CN104500078A - Method for optimizing roadway area stress field in construction outside roadway - Google Patents
Method for optimizing roadway area stress field in construction outside roadway Download PDFInfo
- Publication number
- CN104500078A CN104500078A CN201410837427.7A CN201410837427A CN104500078A CN 104500078 A CN104500078 A CN 104500078A CN 201410837427 A CN201410837427 A CN 201410837427A CN 104500078 A CN104500078 A CN 104500078A
- Authority
- CN
- China
- Prior art keywords
- stress
- roadway
- tunnel
- optimization
- boring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/001—Improving soil or rock, e.g. by freezing; Injections
Abstract
Description
Claims (5)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410837427.7A CN104500078B (en) | 2014-12-29 | 2014-12-29 | A kind of method of construction optimization tunnel regional stress field outside lane |
PCT/CN2015/098034 WO2016107435A1 (en) | 2014-12-29 | 2015-12-21 | Method operating outside of passageway for optimizing passageway regional stress field |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410837427.7A CN104500078B (en) | 2014-12-29 | 2014-12-29 | A kind of method of construction optimization tunnel regional stress field outside lane |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104500078A true CN104500078A (en) | 2015-04-08 |
CN104500078B CN104500078B (en) | 2016-08-17 |
Family
ID=52941517
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410837427.7A Active CN104500078B (en) | 2014-12-29 | 2014-12-29 | A kind of method of construction optimization tunnel regional stress field outside lane |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN104500078B (en) |
WO (1) | WO2016107435A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2016107435A1 (en) * | 2014-12-29 | 2016-07-07 | 中国矿业大学 | Method operating outside of passageway for optimizing passageway regional stress field |
CN111578797A (en) * | 2020-07-06 | 2020-08-25 | 酒泉钢铁(集团)有限责任公司 | Underground medium-length hole blasting suspended roof processing method |
CN112483097A (en) * | 2020-12-18 | 2021-03-12 | 山东科技大学 | Mining roadway scour prevention method under three-dimensional coal pillar based on overhaul |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110704927B (en) * | 2019-09-29 | 2022-09-30 | 安徽理工大学 | Deep well roadway surrounding rock dynamic control method |
CN115263318B (en) * | 2022-06-29 | 2023-09-19 | 中国矿业大学 | Combined pressure relief method for head-on explosion rupture hole of rock burst mine tunneling roadway |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3540995A1 (en) * | 1985-03-01 | 1986-09-04 | Markmann & Moll GmbH & Co KG, 4300 Essen | Injection and tube-releasing apparatus |
GB2358417A (en) * | 2000-01-18 | 2001-07-25 | Allan Cassells Sharp | A method for construction and operation of subaqueous tunnels |
CN101864961A (en) * | 2010-05-27 | 2010-10-20 | 武汉大学 | Method for actively preventing and controlling rock burst |
CN102937399A (en) * | 2012-11-20 | 2013-02-20 | 武汉大学 | Stress relief blasting method based on ground stress transient release |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1180519A1 (en) * | 1984-04-03 | 1985-09-23 | Коммунарский горно-металлургический институт | Method of relieving and strengthening a rock body |
SU1263868A1 (en) * | 1984-12-05 | 1986-10-15 | Коммунарский горно-металлургический институт | Method of controlling the strained state of rock about mine working |
SU1643726A1 (en) * | 1988-06-13 | 1991-04-23 | Всесоюзный Научно-Исследовательский, Проектный И Конструкторский Институт Горного Дела Цветной Металлургии | Method for tunneling mine workings under high rock pressure |
CN1865660A (en) * | 2006-06-16 | 2006-11-22 | 中国矿业大学 | Construction method for weakening zone of floor plate wall rock |
CN102296958A (en) * | 2011-07-22 | 2011-12-28 | 山东科技大学 | Method for preventing rock burst by artificial space defect body |
CN102518471A (en) * | 2011-11-14 | 2012-06-27 | 山东科技大学 | Rock burst energy releasing method of roadway of high stress area in coal mine |
CN104500078B (en) * | 2014-12-29 | 2016-08-17 | 中国矿业大学 | A kind of method of construction optimization tunnel regional stress field outside lane |
-
2014
- 2014-12-29 CN CN201410837427.7A patent/CN104500078B/en active Active
-
2015
- 2015-12-21 WO PCT/CN2015/098034 patent/WO2016107435A1/en active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3540995A1 (en) * | 1985-03-01 | 1986-09-04 | Markmann & Moll GmbH & Co KG, 4300 Essen | Injection and tube-releasing apparatus |
GB2358417A (en) * | 2000-01-18 | 2001-07-25 | Allan Cassells Sharp | A method for construction and operation of subaqueous tunnels |
CN101864961A (en) * | 2010-05-27 | 2010-10-20 | 武汉大学 | Method for actively preventing and controlling rock burst |
CN102937399A (en) * | 2012-11-20 | 2013-02-20 | 武汉大学 | Stress relief blasting method based on ground stress transient release |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2016107435A1 (en) * | 2014-12-29 | 2016-07-07 | 中国矿业大学 | Method operating outside of passageway for optimizing passageway regional stress field |
CN111578797A (en) * | 2020-07-06 | 2020-08-25 | 酒泉钢铁(集团)有限责任公司 | Underground medium-length hole blasting suspended roof processing method |
CN111578797B (en) * | 2020-07-06 | 2022-05-31 | 酒泉钢铁(集团)有限责任公司 | Underground medium-length hole blasting suspended roof processing method |
CN112483097A (en) * | 2020-12-18 | 2021-03-12 | 山东科技大学 | Mining roadway scour prevention method under three-dimensional coal pillar based on overhaul |
Also Published As
Publication number | Publication date |
---|---|
WO2016107435A1 (en) | 2016-07-07 |
CN104500078B (en) | 2016-08-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Fangtian et al. | Whole section anchor–grouting reinforcement technology and its application in underground roadways with loose and fractured surrounding rock | |
CN104500078A (en) | Method for optimizing roadway area stress field in construction outside roadway | |
CN104564086B (en) | A kind of big lane regional stress field optimization method | |
CN104763432B (en) | A kind of method that high stress tunnel country rock release controls large deformation | |
CN102900460B (en) | Method for performing through-going seam cutting, pressure relief, permeability enhancement and quick tunneling on soft and high-outburst coal seam | |
CN202064981U (en) | Soft coal layer roadway supporting structure | |
CN102644476B (en) | Method for pumping gas of protected layer by layer penetration and hole drilling on high-position drilling fields of protecting layer machinery tunnel | |
CN102392678A (en) | Gas drainage method combining surface and underground fracturing and permeability improvement | |
CN110130897A (en) | Roof weakening solution danger method | |
CN103758560B (en) | A kind of multiple topping packet zone mash gas harnessing method that goes forward one by one | |
CN110593875B (en) | Gob-side entry driving method of grouting anchor cable based on full period of roadway service | |
CN102587962A (en) | Methods for arranging and supporting wall-expanded gas extraction drill sites | |
Xu et al. | Mining-induced movement properties and fissure time-space evolution law in overlying strata | |
CN109915197A (en) | A kind of method that rock gangway km directional long borehole substitution middle part bottom pumping rock gangway is taken out at bottom | |
CN103557001B (en) | A kind of low section high oper cylinler shrink afterwards filling mining method | |
CN203594035U (en) | Multilevel combined protection structure for shallow hole blasting excavation bridge foundation pit construction | |
CN104234716B (en) | The packed cofferdam method of mining by the way of filling | |
CN104632229A (en) | Method for optimizing stress field of roadway area based on main stress differences | |
CN106285745A (en) | Underground coal mine stress field principal direction of stress Forecasting Methodology | |
CN103760622A (en) | Method for monitoring activity state of underground fault | |
CN105156120A (en) | Inclined-shaft reverse excavation construction method for hillside cave depot | |
CN109441480B (en) | Temporary supporting construction method for backward tunnel face of multi-arch tunnel | |
CN104989330A (en) | Coalbed gas recovery method | |
CN110566238A (en) | Mud rock roof small coal pillar gob-side roadway supporting structure and method thereof | |
CN104343453A (en) | Filling mining method of slowly-inclined medium-thick ore deposit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 221116 Research Institute of China University of Mining and Technology,, Jiangsu Applicant after: China University of Mining & Technology Address before: 221116 Research Institute, China University of Mining and Technology, Xuzhou University, Jiangsu, China, Applicant before: China University of Mining & Technology |
|
CB03 | Change of inventor or designer information |
Inventor after: Zheng Xigui Inventor after: Zhang Nong Inventor after: Fu Shixiong Inventor after: Yue Wei Inventor after: Liu Na Inventor after: Shi Chaomin Inventor before: Zhang Nong Inventor before: Zheng Xigui Inventor before: Fu Shixiong Inventor before: Yue Wei Inventor before: Liu Na Inventor before: Shi Chaomin |
|
COR | Change of bibliographic data | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |