sleeve 420 on the middle casing 422
The corresponding venthole of venthole 421.In this way, the compressed air in combination roof beam structure 409 and 414 can enter compressed-air atomizer
407.The upper end of the center piston 423 has external screw thread, couples with the 422 tail portion internal screw thread of middle casing, center piston
423 protrude into the venthole lower part of the middle casing 422, and rotary-piston moves up and down it, can partly or entirely block middle layer
The venthole 421 of casing 422 realizes the variation of through-hole flow area, adjusts the air mass flow for entering compressed-air atomizer tube body.When
When all blocking, compressed-air atomizer is closed.The tail portion of above-mentioned middle casing 422 and the center piston is equipped with locking nut
424, for being locked after stretching, being allowed to fixed.
Certainly, directly close or hollow in hollow elongated tubular combination roof beam structure and 20 surface of substrate to be coated to simplify structure
Bending long tube and the close side in 20 surface of substrate to be coated set circular hole or open long hole.
The quantity of above-mentioned compressed-air atomizer 407 is according to the substrate to be coated width sprayed, the covering of compressed-air atomizer
The thickness of face and spraying determines that the distance between each compressed-air atomizer is 5 centimetres~100 centimetres.
When installation, above-mentioned end blow device and edge air curtain apparatus and sprayer should be separately positioned on substrate to be coated 20
Above or below, it may be assumed that when carrying out front electrostatic powder coating, above-mentioned end blow device and edge air curtain apparatus are arranged in quilt
It applies below substrate, 407 direction of compressed-air atomizer upward, cleans the substrate to be coated back side and edge, air curtain.Similarly, when
When carrying out back side electrostatic powder coating, above-mentioned end blow device and edge air curtain apparatus are arranged above substrate to be coated, compression
Air nozzle 407 is directed downward, and is cleaned to substrate to be coated front and edge, air curtain.
Shown in Figure 5 to adapt to high speed continuous spray, the sprayer locomotive 33 includes: pedestal 520 and fixed peace
Base-mounted vehicle frame 521, the one or both sides of the vehicle frame 521 are equipped with cantilever beam 502, pacify on the cantilever beam 502
Equipped with sprayer 13.
Above-mentioned sprayer locomotive 33 is mounted on the frame-type mobile trolley used 309, and the pedestal 520 has wheel
505, the shape of the vehicle frame 521 is inverted " u "-shaped, is set with the sliding support moved above and below along vehicle frame on two columns
522, the cantilever beam 502 is mounted on the one or both sides of the sliding support 522, on the base between two columns of vehicle frame
It is provided with screw elevator 504, is provided between the screw elevator 504 and the cantilever beam 502 and is mounted on cunning
Drive rod 503 in dynamic pair support base 507, the sliding pair support base 507 are mounted on one of inverted " u "-shaped vehicle frame 521
The inside of column.In this way, one side sprayer locomotive 33 and sprayer 13 can be as rapidly shift-in produces together in powder rooms
Line adjusts sprayer nozzle at a distance from substrate to be coated surface, guarantees coating quality.Equally, sprayer locomotive 33 and spraying
Device 13 can rapidly remove production line with powder room together, carry out maintenance and subsequent production prepares.Two aspects, two cantilevers
Beam can install two sprayers simultaneously, keep each sprayer interval more compact, more sprayings can be arranged in unit area
Device.Three aspects, cantilever beam can concentrate input cable, tube cell 601 and the compressed air hose 602 etc. of storage sprayer, both have
Dustproof effect, and convenient to overhaul and replacement.In short, above-mentioned sprayer locomotive 33 is similarly realization, continuous spray is established at high speed
Basis.
For the powder spray amount for improving each sprayer, referring to Fig. 6, above-mentioned sprayer is line source electrode electrostatic powder coating
Device, comprising: sprayer ontology, the sprayer ontology have the pipe fitting 603 and installation compressed air hose of installation tube cell 601
The hole of 602 connector 604,605 top of cavity of installation tube cell pipe fitting are circular apertures, and lower part is set as growing flat seam type spray seam, should
It is " line source " electrode 608 that the both sides of slit through-hole, which stud with the metal material that section is knife-edge, and left and right is along sprayer
Heart line is symmetrical arranged.When " line source " electrode accesses external HV generator, above-mentioned sprayer is equivalent to existing skill
More spray gun is gathered of art collects in a row, the connecting of such as same group of " line source " electrode very much " point source " electrodes, charge capacity number
" point source " electrode of times prior art.The line source electrode is elongated shape, can be an one metal wire electrode, can be blade
The metal material of shape can be knife-edge metal material with zigzag fashion or section similar to the metal material of triangle.
For the charged amount of powder for further increasing each sprayer, the spray orifice of above-mentioned sprayer nozzle 607 is a length
Shape spray seam, it is parallel lines which, which stitches both sides section,;The either splayed or tubaeform of less entrance and bigger exit, eight word
Shape both sides are straight lines;Either curve.Either splayed or tubaeform, left and right is along sprayer center line symmetrical setting.
In this way, the electrostatic field generated using " line source " electrode, can satisfy and carry out charged requirement to a large amount of powder of ejection,
Powder spray ability is improved, is suitable for metal coiled material and the continuous powder spray production equipment of plate carries out continuous spray at high speed.
Meanwhile external electrostatic generator can be accomplished to be greater than the more electrostatic generator power built in spray gun of the prior art
Summation can apply bigger charge capacity to sprayer " line source " electrode of the invention.
To guarantee powder homogenization spraying, the hole of the tube cell pipe fitting 503 and the efferent duct of air compressor first, second
703 hole is adapted, and the hole of the efferent duct 703 in the hole and air compressor third of the compressed air pipe fitting 504 is adapted.Ginseng
As shown in Fig. 7, Fig. 7 a, each air compressor includes: gas tank 701, with the tank connected input pipe 714 of gas and efferent duct
703.The top of the gas tank 701 is cylindrical body, and lower part is inverted cone 702, and the input pipe 714 passes through bending pipeline 705
Vertical with the inverted cone 702 to connect, the efferent duct 703 is multichannel, is symmetrically arranged in around tank body center line described
The caliber on the top of gas tank 701, each road efferent duct 703 is identical, arrival end close to be arranged in the gas tank 701, close to described
The centerline of gas tank 701, outlet end pass through the tank skin of the gas tank 701.
In this way, more branch output gas tanks can equivalent be equably that each sprayer provides the states phase such as pressure, flow
To consistent compressed air, keep the powder supply pressure of the connect venturi pump 707 of all sprayers identical, carries out high speed electrostatic powder
When spraying, the electrostatic powder that each sprayer sprays is consistent.
To be further ensured that powder homogenization spraying, also pacify in the gas tank 701, at the inverted cone 702
Part 704 is combed equipped with horizontally disposed flow-disturbing, it is 1~6 which, which combs part 704, has and is uniformly distributed mesh shape or more
A hole shape.
When installation, referring to shown in Fig. 7 b, the tube cell pipe fitting 503 of the sprayer 13 passes through connecting tube 710 and venturi
The efferent duct connection of pump 707, the atomizer pipe 708 of the venturi pump 707, boost motor pipe 709 respectively by connecting tube 713 with
The efferent duct 703 of air compressor first, second is connected in series.13 compressed air pipe fitting of sprayer, 504 connecting tube and compression
The efferent duct 703 of air engine third connects.
Above-mentioned substrate to be coated can be the interrupted steel plate of plane, aluminium sheet, be also possible to coil of strip, aluminium volume.The interrupted steel plate of plane, aluminium
Plate in addition to substrate to be coated is different, is also had any different: one, entering before curing of coatings section unit from coil of strip, aluminium volume spraying production
Mouthful section unit 1 and setting in the outlet section unit 3 after curing of coatings section unit are different, secondly, interrupted steel plate, aluminium
Plate is held up by chain passes through powder room, and coil of strip, aluminium volume horizontal hanging scale lever pass through powder room.Metal coiled material and plate of the present invention connect
The improvement that continuous powder spray production equipment is carried out primarily directed to the curing of coatings section unit on production line in the prior art, thus
It is the interrupted steel plate of plane, aluminium that the continuous powder spray production equipment of metal coiled material and plate of the present invention, which can be used not only for substrate to be coated,
The continuous electrostatic powder coating of plate, can be used for the continuous electrostatic powder coating that substrate to be coated is coil of strip, aluminium volume, and a machine is more
With market is widely used.
Now illustrate operation process by taking the continuous powder spray production of coil of strip as an example.
The continuous powder spray production equipment of metal coiled material and plate of the present invention, can both carry out single side spraying, can also
To realize two-sided while spray.The step of carrying out single side spraying, comprising:
Step 1: unit preparation
1) the external electrostatic that the spraying production equipment floating coat solidifies each sprayer 13 in section unit, is adjusted to occur
Device controls power supply High voltage output value between 30kV~100kV;
2) output pressure for, adjusting air compressor in the spraying production equipment is 0.04MPa~0.5MPa, guarantees institute
There is each output pressure value in sprayer 13 from air compressor identical;
3) position for, adjusting each sprayer locomotive 33 and powder room 28 in the spraying production equipment, keeps sprayer mobile
The cantilever beam 502 of vehicle 33 passes through the sprayer aperture 306 in powder room, and the sprayer 13 on cantilever beam 502 is located at the table of substrate to be coated
At face;
4), powder room 28 and sprayer locomotive 33 are held by frame-type mobile trolley used 309 in the spraying production equipment
It carries and moves into substrate to be coated production center line position, await orders;
5), igniting heating, curing of coatings furnace temperature control between 180 DEG C~250 DEG C;
Step 2: feeding, cleaning
Substrate to be coated 20 enters uncoiler 4, the entrance transverse cutting unit 5, head of the entrance unit 1 of the spraying production equipment
Run-out suture with or bonding machine 6, entry loop 7, cleaning by degreasing section equipment 8, chemical roll coater 9 and drying oven 10, to by painting base
The upper and lower surface of material carries out cleaning by degreasing and chemical treatment;
Step 3: electrostatic powder coating and curing of coatings
1), substrate to be coated 20 enters the powder room 28 in the curing of coatings section unit of the spraying production equipment, sprayer 13
Upper surface or lower surface to substrate to be coated 20 spray electrostatic powder;
For example, when the substrate to be coated speed of service be 60 ms/min when, electrostatic powder spray speed be 100 grams~150 grams/
Minute, when the substrate to be coated speed of service is 100 ms/min, it is 150 grams~250 gram/minutes that electrostatic powder, which sprays speed, is made
25 μm~80 μm of the coating layer thickness on substrate to be coated surface;
2), in spraying, compressed-air atomizer 407 and the substrate to be coated traffic direction 405 for controlling edge air curtain apparatus 406 are wide
The distance between both sides are spent, air curtain is formed, are adsorbed with stopping to be sprayed-on the powder on surface in spraying around the edge of substrate to be coated
Onto another surface;The distance is usual depending on substrate to be coated production run speed, for example, when the speed of service is at 60 ms/min,
The two distance is 70mm~90mm, and when the speed of service reaches 100 ms/min, the two distance is 110mm~130mm.
It controls end blow device 403 simultaneously to clean the surface, the compressed-air atomizer of end blow device 403
407 usually directly proportional to 426 air pressure of the spout of compressed-air atomizer to the distance between substrate to be coated, for example, when air pressure is
When 0.2MPa, the two distance is 8mm~12mm, and when air pressure is 0.4MPa, the two distance is 25mm~35mm.
3), substrate to be coated 20 enters the curing of coatings furnace 14 in the curing of coatings section unit of the spraying production equipment, right
The coating of sprayed surface is dried, is solidified, and solidification temperature is at 180 DEG C~250 DEG C, and curing time was at 20 seconds~25 seconds;Gu
Change length of time depending on the thickness of substrate to be coated, if curing time is 20 seconds with a thickness of 0.4mm, if with a thickness of
0.6mm, then curing time is 25 seconds or so.
4th step, product handling system
Cooling device 15 that the substrate to be coated 20 of coating enters in the outlet section unit 3 of the spraying production equipment goes out
Mouth loop 16, protection or decoration membrane laminating machine 17, outlet cross cut shears 18 and an at least coiling machine 19, to the substrate to be coated of coating
The product handling systems such as protective overlay film is carried out, shears, batch.
Similarly, aforementioned production method also can continuously give birth to the monochromatic two-sided electrostatic powder coating of substrate to be coated progress at high speed
It produces.To keep text succinct, production method something in common is no longer stated, production method the difference is that:
Above-mentioned first step .5) in be close or remove in powder room 28 along 20 traffic direction of substrate to be coated, 405 width both sides
Edge air curtain apparatus 406 and end blow device 403.The powder supply pressure for controlling sprayer, when making double-face spray painting, one finishing coat
With a thickness of 25 μm~80 μm, another side coating layer thickness is 7 μm~40 μm.
Above-mentioned third step .1) in be electrostatic that sprayer 13 sprays same color to the upper and lower surfaces of substrate to be coated 20
Powder,
Above-mentioned third step .2) in be curing of coatings furnace 14 that substrate to be coated 20 enters, simultaneously to the coating of sprayed surface
It dried, solidified,
In addition, either single side spraying either double-face spray painting is needed when the substrate to be coated of coating reaches certain batch
When carrying out colour changing in continuous production, the powder room on production line and sprayer locomotive 33 engaged therewith are withdrawn from, load is changed to
The offline standby powder room of other colors of spraying in need and sprayer locomotive 33 engaged therewith, carry out repeatedly.From
And make the substrate to be coated of each batch that there is different colors, meet the market demand.
Claims (14)
1. a kind of metal coiled material and the continuous powder spray production equipment of plate, including curing of coatings section unit (2), the curing of coatings
Section unit (2) include powder room (28), more with powder room (28) cooperate sprayer locomotives (33) and with powder room (28) phase
The curing of coatings furnace (14) of neighbour's arrangement, the powder room (28) include: the room body (301) with import (304), outlet (311), should
Room body (301), which is parallel in the one side wall or two side walls in production line direction, has sprayer aperture (306), it is characterised in that:
The connection import (304) and outlet are provided in the one side wall that the room body (301) is parallel to production line direction
(311) horizontal slots (303) are provided with closing door (302) at the horizontal slots, and the sprayer aperture (306) is located at institute
State the above and or below of horizontal slots (303);The room body (301) is mounted on frame-type mobile trolley used (309), the frame
Posture mobile trolley used (309) is run on ground rail (310);
It is located at the outlet (311) in the room body (301) and is provided with end blow device (403), and along substrate to be coated
(20) traffic direction (405) width both sides are each provided with edge air curtain apparatus (406), the end blow device (403) and side
Portion's air curtain apparatus (406), which is mounted on to be connected on the room body (301) side wall or room body ground (408), is accordingly connected and fixed knot
On structure (413);
The sprayer locomotive (33) includes: pedestal (520) and the vehicle frame (521) being fixedly mounted on pedestal, the vehicle frame
(521) it is equipped on cantilever beam (502), is equipped with sprayer (13) on the cantilever beam (502), the sprayer is line source electricity
Pole electrostatic powder coating device, comprising: sprayer ontology is equipped with 2~100 tube cell pipes on the sprayer ontology (616) and connects
Head (603) and the compressed air pipe fitting (604) for being located at tube cell pipe fitting (603) two sides;It further include being located at the spraying
Sprayer nozzle (607) below the spraying cavity (605) of device ontology and the electrode (608) below the sprayer nozzle,
The electrode (608) of each sprayer (13) is by being connected in parallel output electricity of the part with an electrostatic generator being placed in outside sprayer
Cable connection;Or the electrode (608) of each sprayer (13) is respectively connect with an electrostatic generator being placed in outside it.
2. metal coiled material according to claim 1 and the continuous powder spray production equipment of plate, it is characterised in that: the end
Portion's blow device (403) includes: that hollow elongated tubular combines roof beam structure (409) and row's compressed-air atomizer (407) mounted thereto,
The crossbeam of hollow elongated tubular combination roof beam structure (409) is that the overlapping of multilayer hollow long tube is fixedly connected with composition, there is hole phase between each pipe
Logical, or be one layer of single tube structure, closed at both ends and be provided with shaft (410), which is mounted on revolute pair (411)
On, revolute pair (411) is connect with stock (412) are adjusted, and the compressed-air atomizer (407) is vertically installed in cutting for combination roof beam structure
Face center, perpendicular to combination roof beam structure length direction.
3. metal coiled material according to claim 2 and the continuous powder spray production equipment of plate, it is characterised in that: the side
Portion's air curtain apparatus (406) includes: curved hollow long tube combination roof beam structure (414) and row's compressed-air atomizer mounted thereto
(407), the crossbeam of bending long tube combination roof beam structure (414) is overlapped for multilayer hollow long tube is fixedly connected with composition, between each pipe
There is hole to communicate, or is one layer of single tube structure, it is closed at both ends, it is each provided with active support at its both ends, the movable supporting
Device include flexural pivot (415) and with hinged support rod (416), which is installed on powder room side wall or room body
In powder room revolute pair (417) on ground (408), the installation axle (419) of the flexural pivot combines roof beam structure company with curved hollow long tube
It connects, is provided with retractable structure (418) on the support rod (416), the compressed-air atomizer (407) is vertically installed in combination
The kernel of section of roof beam structure, perpendicular to combination roof beam structure length direction.
4. metal coiled material according to claim 2 and the continuous powder spray production equipment of plate, it is characterised in that: the pressure
Contracting air nozzle (407) includes: outer layer sleeve (420), middle casing (422) and center piston (423), the outer layer sleeve
(420) it passes through combination roof beam structure to be fixedly mounted on thereon, has on the outer layer sleeve and communicate with the outermost layer pipe for combining roof beam structure
One or more ventholes (421), the inner hole at the outer tube both ends respectively have one section of internal screw thread, under the middle casing (422)
There is hole at end, and upper end inner hole has internal screw thread, and there is external screw thread in both ends outer surface, described with the outer layer sleeve (420) thread connection
On middle casing (422) have venthole corresponding with venthole (421) of the outer layer sleeve (420), it is described in be indecisive and changeable
The upper end for filling in (423) has external screw thread, couples with the middle casing (422) tail portion internal screw thread, the center piston (423) is stretched
Enter the venthole lower part of the middle casing (422), the tail portion of above-mentioned middle casing (422) and the center piston is equipped with lock
Tight nut, or circular hole is directly opened in hollow elongated tubular combination roof beam structure (409) and the close side in substrate to be coated (20) surface,
Or open long hole.
5. metal coiled material according to claim 3 and the continuous powder spray production equipment of plate, it is characterised in that: the pressure
Contracting air nozzle (407) includes: outer layer sleeve (420), middle casing (422) and center piston (423), the outer layer sleeve
(420) it passes through combination roof beam structure to be fixedly mounted on thereon, there is 1 communicated with the outermost layer pipe for combining roof beam structure on the outer layer sleeve
A or multiple ventholes (421), the inner hole at the outer tube both ends respectively have one section of internal screw thread, the lower end of the middle casing (422)
Have hole, upper end inner hole has internal screw thread, and there is external screw thread in both ends outer surface, and the outer layer sleeve (420) thread connection, it is described in
There is venthole corresponding with venthole (421) of the outer layer sleeve (420), the center piston on layer casing (422)
(423) upper end has external screw thread, couples with the middle casing (422) tail portion internal screw thread, the center piston (423) is protruded into
The tail portion of the venthole lower part of the middle casing (422), above-mentioned middle casing (422) and the center piston is equipped with locking
Nut, or circular hole is directly opened in hollow elongated tubular combination roof beam structure (409) and the close side in substrate to be coated (20) surface, or
Open long hole.
6. metal coiled material according to claim 4 and the continuous powder spray production equipment of plate, it is characterised in that: the spray
The spray orifice for applying device nozzle (607) is elongate linear spray seam, and it is parallel lines (611) or entrance which, which stitches both sides section,
Small, the big splayed or tubaeform in outlet, the splayed both sides are straight line (612) or curve (613), either eight
Font is tubaeform, and left and right is symmetrical arranged along sprayer center line (614).
7. metal coiled material according to claim 5 and the continuous powder spray production equipment of plate, it is characterised in that: the spray
The spray orifice for applying device nozzle (607) is elongate linear spray seam, and it is parallel lines (611) or entrance which, which stitches both sides section,
Small, the big splayed or tubaeform in outlet, the splayed both sides are straight line (612) or curve (613), either eight
Font is tubaeform, and left and right is symmetrical arranged along sprayer center line (614).
8. metal coiled material according to claim 1 or 2 and the continuous powder spray production equipment of plate, it is characterised in that: institute
The hole for stating the hole of tube cell pipe fitting (603) and the efferent duct (703) of air compressor first, second is adapted, the compressed air hose
The hole of connector (604) is adapted with the hole of the efferent duct (703) of air compressor third;Each air compressor includes: gas tank
(701), with the tank connected input pipe of gas (714) and efferent duct (703), the top of the gas tank (701) is cylindrical body, and lower part is
Inverted cone (702), the input pipe (714) connect by the way that bending pipeline (705) are vertical with the inverted cone (702), institute
Stating efferent duct (703) is multichannel, and the top of the gas tank (701), each road efferent duct are symmetrically arranged in around tank body center line
(703) caliber is identical, arrival end close to be arranged in the gas tank (701), the centerlines close to the gas tank (701),
Outlet end passes through the tank skin of the gas tank (701).
9. metal coiled material according to claim 1 or 2 and the continuous powder spray production equipment of plate, it is characterised in that: institute
It states sprayer locomotive (33) to be mounted on the frame-type mobile trolley used (309) or install on the ground, the pedestal (520)
With wheel (505), the shape of the vehicle frame (521) is inverted " u "-shaped, is set on two columns and moves above and below along vehicle frame
Sliding support (522), the cantilever beam (502) is mounted on the one or both sides of the sliding support (522), on the base
Screw elevator (504) are provided between two columns of vehicle frame, the screw elevator (504) and the cantilever beam
(502) drive rod (503) being mounted in sliding pair support base (507), sliding pair support base (507) peace are provided between
Mounted in the inside of a column of inverted " u "-shaped vehicle frame (521).
10. metal coiled material according to claim 5 and the continuous powder spray production equipment of plate, it is characterised in that: described
Sprayer locomotive (33) is mounted on the frame-type mobile trolley used (309) or installs on the ground, pedestal (520) tool
Have wheel (505), the shape of the vehicle frame (521) is inverted " u "-shaped, is set on two columns and moves above and below along vehicle frame
Sliding support (522), the cantilever beam (502) are mounted on the one or both sides of the sliding support (522), on the base vehicle
Screw elevator (504) are provided between two columns of frame, the screw elevator (504) and the cantilever beam
(502) drive rod (503) being mounted in sliding pair support base (507), sliding pair support base (507) peace are provided between
Mounted in the inside of a column of inverted " u "-shaped vehicle frame (521).
11. metal coiled material according to claim 6 and the continuous powder spray production equipment of plate, it is characterised in that: described
Sprayer locomotive (33) is mounted on the frame-type mobile trolley used (309) or installs on the ground, pedestal (520) tool
Have wheel (505), the shape of the vehicle frame (521) is inverted " u "-shaped, is set on two columns and moves above and below along vehicle frame
Sliding support (522), the cantilever beam (502) are mounted on the one or both sides of the sliding support (522), on the base vehicle
Screw elevator (504) are provided between two columns of frame, the screw elevator (504) and the cantilever beam
(502) drive rod (503) being mounted in sliding pair support base (507), sliding pair support base (507) peace are provided between
Mounted in the inside of a column of inverted " u "-shaped vehicle frame (521).
12. a kind of metal coiled materials described in any item according to claim 1~11 and the continuous powder spray production equipment of plate
Electrostatic powder continuous spray production method, it is characterised in that: step includes:
Step 1: unit preparation
1) the external electrostatic that the spraying production equipment floating coat solidifies each sprayer (13) in section unit (2) is adjusted to occur
Device controls power supply High voltage output value between 30kV~100kV;
2) output pressure for adjusting air compressor in the spraying production equipment is 0.04MPa~0.5MPa, guarantees all sprays
It is identical to apply each output pressure value from air compressor in device (13);
3) position for adjusting each sprayer locomotive (33) and powder room (28) in the spraying production equipment, makes sprayer locomotive
(33) cantilever beam (502) passes through the sprayer aperture (306) in powder room, and the sprayer (13) on cantilever beam (502), which is located at, to be applied
At the surface of substrate;
4) powder room (28) and sprayer locomotive (33) are held by frame-type mobile trolley used (309) in the spraying production equipment
It carries and moves into substrate to be coated production center line position, await orders;
5) igniting heating, curing of coatings furnace (14) temperature are controlled at 180 DEG C~250 DEG C;
Step 2: feeding, cleaning
Substrate to be coated (20) enters the entrance unit (1) of the spraying production equipment, carries out to the upper and lower surface of substrate to be coated
Cleaning by degreasing and chemical treatment;
Step 3: electrostatic powder coating and curing of coatings
1) substrate to be coated (20) enters the powder room (28) in the curing of coatings section unit (2) of the spraying production equipment, sprayer
(13) upper surface to substrate to be coated (20) or lower surface spray electrostatic powder;
2) in spraying, control is located at the edge air curtain apparatus (406) on substrate to be coated (20) traffic direction (405) width both sides, shape
At air curtain, it is adsorbed on another surface with the edge for stopping the powder for being sprayed-on surface in spraying to bypass substrate to be coated;Positioned at this
End blow device (403) on surface is cleaned simultaneously;
3) substrate to be coated (20) enters the curing of coatings furnace (14) in the curing of coatings section unit (2) of the spraying production equipment,
The coating of sprayed surface is dried, is solidified, solidification temperature is at 180 DEG C~250 DEG C, and curing time was at 20 seconds~25 seconds;
4th step, product handling system
The substrate to be coated (20) of coating enter cooling device (15) in the outlet section unit (3) of the spraying production equipment,
Outlet looping (16), protection or decoration membrane laminating machine (17), outlet cross cut shears (18) and an at least coiling machine (19).
13. a kind of metal coiled materials described in any item according to claim 1~11 and the continuous powder spray production equipment of plate
Electrostatic powder continuous spray production method, it is characterised in that: step includes:
Step 1: unit preparation
1) the external electrostatic that the spraying production equipment floating coat solidifies each sprayer (13) in section unit (2) is adjusted to occur
Device controls power supply High voltage output value between 30kV~100kV;
2) output pressure for adjusting air compressor in the spraying production equipment is 0.04MPa~0.5MPa, guarantees all sprays
It is identical to apply each output pressure value from air compressor in device (13);
3) position for adjusting each sprayer locomotive (33) and powder room (28) in the spraying production equipment, makes sprayer locomotive
(33) cantilever beam (502) passes through the sprayer aperture (306) in powder room, and the sprayer (13) on cantilever beam (502), which is located at, to be applied
At the surface of substrate;
4) powder room (28) and sprayer locomotive (33) are held by frame-type mobile trolley used (309) in the spraying production equipment
It carries and moves into substrate to be coated production center line position, await orders;
5) it closes or removes in powder room (28) along the edge air curtain apparatus on substrate to be coated (20) traffic direction (405) width both sides
(406) and end blow device (403);
6), igniting heating, curing of coatings furnace temperature control between 180 DEG C~250 DEG C;
Step 2: feeding, cleaning
Substrate to be coated (20) enters the entrance unit (1) of the spraying production equipment, carries out to the upper and lower surface of substrate to be coated
Cleaning by degreasing and chemical treatment;
Step 3: electrostatic powder coating and curing of coatings
1) substrate to be coated (20) enters the powder room (28) in the curing of coatings section unit (2) of the spraying production equipment, sprayer
(13) upper and lower surfaces of substrate to be coated (20) are sprayed with the electrostatic powder of same color;
2) substrate to be coated (20) enters the curing of coatings furnace (14) in the curing of coatings section unit (2) of the spraying production equipment,
The coating of sprayed surface is dried, is solidified;
4th step, product handling system
The substrate to be coated (20) of coating enter cooling device (15) in the outlet section unit (3) of the spraying production equipment,
Outlet looping (16), protection or decoration membrane laminating machine (17), outlet cross cut shears (18) and an at least coiling machine (19).
14. production method according to claim 12 or 13, it is characterised in that: either single side spraying either two-sided spray
It applies, when the substrate to be coated for being sprayed with electrostatic powder reaches certain batch, needs to carry out colour changing in continuous production, withdraws from production
Powder room and sprayer locomotive engaged therewith (33) on line are changed to the offline standby for being loaded with and needing the other colors sprayed
Powder room and sprayer locomotive engaged therewith (33), carry out repeatedly.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510081127.5A CN104588284B (en) | 2015-02-13 | 2015-02-13 | Metal coiled material and the continuous powder spray production equipment of plate and its production method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510081127.5A CN104588284B (en) | 2015-02-13 | 2015-02-13 | Metal coiled material and the continuous powder spray production equipment of plate and its production method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104588284A CN104588284A (en) | 2015-05-06 |
CN104588284B true CN104588284B (en) | 2019-02-19 |
Family
ID=53114535
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510081127.5A Active CN104588284B (en) | 2015-02-13 | 2015-02-13 | Metal coiled material and the continuous powder spray production equipment of plate and its production method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104588284B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105128237B (en) * | 2015-08-24 | 2017-05-31 | 自贡市巨光硬面材料科技有限公司 | Powder solid fusing device and technique on a kind of spheroid |
CN108722830B (en) * | 2017-04-20 | 2021-07-16 | 宝山钢铁股份有限公司 | Hot-rolled chromium-molybdenum low-alloy steel rust-proof production method |
CN109482379B (en) * | 2018-12-26 | 2024-02-06 | 中冶京诚工程技术有限公司 | Pin header type electrostatic guiding device and powder electrostatic spraying device |
CN109499793B (en) * | 2018-12-26 | 2024-02-06 | 中冶京诚工程技术有限公司 | Belt type electrostatic guiding device and powder electrostatic spraying device |
CN109821676B (en) * | 2019-03-04 | 2024-02-06 | 中冶京诚工程技术有限公司 | Mesh thin electrostatic guiding device and powder electrostatic spraying device |
CN115367541B (en) * | 2022-10-25 | 2022-12-20 | 常州盛沅新材料科技有限公司 | Packaging film conveying device |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101758005A (en) * | 2008-12-25 | 2010-06-30 | 浙江明泉工业涂装有限公司 | Automatic powder spraying device, spraying system and spraying method for inside of container |
CN101972726A (en) * | 2010-10-21 | 2011-02-16 | 中煤邯郸煤矿机械有限责任公司 | Hydraulic cylinder surface shot blasting, paint spraying and drying system and shot blasting, paint spraying and drying process thereof |
CN102259071A (en) * | 2011-06-21 | 2011-11-30 | 东莞丰裕电机有限公司 | Fully-automatic spray coating equipment |
JP3173913U (en) * | 2009-07-15 | 2012-03-01 | 浙江▲龍▼▲馳▼防腐技▲術▼有限公司 | Automatic painting production line for anti-corrosion coating on large steel pipes |
CN103831219A (en) * | 2014-03-20 | 2014-06-04 | 浙江明泉工业涂装有限公司 | Efficient air returning structure for painting production line solidifying device |
CN203944499U (en) * | 2014-07-04 | 2014-11-19 | 天津市雍华科技有限公司 | A kind of electrostatic spraying powder retracting device |
CN203991073U (en) * | 2014-08-06 | 2014-12-10 | 无锡顺达智能自动化工程股份有限公司 | The purging motor blast pipe of finish paint paint spray booth |
CN104549860A (en) * | 2013-10-28 | 2015-04-29 | 富鼎电子科技(嘉善)有限公司 | Baking varnish spraying equipment |
CN204710665U (en) * | 2015-02-13 | 2015-10-21 | 北京京诚之星科技开发有限公司 | Metal coiled material and the continuous powder spray production equipment of sheet material |
-
2015
- 2015-02-13 CN CN201510081127.5A patent/CN104588284B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101758005A (en) * | 2008-12-25 | 2010-06-30 | 浙江明泉工业涂装有限公司 | Automatic powder spraying device, spraying system and spraying method for inside of container |
JP3173913U (en) * | 2009-07-15 | 2012-03-01 | 浙江▲龍▼▲馳▼防腐技▲術▼有限公司 | Automatic painting production line for anti-corrosion coating on large steel pipes |
CN101972726A (en) * | 2010-10-21 | 2011-02-16 | 中煤邯郸煤矿机械有限责任公司 | Hydraulic cylinder surface shot blasting, paint spraying and drying system and shot blasting, paint spraying and drying process thereof |
CN102259071A (en) * | 2011-06-21 | 2011-11-30 | 东莞丰裕电机有限公司 | Fully-automatic spray coating equipment |
CN104549860A (en) * | 2013-10-28 | 2015-04-29 | 富鼎电子科技(嘉善)有限公司 | Baking varnish spraying equipment |
CN103831219A (en) * | 2014-03-20 | 2014-06-04 | 浙江明泉工业涂装有限公司 | Efficient air returning structure for painting production line solidifying device |
CN203944499U (en) * | 2014-07-04 | 2014-11-19 | 天津市雍华科技有限公司 | A kind of electrostatic spraying powder retracting device |
CN203991073U (en) * | 2014-08-06 | 2014-12-10 | 无锡顺达智能自动化工程股份有限公司 | The purging motor blast pipe of finish paint paint spray booth |
CN204710665U (en) * | 2015-02-13 | 2015-10-21 | 北京京诚之星科技开发有限公司 | Metal coiled material and the continuous powder spray production equipment of sheet material |
Also Published As
Publication number | Publication date |
---|---|
CN104588284A (en) | 2015-05-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104588284B (en) | Metal coiled material and the continuous powder spray production equipment of plate and its production method | |
CN104668139B (en) | Metal coiled material and the continuous powder spray production equipment of plate and its production method | |
CN106694266B (en) | A kind of electrostatic spraying apparatus | |
CN104588251B (en) | Powder blocks and clearing apparatus in a kind of electrostatic powder coating | |
WO2012016637A1 (en) | Modular installation for the surface treatment of articles | |
CN206838367U (en) | Large-scale steel pipe automates spray-painting plant | |
CN204602462U (en) | Metal coiled material and the continuous powder spray production equipment of sheet material | |
CN215430024U (en) | Coating device with stoving function for enameled wire production and processing | |
CN204710665U (en) | Metal coiled material and the continuous powder spray production equipment of sheet material | |
WO2012089789A1 (en) | Paint booth for painting plants for products | |
EP0777534A1 (en) | Workpiece spray-painting device | |
JP2865251B1 (en) | Powder coating booth for automotive body coating plant | |
CN210712376U (en) | Antirust liquid coating device for producing gas-phase antirust paper | |
CN216826900U (en) | Surface spraying and drying integrated device for plastic protection plate processing | |
CN113304939B (en) | Steel wire Dacromet coating device and coating process thereof | |
CN201284367Y (en) | Apparatus for generating zinc flower on surface of hot galvanizing strip steel coating | |
CN113924170B (en) | Device for applying paint and cleaning method thereof | |
US20220226854A1 (en) | Apparatus for applying paint to mainly flat parts | |
CN210304290U (en) | High-efficient spraying equipment of auto parts | |
CN208554696U (en) | A kind of ink spray equipment | |
CN206661530U (en) | A kind of slide fastener spray-painting plant | |
CN206009078U (en) | A kind of spray equipment | |
CN107096762A (en) | Dust purging, xegregating unit | |
CN216936699U (en) | Automatic spraying system | |
CN204866350U (en) | Integrated apparatus for producing of furniture spare part is exclusively used in |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20181203 Address after: 100176 No. 7 Jian'an Street, Beijing Economic and Technological Development Zone Applicant after: Zhongye Jingcheng Engineering Technology Co., Ltd. Applicant after: CERI Technology Co., Ltd. Address before: Room 502, Room 7, Jian'an Street, Daxing District, Beijing Applicant before: CERI Technology Co., Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |