CN104455723B - Building pipe clamp connection drainage system branch pipe combines preset construction method of installation - Google Patents

Building pipe clamp connection drainage system branch pipe combines preset construction method of installation Download PDF

Info

Publication number
CN104455723B
CN104455723B CN201410749317.5A CN201410749317A CN104455723B CN 104455723 B CN104455723 B CN 104455723B CN 201410749317 A CN201410749317 A CN 201410749317A CN 104455723 B CN104455723 B CN 104455723B
Authority
CN
China
Prior art keywords
manifold system
assembly
pipe
system sub
sub
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410749317.5A
Other languages
Chinese (zh)
Other versions
CN104455723A (en
Inventor
王奇维
黄昌学
全进学
马伟力
缪建涛
程凯
谢磊
张晓晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Work San Construction Group Co Ltd Is Built In Shaanxi
Original Assignee
Work San Construction Group Co Ltd Is Built In Shaanxi
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Work San Construction Group Co Ltd Is Built In Shaanxi filed Critical Work San Construction Group Co Ltd Is Built In Shaanxi
Priority to CN201410749317.5A priority Critical patent/CN104455723B/en
Publication of CN104455723A publication Critical patent/CN104455723A/en
Application granted granted Critical
Publication of CN104455723B publication Critical patent/CN104455723B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/12Plumbing installations for waste water; Basins or fountains connected thereto; Sinks
    • E03C1/122Pipe-line systems for waste water in building

Abstract

Preset construction method of installation, including step are combined the invention discloses a kind of building pipe clamp connection drainage system branch pipe:First, prefabricated processing, two, manifold system sub-assembly it is assembled, three, manifold system integral hoisting, four, repeat step three, until the manifold system integral hoisting of each floor is finished, five, standpipe is installed, six, Ventilating for roof pipe and underground lever drainage house steward are installed out.Project progress of the present invention is not influenceed by the secondary masonry progress of civil engineering, and construction procedure is simple, and difficulty of construction is low, reduces workload, shortens the duration, improves efficiency of construction, reduces waste of material, practical, is easy to promote the use of.

Description

Building pipe clamp connection drainage system branch pipe combines preset construction method of installation
Technical field
The invention belongs to building water supply and drainage system construction technical field, and in particular to a kind of building pipe clamp connection draining System branch pipe combines preset construction method of installation.
Background technology
In current architectural drainage system work progress, generally use and the construction that vertical standpipe installs manifold system again is first installed Sequentially, pipe joint is generally using the connection of bonding mouth, silk mouthful connection and hot-melt adhesive paste, and traditional method major defect is as follows:
1st, drainage pipeline conventional mounting order, its project progress is influenceed by the secondary masonry progress of civil engineering, adds engineering and enter Degree and the difficulty of cost control.
2nd, manifold system is using in-site measurement, manual blanking, and workload is big, long in time limit, and is unfavorable for the system of tubing Management, material is difficult to that system is prewired, and waste of material is larger.
3rd, all operations of traditional construction belong to high-rise working, and workload is big, and difficulty of construction is big, and work efficiency is low, and the duration is longer.
The content of the invention
In view of the above-mentioned deficiencies in the prior art, the technical problem to be solved by the present invention is that providing a kind of building pipe Clamp connection drainage system branch pipe combines preset construction method of installation, and its construction procedure is simple, and difficulty of construction is low, reduces work Amount, shortens the duration, improves efficiency of construction, reduce waste of material, practical, is easy to promote the use of.
In order to solve the above technical problems, the technical solution adopted by the present invention is:A kind of building pipe clamp connection draining system Branch pipe of uniting combines preset construction method of installation, it is characterised in that this method comprises the following steps:
Step 1: prefabricated processing:According to the manifold system figure being pre-designed and according to conventional method for prefabricating, respectively to assembly The multiple manifold system sub-assemblies for constituting the manifold system carry out prefabricated processing;
Step 2: manifold system sub-assembly is assembled:According to the manifold system figure being pre-designed, the manifold system will be constituted Multiple manifold system sub-assemblies be sequentially connected and be integrated by clip;
Step 3: manifold system integral hoisting:Steel wire rope is worn from floor prepared hole and the branch piping is fixed on On system, the manifold system is integrally sling, until each manifold system sub-assembly in the manifold system is lifted with being used for After the suspension bracket contact of the manifold system sub-assembly, corresponding suspension bracket is fixedly connected with manifold system sub-assembly, the suspension bracket It is fixedly connected on the floor;
Step 4: repeat step three, until the manifold system integral hoisting of each floor is finished;
Step 5: installing standpipe:According to conventional standpipe installation method, the standpipe in each floor is installed from the bottom to top, and After the standpipe in installing each floor, the standpipe in the floor is connected as one by the manifold system in clip and the floor Body;
Step 6: installing out Ventilating for roof pipe and underground lever drainage house steward:Installed according to the conventional Ventilating for roof pipe that goes out Method installs out Ventilating for roof pipe, and total according to conventional underground lever drainage house steward installation method installation underground lever drainage Pipe.
Above-mentioned building pipe clamp connection drainage system branch pipe combines preset construction method of installation, it is characterised in that:Step Manifold system sub-assembly described in rapid one includes the first manifold system sub-assembly, the second manifold system sub-assembly and the 3rd piping System sub-assembly, the first manifold system sub-assembly is made up of the first vertical tube, the first transverse tube, the first three-way pipe and reducing joint, First vertical tube is connected with the top port of the first three-way pipe, and the first side ports of first transverse tube and the first three-way pipe connect Connect, the reducing joint is connected with the second side ports of the first three-way pipe;The second manifold system sub-assembly by the second vertical tube, Second transverse tube and the second three-way pipe composition, second vertical tube are connected with the top port of the second three-way pipe, second transverse tube It is connected with the first side ports of the second three-way pipe;The 3rd manifold system sub-assembly is by the 3rd vertical tube, the 3rd transverse tube and 90 degree Elbow is constituted, and the 3rd vertical tube is connected with the top port of 90 degree of elbows, the side ports of the 3rd transverse tube and 90 degree of elbows Connection.
Above-mentioned building pipe clamp connection drainage system branch pipe combines preset construction method of installation, it is characterised in that:Institute The quantity for stating the first manifold system sub-assembly, the second manifold system sub-assembly and the 3rd manifold system sub-assembly is one.
Above-mentioned building pipe clamp connection drainage system branch pipe combines preset construction method of installation, it is characterised in that:Step Corresponding suspension bracket is fixedly connected with manifold system sub-assembly by pipe collar and screw in rapid three, the suspension bracket passes through expanding screw Bolt is fixedly connected on the floor.
The present invention has advantages below compared with prior art:
1st, construction procedure of the invention is simple, instead of traditional handicraft with a kind of new construction method, it is easy to implement.
2nd, present invention employs being installed to manifold system integral hoisting, standpipe is then installed from the bottom to top, and with branch piping System carries out clamp connection, finally installs out the construction method of Ventilating for roof pipe and underground lever drainage house steward, realizes building pipe The preset construction method of road clamp connection drainage system branch pipe sub-assembly, wherein, it is preset in " putting " refer to the pre- of branch pipe sub-assembly First production and leading location and installation, project progress are not influenceed by the secondary masonry progress of civil engineering, and difficulty of construction is low, reduces work Amount, shortens the duration, improves efficiency of construction, and beneficial to the system administration of tubing, reduce waste of material.
3rd, the present invention uses clamp connection to building pipe drainage system, has been effectively saved the junction loss of traditional socket joint Space, it is to avoid the shortcoming that disposable connection can not be reused, follow-up maintenance can avoid the brought destruction of tradition connection Property construction.
4th, the present invention's is practical, is easy to promote the use of.
In summary, construction procedure of the invention is simple, and difficulty of construction is low, reduces workload, shortens the duration, improves Efficiency of construction, reduces waste of material, practical, is easy to promote the use of.
Below by drawings and examples, technical scheme is described in further detail.
Brief description of the drawings
Fig. 1 is the method flow block diagram of construction method of the present invention.
Fig. 2 is the structural representation of the first manifold system sub-assembly of the invention.
Fig. 3 is the structural representation of the second manifold system sub-assembly of the invention.
Fig. 4 is the structural representation of the 3rd manifold system sub-assembly of the invention.
Fig. 5 is manifold system sub-assembly on-site consolidation schematic diagram of the present invention.
Fig. 6 is the live integral hoisting schematic diagram of manifold system of the present invention.
Fig. 7 is the live integral installation schematic diagram of manifold system of the present invention.
Fig. 8 is standpipe scheme of installation of the present invention.
Fig. 9 is drainage system pipe installation effect figure of the present invention.
Description of reference numerals:
1-the first manifold system sub-assembly;The vertical tubes of 1-1-first;The transverse tubes of 1-2-first;
The three-way pipes of 1-3-first;1-4-reducing joint;2-the second manifold system sub-assembly;
The vertical tubes of 2-1-second;The transverse tubes of 2-2-second;The three-way pipes of 2-3-second;
3-the three manifold system sub-assembly;The vertical tubes of 3-1-the 3rd;The transverse tubes of 3-2-the 3rd;
3-3-90 degree elbow;4-suspension bracket;5-floor;
6-clip;7-steel wire rope;8-standpipe;
9-go out Ventilating for roof pipe;10-underground lever drainage house steward;11-floor;
12-wall.
Embodiment
As shown in figure 1, the building pipe clamp connection drainage system branch pipe of the present invention combines preset construction method of installation, bag Include following steps:
Step 1: prefabricated processing:According to the manifold system figure being pre-designed and according to conventional method for prefabricating, respectively to assembly The multiple manifold system sub-assemblies for constituting the manifold system carry out prefabricated processing;
Step 2: manifold system sub-assembly is assembled:As shown in figure 5, according to the manifold system figure being pre-designed, by constituting The multiple manifold system sub-assemblies for stating manifold system are sequentially connected by clip 6 and are integrated;
Step 3: manifold system integral hoisting:As shown in Figure 6 and Figure 7, steel wire rope 7 is worn simultaneously from the reserving hole of floor 5 It is fixed in the manifold system, the manifold system is integrally sling, until each manifold system in the manifold system After sub-assembly is contacted with the suspension bracket 4 for lifting the manifold system sub-assembly, by corresponding suspension bracket 4 and manifold system sub-assembly It is fixedly connected, the suspension bracket 4 is fixedly connected on the floor 5;
Step 4: repeat step three, until the manifold system integral hoisting of each floor is finished;
Step 5: installing standpipe 8:As shown in figure 8, according to the conventional installation method of standpipe 8, each floor is installed from the bottom to top In standpipe 8, and after the standpipe 8 in installing each floor, by the standpipe 8 in the floor pass through clip 6 with the floor Manifold system is connected as one;
Step 6: as shown in figure 9, installing out Ventilating for roof pipe 9 and underground lever drainage house steward 10:Go out room according to conventional The installation method of face permeability cell 9 installs out Ventilating for roof pipe 9, and is installed according to the conventional installation method of underground lever drainage house steward 10 Underground lever drainage house steward 10.
In the present embodiment, manifold system sub-assembly described in step one includes the first manifold system sub-assembly 1, the second branch pipe The manifold system sub-assembly 3 of system in combination part 2 and the 3rd, as shown in Fig. 2 the first manifold system sub-assembly 1 is by the first vertical tube 1-1, the first transverse tube 1-2, the first three-way pipe 1-3 and reducing joint 1-4 compositions, the first vertical tube 1-1 and the first three-way pipe 1-3 Top port connection, the first transverse tube 1-2 is connected with the first three-way pipe 1-3 the first side ports, the reducing joint 1-4 It is connected with the first three-way pipe 1-3 the second side ports;As shown in figure 3, the second manifold system sub-assembly 2 is by the second vertical tube 2- 1st, the second transverse tube 2-2 and the second three-way pipe 2-3 compositions, the second vertical tube 2-1 and the second three-way pipe 2-3 top port connect Connect, the second transverse tube 2-2 is connected with the second three-way pipe 2-3 the first side ports;As shown in figure 4, the 3rd manifold system Sub-assembly 3 is made up of the 3rd vertical tube 3-1, the 3rd transverse tube 3-2 and 90 degree of elbow 3-3, the 3rd vertical tube 3-1 and 90 degree of elbow 3- 3 top port connection, the 3rd transverse tube 3-2 is connected with 90 degree of elbow 3-3 side ports.
In the present embodiment, the first manifold system sub-assembly 1, the second manifold system sub-assembly 2 and the 3rd manifold system The quantity of sub-assembly 3 is one.
In the present embodiment, corresponding suspension bracket 4 and manifold system sub-assembly are fixed by pipe collar and screw in step 3 Connection, the suspension bracket 4 is fixedly connected on the floor 5 by expansion bolt.
In summary, present invention employs being installed to manifold system integral hoisting, standpipe is then installed from the bottom to top, and with Manifold system carries out clip 6 and connected, and finally installs out the construction method of Ventilating for roof pipe 9 and underground lever drainage house steward 10, real The preset construction method of building pipe clamp connection drainage system branch pipe sub-assembly is showed.
It is described above, only it is presently preferred embodiments of the present invention, not the present invention is imposed any restrictions, it is every according to the present invention Any simple modification, change and equivalent structure change that technical spirit is made to above example, still fall within skill of the present invention In the protection domain of art scheme.

Claims (1)

1. a kind of building pipe clamp connection drainage system branch pipe combines preset construction method of installation, it is characterised in that this method bag Include following steps:
Step 1: prefabricated processing:According to the manifold system figure being pre-designed and according to conventional method for prefabricating, respectively to being assemblied to form Multiple manifold system sub-assemblies of the manifold system carry out prefabricated processing;
Step 2: manifold system sub-assembly is assembled:According to the manifold system figure being pre-designed, many of the manifold system will be constituted Individual manifold system sub-assembly is sequentially connected by clip (6) and is integrated;
Step 3: manifold system integral hoisting:Steel wire rope (7) is worn from floor (5) reserving hole and is fixed on the branch pipe In system, the manifold system is integrally sling, until each manifold system sub-assembly in the manifold system is hung with being used for After suspension bracket (4) contact for filling the manifold system sub-assembly, corresponding suspension bracket (4) is fixedly connected with manifold system sub-assembly, The suspension bracket (4) is fixedly connected on the floor (5);
Step 4: repeat step three, until the manifold system integral hoisting of each floor is finished;
Step 5: installing standpipe (8):According to conventional standpipe (8) installation method, the standpipe in each floor is installed from the bottom to top (8), and after the standpipe (8) in installing each floor, the standpipe (8) in the floor is passed through in clip (6) and the floor Manifold system is connected as one;
Step 6: installing out Ventilating for roof pipe (9) and underground lever drainage house steward (10):Go out Ventilating for roof pipe according to conventional (9) installation method installs out Ventilating for roof pipe (9), and installs ground according to conventional underground lever drainage house steward (10) installation method Lower horizontal drainage house steward (10);
Manifold system sub-assembly described in step one includes the first manifold system sub-assembly (1), the second manifold system sub-assembly (2) With the 3rd manifold system sub-assembly (3), the first manifold system sub-assembly (1) is by the first vertical tube (1-1), the first transverse tube (1- 2), the first three-way pipe (1-3) and reducing joint (1-4) composition, first vertical tube (1-1) and the top of the first three-way pipe (1-3) Portion port is connected, and first transverse tube (1-2) is connected with the first side ports of the first three-way pipe (1-3), the reducing joint (1- 4) the second side ports with the first three-way pipe (1-3) are connected;The second manifold system sub-assembly (2) by the second vertical tube (2-1), Second transverse tube (2-2) and the second three-way pipe (2-3) composition, second vertical tube (2-1) and the top end of the second three-way pipe (2-3) Mouth connection, second transverse tube (2-2) is connected with the first side ports of the second three-way pipe (2-3);The 3rd manifold system group Component (3) is made up of the 3rd vertical tube (3-1), the 3rd transverse tube (3-2) and 90 degree of elbows (3-3), the 3rd vertical tube (3-1) and 90 The top port connection of elbow (3-3) is spent, the 3rd transverse tube (3-2) is connected with the side ports of 90 degree of elbows (3-3);
Corresponding suspension bracket (4) is fixedly connected with manifold system sub-assembly by pipe collar and screw in step 3, the suspension bracket (4) it is fixedly connected on by expansion bolt on the floor (5);
The first manifold system sub-assembly (1), the second manifold system sub-assembly (2) and the 3rd manifold system sub-assembly (3) Quantity is one.
CN201410749317.5A 2014-12-04 2014-12-04 Building pipe clamp connection drainage system branch pipe combines preset construction method of installation Active CN104455723B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410749317.5A CN104455723B (en) 2014-12-04 2014-12-04 Building pipe clamp connection drainage system branch pipe combines preset construction method of installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410749317.5A CN104455723B (en) 2014-12-04 2014-12-04 Building pipe clamp connection drainage system branch pipe combines preset construction method of installation

Publications (2)

Publication Number Publication Date
CN104455723A CN104455723A (en) 2015-03-25
CN104455723B true CN104455723B (en) 2017-08-08

Family

ID=52902236

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410749317.5A Active CN104455723B (en) 2014-12-04 2014-12-04 Building pipe clamp connection drainage system branch pipe combines preset construction method of installation

Country Status (1)

Country Link
CN (1) CN104455723B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106245711A (en) * 2016-08-01 2016-12-21 莎丽科技股份有限公司 A kind of integrated installation method of domestic feed pipe
CN106049623A (en) * 2016-08-01 2016-10-26 莎丽科技股份有限公司 Integrated installing method of home-use water discharging pipe
CN108194702B (en) * 2017-12-06 2020-12-15 上海建工五建集团有限公司 Method for installing pipeline in narrow pipe hoistway
CN111425663B (en) * 2020-05-12 2021-07-06 山西西建集团有限公司 Toilet drainage pipeline construction assembly and method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2120145U (en) * 1992-03-18 1992-10-28 山西师范大学 Storm drain accessories for building

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB576667A (en) * 1944-02-02 1946-04-15 Abraham Fishko Improvements in or relating to means for passing pipes through the floors of a building
DE2707681C3 (en) * 1976-02-25 1980-11-20 Kubota Ltd., Osaka (Japan) Deflection tube
CN2083598U (en) * 1990-11-27 1991-08-28 北京市第三住宅建筑工程公司 Domestic waste-water plumbing pipe-line parts
JP2002364041A (en) * 2001-06-11 2002-12-18 Kubota Corp Sound absorbing type leg-section bend connecting structure and sound absorbing type expansion joint pipe
CN1200182C (en) * 2001-12-07 2005-05-04 谭渝芳 Open-type drainage system and its installing process
CN100554604C (en) * 2007-06-22 2009-10-28 王凤蕊 Architecture indoor single-stack drain system and mounting method thereof
CN202519751U (en) * 2012-01-10 2012-11-07 李继昌 Cross-layer drainage flushing system
CN202850142U (en) * 2012-11-17 2013-04-03 张永海 Indoor pipeline drainage system for storied building
CN103882918B (en) * 2012-12-20 2016-08-03 中建四局第一建筑工程有限公司 The water discharge method of floor hydrops and device during construction of super highrise building

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2120145U (en) * 1992-03-18 1992-10-28 山西师范大学 Storm drain accessories for building

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
排水管道安装;鲍福昌,张文香;《管道工技能图解》;20120731;第125-127页 *
浅谈模块化施工中管道支吊架的安装;江冬艳、程好秋;《中国新技术新产品》;20131031(第10期);第74页第1栏第4段至第2栏第1段 *

Also Published As

Publication number Publication date
CN104455723A (en) 2015-03-25

Similar Documents

Publication Publication Date Title
CN104455723B (en) Building pipe clamp connection drainage system branch pipe combines preset construction method of installation
CN211499913U (en) Low-energy-consumption prefabricated house
CN105064699A (en) Semi-automatic piling and building method for building
CN105821989A (en) Assembly type steel pipe bundle concrete shear wall structure system and construction method thereof
CN103437556A (en) Waterproof and heat-preservation construction method for building water supply and drainage and heating engineering
CN204212383U (en) Plug-in type steel pipe scaffold
CN207314540U (en) A kind of full prefabricated buildings of PC components
CN209369144U (en) A kind of precast floor slab connecting node
CN106760059B (en) Assembled building structure system
CN106979635B (en) A kind of ground-source heat pump system underground heat-transfer pipe construction method
CN202187363U (en) Shear cylinder structure for grouting connection of offshore wind power foundation structure
CN109000042B (en) Horizontal air duct wall penetrating system and construction method thereof
CN204959890U (en) Prefabricated mounting structure of indoor U -PVC soil stack of high -rise building
CN207315379U (en) A kind of precast assembly vertical shaft
CN207406301U (en) To drilling Auto-drainage equipment under one kind
CN204466418U (en) Combined energy-saving heat-preserving wall greenhouse by solar heat
CN205502603U (en) Intelligence vacuum mud jacking system
CN205617606U (en) Concrete shear wall structure system is restrainted to assembled steel pipe
CN203794496U (en) Firefighting pipe lifting device
CN205917730U (en) Tubular cross section steel buckled plate city utility tunnel
CN207660296U (en) A kind of precast concrete hanging apparatus
CN202530518U (en) Embedded device at sewer line in toilet
CN206957243U (en) A kind of intelligent curtain wall installation mechanical structure
CN205206337U (en) Top module system core section of thick bamboo wall body spraying system all
CN211738267U (en) Prefabricated balcony riser mounting structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant