CN102900460B - Method for performing through-going seam cutting, pressure relief, permeability enhancement and quick tunneling on soft and high-outburst coal seam - Google Patents
Method for performing through-going seam cutting, pressure relief, permeability enhancement and quick tunneling on soft and high-outburst coal seam Download PDFInfo
- Publication number
- CN102900460B CN102900460B CN201210437230.5A CN201210437230A CN102900460B CN 102900460 B CN102900460 B CN 102900460B CN 201210437230 A CN201210437230 A CN 201210437230A CN 102900460 B CN102900460 B CN 102900460B
- Authority
- CN
- China
- Prior art keywords
- coal
- heading
- seam
- slot hole
- layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The invention discloses a method for performing through-going seam cutting, pressure relief, permeability enhancement and quick tunneling on a soft and high-outburst coal seam, and in particular is applied to quick tunneling in a coal seam which is high in outburst danger and a laneway is difficult to support in a coal mine. The method comprises the following steps of: forming a network type fractured net by high-pressure jet flow seam cutting, pressure relief and permeability enhancement technologies, and enhancing an effect of extracting strip-type coal seam gas on a coal laneway subjected to through-going drilling and pre-extraction; and forming a network type filling region by pressing and injecting filling materials, so that the strength and stress distribution of a coal body are improved, the coal laneway is easy to maintain in the tunneling process, a phenomenon that the gas rushes out of a tunneled laneway is avoided, gas accidents are eliminated in the tunneling process, and an aim of safely and quickly tunneling the laneway is fulfilled.
Description
Technical field
The present invention relates to a kind of speedy drivage method, be especially a kind ofly applicable in colliery, there is strong outburst hazard, the prominent coal seam of soft height in supporting difficulty coal seam wears the anti-reflection and speedy drivage method of layer slot release.
Background technology
The exploitation in the prominent coal seam of soft height is accompanied by a large amount of Gas, and outstanding threat is larger, and the soft coal roadway support difficulty that causes of ature of coal, seriously restricts mine safety and produces fast.At present; cannot exploit topping time; mainly solve the gas problem in the tunneling process of high prominent coal seam by taking out in advance coal-bed gas; but; conventional gas pumping method exists single hole gas pumping effective range little; drilling construction workload is large, and extraction efficiency deficiency on the low side, cannot effectively solve the gas hazard in tunneling process.Because ature of coal in coal road tunneling process is soft and pressure is larger, roadway maintenance is very difficult, wastes a large amount of manpower and materials, affects programming, causes debalance of preparation and winning work.
Summary of the invention
Technical problem: the object of the invention is for the problem existing in prior art, provide the prominent coal seam of a kind of soft height to wear the anti-reflection and speedy drivage method of layer slot release, by adopting the anti-reflection technology of base plate layer-through drilling high-pressure spray slot release, form network type fracture network, strengthening layer-through drilling is taken out the extracting result of coal road band coal-bed gas in advance; And by pressure injection filler, form network type filling area, with improve heading around the Strenth and stress of coal body distribute, make that maintenance in coal road tunneling process becomes easily, eliminate the Gas Disaster in tunneling process, thereby realize driving safely and fast.
Technical scheme: the anti-reflection and speedy drivage method of layer slot release is worn in the prominent coal seam of soft height of the present invention: be included in and move towards cloth bottom set along work plane in seat earth rock stratum and take out lane, in Di Chou lane, arrange drill site, in each drill site in Cong Dichou lane, wear a layer slot hole to the construction of coal seam direction, until through coal seam, to carrying out high-pressure hydraulic slot in coal seam, implement afterwards gas pumping; Characterized by further comprising following steps:
A, multiple drill sites that arrangement pitch is 6 ~ 8m in described Di Chou lane, each drill site is arranged layer slot hole of wearing of 5 ~ 7 linear distributions in coal seam, the whole pitch of holes of wearing layer slot hole is 6 ~ 8m;
B, before the heading digging time 30 ~ 50 days, stop gas pumping to wearing a layer slot hole near a row of pre-pick both sides, heading position, wear in layer slot hole pressure injection filler successively by grouting pump to a row who stops gas pumping, the coal body of pre-pick heading both sides is reinforced;
Gas pumping is continued in layer slot hole of wearing of c, not filling;
D, before the heading digging time 5 ~ 7 days, test to gas pumping effect, reaches after " control coal and Gas Outburst regulation " requirement, can tunnel according to a conventional method heading in the heading time of digging;
E, in driving heading process, continue to wear in layer slot hole pressure injection filler successively near a row of pre-pick both sides, heading position, two rows that ensure filling successively wear a layer slot hole site and answer advance development head to be not less than 50m.
Described each drill site is worn layer number in slot hole according to seam inclination and is worn layer radius of influence in slot hole and determine.
When described heading starts to tunnel, coal body is reinforced distance need exceed 50m.
Beneficial effect: it is anti-reflection that the present invention carries out release by mine floor rock gangway layer-through drilling inner high voltage jet slot to the prominent coal seam of height, improve layer-through drilling and take out in advance the extracting result of coal road band coal-bed gas, eliminate the high gas gradient in coal seam, reduce the gas emission in heading tunneling process, improve heading driving speed; And by pressure injection filler, form network type filling area, increase coal mass strength, improve the supporting condition of coal road driving, reduce coal road two and help gas gushing out to digging laneway, in eliminating high prominent coal road driving outburst hazard, solve the problem of coal roadway support difficulty, greatly improve the speed of the prominent Coal roadway driving of soft height.The present invention can make the prominent coal bed gas extraction concentration of soft height improve 10 ~ 15%, and pre-pumping rate improves 25%, and every hole coal output reaches more than 3 tons; Take out in advance the drilling hole amount needing and reduce 20% ~ 30%, take out in advance the time decreased 20% needing; There is fabulous promotional value.
Brief description of the drawings
Fig. 1 is the prominent coal seam speedy drivage structural representation of the soft height of the present invention;
Fig. 2 is the A-A generalized section of Fig. 1;
In figure: 1-coal seam, 2-heading, 3-Di Chou lane, 4-wears a layer slot hole, and the outer command range of outline line is helped in 5-network type filling area on H1-tunnel, help the outer command range of outline line, α-seam inclination under H2-tunnel.
Detailed description of the invention
Below in conjunction with accompanying drawing, one embodiment of the present of invention are further described:
As shown in Figure 1, anti-reflection and the speedy drivage method of layer slot release is worn in the prominent coal seam of soft height of the present invention, first according to looking into geological information parameter: coal seam thickness, seam inclination α, bearing, gas parameter, hydrologic regime and other have the parameter of requirement in construction, formulate detailed embodiment.Carry out pre-implementation preparatory work, consider to process the hazards such as crack, tomography, water.In 1 floor strata of coal seam, move towards cloth bottom set along work plane and take out lane 3, test the radius of influence of determining slot hole by slot; Complete in Hou Dichou lane and arrange a drill site every 6 ~ 8m, 5 ~ 7 of each drill site layouts are worn a layer slot hole 4, and slot hole is linear distribution in coal seam, and whole pitch of holes is 6 ~ 8m.According to the radius of influence in seam inclination α and slot hole, determine the number in each drill site slot hole, on the tunnel of the seam inclination α of its medium dip, high-dipping between 25o to 90o, help outline line to control distance H 1 outward and be at least 20m, under tunnel, help outline line to control distance H 2 outward and be at least 10m, on the tunnel of the seam inclination α of gentle dip, nearly level between 0o to 25o, help outline line to control outward to help outline line to control distance H 2 outward under distance H 1 and tunnel to be at least 15m.If coal seam is gentle dip or flat seam, the wide 4m of heading 2, the slot hole radius of influence is 3.7m, needing the distance of controlling is 34m, arrange that wearing a layer slot hole 4 for 5 can control 37m, command range is greater than 34m, therefore arranges that wearing layer slot hole 4 for 5 gets final product (in heading 2, arranging 1,2 of the each layouts of its upper and lower side); If coal seam is for tilting or half-edge coal seam, the wide 4m of heading 2, the slot hole radius of influence is 3.3m, needing the distance of controlling is 34m, arrange that wearing a layer slot hole 4 for 6 can control 39.6m, command range is greater than 34m, therefore arranges that wearing layer slot hole 4 for 6 can (arrange 1 in heading 2, on it, side arranges 3, and lower side arranges 2).In each drill site in Cong Dichou lane 3, wear a layer slot hole 4 to coal seam 1 direction construction, until through coal seam 1, to carrying out high-pressure hydraulic slot in coal seam 1, implement afterwards gas pumping, before the 2 digging times of heading 30 ~ 50 days, stop gas pumping to wearing a layer slot hole 4 near a row of pre-pick heading 2 both sides, position, wear in layer slot hole 4 pressure injection filler successively by grouting pump to a row who stops gas pumping, coal body to pre-pick heading both sides is reinforced, other not filling wear a layer slot hole 4 and continue mash gas extraction, after filler solidifies, form network type filling area 5 in heading 2 both sides, as shown in Figure 2, network type filling area 5 can increase coal mass strength, improving stress in coal bed distributes, stop the gas in 5 outsides, network type filling area to be gushed out to the pre-pick of heading 2 position simultaneously.Before the heading digging time 5 ~ 7 days, gas pumping effect is tested, after reaching " control coal and Gas Outburst regulation " and requiring, tunnel according to a conventional method heading 2 in the 2 digging times of heading, now coal body is reinforced apart from exceeding 50m.In driving heading 2 processes, continue to wear in layer slot hole 4 pressure injection filler successively near a row of pre-pick heading 2 both sides, position, two rows that ensure filling successively wear layer 4 position, slot hole and answer advance development head to be not less than 50m.
Claims (1)
1. the anti-reflection and speedy drivage method of layer slot release is worn in the prominent coal seam of a soft height, be included in and move towards cloth bottom set along work plane in the floor strata of coal seam (1) and take out lane (3), in Di Chou lane (3), arrange drill site, in each drill site in Cong Dichou lane (3), to coal seam, a layer slot hole (4) worn in the construction of (1) direction, until through coal seam (1), to carrying out high-pressure hydraulic slot in coal seam (1), implement afterwards gas pumping; Characterized by further comprising following steps:
A, multiple drill sites that arrangement pitch is 6 ~ 8m in described Di Chou lane (3), each drill site is arranged layer slot hole (4) of wearing of 5 ~ 7 linear distributions in coal seam (1), wearing layer whole pitch of holes in slot hole (4) is 6 ~ 8m; Described each drill site is worn layer number in slot hole (4) according to seam inclination α and is worn layer radius of influence in slot hole (4) and determine; On the tunnel of the seam inclination α of inclination, high-dipping between 25o to 90o, helping outline line to control distance H 1 is outward at least 20m, helps outline line to control distance H 2 outward and be at least 10m under tunnel; On the tunnel of the seam inclination α of gentle dip, nearly level between 0o to 25o, help outline line to control outward to help outline line to control distance H 2 outward under distance H 1 and tunnel to be at least 15m;
B, in heading (2) the digging time first 30 ~ 50 days, stop gas pumping to wearing a layer slot hole (4) near a row of pre-pick heading (2) both sides, position, wear in layer slot hole (4) pressure injection filler successively by grouting pump to a row who stops gas pumping, the coal body of pre-pick heading (2) both sides is reinforced;
Gas pumping is continued in layer slot hole (4) of wearing of c, not filling;
D, in heading (2) the digging time first 5 ~ 7 days, test to gas pumping effect, reaches after " control coal and Gas Outburst regulation " requirement, can tunnel according to a conventional method heading (2) in heading (2) the digging time; The coal body of heading (2) both sides is reinforced distance need exceed 50m;
E, in driving heading (2) process, continue to wear in layer slot hole (4) pressure injection filler successively near a row of pre-pick heading (2) both sides, position, two rows that ensure filling successively wear a layer position, slot hole (4) and answer advance development head to be not less than 50m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210437230.5A CN102900460B (en) | 2012-11-06 | 2012-11-06 | Method for performing through-going seam cutting, pressure relief, permeability enhancement and quick tunneling on soft and high-outburst coal seam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210437230.5A CN102900460B (en) | 2012-11-06 | 2012-11-06 | Method for performing through-going seam cutting, pressure relief, permeability enhancement and quick tunneling on soft and high-outburst coal seam |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102900460A CN102900460A (en) | 2013-01-30 |
CN102900460B true CN102900460B (en) | 2014-10-29 |
Family
ID=47572917
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210437230.5A Expired - Fee Related CN102900460B (en) | 2012-11-06 | 2012-11-06 | Method for performing through-going seam cutting, pressure relief, permeability enhancement and quick tunneling on soft and high-outburst coal seam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102900460B (en) |
Families Citing this family (27)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103291354B (en) * | 2013-05-20 | 2015-06-10 | 中国矿业大学 | Filling and reinforcing method for floor roadway cross-layer pressure-relief borehole |
CN103306713B (en) * | 2013-05-20 | 2015-12-09 | 中国矿业大学 | A kind of high prominent coal seam layer-through drilling networking reinforcement means |
CN103510958B (en) * | 2013-10-08 | 2016-08-10 | 中国矿业大学 | A kind of gentle dip super-high seam rock cross-cut coal uncovering |
CN103510957B (en) * | 2013-10-08 | 2016-04-20 | 中国矿业大学 | A kind of combined type coal uncovering method |
CN103775121B (en) * | 2014-01-20 | 2015-09-30 | 中国矿业大学 | A kind of hydraulic slotted liner technique U-shaped hole deslagging mash gas harnessing method |
CN104481540A (en) * | 2014-10-08 | 2015-04-01 | 六盘水师范学院 | Method for controlling multiple coal mining hazards by high level borehole grouting |
CN104314610A (en) * | 2014-10-11 | 2015-01-28 | 中煤科工集团重庆研究院有限公司 | Coal road stripe region burst-preventing method |
CN104747072B (en) * | 2015-01-12 | 2017-01-25 | 徐州博安科技发展有限责任公司 | Waterpower drilling, cutting and sewing system |
CN104763462A (en) * | 2015-04-07 | 2015-07-08 | 中国矿业大学 | Method for extracting high-pressure hydraulic cave-manufacturing gas from rock roadway crossing hole |
CN104912588B (en) * | 2015-05-18 | 2017-01-25 | 太原理工大学 | Spalling permeability increasing method for rapid excavation of underground seam gateway |
CN105221182B (en) * | 2015-09-21 | 2017-11-17 | 河南理工大学 | Coal uncovering method under the complex geological condition of pole |
CN106567728A (en) * | 2015-10-13 | 2017-04-19 | 六盘水师范学院 | High gas coal seam group base plate drainage and gas extraction system |
CN105298448B (en) * | 2015-10-13 | 2018-02-13 | 天地科技股份有限公司 | The distribution method of coal bed gas extraction engineering |
CN106014473B (en) * | 2016-02-03 | 2018-01-09 | 中国矿业大学(北京) | A kind of cross borehole constrained expansion explosion network permeability-increasing gas drainage method |
CN106812532A (en) * | 2016-03-30 | 2017-06-09 | 六盘水师范学院 | A kind of coal petrography of high gas and outburst mine girdle half cuts top tunnel speedy drivage system |
CN106812551A (en) * | 2016-03-30 | 2017-06-09 | 六盘水师范学院 | A kind of newly-built high gas and outburst mine in mountain area is worn layer and is taken out and speedy drivage system in advance |
CN105909254B (en) * | 2016-04-29 | 2018-04-24 | 中煤科工集团西安研究院有限公司 | Projecting coal bed bottom plate, which is faced upward, wears the advanced area cover coal roadway tunneling method of layer directional hole |
CN107121036A (en) * | 2017-06-08 | 2017-09-01 | 刘冲 | Di Chou lanes return air connection lane deep hole blasting method |
CN107152303A (en) * | 2017-07-05 | 2017-09-12 | 安徽理工大学 | A kind of low ventilative high gas layer is by the method for the shielding efficient unloading pressure by blasting extraction in lane |
CN108590739B (en) * | 2018-04-11 | 2019-10-29 | 中国平煤神马能源化工集团有限责任公司 | A kind of prominent tunnel regionality energy divides source to control anti-burst method |
CN108894814B (en) * | 2018-06-29 | 2019-11-22 | 徐州工程学院 | A method of high temperature nitrogen speedy drivage is infused for layer-through drilling |
CN110656972A (en) * | 2019-10-31 | 2020-01-07 | 郑州慧矿智能科技有限公司 | Coal roadway stripe coal seam gas extraction method based on controllable shock waves |
CN110952951A (en) * | 2019-12-13 | 2020-04-03 | 安徽理工大学 | High-air-tightness hole sealing method for short-distance pressure-relief coal seam crossing gas extraction drill hole |
CN113431623B (en) * | 2021-07-28 | 2023-06-09 | 西安科技大学 | High-gas weak coal seam extraction system and method |
CN114607338B (en) * | 2022-03-21 | 2023-08-18 | 煤炭科学技术研究院有限公司 | Coal mine underground coal rock gas prevention and control composite dynamic disaster method and device |
CN114673502B (en) * | 2022-05-09 | 2022-12-02 | 中国矿业大学 | Multi-mode disaster chain type treatment method based on bottom plate rock roadway |
CN115614006B (en) * | 2022-10-27 | 2023-08-18 | 重庆大学 | Coal gas exploitation method combining layered pressure relief and multi-layer combined mining |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101105138A (en) * | 2007-08-15 | 2008-01-16 | 湖南科技大学 | Method for suppressing coal and gas outburst |
CN101382073A (en) * | 2007-09-29 | 2009-03-11 | 永城煤电集团有限责任公司 | 'Three-soft' low permeability high gas coal seam rapidly digging method |
CN101603431A (en) * | 2009-07-14 | 2009-12-16 | 中国矿业大学 | A kind of method for reinforcing outburst-prone coal seam cross-cut coal uncovering |
CN102168560A (en) * | 2011-03-10 | 2011-08-31 | 贵州铸安矿山科技股份有限公司 | Displacement crosscut coal uncovering method |
CN102748065A (en) * | 2012-07-30 | 2012-10-24 | 武汉大学 | Method for extracting gas of blank zone of working face with large mining length |
-
2012
- 2012-11-06 CN CN201210437230.5A patent/CN102900460B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101105138A (en) * | 2007-08-15 | 2008-01-16 | 湖南科技大学 | Method for suppressing coal and gas outburst |
CN101382073A (en) * | 2007-09-29 | 2009-03-11 | 永城煤电集团有限责任公司 | 'Three-soft' low permeability high gas coal seam rapidly digging method |
CN101603431A (en) * | 2009-07-14 | 2009-12-16 | 中国矿业大学 | A kind of method for reinforcing outburst-prone coal seam cross-cut coal uncovering |
CN102168560A (en) * | 2011-03-10 | 2011-08-31 | 贵州铸安矿山科技股份有限公司 | Displacement crosscut coal uncovering method |
CN102748065A (en) * | 2012-07-30 | 2012-10-24 | 武汉大学 | Method for extracting gas of blank zone of working face with large mining length |
Non-Patent Citations (2)
Title |
---|
林柏泉.钻孔割缝网络化增透机制及其在底板穿层钻孔瓦斯抽采中的应用.《煤炭学报》.2012,第37卷(第9期), |
钻孔割缝网络化增透机制及其在底板穿层钻孔瓦斯抽采中的应用;林柏泉;《煤炭学报》;20120930;第37卷(第9期);第1427-1428页 * |
Also Published As
Publication number | Publication date |
---|---|
CN102900460A (en) | 2013-01-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102900460B (en) | Method for performing through-going seam cutting, pressure relief, permeability enhancement and quick tunneling on soft and high-outburst coal seam | |
CN106907175B (en) | The efficient extraction coal roadway stripe gas of bottom plate concordant long drilled holes staged fracturing and region outburst elimination method | |
CN102080518B (en) | Method for extracting gas from coal seam roof complex branched well | |
CN111305876A (en) | Deep roadway anchoring-splitting grouting-hydraulic fracturing pressure relief cooperative control method | |
CN109736805A (en) | A kind of method of the modified release watershed management bump of thick-layer tight roof | |
CN103758560B (en) | A kind of multiple topping packet zone mash gas harnessing method that goes forward one by one | |
CN103867229B (en) | A kind of coal mine large-mining is dark prevents and treats comprehensive treatment method for water with lower group of coal mining | |
CN111594258A (en) | Technical method for quickly extracting gas to reach standard by using broken soft low-permeability outburst coal seam instead of roadway through holes | |
AU2021453348B2 (en) | Method for preventing and controlling rock bursts in development roadway group | |
CN102644476A (en) | Method for pumping gas of protected layer by layer penetration and hole drilling on high-position drilling fields of protecting layer machinery tunnel | |
CN104632223B (en) | Mining environment reconstructing movable type pumping filling artificial ore pillar shrinkage stoping | |
CN106968671B (en) | The filling of underground coal mine coal working face return channel withdraws method | |
CN110529113B (en) | Anti-impact method for deep well thick coal seam complex geological condition multi-factor coupling high stress area crossing contact roadway | |
CN112576305B (en) | Method for preventing and controlling water damage of working surface separation layer | |
CN102678092A (en) | Method for commonly extracting coal and coal bed gas by up-hole and down-hole joint construction | |
CN113107488B (en) | Method for treating roof of fully mechanized coal mining face of coal mine | |
CN108150206A (en) | A kind of method by fully-mechanized mining working crossheading caving place | |
CN104453900A (en) | Filling mining method of near-horizontal ore body | |
CN113431577A (en) | Method for arranging same-direction inward-staggered roadways in ultra-close coal seam mining | |
CN106401609A (en) | Bottom plate pressure relief and reinforcement structure for controlling floor heave of deep roadway and construction method of bottom plate pressure relief and reinforcement structure | |
CN206205903U (en) | A kind of base plate release ruggedized construction of control deep tunnel bottom distension | |
CN106285745A (en) | Underground coal mine stress field principal direction of stress Forecasting Methodology | |
CN105781552A (en) | Novel high-gas outburst coal seam stereoscopic punching crosscut coal uncovering method | |
CN105240012A (en) | F-type section coal-mining method allowing commingled mining of coal pillars | |
CN105019935A (en) | Overground/underground combined pressure relief outburst elimination coal seam rapid channel digging method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |