CN207315379U - A kind of precast assembly vertical shaft - Google Patents

A kind of precast assembly vertical shaft Download PDF

Info

Publication number
CN207315379U
CN207315379U CN201721389376.1U CN201721389376U CN207315379U CN 207315379 U CN207315379 U CN 207315379U CN 201721389376 U CN201721389376 U CN 201721389376U CN 207315379 U CN207315379 U CN 207315379U
Authority
CN
China
Prior art keywords
vertical shaft
prefabricated
lining
construction
precast assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721389376.1U
Other languages
Chinese (zh)
Inventor
陈立锦
薛文杰
何海江
何枝柳
刘玉飞
刘炳旺
王克
许立建
常新宏
葛学伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BCEG Civil Engineering Co Ltd
Original Assignee
BCEG Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BCEG Civil Engineering Co Ltd filed Critical BCEG Civil Engineering Co Ltd
Priority to CN201721389376.1U priority Critical patent/CN207315379U/en
Application granted granted Critical
Publication of CN207315379U publication Critical patent/CN207315379U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a kind of precast assembly vertical shaft, precast assembly vertical shaft includes orlop prefabricated lining and some standard knot prefabricated linings, and one week of the prefabricated lining is made of the ending docking of vertical shaft prefabricated film;Construction procedure is:According to the actual specification for determining vertical shaft of engineering, design, make vertical shaft prefabricated film;Construction site assembly orlop prefabricated lining simultaneously sinks;Installation last layer prefabricated lining simultaneously sinks, until vertical shaft sinks down into designed elevation;Carry out shaft floor back cover construction;After vertical shaft back cover intensity reaches design load, punch on prefabricated lining.A kind of precast assembly vertical shaft provided by the utility model has the advantages that energy conservation and environmental protection, safe and reliable, effectively shortens the cycle of construction, has ensured construction quality.

Description

A kind of precast assembly vertical shaft
Technical field
The utility model belongs to construction engineering technical field, more particularly to a kind of precast assembly vertical shaft.
Background technology
Vertical shaft transports the passage of underground sediment or mud, and plenum ventilation mouth when being excavation or cleaning karez closed conduit. In engineering construction field, vertical shaft is used frequently as the working pit of project dug underground and pipe-jacking project.
The currently used method of Construction of Silo is " inverted side-wall ", i.e., is used as " main joist " using grid steel, then pass through extension The method of net anchor spraying concrete forms support system to shaft wall.But anchoring shotcrete with wire mesh construction can cause the wasting of resources and air Pollution, huge challenge is brought to air quality and environmental protection.There are the wasting of resources, pollution environment, construction for this construction method The shortcomings of security risk is big, the construction period is long, construction quality is not easy to ensure, also do not meet State Council's proposition greatly develops assembling The requirement of formula building.
Utility model content
The purpose of this utility model is to be directed to above-mentioned technical problem, there is provided a kind of precast assembly vertical shaft, its step is reasonable, Assembled, the method for integral sinking using vertical shaft prefabricated film, has the advantages that energy conservation and environmental protection, safe and reliable, effectively shortens construction Cycle, ensured construction quality;In terms of environmental protection, wasted substantially without airborne dust, No Assets in work progress, used in vertical shaft Borehole wall component all using prefabrication, in addition to orlop prefabricated lining needs to be adjusted according to caliber, remaining all may be used Using standard component, to greatly save resource, accelerate construction progress.
The technical solution of the utility model
In order to solve the above technical problems, a kind of precast assembly vertical shaft provided by the utility model, it is prefabricated that it includes orlop The borehole wall and some standard knot prefabricated linings, one week of the prefabricated lining are made of the ending docking of vertical shaft prefabricated film;Adjacent is perpendicular Transverse connection is provided between well prefabricated film, the vertical direction of adjacent prefabricated lining is provided with vertical connection bolt.
Further, the vertical shaft prefabricated film is linear type, its end set has triangle enlarged footing.
Further, one week of vertical shaft includes four pieces of vertical shaft prefabricated films, its end to end square vertical shaft of composition.
Further, in addition to orlop prefabricated lining, other layer of prefabricated lining is standard knot prefabricated lining, other prefabricated wells The quantity of wall is related with the designed elevation of vertical shaft.
Further, sealing rod is provided between the contiguous prefabricated borehole wall, the vertical direction of the contiguous prefabricated borehole wall is by vertically connecting Connecting bolt is fixed.
The utility model beneficial effect:
A kind of precast assembly vertical shaft provided by the utility model and its construction method, its step is reasonable, has abandoned tradition and " has fallen Hang the borehole wall " construction method, avoid the wasting of resources, environmental pollution, security risk, construction period that conventional construction method brings And construction quality without ensureing the problem of, there is energy conservation and environmental protection, safe and reliable, effectively shortens the cycle of construction, guarantee Construction quality.
Brief description of the drawings
By the detailed description made in conjunction with the following drawings, the above-mentioned advantage of the utility model will be apparent and more hold Readily understood, these attached drawings are simply schematical, are not intended to limit the utility model, wherein:
Fig. 1 is the flow chart of precast assembly shaft construction method described in the utility model;
Fig. 2 is the top view of precast assembly vertical shaft described in the utility model;
Fig. 3 is the schematic diagram of the vertical shaft prefabricated film of precast assembly vertical shaft described in the utility model;
Fig. 4 is the schematic diagram after the assembly in place of orlop prefabricated lining;
Fig. 5 is the schematic diagram after cubsoil is excavated in orlop prefabricated lining;
Fig. 6 is the schematic diagram after orlop prefabricated lining once sinks;
Fig. 7 is the schematic diagram that orlop prefabricated lining sinks down into designed elevation;
Fig. 8 is upper strata prefabricated lining and the schematic diagram after orlop prefabricated lining assembly;
Fig. 9 is upper strata prefabricated lining and the schematic diagram after the assembly sinking of orlop prefabricated lining;
Figure 10 is that precast assembly vertical shaft completes the sectional view after assembly;
Figure 11 is the schematic diagram of precast assembly shaft floor back cover construction;
Figure 12 is the schematic diagram after precast assembly vertical shaft punches.
Embodiment
With reference to specific embodiments and the drawings, a kind of precast assembly vertical shaft and its construction method to the utility model into Row describes in detail.
The embodiment recorded herein is the specific embodiment of the utility model, for illustrating the utility model Design, is explanatory and exemplary, should not be construed as the limit to the utility model embodiment and the scope of the utility model System.In addition to the embodiment recorded herein, those skilled in the art can also be based on the application claims and specification institute is public The content opened includes doing using the embodiment to recording herein using obvious other technical solutions, these technical solutions Go out the technical solution of any obvious substitutions and modifications.
The attached drawing of this specification is schematic diagram, aids in illustrating the design of the utility model, it is schematically indicated each several part Shape and its correlation.Note that for the ease of clearly show the utility model embodiment each component structure, respectively Do not drawn between attached drawing according to identical ratio.Identical reference marker is used to represent identical part.
Fig. 1 to Figure 12 is a kind of schematic diagram of herein described precast assembly shaft construction method.
A kind of precast assembly vertical shaft provided by the utility model, it includes orlop prefabricated lining and some standard knots are prefabricated The borehole wall, one week of the prefabricated lining are made of the ending docking of vertical shaft prefabricated film;Horizontal stroke is provided between adjacent vertical shaft prefabricated film To connector, the vertical direction of adjacent prefabricated lining is provided with vertical connection bolt.
In the application, the vertical shaft prefabricated film is linear type, its end set has triangle enlarged footing;One week of vertical shaft Including four pieces of vertical shaft prefabricated films, its end to end square vertical shaft of composition;In addition to orlop prefabricated lining, other layer of prefabricated lining is Standard knot prefabricated lining, the quantity of other prefabricated linings are related with the designed elevation of vertical shaft;It is provided between the contiguous prefabricated borehole wall Sealing rod, the vertical direction of the contiguous prefabricated borehole wall are fixed by vertically connecting bolt.
A kind of flow chart of precast assembly shaft construction method.As shown in Figure 1, it specifically includes following steps:
S1, according to the actual specification for determining vertical shaft of engineering, design, make vertical shaft prefabricated film;
In this step, according to engineering requirements, the size of the length of vertical shaft is determined, it is then corresponding to determine to erect The size of well prefabricated film;The vertical shaft prefabricated film is linear type, its end set has triangle enlarged footing, as shown in Figure 3;It is perpendicular One week of well includes four pieces of vertical shaft prefabricated films, its end to end square vertical shaft of composition, as shown in Figure 2.
S2, construction site assembly orlop prefabricated lining simultaneously sink;
In this step, orlop prefabricated lining needs to be adjusted according to the diameter of pipeline, orlop vertical shaft prefabricated film After machining, assembly is carried out at the construction field (site), to form orlop prefabricated lining.Orlop prefabricated lining is assembled and sinks to wrapping Include following steps:
S2-1, vertical shaft prefabricated film head and the tail is docked, adjacent vertical shaft prefabricated film connects to form orlop by I-steel angle brace Prefabricated lining is simultaneously in place, and Fig. 4 is the schematic diagram after the assembly in place of orlop prefabricated lining;
S2-2, excavates the middle cubsoil inside vertical shaft, and it is 300mm to excavate depth, as shown in Figure 5;
S2-3, excavates vertical shaft lower part cubic metre of earth, is once sunk, as shown in Figure 6;Prefabricated vertical shaft single submergence depth control Within 100mm.
S2-4, repeat step S2-2 to S2-3, sink to setting absolute altitude, as shown in Figure 7 by orlop prefabricated lining.
S3, installs last layer prefabricated lining and sinks, until vertical shaft sinks down into designed elevation;
Specifically, in addition to orlop prefabricated lining, other layer of prefabricated lining is standard knot prefabricated lining, other prefabricated linings Quantity it is related with the designed elevation of vertical shaft.Sealing rod, the vertical side of the contiguous prefabricated borehole wall are provided between the contiguous prefabricated borehole wall Fixed to by vertically connecting bolt, Fig. 8 is upper strata prefabricated lining and the schematic diagram after orlop prefabricated lining assembly;Prefabricated lining Need integral sinking after assembly, Figure 10 be precast assembly vertical shaft complete it is assembled after sectional view, Fig. 9 be upper strata prefabricated lining with most Schematic diagram after the assembly sinking of lower floor's prefabricated lining.
S4, after precast assembly vertical shaft sinks down into designed elevation, carries out shaft floor back cover construction;
In this step, the sinking step of other layer of prefabricated lining is:
S4-1, excavates the middle cubsoil inside vertical shaft, and it is 300mm to excavate depth;
S4-2, excavates vertical shaft lower part cubic metre of earth, is once sunk, and single submergence depth is controlled within 100mm;
S4-3, repeat step S4-1 to S4-2, setting absolute altitude is sunk to by individual layer prefabricated lining.
Vertical shaft back cover uses reinforced concrete cast-in-situ, to ensure the water proofing property of vertical shaft integral strength and bottom plate, and depending on that need to set Catch pit is put, as shown in figure 11.
S5, after vertical shaft back cover intensity reaches design load, punches on prefabricated lining.
After vertical shaft armored concrete back cover plate intensity reaches design load, punch on prefabricated lining, as shown in figure 12, punch After the completion of carry out next procedure construction.At the construction field (site), after vertical shaft armored concrete back cover plate intensity reaches 50%, it is possible to Punch on prefabricated lining.
In the embodiment shown in Fig. 2 to Figure 12, vertical shaft prefabricated film I-steel angle brace connected horizontally is 32C, and vertical shaft is pre- The thickness of film-making is 300mm, is provided with hanging ring, lifting during facilitating assembly;The vertical direction of the contiguous prefabricated borehole wall by The vertical connection bolt of φ 24mm is fixed.
Due to the height of the vertical shaft prefabricated film of orlop prefabricated lining, to be higher than the corresponding vertical shaft of standard knot prefabricated lining pre- Film-making, therefore, the hanging ring root on vertical shaft prefabricated film set perforative main reinforcement, to ensure the security of construction.
Compared with the prior art the shortcomings that and deficiency, a kind of precast assembly vertical shaft and its construction party provided by the utility model Method, its step is reasonable, has abandoned the construction method of traditional " inverted side-wall ", avoids the resource wave that conventional construction method is brought Take, environmental pollution, security risk, construction period and construction quality without ensureing the problem of, there is energy conservation and environmental protection, safe and reliable excellent Point, effectively shortens the cycle of construction, has ensured construction quality.
The utility model is not limited to the above embodiment, anyone can draw other under the enlightenment of the utility model Various forms of products, however, make any change in its shape or structure, it is every with identical or similar to the present application Technical solution, all fall within the scope of protection of the utility model.

Claims (5)

1. a kind of precast assembly vertical shaft, it is characterised in that described including orlop prefabricated lining and some standard knot prefabricated linings One week of prefabricated lining is made of the ending docking of vertical shaft prefabricated film;Transverse connection is provided between adjacent vertical shaft prefabricated film, The vertical direction of adjacent prefabricated lining is provided with vertical connection bolt.
2. precast assembly vertical shaft according to claim 1, it is characterised in that the vertical shaft prefabricated film is linear type, its end Portion is provided with triangle enlarged footing.
3. precast assembly vertical shaft according to claim 1, it is characterised in that one week of vertical shaft includes four pieces of vertical shaft prefabricated films, Its end to end square vertical shaft of composition.
4. precast assembly vertical shaft according to claim 1, it is characterised in that in addition to orlop prefabricated lining, other layer prefabricated The borehole wall is standard knot prefabricated lining, and the quantity of other prefabricated linings is related with the designed elevation of vertical shaft.
5. precast assembly vertical shaft according to claim 1, it is characterised in that sealing rod is provided between the contiguous prefabricated borehole wall, The vertical direction of the contiguous prefabricated borehole wall is fixed by vertically connecting bolt.
CN201721389376.1U 2017-10-25 2017-10-25 A kind of precast assembly vertical shaft Expired - Fee Related CN207315379U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721389376.1U CN207315379U (en) 2017-10-25 2017-10-25 A kind of precast assembly vertical shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721389376.1U CN207315379U (en) 2017-10-25 2017-10-25 A kind of precast assembly vertical shaft

Publications (1)

Publication Number Publication Date
CN207315379U true CN207315379U (en) 2018-05-04

Family

ID=62378635

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721389376.1U Expired - Fee Related CN207315379U (en) 2017-10-25 2017-10-25 A kind of precast assembly vertical shaft

Country Status (1)

Country Link
CN (1) CN207315379U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107701191A (en) * 2017-10-25 2018-02-16 北京建工土木工程有限公司 A kind of precast assembly vertical shaft and its construction method
CN109183821A (en) * 2018-09-18 2019-01-11 中国矿业大学 A kind of quick detachable predetermined level precipitation well construction and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107701191A (en) * 2017-10-25 2018-02-16 北京建工土木工程有限公司 A kind of precast assembly vertical shaft and its construction method
CN109183821A (en) * 2018-09-18 2019-01-11 中国矿业大学 A kind of quick detachable predetermined level precipitation well construction and construction method

Similar Documents

Publication Publication Date Title
CN103215960B (en) Grouting method for high polymer vertical support system
CN204418187U (en) Subway protection region soil nail wall is in conjunction with double-row pile deep foundation ditch composite supporting construction
CN1948633A (en) Tray type excarvating contrary construction method
CN104711994A (en) Foundation pit deep well rainfall and plugging construction method
CN115182737B (en) Vertical orthogonal ejection type air duct structure of deeply buried subway station and construction method
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN102444143B (en) Construction method for cancelling operation channel for facades of basement
CN105756059A (en) Back anchor type anti-floating anchor and construction method
CN112727466A (en) Construction method for support-free prefabricated assembled type shield tunnel air shaft structure
CN112323823A (en) Filling device and method for waste air-raid shelter of pile foundation construction site
CN103114595A (en) Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN207315379U (en) A kind of precast assembly vertical shaft
CN106088154A (en) Prefabricated assembled underground silo compound shaft construction method and silo structure
CN110206038A (en) Supporting construction and construction method at a kind of concave foundation pit external corner
CN205100989U (en) Utilize oblique access structure of subway access & exit double as construction
CN203229955U (en) Foundation pit enclosure structure allowing supporting while excavating
CN104863183B (en) Damping pilework and construction method is isolated in large cross-section tunnel proximity architecture construction
CN106930768A (en) Tunnel Construction and application
CN107165640B (en) Tunnels and underground engineering surely builds method certainly
CN109898556A (en) A kind of underground pipe gallery structure and sunk type construction method
CN213014295U (en) A slip casting fills device for handling abandonment air-raid shelter
CN107701191A (en) A kind of precast assembly vertical shaft and its construction method
CN107326932B (en) Quasi-semi-reverse construction method for underground garage
CN206376277U (en) The structure of underground pipe gallery
CN208533542U (en) A kind of foundation pit supporting construction using three-level echelon joint system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180504

Termination date: 20201025

CF01 Termination of patent right due to non-payment of annual fee