CN104500078A - Method for optimizing roadway area stress field in construction outside roadway - Google Patents

Method for optimizing roadway area stress field in construction outside roadway Download PDF

Info

Publication number
CN104500078A
CN104500078A CN201410837427.7A CN201410837427A CN104500078A CN 104500078 A CN104500078 A CN 104500078A CN 201410837427 A CN201410837427 A CN 201410837427A CN 104500078 A CN104500078 A CN 104500078A
Authority
CN
China
Prior art keywords
stress
roadway
tunnel
optimization
boring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410837427.7A
Other languages
Chinese (zh)
Other versions
CN104500078B (en
Inventor
张农
郑西贵
付世雄
岳炜
刘娜
师超民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201410837427.7A priority Critical patent/CN104500078B/en
Publication of CN104500078A publication Critical patent/CN104500078A/en
Priority to PCT/CN2015/098034 priority patent/WO2016107435A1/en
Application granted granted Critical
Publication of CN104500078B publication Critical patent/CN104500078B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections

Abstract

The invention discloses a method for optimizing a roadway area stress field in construction outside a roadway, and belongs to the technical field of roadway support. The method comprises the following steps of firstly excavating a relieving roadway at a proper location in the floor strata of a pre-excavated roadway, testing ground stress in a roadway communicated with the pre-excavated roadway, and finding the position with a maximum principal stress difference of roadway sides after roadway excavation through calculation and analysis; constructing multiple rows of stress optimization drill holes in the relieving roadway towards the position with the maximum principal stress difference, and implementing static blasting in the position of the maximum principal stress difference so as to optimize the roadway area stress field. By applying the method, a high stress roadway having no condition of a pressure relieving scheme for construction inside the roadway can be subjected to pressure relieving and roadway area stress field optimization; the method is simple, convenient to operate, good in application effect and bright in application prospect.

Description

A kind of method of construction optimization tunnel regional stress field outside lane
Technical field
The present invention relates to the method for construction optimization tunnel regional stress field outside a kind of lane, before being particularly useful for deep-well, high-ground stress tunnelling, regional stress field optimization is carried out to tunnel, belong to Roadway Support Technology field.
Background technology
The distortion in tunnel is the inevitable phenomenon in coal production, tunnel is because of the difference of concrete occurrence condition, can produce and crush, two help to shift near the metaboly different with pucking etc., make drift section can not meet the demand of the activities in production such as ventilation, transport, pedestrian, haul.Especially, after coal mining enters deep mining, high stress tunnel is changed in tunnel into.Deep-well high stress tunnel shows that pressure is large, deflection is large and the feature such as rate of strain is fast, and especially horizontal stress is large, pucking deflection is large, and tunnel needs frequent overhauling could meet normal need of production.Practice shows, the tunnel revision rate of deep mining can reach 40%-80%, have even up to 100%.The effective support problem of deep-well, high stress tunnel brings huge puzzlement to the normal production in colliery.For above problem, Chinese scholars and colliery engineering technician propose many release Theories and methods, and have carried out repeatedly putting into practice, and comprise frame stiffens, boring release, grooving etc.But mostly these methods are to construct based in tunnel, delayed or be parallel to tunnelling, contradict with tunnelling, improve the labour intensity of workman, add working procedure, only can implement in the scope in the tunnel tunneled and several meters, driving face front, and effect limitation, deep-well tunnel distortion is still serious.When the occurrence condition of deep-well tunnel does not allow to construct in tunnel release scheme, but when just must carry out release before driving, namely said method does not have feasibility, so existing method can not be adopted to carry out release for such tunnel, need badly propose to construct outside a kind of lane, effective and feasible pressure relief method.
Summary of the invention
Technical problem: the object of the invention is not possess in this tunnel the condition of release scheme of constructing for part deep-well, high-ground stress tunnel and must carry out the problem of release before driving, provides a kind of drilling and blasting of constructing outside lane to optimize tunnel regional stress field method.
Technical scheme: the method for construction optimization tunnel regional stress field outside lane of the present invention, comprises the steps:
(1) in the tunnel be connected with pre-digging laneway, construction stress removes boring, stress relief method is utilized to survey geostatic stress, obtain the size and Orientation distribution of main stress bar, to calculate and after determining pre-digging laneway pick lane, major principal stress difference position and the relative distance c that helps of pre-tunnel laneway are helped in pre-tunnel laneway road two;
(2) in the backplane level position of pre-digging laneway, tunnel a relieving roadway in advance, and carry out supporting;
(3) help major principal stress difference position to arrange the position, hole that multiple row stress optimization is holed respectively from relieving roadway top board to pre-tunnel laneway road two;
(4) by arranging the boring of construction stress optimization one by one, and in Kong Di powder charge district's powder charge that each stress optimization is holed;
(5) static(al) explosion is carried out in counter stress optimization boring, optimizes tunnel regional stress field.
The horizontal range a of described relieving roadway and pre-digging laneway is 0 ~ 30m, vertical distance b is 5 ~ 40m.
The vertical distance e of described stress releasing borehole and pre-digging laneway is the pre-digging laneway span scope of 2 ~ 3 times.
The spacing f of adjacent two row of described multiple row stress optimization boring is 0.6 ~ 2m, the array pitch g of adjacent two rows is 0.6 ~ 1.2m, and length l, the stress optimization boring of stress optimization boring are determined by horizontal range a, vertical distance b, relative distance c with the angle α of vertical direction.
The loaded length d in described powder charge district is 1 ~ 3m.
Beneficial effect: the present invention in the tunnel be connected with pre-digging laneway by stress relief method side geostatic stress, obtain country rock intermediate principal stress size and the direction in region residing for pre-digging laneway, the major principal stress formed in roadway's sides after computation and analysis obtains Chu Jue lane difference position.In the layer position that the below of pre-digging laneway layer position is suitable, the relieving roadway that driving one is parallel with pre-digging laneway in advance, there is large distortion and even destroy completely after boring release completes in the supporting intensity permission tunnel of this Relieving way, plays certain release effect to pre-digging laneway.In the relieving roadway of base plate, help the boring of major principal stress difference position construction multiple row stress optimization respectively to the left and right two of pre-digging laneway, powder charge and static(al) unloading pressure by blasting are carried out to boring.May correspond to power optimization boring after powder charge adopts many rows to be divided into one group, and the mode of sequence blasting in units of group carries out release.After upper one group of stress optimization drilling and blasting has been constructed, circulation is carried out holing, powder charge, unloading pressure by blasting, complete and optimize in advance the tunnel regional stress field of pre-digging laneway total length, its method is simple, and easy to operate, implementation result is good.Major advantage has:
1. the driving of relieving roadway not only solves the problem of release scheme constructional difficulties in lane, and the distortion of relieving roadway also serves the effect of release to pre-digging laneway;
2. the construction of multiple row boring serves certain release effect to pre-digging laneway;
3. unloading pressure by blasting has been carried out in pair major principal stress difference position, and unloading pressure by blasting has order ground property and specific aim;
4. adopt the mode of order of packets explosion to carry out release during explosion, release effect is better;
5. adopt the mode of static(al) explosion to carry out unloading pressure by blasting, can not damage the roadway surrounding rock of superficial part.
Accompanying drawing explanation
Fig. 1 is the method schematic diagram of construction optimization tunnel regional stress field outside lane of the present invention;
Fig. 2 is stress releasing borehole schematic diagram in the method for construction optimization tunnel regional stress field outside lane of the present invention;
Fig. 3 is the layout schematic diagram of roof Stress optimization boring in the method for construction optimization tunnel regional stress field outside lane of the present invention.
In figure: the pre-digging laneway of 1-; 2-relieving roadway; 3-major principal stress difference position; 4-stress optimization is holed; 5-powder charge district; 6-tunnel; 7-stress releasing borehole.
Detailed description of the invention
Below in conjunction with accompanying drawing, one embodiment of the present of invention are further described:
The method of construction optimization tunnel regional stress field outside lane of the present invention, concrete steps are as follows:
(1) test of geostatic stress, obtain major principal stress difference position: in the tunnel 6 be connected with pre-digging laneway 1, construction stress removes boring 7, as shown in Figure 2, stress relief method is utilized to survey geostatic stress, obtain the size and Orientation distribution of main stress bar, to calculate and after determining that pre-digging laneway 1 digs lane, the relative distance c that pre-tunnel laneway road two helps major principal stress difference position 3 and pre-tunnel laneway to help; Described stress releasing borehole 7 and the vertical distance e of pre-digging laneway 1 are the pre-digging laneway span scope of 2 ~ 3 times.
(2) relieving roadway is tunneled: in the backplane level position of pre-digging laneway 1, tunnel a relieving roadway 2 in advance, and carry out supporting; The intensity of supporting allows relieving roadway 2 to complete, and stress optimization boring is arranged, large deformation and failure occurs after explosion, plays release effect to pre-digging laneway.Described relieving roadway 2 is 0 ~ 30m, vertical distance b with the horizontal range a of pre-digging laneway 1 is 5 ~ 40m, as shown in Figure 1.
(3) stress optimization boring is arranged: help major principal stress difference position 3 to arrange the position, hole of multiple row stress optimization boring 4 respectively from relieving roadway 2 top board to pre-tunnel laneway road two; Borehole bottom location drops on major principal stress difference position 3 place; Length l, the stress optimization boring 4 of stress optimization boring 4 are determined by horizontal range a, vertical distance b, relative distance c with the angle α of vertical direction; Described multiple row stress optimization hole 4 adjacent two row spacing f be 0.6 ~ 2m, adjacent two row array pitch g be 0.6 ~ 1.2m, the diameter D of boring is more than 40mm.
(4) by arranging the boring of construction stress optimization one by one 4, and powder charge at the bottom of the hole of each stress optimization boring 4, the loaded length d in Kong Di powder charge district 5 is 1 ~ 3m.
(5) static(al) explosion is carried out in counter stress optimization boring 4, optimizes tunnel regional stress field.Can adopt during explosion and arrange grouping more, the mode of sequence blasting in units of group carries out unloading pressure by blasting, and for Fig. 3, every five row hole drillings are divided into a group, are numbered 1# ~ 5#; First explosion is carried out to 3# row hole drilling, after certain interval of time, then to the static(al) explosion simultaneously of 2#, 4# row hole drilling, then after a period of time of being separated by, then static(al) explosion is carried out to 1#, 5# row hole drilling simultaneously.
(6): repeat step (3), (4), (5): after a upper section drilling and blasting is complete, repeat boring, powder charge, explosion, until complete tunnel regional stress field optimization aim in whole audience region, tunnel.

Claims (5)

1. the method for construction optimization tunnel regional stress field outside lane, its spy is to comprise the steps:
(1) in the tunnel (6) be connected with pre-digging laneway (1), construction stress removes boring (7), stress relief method is utilized to survey geostatic stress, obtain the size and Orientation distribution of main stress bar, to calculate and after determining pre-digging laneway (1) pick lane, the relative distance that pre-tunnel laneway road two helps major principal stress difference position (3) to help with pre-tunnel laneway c;
(2) in the backplane level position of pre-digging laneway (1), tunnel a relieving roadway (2) in advance, and carry out supporting;
(3) help major principal stress difference position (3) to arrange the position, hole of multiple row stress optimization boring (4) respectively from relieving roadway (2) top board to pre-tunnel laneway road two;
(4) by arranging the boring of construction stress optimization one by one (4), and Kong Di powder charge district (5) powder charge of hole at each stress optimization (4);
(5) static(al) explosion is carried out in counter stress optimization boring (4), optimizes tunnel regional stress field.
2. the method for construction optimization tunnel regional stress field outside lane according to claim 1, is characterized in that: the horizontal range of described relieving roadway (2) and pre-digging laneway (1) abe 0 ~ 30m, vertical distance bbe 5 ~ 40m.
3. the method for construction optimization tunnel regional stress field outside lane according to claim 1, is characterized in that: the vertical distance of described stress releasing borehole (7) and pre-digging laneway (1) eit is the pre-digging laneway span scope of 2 ~ 3 times.
4. the method for construction optimization tunnel regional stress field outside lane according to claim 1, is characterized in that: the spacing of adjacent two row of described multiple row stress optimization boring (4) fbe 0.6 ~ 2m, the array pitch of adjacent two rows gbe 0.6 ~ 1.2m, the length of stress optimization boring (4) l, stress optimization boring (4) and vertical direction angle αpass through horizontal range a, vertical distance b, relative distance cdetermine.
5. the method for construction optimization tunnel regional stress field outside lane according to claim 1, is characterized in that: the loaded length in described powder charge district (5) dbe 1 ~ 3m.
CN201410837427.7A 2014-12-29 2014-12-29 A kind of method of construction optimization tunnel regional stress field outside lane Active CN104500078B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201410837427.7A CN104500078B (en) 2014-12-29 2014-12-29 A kind of method of construction optimization tunnel regional stress field outside lane
PCT/CN2015/098034 WO2016107435A1 (en) 2014-12-29 2015-12-21 Method operating outside of passageway for optimizing passageway regional stress field

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410837427.7A CN104500078B (en) 2014-12-29 2014-12-29 A kind of method of construction optimization tunnel regional stress field outside lane

Publications (2)

Publication Number Publication Date
CN104500078A true CN104500078A (en) 2015-04-08
CN104500078B CN104500078B (en) 2016-08-17

Family

ID=52941517

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410837427.7A Active CN104500078B (en) 2014-12-29 2014-12-29 A kind of method of construction optimization tunnel regional stress field outside lane

Country Status (2)

Country Link
CN (1) CN104500078B (en)
WO (1) WO2016107435A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016107435A1 (en) * 2014-12-29 2016-07-07 中国矿业大学 Method operating outside of passageway for optimizing passageway regional stress field
CN111578797A (en) * 2020-07-06 2020-08-25 酒泉钢铁(集团)有限责任公司 Underground medium-length hole blasting suspended roof processing method
CN112483097A (en) * 2020-12-18 2021-03-12 山东科技大学 Mining roadway scour prevention method under three-dimensional coal pillar based on overhaul

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110704927B (en) * 2019-09-29 2022-09-30 安徽理工大学 Deep well roadway surrounding rock dynamic control method
CN115263318B (en) * 2022-06-29 2023-09-19 中国矿业大学 Combined pressure relief method for head-on explosion rupture hole of rock burst mine tunneling roadway

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3540995A1 (en) * 1985-03-01 1986-09-04 Markmann & Moll GmbH & Co KG, 4300 Essen Injection and tube-releasing apparatus
GB2358417A (en) * 2000-01-18 2001-07-25 Allan Cassells Sharp A method for construction and operation of subaqueous tunnels
CN101864961A (en) * 2010-05-27 2010-10-20 武汉大学 Method for actively preventing and controlling rock burst
CN102937399A (en) * 2012-11-20 2013-02-20 武汉大学 Stress relief blasting method based on ground stress transient release

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1180519A1 (en) * 1984-04-03 1985-09-23 Коммунарский горно-металлургический институт Method of relieving and strengthening a rock body
SU1263868A1 (en) * 1984-12-05 1986-10-15 Коммунарский горно-металлургический институт Method of controlling the strained state of rock about mine working
SU1643726A1 (en) * 1988-06-13 1991-04-23 Всесоюзный Научно-Исследовательский, Проектный И Конструкторский Институт Горного Дела Цветной Металлургии Method for tunneling mine workings under high rock pressure
CN1865660A (en) * 2006-06-16 2006-11-22 中国矿业大学 Construction method for weakening zone of floor plate wall rock
CN102296958A (en) * 2011-07-22 2011-12-28 山东科技大学 Method for preventing rock burst by artificial space defect body
CN102518471A (en) * 2011-11-14 2012-06-27 山东科技大学 Rock burst energy releasing method of roadway of high stress area in coal mine
CN104500078B (en) * 2014-12-29 2016-08-17 中国矿业大学 A kind of method of construction optimization tunnel regional stress field outside lane

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3540995A1 (en) * 1985-03-01 1986-09-04 Markmann & Moll GmbH & Co KG, 4300 Essen Injection and tube-releasing apparatus
GB2358417A (en) * 2000-01-18 2001-07-25 Allan Cassells Sharp A method for construction and operation of subaqueous tunnels
CN101864961A (en) * 2010-05-27 2010-10-20 武汉大学 Method for actively preventing and controlling rock burst
CN102937399A (en) * 2012-11-20 2013-02-20 武汉大学 Stress relief blasting method based on ground stress transient release

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016107435A1 (en) * 2014-12-29 2016-07-07 中国矿业大学 Method operating outside of passageway for optimizing passageway regional stress field
CN111578797A (en) * 2020-07-06 2020-08-25 酒泉钢铁(集团)有限责任公司 Underground medium-length hole blasting suspended roof processing method
CN111578797B (en) * 2020-07-06 2022-05-31 酒泉钢铁(集团)有限责任公司 Underground medium-length hole blasting suspended roof processing method
CN112483097A (en) * 2020-12-18 2021-03-12 山东科技大学 Mining roadway scour prevention method under three-dimensional coal pillar based on overhaul

Also Published As

Publication number Publication date
WO2016107435A1 (en) 2016-07-07
CN104500078B (en) 2016-08-17

Similar Documents

Publication Publication Date Title
Fangtian et al. Whole section anchor–grouting reinforcement technology and its application in underground roadways with loose and fractured surrounding rock
CN104500078A (en) Method for optimizing roadway area stress field in construction outside roadway
CN104564086B (en) A kind of big lane regional stress field optimization method
CN104763432B (en) A kind of method that high stress tunnel country rock release controls large deformation
CN102900460B (en) Method for performing through-going seam cutting, pressure relief, permeability enhancement and quick tunneling on soft and high-outburst coal seam
CN202064981U (en) Soft coal layer roadway supporting structure
CN102644476B (en) Method for pumping gas of protected layer by layer penetration and hole drilling on high-position drilling fields of protecting layer machinery tunnel
CN102392678A (en) Gas drainage method combining surface and underground fracturing and permeability improvement
CN110130897A (en) Roof weakening solution danger method
CN103758560B (en) A kind of multiple topping packet zone mash gas harnessing method that goes forward one by one
CN110593875B (en) Gob-side entry driving method of grouting anchor cable based on full period of roadway service
CN102587962A (en) Methods for arranging and supporting wall-expanded gas extraction drill sites
Xu et al. Mining-induced movement properties and fissure time-space evolution law in overlying strata
CN109915197A (en) A kind of method that rock gangway km directional long borehole substitution middle part bottom pumping rock gangway is taken out at bottom
CN103557001B (en) A kind of low section high oper cylinler shrink afterwards filling mining method
CN203594035U (en) Multilevel combined protection structure for shallow hole blasting excavation bridge foundation pit construction
CN104234716B (en) The packed cofferdam method of mining by the way of filling
CN104632229A (en) Method for optimizing stress field of roadway area based on main stress differences
CN106285745A (en) Underground coal mine stress field principal direction of stress Forecasting Methodology
CN103760622A (en) Method for monitoring activity state of underground fault
CN105156120A (en) Inclined-shaft reverse excavation construction method for hillside cave depot
CN109441480B (en) Temporary supporting construction method for backward tunnel face of multi-arch tunnel
CN104989330A (en) Coalbed gas recovery method
CN110566238A (en) Mud rock roof small coal pillar gob-side roadway supporting structure and method thereof
CN104343453A (en) Filling mining method of slowly-inclined medium-thick ore deposit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 221116 Research Institute of China University of Mining and Technology,, Jiangsu

Applicant after: China University of Mining & Technology

Address before: 221116 Research Institute, China University of Mining and Technology, Xuzhou University, Jiangsu, China,

Applicant before: China University of Mining & Technology

CB03 Change of inventor or designer information

Inventor after: Zheng Xigui

Inventor after: Zhang Nong

Inventor after: Fu Shixiong

Inventor after: Yue Wei

Inventor after: Liu Na

Inventor after: Shi Chaomin

Inventor before: Zhang Nong

Inventor before: Zheng Xigui

Inventor before: Fu Shixiong

Inventor before: Yue Wei

Inventor before: Liu Na

Inventor before: Shi Chaomin

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant