CN104455723B - Building pipe clamp connection drainage system branch pipe combines preset construction method of installation - Google Patents
Building pipe clamp connection drainage system branch pipe combines preset construction method of installation Download PDFInfo
- Publication number
- CN104455723B CN104455723B CN201410749317.5A CN201410749317A CN104455723B CN 104455723 B CN104455723 B CN 104455723B CN 201410749317 A CN201410749317 A CN 201410749317A CN 104455723 B CN104455723 B CN 104455723B
- Authority
- CN
- China
- Prior art keywords
- manifold system
- assembly
- pipe
- system sub
- sub
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 34
- 238000009434 installation Methods 0.000 title claims abstract description 24
- 238000000034 method Methods 0.000 claims abstract description 17
- 238000012545 processing Methods 0.000 claims abstract description 7
- 239000000725 suspension Substances 0.000 claims description 16
- 238000000429 assembly Methods 0.000 claims description 5
- 239000000203 mixture Substances 0.000 claims description 5
- 229910000831 Steel Inorganic materials 0.000 claims description 4
- 239000010959 steel Substances 0.000 claims description 4
- 238000007796 conventional method Methods 0.000 claims description 3
- 239000000463 material Substances 0.000 abstract description 6
- 239000002699 waste material Substances 0.000 abstract description 5
- 238000010586 diagram Methods 0.000 description 4
- 239000004831 Hot glue Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000035699 permeability Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03C—DOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
- E03C1/00—Domestic plumbing installations for fresh water or waste water; Sinks
- E03C1/12—Plumbing installations for waste water; Basins or fountains connected thereto; Sinks
- E03C1/122—Pipe-line systems for waste water in building
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Sink And Installation For Waste Water (AREA)
Abstract
Preset construction method of installation, including step are combined the invention discloses a kind of building pipe clamp connection drainage system branch pipe:First, prefabricated processing, two, manifold system sub-assembly it is assembled, three, manifold system integral hoisting, four, repeat step three, until the manifold system integral hoisting of each floor is finished, five, standpipe is installed, six, Ventilating for roof pipe and underground lever drainage house steward are installed out.Project progress of the present invention is not influenceed by the secondary masonry progress of civil engineering, and construction procedure is simple, and difficulty of construction is low, reduces workload, shortens the duration, improves efficiency of construction, reduces waste of material, practical, is easy to promote the use of.
Description
Technical field
The invention belongs to building water supply and drainage system construction technical field, and in particular to a kind of building pipe clamp connection draining
System branch pipe combines preset construction method of installation.
Background technology
In current architectural drainage system work progress, generally use and the construction that vertical standpipe installs manifold system again is first installed
Sequentially, pipe joint is generally using the connection of bonding mouth, silk mouthful connection and hot-melt adhesive paste, and traditional method major defect is as follows:
1st, drainage pipeline conventional mounting order, its project progress is influenceed by the secondary masonry progress of civil engineering, adds engineering and enter
Degree and the difficulty of cost control.
2nd, manifold system is using in-site measurement, manual blanking, and workload is big, long in time limit, and is unfavorable for the system of tubing
Management, material is difficult to that system is prewired, and waste of material is larger.
3rd, all operations of traditional construction belong to high-rise working, and workload is big, and difficulty of construction is big, and work efficiency is low, and the duration is longer.
The content of the invention
In view of the above-mentioned deficiencies in the prior art, the technical problem to be solved by the present invention is that providing a kind of building pipe
Clamp connection drainage system branch pipe combines preset construction method of installation, and its construction procedure is simple, and difficulty of construction is low, reduces work
Amount, shortens the duration, improves efficiency of construction, reduce waste of material, practical, is easy to promote the use of.
In order to solve the above technical problems, the technical solution adopted by the present invention is:A kind of building pipe clamp connection draining system
Branch pipe of uniting combines preset construction method of installation, it is characterised in that this method comprises the following steps:
Step 1: prefabricated processing:According to the manifold system figure being pre-designed and according to conventional method for prefabricating, respectively to assembly
The multiple manifold system sub-assemblies for constituting the manifold system carry out prefabricated processing;
Step 2: manifold system sub-assembly is assembled:According to the manifold system figure being pre-designed, the manifold system will be constituted
Multiple manifold system sub-assemblies be sequentially connected and be integrated by clip;
Step 3: manifold system integral hoisting:Steel wire rope is worn from floor prepared hole and the branch piping is fixed on
On system, the manifold system is integrally sling, until each manifold system sub-assembly in the manifold system is lifted with being used for
After the suspension bracket contact of the manifold system sub-assembly, corresponding suspension bracket is fixedly connected with manifold system sub-assembly, the suspension bracket
It is fixedly connected on the floor;
Step 4: repeat step three, until the manifold system integral hoisting of each floor is finished;
Step 5: installing standpipe:According to conventional standpipe installation method, the standpipe in each floor is installed from the bottom to top, and
After the standpipe in installing each floor, the standpipe in the floor is connected as one by the manifold system in clip and the floor
Body;
Step 6: installing out Ventilating for roof pipe and underground lever drainage house steward:Installed according to the conventional Ventilating for roof pipe that goes out
Method installs out Ventilating for roof pipe, and total according to conventional underground lever drainage house steward installation method installation underground lever drainage
Pipe.
Above-mentioned building pipe clamp connection drainage system branch pipe combines preset construction method of installation, it is characterised in that:Step
Manifold system sub-assembly described in rapid one includes the first manifold system sub-assembly, the second manifold system sub-assembly and the 3rd piping
System sub-assembly, the first manifold system sub-assembly is made up of the first vertical tube, the first transverse tube, the first three-way pipe and reducing joint,
First vertical tube is connected with the top port of the first three-way pipe, and the first side ports of first transverse tube and the first three-way pipe connect
Connect, the reducing joint is connected with the second side ports of the first three-way pipe;The second manifold system sub-assembly by the second vertical tube,
Second transverse tube and the second three-way pipe composition, second vertical tube are connected with the top port of the second three-way pipe, second transverse tube
It is connected with the first side ports of the second three-way pipe;The 3rd manifold system sub-assembly is by the 3rd vertical tube, the 3rd transverse tube and 90 degree
Elbow is constituted, and the 3rd vertical tube is connected with the top port of 90 degree of elbows, the side ports of the 3rd transverse tube and 90 degree of elbows
Connection.
Above-mentioned building pipe clamp connection drainage system branch pipe combines preset construction method of installation, it is characterised in that:Institute
The quantity for stating the first manifold system sub-assembly, the second manifold system sub-assembly and the 3rd manifold system sub-assembly is one.
Above-mentioned building pipe clamp connection drainage system branch pipe combines preset construction method of installation, it is characterised in that:Step
Corresponding suspension bracket is fixedly connected with manifold system sub-assembly by pipe collar and screw in rapid three, the suspension bracket passes through expanding screw
Bolt is fixedly connected on the floor.
The present invention has advantages below compared with prior art:
1st, construction procedure of the invention is simple, instead of traditional handicraft with a kind of new construction method, it is easy to implement.
2nd, present invention employs being installed to manifold system integral hoisting, standpipe is then installed from the bottom to top, and with branch piping
System carries out clamp connection, finally installs out the construction method of Ventilating for roof pipe and underground lever drainage house steward, realizes building pipe
The preset construction method of road clamp connection drainage system branch pipe sub-assembly, wherein, it is preset in " putting " refer to the pre- of branch pipe sub-assembly
First production and leading location and installation, project progress are not influenceed by the secondary masonry progress of civil engineering, and difficulty of construction is low, reduces work
Amount, shortens the duration, improves efficiency of construction, and beneficial to the system administration of tubing, reduce waste of material.
3rd, the present invention uses clamp connection to building pipe drainage system, has been effectively saved the junction loss of traditional socket joint
Space, it is to avoid the shortcoming that disposable connection can not be reused, follow-up maintenance can avoid the brought destruction of tradition connection
Property construction.
4th, the present invention's is practical, is easy to promote the use of.
In summary, construction procedure of the invention is simple, and difficulty of construction is low, reduces workload, shortens the duration, improves
Efficiency of construction, reduces waste of material, practical, is easy to promote the use of.
Below by drawings and examples, technical scheme is described in further detail.
Brief description of the drawings
Fig. 1 is the method flow block diagram of construction method of the present invention.
Fig. 2 is the structural representation of the first manifold system sub-assembly of the invention.
Fig. 3 is the structural representation of the second manifold system sub-assembly of the invention.
Fig. 4 is the structural representation of the 3rd manifold system sub-assembly of the invention.
Fig. 5 is manifold system sub-assembly on-site consolidation schematic diagram of the present invention.
Fig. 6 is the live integral hoisting schematic diagram of manifold system of the present invention.
Fig. 7 is the live integral installation schematic diagram of manifold system of the present invention.
Fig. 8 is standpipe scheme of installation of the present invention.
Fig. 9 is drainage system pipe installation effect figure of the present invention.
Description of reference numerals:
1-the first manifold system sub-assembly;The vertical tubes of 1-1-first;The transverse tubes of 1-2-first;
The three-way pipes of 1-3-first;1-4-reducing joint;2-the second manifold system sub-assembly;
The vertical tubes of 2-1-second;The transverse tubes of 2-2-second;The three-way pipes of 2-3-second;
3-the three manifold system sub-assembly;The vertical tubes of 3-1-the 3rd;The transverse tubes of 3-2-the 3rd;
3-3-90 degree elbow;4-suspension bracket;5-floor;
6-clip;7-steel wire rope;8-standpipe;
9-go out Ventilating for roof pipe;10-underground lever drainage house steward;11-floor;
12-wall.
Embodiment
As shown in figure 1, the building pipe clamp connection drainage system branch pipe of the present invention combines preset construction method of installation, bag
Include following steps:
Step 1: prefabricated processing:According to the manifold system figure being pre-designed and according to conventional method for prefabricating, respectively to assembly
The multiple manifold system sub-assemblies for constituting the manifold system carry out prefabricated processing;
Step 2: manifold system sub-assembly is assembled:As shown in figure 5, according to the manifold system figure being pre-designed, by constituting
The multiple manifold system sub-assemblies for stating manifold system are sequentially connected by clip 6 and are integrated;
Step 3: manifold system integral hoisting:As shown in Figure 6 and Figure 7, steel wire rope 7 is worn simultaneously from the reserving hole of floor 5
It is fixed in the manifold system, the manifold system is integrally sling, until each manifold system in the manifold system
After sub-assembly is contacted with the suspension bracket 4 for lifting the manifold system sub-assembly, by corresponding suspension bracket 4 and manifold system sub-assembly
It is fixedly connected, the suspension bracket 4 is fixedly connected on the floor 5;
Step 4: repeat step three, until the manifold system integral hoisting of each floor is finished;
Step 5: installing standpipe 8:As shown in figure 8, according to the conventional installation method of standpipe 8, each floor is installed from the bottom to top
In standpipe 8, and after the standpipe 8 in installing each floor, by the standpipe 8 in the floor pass through clip 6 with the floor
Manifold system is connected as one;
Step 6: as shown in figure 9, installing out Ventilating for roof pipe 9 and underground lever drainage house steward 10:Go out room according to conventional
The installation method of face permeability cell 9 installs out Ventilating for roof pipe 9, and is installed according to the conventional installation method of underground lever drainage house steward 10
Underground lever drainage house steward 10.
In the present embodiment, manifold system sub-assembly described in step one includes the first manifold system sub-assembly 1, the second branch pipe
The manifold system sub-assembly 3 of system in combination part 2 and the 3rd, as shown in Fig. 2 the first manifold system sub-assembly 1 is by the first vertical tube
1-1, the first transverse tube 1-2, the first three-way pipe 1-3 and reducing joint 1-4 compositions, the first vertical tube 1-1 and the first three-way pipe 1-3
Top port connection, the first transverse tube 1-2 is connected with the first three-way pipe 1-3 the first side ports, the reducing joint 1-4
It is connected with the first three-way pipe 1-3 the second side ports;As shown in figure 3, the second manifold system sub-assembly 2 is by the second vertical tube 2-
1st, the second transverse tube 2-2 and the second three-way pipe 2-3 compositions, the second vertical tube 2-1 and the second three-way pipe 2-3 top port connect
Connect, the second transverse tube 2-2 is connected with the second three-way pipe 2-3 the first side ports;As shown in figure 4, the 3rd manifold system
Sub-assembly 3 is made up of the 3rd vertical tube 3-1, the 3rd transverse tube 3-2 and 90 degree of elbow 3-3, the 3rd vertical tube 3-1 and 90 degree of elbow 3-
3 top port connection, the 3rd transverse tube 3-2 is connected with 90 degree of elbow 3-3 side ports.
In the present embodiment, the first manifold system sub-assembly 1, the second manifold system sub-assembly 2 and the 3rd manifold system
The quantity of sub-assembly 3 is one.
In the present embodiment, corresponding suspension bracket 4 and manifold system sub-assembly are fixed by pipe collar and screw in step 3
Connection, the suspension bracket 4 is fixedly connected on the floor 5 by expansion bolt.
In summary, present invention employs being installed to manifold system integral hoisting, standpipe is then installed from the bottom to top, and with
Manifold system carries out clip 6 and connected, and finally installs out the construction method of Ventilating for roof pipe 9 and underground lever drainage house steward 10, real
The preset construction method of building pipe clamp connection drainage system branch pipe sub-assembly is showed.
It is described above, only it is presently preferred embodiments of the present invention, not the present invention is imposed any restrictions, it is every according to the present invention
Any simple modification, change and equivalent structure change that technical spirit is made to above example, still fall within skill of the present invention
In the protection domain of art scheme.
Claims (1)
1. a kind of building pipe clamp connection drainage system branch pipe combines preset construction method of installation, it is characterised in that this method bag
Include following steps:
Step 1: prefabricated processing:According to the manifold system figure being pre-designed and according to conventional method for prefabricating, respectively to being assemblied to form
Multiple manifold system sub-assemblies of the manifold system carry out prefabricated processing;
Step 2: manifold system sub-assembly is assembled:According to the manifold system figure being pre-designed, many of the manifold system will be constituted
Individual manifold system sub-assembly is sequentially connected by clip (6) and is integrated;
Step 3: manifold system integral hoisting:Steel wire rope (7) is worn from floor (5) reserving hole and is fixed on the branch pipe
In system, the manifold system is integrally sling, until each manifold system sub-assembly in the manifold system is hung with being used for
After suspension bracket (4) contact for filling the manifold system sub-assembly, corresponding suspension bracket (4) is fixedly connected with manifold system sub-assembly,
The suspension bracket (4) is fixedly connected on the floor (5);
Step 4: repeat step three, until the manifold system integral hoisting of each floor is finished;
Step 5: installing standpipe (8):According to conventional standpipe (8) installation method, the standpipe in each floor is installed from the bottom to top
(8), and after the standpipe (8) in installing each floor, the standpipe (8) in the floor is passed through in clip (6) and the floor
Manifold system is connected as one;
Step 6: installing out Ventilating for roof pipe (9) and underground lever drainage house steward (10):Go out Ventilating for roof pipe according to conventional
(9) installation method installs out Ventilating for roof pipe (9), and installs ground according to conventional underground lever drainage house steward (10) installation method
Lower horizontal drainage house steward (10);
Manifold system sub-assembly described in step one includes the first manifold system sub-assembly (1), the second manifold system sub-assembly (2)
With the 3rd manifold system sub-assembly (3), the first manifold system sub-assembly (1) is by the first vertical tube (1-1), the first transverse tube (1-
2), the first three-way pipe (1-3) and reducing joint (1-4) composition, first vertical tube (1-1) and the top of the first three-way pipe (1-3)
Portion port is connected, and first transverse tube (1-2) is connected with the first side ports of the first three-way pipe (1-3), the reducing joint (1-
4) the second side ports with the first three-way pipe (1-3) are connected;The second manifold system sub-assembly (2) by the second vertical tube (2-1),
Second transverse tube (2-2) and the second three-way pipe (2-3) composition, second vertical tube (2-1) and the top end of the second three-way pipe (2-3)
Mouth connection, second transverse tube (2-2) is connected with the first side ports of the second three-way pipe (2-3);The 3rd manifold system group
Component (3) is made up of the 3rd vertical tube (3-1), the 3rd transverse tube (3-2) and 90 degree of elbows (3-3), the 3rd vertical tube (3-1) and 90
The top port connection of elbow (3-3) is spent, the 3rd transverse tube (3-2) is connected with the side ports of 90 degree of elbows (3-3);
Corresponding suspension bracket (4) is fixedly connected with manifold system sub-assembly by pipe collar and screw in step 3, the suspension bracket
(4) it is fixedly connected on by expansion bolt on the floor (5);
The first manifold system sub-assembly (1), the second manifold system sub-assembly (2) and the 3rd manifold system sub-assembly (3)
Quantity is one.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410749317.5A CN104455723B (en) | 2014-12-04 | 2014-12-04 | Building pipe clamp connection drainage system branch pipe combines preset construction method of installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410749317.5A CN104455723B (en) | 2014-12-04 | 2014-12-04 | Building pipe clamp connection drainage system branch pipe combines preset construction method of installation |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104455723A CN104455723A (en) | 2015-03-25 |
CN104455723B true CN104455723B (en) | 2017-08-08 |
Family
ID=52902236
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410749317.5A Expired - Fee Related CN104455723B (en) | 2014-12-04 | 2014-12-04 | Building pipe clamp connection drainage system branch pipe combines preset construction method of installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104455723B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106049623A (en) * | 2016-08-01 | 2016-10-26 | 莎丽科技股份有限公司 | Integrated installing method of home-use water discharging pipe |
CN106245711A (en) * | 2016-08-01 | 2016-12-21 | 莎丽科技股份有限公司 | A kind of integrated installation method of domestic feed pipe |
CN108194702B (en) * | 2017-12-06 | 2020-12-15 | 上海建工五建集团有限公司 | Method for installing pipeline in narrow pipe hoistway |
CN111425663B (en) * | 2020-05-12 | 2021-07-06 | 山西西建集团有限公司 | Toilet drainage pipeline construction assembly and method |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2120145U (en) * | 1992-03-18 | 1992-10-28 | 山西师范大学 | Storm drain accessories for building |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB576667A (en) * | 1944-02-02 | 1946-04-15 | Abraham Fishko | Improvements in or relating to means for passing pipes through the floors of a building |
DE2707681C3 (en) * | 1976-02-25 | 1980-11-20 | Kubota Ltd., Osaka (Japan) | Deflection tube |
CN2083598U (en) * | 1990-11-27 | 1991-08-28 | 北京市第三住宅建筑工程公司 | Domestic waste-water plumbing pipe-line parts |
JP2002364041A (en) * | 2001-06-11 | 2002-12-18 | Kubota Corp | Sound absorbing type leg-section bend connecting structure and sound absorbing type expansion joint pipe |
CN1200182C (en) * | 2001-12-07 | 2005-05-04 | 谭渝芳 | Open-type drainage system and its installing process |
CN100554604C (en) * | 2007-06-22 | 2009-10-28 | 王凤蕊 | Architecture indoor single-stack drain system and mounting method thereof |
CN202519751U (en) * | 2012-01-10 | 2012-11-07 | 李继昌 | Cross-layer drainage flushing system |
CN202850142U (en) * | 2012-11-17 | 2013-04-03 | 张永海 | Indoor pipeline drainage system for storied building |
CN103882918B (en) * | 2012-12-20 | 2016-08-03 | 中建四局第一建筑工程有限公司 | The water discharge method of floor hydrops and device during construction of super highrise building |
-
2014
- 2014-12-04 CN CN201410749317.5A patent/CN104455723B/en not_active Expired - Fee Related
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2120145U (en) * | 1992-03-18 | 1992-10-28 | 山西师范大学 | Storm drain accessories for building |
Non-Patent Citations (2)
Title |
---|
排水管道安装;鲍福昌,张文香;《管道工技能图解》;20120731;第125-127页 * |
浅谈模块化施工中管道支吊架的安装;江冬艳、程好秋;《中国新技术新产品》;20131031(第10期);第74页第1栏第4段至第2栏第1段 * |
Also Published As
Publication number | Publication date |
---|---|
CN104455723A (en) | 2015-03-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104455723B (en) | Building pipe clamp connection drainage system branch pipe combines preset construction method of installation | |
CN211499913U (en) | Low-energy-consumption prefabricated house | |
CN105821989A (en) | Assembly type steel pipe bundle concrete shear wall structure system and construction method thereof | |
CN103437556A (en) | Waterproof and heat-preservation construction method for building water supply and drainage and heating engineering | |
CN204212383U (en) | Plug-in type steel pipe scaffold | |
CN106979635B (en) | A kind of ground-source heat pump system underground heat-transfer pipe construction method | |
CN209369144U (en) | A kind of precast floor slab connecting node | |
CN207315379U (en) | A kind of precast assembly vertical shaft | |
CN106760059B (en) | Assembled building structure system | |
CN202187363U (en) | Shear cylinder structure for grouting connection of offshore wind power foundation structure | |
CN204959890U (en) | Prefabricated mounting structure of indoor U -PVC soil stack of high -rise building | |
CN207660296U (en) | A kind of precast concrete hanging apparatus | |
CN207406301U (en) | To drilling Auto-drainage equipment under one kind | |
CN204466418U (en) | Combined energy-saving heat-preserving wall greenhouse by solar heat | |
CN205502603U (en) | Intelligence vacuum mud jacking system | |
CN205617606U (en) | Concrete shear wall structure system is restrainted to assembled steel pipe | |
CN212427205U (en) | Assembled underground pipe gallery is connected to dry-type | |
CN205100443U (en) | Be used for overlength industry factory building siphon drainage system | |
CN203794496U (en) | Firefighting pipe lifting device | |
CN202530518U (en) | Embedded device at sewer line in toilet | |
CN205917730U (en) | Tubular cross section steel buckled plate city utility tunnel | |
CN206957243U (en) | A kind of intelligent curtain wall installation mechanical structure | |
CN205206337U (en) | Top module system core section of thick bamboo wall body spraying system all | |
CN211738267U (en) | Prefabricated balcony riser mounting structure | |
CN204704491U (en) | Integratedly build water string |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170808 |
|
CF01 | Termination of patent right due to non-payment of annual fee |