CN102900460B - Method for performing through-going seam cutting, pressure relief, permeability enhancement and quick tunneling on soft and high-outburst coal seam - Google Patents

Method for performing through-going seam cutting, pressure relief, permeability enhancement and quick tunneling on soft and high-outburst coal seam Download PDF

Info

Publication number
CN102900460B
CN102900460B CN201210437230.5A CN201210437230A CN102900460B CN 102900460 B CN102900460 B CN 102900460B CN 201210437230 A CN201210437230 A CN 201210437230A CN 102900460 B CN102900460 B CN 102900460B
Authority
CN
China
Prior art keywords
coal
heading
seam
slot hole
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210437230.5A
Other languages
Chinese (zh)
Other versions
CN102900460A (en
Inventor
林柏泉
翟成
沈春明
张连军
高亚斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201210437230.5A priority Critical patent/CN102900460B/en
Publication of CN102900460A publication Critical patent/CN102900460A/en
Application granted granted Critical
Publication of CN102900460B publication Critical patent/CN102900460B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a method for performing through-going seam cutting, pressure relief, permeability enhancement and quick tunneling on a soft and high-outburst coal seam, and in particular is applied to quick tunneling in a coal seam which is high in outburst danger and a laneway is difficult to support in a coal mine. The method comprises the following steps of: forming a network type fractured net by high-pressure jet flow seam cutting, pressure relief and permeability enhancement technologies, and enhancing an effect of extracting strip-type coal seam gas on a coal laneway subjected to through-going drilling and pre-extraction; and forming a network type filling region by pressing and injecting filling materials, so that the strength and stress distribution of a coal body are improved, the coal laneway is easy to maintain in the tunneling process, a phenomenon that the gas rushes out of a tunneled laneway is avoided, gas accidents are eliminated in the tunneling process, and an aim of safely and quickly tunneling the laneway is fulfilled.

Description

Anti-reflection and the speedy drivage method of layer slot release is worn in the prominent coal seam of soft height
Technical field
The present invention relates to a kind of speedy drivage method, be especially a kind ofly applicable in colliery, there is strong outburst hazard, the prominent coal seam of soft height in supporting difficulty coal seam wears the anti-reflection and speedy drivage method of layer slot release.
Background technology
The exploitation in the prominent coal seam of soft height is accompanied by a large amount of Gas, and outstanding threat is larger, and the soft coal roadway support difficulty that causes of ature of coal, seriously restricts mine safety and produces fast.At present; cannot exploit topping time; mainly solve the gas problem in the tunneling process of high prominent coal seam by taking out in advance coal-bed gas; but; conventional gas pumping method exists single hole gas pumping effective range little; drilling construction workload is large, and extraction efficiency deficiency on the low side, cannot effectively solve the gas hazard in tunneling process.Because ature of coal in coal road tunneling process is soft and pressure is larger, roadway maintenance is very difficult, wastes a large amount of manpower and materials, affects programming, causes debalance of preparation and winning work.
Summary of the invention
Technical problem: the object of the invention is for the problem existing in prior art, provide the prominent coal seam of a kind of soft height to wear the anti-reflection and speedy drivage method of layer slot release, by adopting the anti-reflection technology of base plate layer-through drilling high-pressure spray slot release, form network type fracture network, strengthening layer-through drilling is taken out the extracting result of coal road band coal-bed gas in advance; And by pressure injection filler, form network type filling area, with improve heading around the Strenth and stress of coal body distribute, make that maintenance in coal road tunneling process becomes easily, eliminate the Gas Disaster in tunneling process, thereby realize driving safely and fast.
Technical scheme: the anti-reflection and speedy drivage method of layer slot release is worn in the prominent coal seam of soft height of the present invention: be included in and move towards cloth bottom set along work plane in seat earth rock stratum and take out lane, in Di Chou lane, arrange drill site, in each drill site in Cong Dichou lane, wear a layer slot hole to the construction of coal seam direction, until through coal seam, to carrying out high-pressure hydraulic slot in coal seam, implement afterwards gas pumping; Characterized by further comprising following steps:
A, multiple drill sites that arrangement pitch is 6 ~ 8m in described Di Chou lane, each drill site is arranged layer slot hole of wearing of 5 ~ 7 linear distributions in coal seam, the whole pitch of holes of wearing layer slot hole is 6 ~ 8m;
B, before the heading digging time 30 ~ 50 days, stop gas pumping to wearing a layer slot hole near a row of pre-pick both sides, heading position, wear in layer slot hole pressure injection filler successively by grouting pump to a row who stops gas pumping, the coal body of pre-pick heading both sides is reinforced;
Gas pumping is continued in layer slot hole of wearing of c, not filling;
D, before the heading digging time 5 ~ 7 days, test to gas pumping effect, reaches after " control coal and Gas Outburst regulation " requirement, can tunnel according to a conventional method heading in the heading time of digging;
E, in driving heading process, continue to wear in layer slot hole pressure injection filler successively near a row of pre-pick both sides, heading position, two rows that ensure filling successively wear a layer slot hole site and answer advance development head to be not less than 50m.
Described each drill site is worn layer number in slot hole according to seam inclination and is worn layer radius of influence in slot hole and determine.
When described heading starts to tunnel, coal body is reinforced distance need exceed 50m.
Beneficial effect: it is anti-reflection that the present invention carries out release by mine floor rock gangway layer-through drilling inner high voltage jet slot to the prominent coal seam of height, improve layer-through drilling and take out in advance the extracting result of coal road band coal-bed gas, eliminate the high gas gradient in coal seam, reduce the gas emission in heading tunneling process, improve heading driving speed; And by pressure injection filler, form network type filling area, increase coal mass strength, improve the supporting condition of coal road driving, reduce coal road two and help gas gushing out to digging laneway, in eliminating high prominent coal road driving outburst hazard, solve the problem of coal roadway support difficulty, greatly improve the speed of the prominent Coal roadway driving of soft height.The present invention can make the prominent coal bed gas extraction concentration of soft height improve 10 ~ 15%, and pre-pumping rate improves 25%, and every hole coal output reaches more than 3 tons; Take out in advance the drilling hole amount needing and reduce 20% ~ 30%, take out in advance the time decreased 20% needing; There is fabulous promotional value.
Brief description of the drawings
Fig. 1 is the prominent coal seam speedy drivage structural representation of the soft height of the present invention;
Fig. 2 is the A-A generalized section of Fig. 1;
In figure: 1-coal seam, 2-heading, 3-Di Chou lane, 4-wears a layer slot hole, and the outer command range of outline line is helped in 5-network type filling area on H1-tunnel, help the outer command range of outline line, α-seam inclination under H2-tunnel.
Detailed description of the invention
Below in conjunction with accompanying drawing, one embodiment of the present of invention are further described:
As shown in Figure 1, anti-reflection and the speedy drivage method of layer slot release is worn in the prominent coal seam of soft height of the present invention, first according to looking into geological information parameter: coal seam thickness, seam inclination α, bearing, gas parameter, hydrologic regime and other have the parameter of requirement in construction, formulate detailed embodiment.Carry out pre-implementation preparatory work, consider to process the hazards such as crack, tomography, water.In 1 floor strata of coal seam, move towards cloth bottom set along work plane and take out lane 3, test the radius of influence of determining slot hole by slot; Complete in Hou Dichou lane and arrange a drill site every 6 ~ 8m, 5 ~ 7 of each drill site layouts are worn a layer slot hole 4, and slot hole is linear distribution in coal seam, and whole pitch of holes is 6 ~ 8m.According to the radius of influence in seam inclination α and slot hole, determine the number in each drill site slot hole, on the tunnel of the seam inclination α of its medium dip, high-dipping between 25o to 90o, help outline line to control distance H 1 outward and be at least 20m, under tunnel, help outline line to control distance H 2 outward and be at least 10m, on the tunnel of the seam inclination α of gentle dip, nearly level between 0o to 25o, help outline line to control outward to help outline line to control distance H 2 outward under distance H 1 and tunnel to be at least 15m.If coal seam is gentle dip or flat seam, the wide 4m of heading 2, the slot hole radius of influence is 3.7m, needing the distance of controlling is 34m, arrange that wearing a layer slot hole 4 for 5 can control 37m, command range is greater than 34m, therefore arranges that wearing layer slot hole 4 for 5 gets final product (in heading 2, arranging 1,2 of the each layouts of its upper and lower side); If coal seam is for tilting or half-edge coal seam, the wide 4m of heading 2, the slot hole radius of influence is 3.3m, needing the distance of controlling is 34m, arrange that wearing a layer slot hole 4 for 6 can control 39.6m, command range is greater than 34m, therefore arranges that wearing layer slot hole 4 for 6 can (arrange 1 in heading 2, on it, side arranges 3, and lower side arranges 2).In each drill site in Cong Dichou lane 3, wear a layer slot hole 4 to coal seam 1 direction construction, until through coal seam 1, to carrying out high-pressure hydraulic slot in coal seam 1, implement afterwards gas pumping, before the 2 digging times of heading 30 ~ 50 days, stop gas pumping to wearing a layer slot hole 4 near a row of pre-pick heading 2 both sides, position, wear in layer slot hole 4 pressure injection filler successively by grouting pump to a row who stops gas pumping, coal body to pre-pick heading both sides is reinforced, other not filling wear a layer slot hole 4 and continue mash gas extraction, after filler solidifies, form network type filling area 5 in heading 2 both sides, as shown in Figure 2, network type filling area 5 can increase coal mass strength, improving stress in coal bed distributes, stop the gas in 5 outsides, network type filling area to be gushed out to the pre-pick of heading 2 position simultaneously.Before the heading digging time 5 ~ 7 days, gas pumping effect is tested, after reaching " control coal and Gas Outburst regulation " and requiring, tunnel according to a conventional method heading 2 in the 2 digging times of heading, now coal body is reinforced apart from exceeding 50m.In driving heading 2 processes, continue to wear in layer slot hole 4 pressure injection filler successively near a row of pre-pick heading 2 both sides, position, two rows that ensure filling successively wear layer 4 position, slot hole and answer advance development head to be not less than 50m.

Claims (1)

1. the anti-reflection and speedy drivage method of layer slot release is worn in the prominent coal seam of a soft height, be included in and move towards cloth bottom set along work plane in the floor strata of coal seam (1) and take out lane (3), in Di Chou lane (3), arrange drill site, in each drill site in Cong Dichou lane (3), to coal seam, a layer slot hole (4) worn in the construction of (1) direction, until through coal seam (1), to carrying out high-pressure hydraulic slot in coal seam (1), implement afterwards gas pumping; Characterized by further comprising following steps:
A, multiple drill sites that arrangement pitch is 6 ~ 8m in described Di Chou lane (3), each drill site is arranged layer slot hole (4) of wearing of 5 ~ 7 linear distributions in coal seam (1), wearing layer whole pitch of holes in slot hole (4) is 6 ~ 8m; Described each drill site is worn layer number in slot hole (4) according to seam inclination α and is worn layer radius of influence in slot hole (4) and determine; On the tunnel of the seam inclination α of inclination, high-dipping between 25o to 90o, helping outline line to control distance H 1 is outward at least 20m, helps outline line to control distance H 2 outward and be at least 10m under tunnel; On the tunnel of the seam inclination α of gentle dip, nearly level between 0o to 25o, help outline line to control outward to help outline line to control distance H 2 outward under distance H 1 and tunnel to be at least 15m;
B, in heading (2) the digging time first 30 ~ 50 days, stop gas pumping to wearing a layer slot hole (4) near a row of pre-pick heading (2) both sides, position, wear in layer slot hole (4) pressure injection filler successively by grouting pump to a row who stops gas pumping, the coal body of pre-pick heading (2) both sides is reinforced;
Gas pumping is continued in layer slot hole (4) of wearing of c, not filling;
D, in heading (2) the digging time first 5 ~ 7 days, test to gas pumping effect, reaches after " control coal and Gas Outburst regulation " requirement, can tunnel according to a conventional method heading (2) in heading (2) the digging time; The coal body of heading (2) both sides is reinforced distance need exceed 50m;
E, in driving heading (2) process, continue to wear in layer slot hole (4) pressure injection filler successively near a row of pre-pick heading (2) both sides, position, two rows that ensure filling successively wear a layer position, slot hole (4) and answer advance development head to be not less than 50m.
CN201210437230.5A 2012-11-06 2012-11-06 Method for performing through-going seam cutting, pressure relief, permeability enhancement and quick tunneling on soft and high-outburst coal seam Expired - Fee Related CN102900460B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210437230.5A CN102900460B (en) 2012-11-06 2012-11-06 Method for performing through-going seam cutting, pressure relief, permeability enhancement and quick tunneling on soft and high-outburst coal seam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210437230.5A CN102900460B (en) 2012-11-06 2012-11-06 Method for performing through-going seam cutting, pressure relief, permeability enhancement and quick tunneling on soft and high-outburst coal seam

Publications (2)

Publication Number Publication Date
CN102900460A CN102900460A (en) 2013-01-30
CN102900460B true CN102900460B (en) 2014-10-29

Family

ID=47572917

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210437230.5A Expired - Fee Related CN102900460B (en) 2012-11-06 2012-11-06 Method for performing through-going seam cutting, pressure relief, permeability enhancement and quick tunneling on soft and high-outburst coal seam

Country Status (1)

Country Link
CN (1) CN102900460B (en)

Families Citing this family (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103291354B (en) * 2013-05-20 2015-06-10 中国矿业大学 Filling and reinforcing method for floor roadway cross-layer pressure-relief borehole
CN103306713B (en) * 2013-05-20 2015-12-09 中国矿业大学 A kind of high prominent coal seam layer-through drilling networking reinforcement means
CN103510958B (en) * 2013-10-08 2016-08-10 中国矿业大学 A kind of gentle dip super-high seam rock cross-cut coal uncovering
CN103510957B (en) * 2013-10-08 2016-04-20 中国矿业大学 A kind of combined type coal uncovering method
CN103775121B (en) * 2014-01-20 2015-09-30 中国矿业大学 A kind of hydraulic slotted liner technique U-shaped hole deslagging mash gas harnessing method
CN104481540A (en) * 2014-10-08 2015-04-01 六盘水师范学院 Method for controlling multiple coal mining hazards by high level borehole grouting
CN104314610A (en) * 2014-10-11 2015-01-28 中煤科工集团重庆研究院有限公司 Coal road stripe region burst-preventing method
CN104747072B (en) * 2015-01-12 2017-01-25 徐州博安科技发展有限责任公司 Waterpower drilling, cutting and sewing system
CN104763462A (en) * 2015-04-07 2015-07-08 中国矿业大学 Method for extracting high-pressure hydraulic cave-manufacturing gas from rock roadway crossing hole
CN104912588B (en) * 2015-05-18 2017-01-25 太原理工大学 Spalling permeability increasing method for rapid excavation of underground seam gateway
CN105221182B (en) * 2015-09-21 2017-11-17 河南理工大学 Coal uncovering method under the complex geological condition of pole
CN106567728A (en) * 2015-10-13 2017-04-19 六盘水师范学院 High gas coal seam group base plate drainage and gas extraction system
CN105298448B (en) * 2015-10-13 2018-02-13 天地科技股份有限公司 The distribution method of coal bed gas extraction engineering
CN106014473B (en) * 2016-02-03 2018-01-09 中国矿业大学(北京) A kind of cross borehole constrained expansion explosion network permeability-increasing gas drainage method
CN106812532A (en) * 2016-03-30 2017-06-09 六盘水师范学院 A kind of coal petrography of high gas and outburst mine girdle half cuts top tunnel speedy drivage system
CN106812551A (en) * 2016-03-30 2017-06-09 六盘水师范学院 A kind of newly-built high gas and outburst mine in mountain area is worn layer and is taken out and speedy drivage system in advance
CN105909254B (en) * 2016-04-29 2018-04-24 中煤科工集团西安研究院有限公司 Projecting coal bed bottom plate, which is faced upward, wears the advanced area cover coal roadway tunneling method of layer directional hole
CN107121036A (en) * 2017-06-08 2017-09-01 刘冲 Di Chou lanes return air connection lane deep hole blasting method
CN107152303A (en) * 2017-07-05 2017-09-12 安徽理工大学 A kind of low ventilative high gas layer is by the method for the shielding efficient unloading pressure by blasting extraction in lane
CN108590739B (en) * 2018-04-11 2019-10-29 中国平煤神马能源化工集团有限责任公司 A kind of prominent tunnel regionality energy divides source to control anti-burst method
CN108894814B (en) * 2018-06-29 2019-11-22 徐州工程学院 A method of high temperature nitrogen speedy drivage is infused for layer-through drilling
CN110656972A (en) * 2019-10-31 2020-01-07 郑州慧矿智能科技有限公司 Coal roadway stripe coal seam gas extraction method based on controllable shock waves
CN110952951A (en) * 2019-12-13 2020-04-03 安徽理工大学 High-air-tightness hole sealing method for short-distance pressure-relief coal seam crossing gas extraction drill hole
CN113431623B (en) * 2021-07-28 2023-06-09 西安科技大学 High-gas weak coal seam extraction system and method
CN114607338B (en) * 2022-03-21 2023-08-18 煤炭科学技术研究院有限公司 Coal mine underground coal rock gas prevention and control composite dynamic disaster method and device
CN114673502B (en) * 2022-05-09 2022-12-02 中国矿业大学 Multi-mode disaster chain type treatment method based on bottom plate rock roadway
CN115614006B (en) * 2022-10-27 2023-08-18 重庆大学 Coal gas exploitation method combining layered pressure relief and multi-layer combined mining

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101105138A (en) * 2007-08-15 2008-01-16 湖南科技大学 Method for suppressing coal and gas outburst
CN101382073A (en) * 2007-09-29 2009-03-11 永城煤电集团有限责任公司 'Three-soft' low permeability high gas coal seam rapidly digging method
CN101603431A (en) * 2009-07-14 2009-12-16 中国矿业大学 A kind of method for reinforcing outburst-prone coal seam cross-cut coal uncovering
CN102168560A (en) * 2011-03-10 2011-08-31 贵州铸安矿山科技股份有限公司 Displacement crosscut coal uncovering method
CN102748065A (en) * 2012-07-30 2012-10-24 武汉大学 Method for extracting gas of blank zone of working face with large mining length

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101105138A (en) * 2007-08-15 2008-01-16 湖南科技大学 Method for suppressing coal and gas outburst
CN101382073A (en) * 2007-09-29 2009-03-11 永城煤电集团有限责任公司 'Three-soft' low permeability high gas coal seam rapidly digging method
CN101603431A (en) * 2009-07-14 2009-12-16 中国矿业大学 A kind of method for reinforcing outburst-prone coal seam cross-cut coal uncovering
CN102168560A (en) * 2011-03-10 2011-08-31 贵州铸安矿山科技股份有限公司 Displacement crosscut coal uncovering method
CN102748065A (en) * 2012-07-30 2012-10-24 武汉大学 Method for extracting gas of blank zone of working face with large mining length

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
林柏泉.钻孔割缝网络化增透机制及其在底板穿层钻孔瓦斯抽采中的应用.《煤炭学报》.2012,第37卷(第9期),
钻孔割缝网络化增透机制及其在底板穿层钻孔瓦斯抽采中的应用;林柏泉;《煤炭学报》;20120930;第37卷(第9期);第1427-1428页 *

Also Published As

Publication number Publication date
CN102900460A (en) 2013-01-30

Similar Documents

Publication Publication Date Title
CN102900460B (en) Method for performing through-going seam cutting, pressure relief, permeability enhancement and quick tunneling on soft and high-outburst coal seam
CN106907175B (en) The efficient extraction coal roadway stripe gas of bottom plate concordant long drilled holes staged fracturing and region outburst elimination method
CN102080518B (en) Method for extracting gas from coal seam roof complex branched well
CN111305876A (en) Deep roadway anchoring-splitting grouting-hydraulic fracturing pressure relief cooperative control method
CN109736805A (en) A kind of method of the modified release watershed management bump of thick-layer tight roof
CN103758560B (en) A kind of multiple topping packet zone mash gas harnessing method that goes forward one by one
CN103867229B (en) A kind of coal mine large-mining is dark prevents and treats comprehensive treatment method for water with lower group of coal mining
CN111594258A (en) Technical method for quickly extracting gas to reach standard by using broken soft low-permeability outburst coal seam instead of roadway through holes
AU2021453348B2 (en) Method for preventing and controlling rock bursts in development roadway group
CN102644476A (en) Method for pumping gas of protected layer by layer penetration and hole drilling on high-position drilling fields of protecting layer machinery tunnel
CN104632223B (en) Mining environment reconstructing movable type pumping filling artificial ore pillar shrinkage stoping
CN106968671B (en) The filling of underground coal mine coal working face return channel withdraws method
CN110529113B (en) Anti-impact method for deep well thick coal seam complex geological condition multi-factor coupling high stress area crossing contact roadway
CN112576305B (en) Method for preventing and controlling water damage of working surface separation layer
CN102678092A (en) Method for commonly extracting coal and coal bed gas by up-hole and down-hole joint construction
CN113107488B (en) Method for treating roof of fully mechanized coal mining face of coal mine
CN108150206A (en) A kind of method by fully-mechanized mining working crossheading caving place
CN104453900A (en) Filling mining method of near-horizontal ore body
CN113431577A (en) Method for arranging same-direction inward-staggered roadways in ultra-close coal seam mining
CN106401609A (en) Bottom plate pressure relief and reinforcement structure for controlling floor heave of deep roadway and construction method of bottom plate pressure relief and reinforcement structure
CN206205903U (en) A kind of base plate release ruggedized construction of control deep tunnel bottom distension
CN106285745A (en) Underground coal mine stress field principal direction of stress Forecasting Methodology
CN105781552A (en) Novel high-gas outburst coal seam stereoscopic punching crosscut coal uncovering method
CN105240012A (en) F-type section coal-mining method allowing commingled mining of coal pillars
CN105019935A (en) Overground/underground combined pressure relief outburst elimination coal seam rapid channel digging method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141029

Termination date: 20201106

CF01 Termination of patent right due to non-payment of annual fee