CN205206337U - Top module system core section of thick bamboo wall body spraying system all - Google Patents
Top module system core section of thick bamboo wall body spraying system all Download PDFInfo
- Publication number
- CN205206337U CN205206337U CN201520850051.3U CN201520850051U CN205206337U CN 205206337 U CN205206337 U CN 205206337U CN 201520850051 U CN201520850051 U CN 201520850051U CN 205206337 U CN205206337 U CN 205206337U
- Authority
- CN
- China
- Prior art keywords
- structure body
- wall
- core walls
- walls structure
- spray
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Details Or Accessories Of Spraying Plant Or Apparatus (AREA)
Abstract
The utility model provides a top module system core section of thick bamboo wall body spraying system all, include: the water tank, the water tank sets up in module system top all, the delivery pipe, the one end of delivery pipe communicate in the water tank, the other end of delivery pipe is connected on water source pumping installations, and spray set, spray set includes: communicate in the main water pipe of water tank, with the template layer position of core section of thick bamboo wall body corresponds on the main water pipe intercommunication first spray thrower and with the second spray thrower of intercommunication on the main water pipe of the firm release layer position correspondence of core section of thick bamboo wall body. After adorning water with the water tank, water changes potential energy into kinetic energy through spray set for rivers spray core section of thick bamboo wall body through spray set. The utility model discloses top module system core section of thick bamboo wall body spraying system all carries out different maintenances to the template layer of core section of thick bamboo wall body and just release layer as required, have use manpower sparingly, advantages such as reduction of erection time, improvement engineering quality.
Description
Technical field
The utility model relates to a kind of backform system core cylinder care field, is specifically related to a kind of Core Walls Structure body of wall spray system of backform system.
Background technology
Along with the rise of domestic and international super highrise building, in construction, backform systematic difference is also thereupon extensive.In construction of super highrise building, the maintenance of backform system kernel heart cylinder concrete wall is an industry difficult problem always.In view of backform system every 4-5 days needs jacking once, then need the body of wall to just building complete body of wall and firm demoulding to carry out water seasoning in construction simultaneously, especially in the summer of heat, concrete strength is high, thickness of wall body is large, belong to typical high strength, concrete in mass, if maintenance is not in place, Core Walls Structure body of wall can produce a large amount of harmful cracks, causes mass defect.If all adopt manual operation maintenance construction, then time-consuming, input cost is large, so needs to provide a kind of Core Walls Structure body of wall spray maintenance device of high efficiency backform system to solve above problem.
Utility model content
In view of the foregoing, existing the utility model provides a kind of Core Walls Structure body of wall spray system of backform system,
For achieving the above object, the technical scheme that the utility model is taked is:
A Core Walls Structure body of wall spray system for backform system, comprising: water tank, described water tank is arranged at the top of backform system; Feed pipe, one end of described feed pipe is communicated in described water tank, and the other end of described feed pipe is connected on water source pumping installations; And spray equipment, described spray equipment comprises: be communicated in the water main of described water tank, coconnected first drencher of the described water main corresponding with the template layer position of described Core Walls Structure body of wall and coconnected second drencher of the water main corresponding with the firm release layer position of described Core Walls Structure body of wall.
The beneficial effects of the utility model are, the Core Walls Structure body of wall spray system of the utility model backform system is by arranging water tank at the top of backform system, water in water tank carries out nourishment by the first drencher in spray equipment to the template layer of Core Walls Structure body of wall, and the water in water tank carries out maintenance by the second drencher in spray equipment to the template layer of Core Walls Structure body of wall.Make the Core Walls Structure body of wall spray system of the utility model backform system carry out different maintenances as required to the template layer of Core Walls Structure body of wall and firm release layer, there is advantages such as saving manpower, reduction of erection time, raising workmanship.
The further improvement of the Core Walls Structure body of wall spray system of the utility model backform system is, described water main is installed on the support outside described Core Walls Structure body of wall, and described water main is arranged along the bearing of trend of described Core Walls Structure body of wall.
The further improvement of the Core Walls Structure body of wall spray system of the utility model backform system is, described water main is that many steel pipes are vertically formed by connecting by joint.
The further improvement of the Core Walls Structure body of wall spray system of the utility model backform system is, described first drencher is spray hose.
The further improvement of the Core Walls Structure body of wall spray system of the utility model backform system is, described second drencher comprises branching pipe and is installed on the timer on described branching pipe.
The further improvement of the Core Walls Structure body of wall spray system of the utility model backform system is, described branching pipe is that hollow type closes steel pipe, and described branching pipe passes through tube connector vertical connection in described water main.
The further improvement of the Core Walls Structure body of wall spray system of the utility model backform system is, described branching pipe is arranged on the support of described Core Walls Structure body of wall.
The further improvement of the Core Walls Structure body of wall spray system of the utility model backform system is, described branching pipe just offers several hole for water sprayings to the side of described Core Walls Structure body of wall.
Accompanying drawing explanation
Fig. 1 is the Core Walls Structure body of wall spray system structural representation of the utility model backform system.
Fig. 2 is the spray equipment schematic diagram of the Core Walls Structure body of wall spray system of the utility model backform system.
Detailed description of the invention
For the benefit of to the understanding of structure of the present utility model, be described below in conjunction with drawings and Examples.
Please refer to Fig. 1, Fig. 2, Fig. 1 is the structural representation of the Core Walls Structure body of wall spray system of the utility model backform system, and Fig. 2 is the spray equipment schematic diagram of the Core Walls Structure body of wall spray system of the utility model backform system.
As depicted in figs. 1 and 2, the utility model provides a kind of Core Walls Structure body of wall spray system of backform system, and comprising: water tank 1, described water tank 1 is arranged at the top of backform system; Feed pipe 2, one end of described feed pipe 2 is communicated in described water tank 1, and the other end of described feed pipe 2 is connected on water source pumping installations; And spray equipment 3, described spray equipment 3 comprises: be communicated in the water main 31 of described water tank 1, coconnected first drencher 32 of the described water main 31 corresponding with template layer 41 position of described Core Walls Structure body of wall and coconnected second drencher 33 of the water main 31 corresponding with firm release layer 42 position of described Core Walls Structure body of wall.
Below said modules is described in detail:
As shown in Figure 1 and Figure 2, water tank 1 is arranged on the support of backform system top level, and the effect of feed pipe 2 is that feed tank 1 is poured water, and one end of feed pipe 2 is connected on water tank 1, and it is water tank pumps water that the other end of feed pipe 2 is connected on water source pumping installations.Preferably, feed pipe 2 pvc pipe of selecting durability degree, ductility, corrosion resistance comparatively outstanding.
Spray equipment 3 comprises the water main 31 on the support being arranged on Core Walls Structure body of wall side, coconnected first drencher 32 of the described water main 31 corresponding with template layer 41 position of described Core Walls Structure body of wall and coconnected second drencher 33 of the water main 31 corresponding with firm release layer 42 position of described Core Walls Structure body of wall.
Water main 31 is vertically formed by connecting by joint for many steel pipes, and water main 31 is arranged on the support outside Core Walls Structure body of wall along the bearing of trend of Core Walls Structure body of wall.First drencher 32 is arranged on the water main 31 corresponding with template layer 41 position of Core Walls Structure body of wall, and is communicated with water main 31, and in order to the operation of convenient constructor, preferably, the first drencher 32 adopts the conventional good spray hose of ductility.The water main that firm release layer 42 position of described Core Walls Structure body of wall is corresponding is communicated with the second drencher 33, the timer 332 that second drencher 33 comprises branching pipe 331 and is installed on branching pipe 331, branching pipe 331 is arranged on the support of Core Walls Structure body of wall, the wall of the mid portion of branching pipe 331 is connected together by tube connector 34 and water main 31, make branching pipe 331 vertical connection on water main 31, side branching pipe 331 facing Core Walls Structure body of wall offers several hole for water sprayings 3311.Preferably, branching pipe 331 adopts well-set closed at both ends hollow type steel tubing.Timer 332 is arranged on branching pipe 331, carries out timing controlled to the current of branching pipe 331.
The water main 31 that template layer 41 position of Core Walls Structure body of wall is corresponding is connected with spray hose 32, and constructor can use the template layer 41 of spray hose 32 pairs of Core Walls Structure bodies of wall to carry out artificial spray maintenance.The water main 31 that firm release layer 42 position of Core Walls Structure body of wall is corresponding is connected with branching pipe 331, branching pipe 331 is provided with timer 332, and constructor can carry out automatic spray by the artificial setting to timer 332 or the remote pilot to timer 332 to Core Walls Structure body of wall.
The actual installation of the Core Walls Structure body of wall spray system of the utility model backform system be operating as:
Water tank 1 in a kind of for the utility model backform system core cylinder body of wall spray equipment is arranged on backform system top end holder, poured water by feed pipe 2 pairs of water tanks 1, water in water tank 1 changes potential energy into kinetic energy by spray equipment 3, more careful nourishment can be carried out by the first drencher 32 to it at the template layer 41 of Core Walls Structure body of wall, more convenient automatic maintenance can be carried out by the second drencher 33 at the firm release layer 42 of Core Walls Structure body of wall.Preferred version about the Core Walls Structure body of wall spray system actual installation of a kind of backform system of the utility model is:
Because Core Walls Structure body of wall is generally used for the construction of super highrise building, along with the continuous construction of Core Walls Structure body of wall is increased, the Core Walls Structure body of wall spray system of a kind of backform system of the utility model can meet the demand of the Core Walls Structure body of wall length need carrying out maintenance by adding water main 31, along with constantly increasing of Core Walls Structure body of wall, the pumping at water source is with regard to difficulty all the more, preferably, can every 10 layers a transfer water tank is set.
Below embodiment has been described in detail the utility model by reference to the accompanying drawings, and those skilled in the art can make multiple change to the utility model according to the above description.Thus, under the prerequisite not violating claim aim of the present utility model, some details in embodiment should not formed restriction of the present utility model, the utility model by the scope that defines using appended claims as protection domain.
Claims (8)
1. a Core Walls Structure body of wall spray system for backform system, is characterized in that comprising:
Water tank, described water tank is arranged at the top of backform system;
Feed pipe, one end of described feed pipe is communicated in described water tank, and the other end of described feed pipe is connected on water source pumping installations; And
Spray equipment, described spray equipment comprises: be communicated in the water main of described water tank, coconnected first drencher of the described water main corresponding with the template layer position of described Core Walls Structure body of wall and coconnected second drencher of the water main corresponding with the firm release layer position of described Core Walls Structure body of wall.
2. the Core Walls Structure body of wall spray system of a kind of backform system according to claim 1, it is characterized in that: described water main is installed on the support outside described Core Walls Structure body of wall, and described water main is arranged along the bearing of trend of described Core Walls Structure body of wall.
3. the Core Walls Structure body of wall spray system of a kind of backform system according to claim 2, is characterized in that: described water main is that many steel pipes are vertically formed by connecting by joint.
4. the Core Walls Structure body of wall spray system of a kind of backform system according to claim 1, is characterized in that: described first drencher is spray hose.
5. the Core Walls Structure body of wall spray system of a kind of backform system according to claim 1, is characterized in that: described second drencher comprises branching pipe and is installed on the timer on described branching pipe.
6. the Core Walls Structure body of wall spray system of a kind of backform system according to claim 5, is characterized in that: described branching pipe is that hollow type closes steel pipe, described branching pipe by tube connector vertical connection in described water main.
7. the Core Walls Structure body of wall spray system of a kind of backform system according to claim 6, is characterized in that: described branching pipe is arranged on the support of described Core Walls Structure body of wall.
8. the Core Walls Structure body of wall spray system of a kind of backform system according to claim 6, is characterized in that: described branching pipe just offers several hole for water sprayings to the side of described Core Walls Structure body of wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520850051.3U CN205206337U (en) | 2015-10-29 | 2015-10-29 | Top module system core section of thick bamboo wall body spraying system all |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520850051.3U CN205206337U (en) | 2015-10-29 | 2015-10-29 | Top module system core section of thick bamboo wall body spraying system all |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205206337U true CN205206337U (en) | 2016-05-04 |
Family
ID=55844063
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520850051.3U Expired - Fee Related CN205206337U (en) | 2015-10-29 | 2015-10-29 | Top module system core section of thick bamboo wall body spraying system all |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205206337U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107859093A (en) * | 2017-12-15 | 2018-03-30 | 中建三局第三建设工程有限责任公司 | Core Walls Structure climbing formwork for construction pipe band fire-fighting water storage system and its construction method |
-
2015
- 2015-10-29 CN CN201520850051.3U patent/CN205206337U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107859093A (en) * | 2017-12-15 | 2018-03-30 | 中建三局第三建设工程有限责任公司 | Core Walls Structure climbing formwork for construction pipe band fire-fighting water storage system and its construction method |
CN107859093B (en) * | 2017-12-15 | 2023-11-17 | 中建三局第三建设工程有限责任公司 | Fire-fighting water storage system for core tube climbing formwork construction pipe belt and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204491666U (en) | A kind of steel corrugated sheet Urban Underground pipe gallery | |
CN103437556A (en) | Waterproof and heat-preservation construction method for building water supply and drainage and heating engineering | |
CN205776342U (en) | A kind of prefabricated pipe gallery tube coupling attachment structure | |
CN205206337U (en) | Top module system core section of thick bamboo wall body spraying system all | |
CN204439296U (en) | A kind of project supervision external wall and window limit water test device | |
CN103161162A (en) | Anti-floating anchor rod capable of collecting ground source heat energy and construction method | |
CN202148922U (en) | Water drainage device for underground mining | |
CN205100443U (en) | Be used for overlength industry factory building siphon drainage system | |
CN203546602U (en) | Prestressed corrugated-pipe protecting device used in concrete-pouring process of beam | |
CN206514071U (en) | A kind of pipeline | |
CN203942250U (en) | A kind of submerged cable protecting pipe | |
CN202175988U (en) | Three-grille fire-fighting pool system | |
CN108505545B (en) | Waterproof method for building foundation raft penetrating through underground pipe group | |
CN208535348U (en) | A kind of new indoor hot water pipe and its mounting structure | |
CN107916674B (en) | Shallow foundation pit dewatering device | |
CN205688450U (en) | One is drawn water pipeline multithread charge for remittance device | |
CN201474307U (en) | Water-drenching device on exterior wall of high-rise building | |
CN204328234U (en) | A kind of sewer assembly | |
CN204401470U (en) | The concrete water injector of a kind of Bridge High-pier spraying health promotion | |
CN205179957U (en) | Water conservancy irrigation device | |
CN204911903U (en) | Bore is less than horizontal steel cylinder concrete pipe outer anti -corrosion automatic spraying device of 1400mm | |
CN204081034U (en) | A kind of Integral glass fibre reinforced plastic inspection pit | |
CN204464920U (en) | PCCP electric power piping lane inwall swelled ring support base | |
CN204098062U (en) | Novel underground PCCP culvert pipe | |
CN203880250U (en) | Novel PPR pipe and connecting part used for being connected with same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160504 Termination date: 20201029 |