CN104452781A - High and steep rock slope ecological restoration structure and method - Google Patents

High and steep rock slope ecological restoration structure and method Download PDF

Info

Publication number
CN104452781A
CN104452781A CN201410563757.1A CN201410563757A CN104452781A CN 104452781 A CN104452781 A CN 104452781A CN 201410563757 A CN201410563757 A CN 201410563757A CN 104452781 A CN104452781 A CN 104452781A
Authority
CN
China
Prior art keywords
slope
rock
rock matter
gentle slope
gentle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410563757.1A
Other languages
Chinese (zh)
Inventor
程华荣
韩启斌
周文君
李朋远
陈梓浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN DONGHUA LANDSCAPING CO Ltd
Original Assignee
SHENZHEN DONGHUA LANDSCAPING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN DONGHUA LANDSCAPING CO Ltd filed Critical SHENZHEN DONGHUA LANDSCAPING CO Ltd
Priority to CN201410563757.1A priority Critical patent/CN104452781A/en
Publication of CN104452781A publication Critical patent/CN104452781A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G2/00Vegetative propagation

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Botany (AREA)
  • Developmental Biology & Embryology (AREA)
  • Environmental Sciences (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention is suitable for the field of ecological restoration engineering, and provides a high and steep rock slope ecological restoration structure. The structure comprises multiple stages of gentle slope belts, each stage of gentle slope belt comprises a rock slope body and a gentle slope platform, a drainage ditch is formed in each gentle slope platform, and water stopping ditches are formed in the two sides of each rock slope body which is further provided with a plurality of plant growing strips; each stage of gentle slope belt is further provided with a supporting assembly and a reinforcing assembly used for reinforcing the rock slope body and the plant growing strips of the gentle slope belt; each stage of gentle slope belt is further provided with a growing substrate layer and seed mixtures sown on the growing substrate layer, each supporting assembly comprises an iron wire net and a plurality of supporting anchor rods, the plant growing strips are installed on the iron wire nets, and each reinforcing assembly comprises an active protecting net and a plurality of reinforcing anchor rods. The invention further discloses a high and steep rock slope ecological restoration method. Because the reinforcing assemblies and the supporting assemblies are arranged on the rock slope bodies, the rock slope bodies, the plant growing strips and the growing substrate layers are reinforced, and plant growing stability and plant growing safety are improved.

Description

High precipitous rock slope restoration of the ecosystem structure and method
Technical field
The invention belongs to Ecological Restoration Works field, particularly relate to a kind of high precipitous rock slope restoration of the ecosystem structure and high precipitous rock slope ecological restoring method.
Background technology
Along with the development of economic construction, the mankind are more serious to the destruction of natural environment, cause very large impact to the ecological homeostasis.Railway, highway, water conservancy, mining etc. construction cause massif to excavate, thus form a large amount of side slopes and high gradient slope.These side slopes and high gradient slope by the impact of various destabilizing factor, easily become the geological disasters such as landslide, avalanche, falling rocks and engineering accident multiplely, cause huge economic loss and bad social influence.Therefore, protection and the maintenance of side slope are stable, affect construction investment and the safe operation of engineering, are also related to local ecological management.
In recent years, along with the promotion energetically of national Ecological Civilization Construction, the Conservative restoration of ecological environment causes the great attention of society, and one of measure that protecting slope ecology is repaired as ecological protection, has caused the great attention of insider.The greening method that current domestic rock side slope is conventional has spraying and sowing plant growth technology, plant biological bag (bar, basin), the platform planting groove that wafts, hangs cage brick, close plating plants cage, planting hole plants seedlings, concrete frame lattice beam method etc., its ecological protection effect with can with periphery ecological environment rapid fusion, there is ecology, environmental protection, economic dispatch advantage, but the greening structure that these rock slope greening methods obtain is generally attachment or is supported in side slope, easily be washed and come off, stable not and safety is poor.
Summary of the invention
The object of the present invention is to provide a kind of high precipitous rock slope restoration of the ecosystem structure, be intended to solve existing greening high precipitous rock slope structure and be easily washed and come off, the stable not and problem that safety is poor.
The present invention is achieved in that a kind of high precipitous rock slope restoration of the ecosystem structure, comprises the multistage gentle slope belt arranged along high precipitous rock slope from top to bottom, gentle slope belt described in every one-level comprises rock matter slope body and is positioned at the gentle slope platform at body top, described rock matter slope, described gentle slope platform is provided with gutter, described gutter is moved towards to arrange along the length of this gentle slope platform, the both sides of described rock matter slope body offer the catchwater be connected with described gutter, described rock matter slope body are also provided with somely plant the carded sliver, gentle slope belt described in every one-level is also provided with supporting component for planting the carded sliver described in supporting and for the rock matter slope body of reinforcing this gentle slope belt and described in plant the reinforcement assembly of the carded sliver, the growth basic unit that gentle slope belt described in every one-level being also provided with sows grass seeds by duster covers described reinforcement assembly and the seed mix be seeded in described growth basic unit, described supporting component comprises the wire gauze be installed on respectively on the body of described rock matter slopes at different levels and the many support anchors supporting described wire gauze, the described carded sliver of planting is fixed on described wire gauze, described reinforcement assembly comprise be layed in respectively described gentle slope belt at different levels corresponding described in plant the active protecting net of carded sliver opposite exterior lateral sides and described active protecting net be fixed on the body of described rock matter slope many and reinforce anchor poles.
The present invention by arranging multistage gentle slope belt on high precipitous rock slope, and offers gutter and catchwater, to facilitate draining on gentle slope belt; The rock matter slope body of gentle slope belt at different levels is installed supporting component fix support and plant the carded sliver, then fix reinforcement assembly on this rock matter slope body, rock matter slope body arranges growth basic unit and covers reinforcement assembly, seed mix is sowed by growth basic unit; By reinforcement assembly, reinforcement protection is carried out to rock matter slope body, reinforcement protection is carried out to plant bar simultaneously, and then also supporting component is reinforced, and by reinforcement assembly, supporting component and plant the carded sliver to growth basic unit carry out firmly, ensure the stable growth of plant, prevent from plant and growth basic unit to be washed to come off, increase the safety of this restoration of the ecosystem structure.
Another object of the present invention is to provide a kind of high precipitous rock slope ecological restoring method, comprise the following steps:
S1) on high precipitous rock slope, offer multistage gentle slope platform, make the rock matter cyphosomatic between this gentle slope platform and the described gentle slope platform of the next stage of this gentle slope platform become gentle slope belt;
S2) the length trend along this gentle slope platform on the platform of described gentle slopes at different levels offers gutter, and offer catchwater in the both sides of described rock matter slopes at different levels body, the gutter on the gentle slope platform that described catchwater is corresponding with this rock matter slope body is connected;
S3) surface dust on described gentle slope belt at different levels, float stone are cleared up, and domatic finishing the to corresponding rock matter slope body;
S4) described rock matter slopes at different levels body domatic on get some installing holes, and at the bottom of the Po Ding, slope of this rock matter slope body each one row described installing hole;
S5) in each described installing hole, insert reinforcing anchor pole respectively, one end of each described reinforcing anchor pole is stretched out outside corresponding described installing hole, and to grout injection in each described installing hole with fixing reinforcing anchor pole;
S6) described rock matter slopes at different levels body domatic on bore some fixing holes, and in each described fixing hole respectively plug-in mounting fixed support anchor pole, and one end of each described support anchors is stretched out outside corresponding described fixing hole;
S7) described rock matter slopes at different levels body domatic on lay wire gauze respectively, described wire gauze domaticly to be laid from top to bottom along described, and is fixed in described support anchors by described wire gauze;
S8) fixedly mount on the described wire gauze of described rock matter slopes at different levels body and multiplely plant the carded sliver;
S9) lay active protecting net respectively in the upper of described rock matter slopes at different levels body, and make described active protecting net be placed on described in plant the outside away from described wire gauze of the carded sliver, described active protecting net is fixed on described reinforcing anchor pole;
S10) to sow grass seeds by duster on the body of described rock matter slopes at different levels growth base material, make described growth base material cover described active protecting net, form growth basic unit;
S11) to sow grass seeds by duster in described growth basic unit seed mix, and carry out maintenance.
The inventive method arranges multistage gentle slope belt on high precipitous rock slope, and on gentle slope belt, offer gutter and catchwater, to facilitate draining, prevents rainwater from washing out rock matter slope body; This rock matter slope body is installed and reinforces anchor pole and active protecting net, and the wire gauze installing support anchors on the body of rock matter slope supports and plants the carded sliver, by reinforcement assembly, reinforcement protection is carried out to rock matter slope body, reinforcement protection is carried out to plant bar simultaneously, and then also supporting component is reinforced, and by reinforcement assembly, supporting component and plant the carded sliver to growth basic unit carry out firmly, ensure the stable growth of plant, prevent from plant and growth basic unit to be washed to come off, increase the safety of plant and growth substrate layer growth.
Accompanying drawing explanation
Fig. 1 is the sectional structure schematic diagram of a kind of high precipitous rock slope restoration of the ecosystem structure that the embodiment of the present invention provides;
Fig. 2 be the gentle slope belt of the high precipitous rock slope restoration of the ecosystem structure of Fig. 1 face structural representation;
Fig. 3 be the reinforcement assembly of the high precipitous rock slope restoration of the ecosystem structure of Fig. 1 face structural representation.
Detailed description of the invention
In order to make object of the present invention, technical scheme and advantage clearly understand, below in conjunction with drawings and Examples, the present invention is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the present invention, be not intended to limit the present invention.
Refer to Fig. 1, Fig. 2 and Fig. 3, a kind of high precipitous rock slope restoration of the ecosystem structure that the embodiment of the present invention provides, comprise the multistage gentle slope belt 1 arranged from top to bottom along high precipitous rock slope; Every one-level gentle slope belt 1 comprises rock matter slope body 11 and gentle slope platform 12, and this gentle slope platform 12 is positioned at the top of this rock matter slope body 11, and the rock matter slope body 11 namely between every one-level gentle slope platform 12 and the next stage gentle slope platform 12 of this gentle slope platform 12 forms one-level gentle slope belt 1.Every one-level gentle slope platform 12 is provided with gutter 13, gutter 13 is moved towards to arrange along the length of this gentle slope platform 12, the then top of the gutter 13 also rock matter slope body 11 of this grade, position gentle slope belt 1, to facilitate the water of discharging on this gentle slope platform 12 and upper level gentle slope belt 1 thereof.The both sides of the rock matter slope body 11 of gentle slope belt 1 at different levels offer catchwater 14, and this catchwater 14 is connected with the gutter 13 at this body 11 top, rock matter slope, to discharge this rock matter slope body 11 and gentle slope, top platform 12 thereof and the water in gutter 13.
Every one-level gentle slope belt 1 is also provided with supporting component 2 and reinforcement assembly 3; Supporting component 2 is fixed with and somely plants the carded sliver 4, thus these are planted the carded sliver 4 and be fixed on corresponding rock matter slope body 11; Reinforcement assembly 3, for reinforcing the rock matter slope body 11 of this gentle slope belt 1 and planting the carded sliver 4, due to the reinforcement effect of reinforcement assembly 3 pairs of rock matter slope bodies 11, and then also can be reinforced and stable support assembly 2.
Supporting component 2 comprises the wire gauze 22 be laid on respectively on rock matter slopes at different levels body 11 and the many support anchors 21 supporting this wire gauze 22; Namely on rock matter slopes at different levels body 11, many support anchors 21 are all installed, when wire gauze 22 is laid on after on this rock matter slope body 11, wire gauze 22 and support anchors 21 are fixedly linked, thus support wire gauze 22.The carded sliver 4 will be planted be fixed on wire gauze 22, thus support and plant the carded sliver 4.Wire gauze 22 is laid from top to bottom along corresponding rock matter slope body 11.
Reinforcement assembly 3 comprises the active protecting net 32 be laid on respectively on rock matter slopes at different levels body 11 and the many reinforcing anchor poles 31 supporting this active protecting net 32, and active protecting net 32 is laid on the corresponding opposite exterior lateral sides away from wire gauze 22 of planting the carded sliver 4; Namely on rock matter slopes at different levels body 11, be all provided with many reinforce anchor pole 31, by reinforcing anchor pole 31, corresponding rock matter slope body 11 is reinforced, and when active protecting net 32 is laid on after on this rock matter slope body 11, active protecting net 32 and reinforcing anchor pole 31 are fixedly linked, active protecting net 32 is then made to form entirety with reinforcing anchor pole 31, reinforce corresponding rock matter slope body 11 further, prevent that rock matter slope body 11 is aging to come off; Plant the carded sliver 4 simultaneously between active protecting net 32 and wire gauze 22, held by active protecting net 32 and plant the carded sliver 4, fixedly to plant the carded sliver 4 further.Active protecting net 32 is laid from top to bottom along corresponding rock matter slope body 11.
Every one-level gentle slope belt 1 is also provided with growth basic unit 5 and seed mix, seed mix is seeded in growth basic unit 5, and grow basic unit 5 and can be attached to through sowing grass seeds by duster on domatic 111 of the rock matter slope body 11 of this gentle slope belt 1 by growth base material, and make growth base material cover reinforcement assembly 3, form growth basic unit 5; Namely grow basic unit 5 cover reinforcement assembly 3, thus for seed mix germinate, growth good basic condition is provided.
By high precipitous rock slope being arranged to multistage gentle slope belt 1, conveniently gentle slope belt 1 at different levels is constructed.Gutter 13 offered by the gentle slope platform 12 of gentle slope belt 1 at different levels, and offers catchwater 14 in the both sides of rock matter slope body 11, to facilitate draining, reduce infiltration, precipitation to the impact of growth basic unit 5, prevent rainwater from washing out rock matter slope body 11.
Rock matter slopes at different levels body 11 is installed and reinforces anchor pole 31 and active protecting net 32, carry out reinforcement protection by reinforcement assembly 3 pairs of rock matter slope bodies 11, ensure stability and the safety of rock matter slope body 11.Rock matter slope body 11 is installed the wire gauze 22 of support anchors 21, and the carded sliver 4 is fixedly planted on wire gauze 22, and make to plant the carded sliver 4 between wire gauze 22 and active protecting net 32, plant the carded sliver 4 to stablize and to firmly fix, to provide stable support and growing environment for plant growth.
Rock matter slopes at different levels body 11 to be sowed grass seeds by duster growth base material, form growth basic unit 5, and make growth basic unit 5 cover active protecting net 32, then grow basic unit 5 cover domatic 111, the supporting component 2 that these are on domatic 111 of corresponding rock matter slope body 11 simultaneously and plant the carded sliver 4, to provide the Nutrient medium layer material (as soil, fertilizer etc.) of adequate thickness for plant growth.The growth basic unit 5 formed simultaneously by supporting component 2, plant the carded sliver 4 and reinforcement assembly 3 supports and goes along with sb. to guard him, effectively can prevent growth basic unit 5 from being come off by rain drop erosion, ensure the growth conditions of plant.Growth basic unit 5 covers rock matter slope body 11, can slow down the weathering of rock matter slope body 11, aging, with the combination of reinforcement assembly 3, ensures the stability that rock matter slope body 11 is long-term and safety.And to sow grass seeds by duster seed mix in growth basic unit 5, with at growth basic unit 5 planting plants, by phytoremediation with beautify ecological environment.
In order to ensure to reinforce anchor pole 31 pairs of rock matter slope bodies 11 reinforcement effect well, the diameter range reinforcing anchor pole 31 is 30-35mm, to ensure that reinforcing anchor pole 31 has enough intensity.The length range reinforcing anchor pole 31 is generally 2.5-3m, and is fixed in rock matter slope body 11, and its one end only needs the length range stretched out outside this rock matter slope body 11 to be 10-20cm, convenient fixing active protecting net 32; Ensure that reinforcing anchor pole 31 is fixed to rock matter slope body 11 part and has enough degree of depth, play rock matter slope body 11 reinforcement effect well.
In order to ensure the application life of reinforcing anchor pole 31, prevent its corrosion, reinforce on anchor pole 31 and be coated with zinc layers, namely this reinforcing anchor pole 31 is galvanized anchor rod.Certainly, conveniently active protecting net 32 is fixed on and reinforces on anchor pole 31, reinforce on one end that anchor pole 31 stretches out rock matter slope body 11 and can external screw thread be set.
In addition, in order to make the reinforcement effect that reinforcing anchor pole 31 pairs of rock matter slope bodies 11 are good, then on rock matter slope body 11, install reinforcing anchor pole 31 needs suitable density, reinforces anchor pole 31 density and arranges overstocked, can increase difficulty of construction and cost.Generally level interval 2.5-3.5m, and vertical interval 2-2.5m arrange one reinforce anchor pole 31 comparatively suitable, namely two reinforcing anchor poles 31 that level is adjacent are at a distance of 2.5-3.5m, reinforce anchor pole 31 at a distance of 2-2.5m for vertically adjacent two, both can ensure rock matter slope body 11 intensity, can ensure again difficulty of construction and cost lower.In order to make active protecting net 32 better be paved with corresponding rock matter slope body 11, need respectively at the bottom of the Po Ding and slope of each rock matter slope body 11 to fix a row and reinforce anchor pole 31.
In general domatic 111 areas of the rock matter slope body 11 of gentle slope belt 1 at different levels are larger, and protective screening generally makes relative narrower, thus, in order to be paved with active protecting net 32 on rock matter slopes at different levels body 11, generally that polylith protective screening is overlapped, be paved with rock matter slope body 11, the active protecting net 32 namely on every one-level gentle slope belt 1 is overlapped by polylith protective screening and forms.And protective screening is generally relatively long, thus for ensureing the intensity of active protecting net 32, every block protective screening is laid from top to bottom along this gentle slope belt 1.
The lap width scope of adjacent two pieces of protective screenings is 10-15cm, and its overlapping regions is fixedly linked by wire rope 33 is interspersed from top to bottom; Namely use steel cable 33, at overlap these two pieces of protective screenings interspersed from top to bottom of adjacent two pieces of protective screenings, thus the protective screenings that two pieces overlap mutually are fixed up.And use steel cable 33 to carry out interspersed connection two pieces of protective screenings, the intensity connected can be ensured, this protective screening can also be held by wire rope 33, and then strengthen bonding strength and the stability of whole active protecting net 32.The diameter range of wire rope 33 is 10-12mm, through ensureing that wire rope 33 has enough intensity, ensures that wire rope 33 can conveniently intert fixing simultaneously.Certainly in order to fixedly secure active protecting net 32 further, iron wire line or steel wire can also be used, at portion, the wire gauze 22 of active protecting net 32 with supporting component 2 is fixedly linked, this connected mode, also active protecting net 32 can be made to fix and support wire gauze 22, increase the steadiness of wire gauze 22.Active protecting net 32 can random selecting with the link position of wire gauze 22.
The steel wire diameter scope of protective screening is 3-4mm, and the sizing grid scope of protective screening is 50*50mm-70*70mm, to ensure that protective screening has sufficient intensity, thus is combined with reinforcing anchor pole 31 and reinforces rock matter slope body 11 and grow basic unit 5.
In addition, reinforce on anchor pole 31 in order to active protecting net 32 is securely fixed in, wire rope 33 can also be set and laterally intert each protective screening (i.e. wire rope 33 level intert each protective screening), and wire rope 33 is fixed on reinforcing anchor pole 31, reinforce on anchor pole 31 to ensure that protective screening is securely fixed in.Protective screening adopts high-tensile steel wires grid, after carrying out longitudinally (i.e. the above-below direction of wire rope 33 along domatic 111) through wire rope 33, laterally linking, being fixed on rock matter slope body 11 by reinforcing anchor pole 31, forming engineering protection, to prevent and treat all kinds of slope geological.And be that main active protecting net 32 carries out domatic 111 covered protections by wire rope 33 net or high-tensile steel wires grid, rock mass structure easily loose, broken, the scar weathering of high precipitous rock slope can be solved, cause the geological disaster such as falling rocks, landslide, and a difficult problem for system anchor bolt anchoring Hou Pen Quan bank protection cannot be carried out.
In like manner, because domatic 111 areas of the rock matter slope body 11 of gentle slope belt 1 at different levels are larger, and wire gauze 22 generally makes relative narrower, in order to be paved with wire gauze 22 on rock matter slopes at different levels body 11, generally that wire gauze 22 is overlapped, be paved with rock matter slope body 11, the wire gauze 22 namely on every one-level gentle slope belt 1 is overlapped by polylith and forms.And wire gauze 22 is general relatively long, thus for ensureing the intensity of wire gauze 22, every block wire gauze 22 is laid from top to bottom along this gentle slope belt 1.The overlap of adjacent two pieces of wire gauze 22 is bundled by iron wire line and is fixedly linked.The lap width scope of adjacent two pieces of wire gauze 22 is generally 10-20cm, and iron wire line can choose the iron wire that diameter is 1.2mm, to reduce difficulty of construction and cost, ensures the bonding strength of wire gauze 22 simultaneously.In order to increase the application life of wire gauze 22, prevent wire gauze 22 corrosion, wire gauze 22 can use galvanized wire mesh 22.
The iron wire diameter range of wire gauze 22 is 2.8-3.5mm, and the sizing grid scope of wire gauze 22 is 50*50mm-70*70mm, plants the carded sliver 4 to ensure that wire gauze 22 has sufficient intensity to support.
Conveniently support and fixing wire gauze 22, support anchors 21 can be L-type, thus is conveniently hung in support anchors 21 by wire gauze 22.Support anchors 21 generally selects diameter range to be the anchor pole of 16-22mm, to ensure the intensity of support anchors 21.In order to ensure that support anchors 21 is fixed on the stability on rock matter slope body 11, the partial-length that support anchors 21 is fixed in rock matter slope body 11 is 35-45cm, and its height stretching out rock matter slope body 11 only needs 8-10cm, to facilitate support iron silk screen 22.
Row's support anchors 21 can be fixed, to facilitate mounting wire gauze 22 on top, the slope of rock side slope at different levels.And the density of support anchors 21 is generally 1-2 root every square metre on domatic 111 of rock matter slope body 11.To ensure the stability of wire gauze 22.
The diameter range of planting the carded sliver 4 is 8-10cm, and multiple carded sliver 4 of planting is fixed on wire gauze 22 from top to bottom, and covers whole wire gauze 22, and neighbouring two are planted the carded sliver 4 at a distance of 20-30cm.Plant the carded sliver 4 inside and planting soil and fertilizer are housed.
In addition, the inside of rock side slope generally has some stowings, when there is ponding in these stowings, can affect the structural strength of rock side slope, reduce its safety, for discharging these ponding, each rock matter slope body 11 domatic 111 on also offer some drain holes 16.Drain hole 16 is perpendicular to domatic 111 of corresponding rock side slope.The degree of depth general range of these drain holes 16 can 70-100cm, and the diameter range of drain hole 16 is 3-4cm.The density of drain hole 16 is generally: two drain holes 16 2-2.5m apart that level is adjacent, and two neighbouring drain holes 16 are at a distance of 0.8-1.5m.Thus convenient ponding of discharging body 11 inside, rock matter slope, intensity and the steadiness of rock matter slope body 11 can not be affected simultaneously.
Because domatic 111 areas of the rock matter slope body 11 of gentle slope belt 1 at different levels are larger, for discharging the water on rock matter slope body 11 in time, the rock matter slope body 11 of every one-level gentle slope belt 1 domatic 111 in the middle part of also offer chute 15, chute 15 is arranged from top to bottom along this rock matter slope body 11, and chute 15 is connected with the gutter 13 of this gentle slope belt 1.
According to the runoff area pro form bill bit traffic of domatic 111, should then determine its standard such as width, the degree of depth when gutter 13 on gentle slope platform 12 is designed, and ensure that gutter 13 bottom of trench has certain gradient; Catchwater 14 should domatic 111 at least 2m of horizontal range corresponding rock matter slope body 11, ensure the bearing capacity of catchwater 14; The width range of chute 15 is generally 1-2m; Higher level's rock matter slope body 11 domatic 111 width to be narrower than domatic 111 of subordinate's rock matter slope body 11; Drain hole 16 can use air drill to hole, and inserts gutter with fixing; Whole drainage system uses C15 steel concrete to build, and namely gutter 13, catchwater 14 and chute 15 can use C15 steel concrete to build.If execution conditions do not allow, block clitter also can be used to build, pointed with cement mortar and the face of painting, finally guarantee that drainage system is unobstructed, flow into bottom reservoir by design direction and also get rid of outside the venue or re-use.Gentle slopes at different levels platform 12 can also be arranged near the outside of domatic 111 of this gentle slope belt 1 and intercept wall 6, spill in growth basic unit 5 to prevent water in gutter 13.
The growth base material that rock matter slope body 11 is sowed grass seeds by duster comprises planting soil, fertilizer, composite fertilizer, water-loss reducer, rubber powder and cement; Wherein the ratio of planting soil, fertilizer and composite fertilizer is planting soil is 100 parts, and fertilizer is 8-12 part, and composite fertilizer is 4-6 part, and the content of cement accounts for this growth base material overall percentage is 3%-5%.Thus provide good condition with plant growth, avoid again using simultaneously and excessively cause that surface soil alkalinity is higher affects plant growth.Preferentially, growth base material is made up of planting soil, fertilizer, composite fertilizer, water-loss reducer, rubber powder and cement, and the ratio of planting soil, fertilizer and composite fertilizer is planting soil is 100 parts, fertilizer is 8-12 part, composite fertilizer is 4-6 part, and the content of cement is when to account for this growth base material overall percentage be 3%-5%, and plant growth nutrient environment is best, plant growth is the fastest, and restoration of the ecosystem reaches best.
The seed mix of sowing grass seeds by duster in growth basic unit 5 comprises herbaceous plant seeds, shrub plant seed, liana seed and flowers and plants vegetable seeds.Will ensure the uniformity and the use amount of seed when seed mix is sowed grass seeds by duster, being generally the total consumption of every square meter seed mix is 30g.In seed mix, herbaceous plant seeds, shrub plant seed, liana seed and flowers and plants vegetable seeds all at least will ensure one.Herbaceous plant seeds can be selected from the vegetable seeds such as Bermuda grass, paspalum notatum, molasses grass, Festuca Arundinacea; Shrub plant seed can be selected from the vegetable seeds such as crotalaria mucronata, pigeonpea (mountain green soy bean), white popinac, locust tree, aalii; Liana seed can be selected from the vegetable seeds such as kudzu, morning glory; Flowers and plants vegetable seeds can be selected from the vegetable seeds such as pot marigold, coreopsis.In seed mix, Bamboo resource quantity is 5 ~ 7 kinds and is advisable.
In order to accelerate germination, the growth of seed, after seed mix has been sowed grass seeds by duster, the non-woven fabrics that can cover in growth basic unit 5, and reinforce firmly, and carry out later stage maintenance.Rainwater comparatively multizone can cover two-layer nonwoven, with by non-woven fabrics exclusive segment rainwater, to protect growth basic unit 5 and plant.
Please again consult Fig. 1, Fig. 2 and Fig. 3, the embodiment of the invention also discloses a kind of high precipitous rock slope ecological restoring method, comprise the following steps:
S1) on high precipitous rock slope, offer multistage gentle slope platform 12, make the rock matter slope body 11 between the described gentle slope platform 12 of the next stage of this gentle slope platform 12 and this gentle slope platform 12 form gentle slope belt 1;
S2) the length trend along this gentle slope platform 12 on described gentle slopes at different levels platform 12 offers gutter 13, offer catchwater 14 in the both sides of described rock matter slopes at different levels body 11, the gutter 13 on the gentle slope platform 12 that described catchwater 14 is corresponding with this rock matter slope body 11 is connected;
S3) surface dust on described gentle slope belt 1 at different levels, float stone are cleared up, and domatic 111 of corresponding rock matter slope body 11 is repaired;
S4) on domatic 111 of described rock matter slopes at different levels body 11, get some installing holes, and at the bottom of the Po Ding, slope of this rock matter slope body 11 each one row described installing hole;
S5) in each described installing hole, insert reinforcing anchor pole 31 respectively, one end of each described reinforcing anchor pole 31 is stretched out outside corresponding described installing hole, and to grout injection in each described installing hole with fixing reinforcing anchor pole 31;
S6) on domatic 111 of described rock matter slopes at different levels body 11, bore some fixing holes, and in each described fixing hole, distinguish plug-in mounting fixed support anchor pole 21, and one end of each described support anchors 21 is stretched out outside corresponding described fixing hole;
S7) on domatic 111 of described rock matter slopes at different levels body 11, lay wire gauze 22 respectively, described wire gauze 22 is laid from top to bottom along described domatic 111, and is fixed in described support anchors 21 by described wire gauze 22;
S8) fixedly mount on the described wire gauze 22 of described rock matter slopes at different levels body 11 and multiplely plant the carded sliver 4;
S9) lay active protecting net 32 respectively in the upper of described rock matter slopes at different levels body 11, and make described active protecting net 32 be placed on described in plant the outside away from described wire gauze 22 of the carded sliver 4, described active protecting net 32 is fixed on described reinforcing anchor pole 31;
S10) to sow grass seeds by duster on described rock matter slopes at different levels body 11 growth base material, make described growth base material cover described active protecting net 32, form growth basic unit 5;
S11) to sow grass seeds by duster in described growth basic unit 5 seed mix, and carry out maintenance.
By above-mentioned S1) high precipitous rock slope is arranged to multistage gentle slope belt 1 by step, convenient gentle slope belt 1 at different levels to be constructed.By above-mentioned S2) step offers gutter 13, and offers catchwater 14 in the both sides of rock matter slope body 11 on the gentle slope platform 12 of gentle slope belt 1 at different levels, to facilitate draining, prevents rainwater from washing out rock matter slope body 11.By above-mentioned S1) step cleaning surface dust, float stone, ensure the safety of construction.Pass through S4) and S5) step fixed installation reinforce anchor pole 31, rock matter slope body 11 is reinforced.Pass through S6) and S7) step fixed installation support anchors 21 and wire gauze 22.Support anchors 21 and wire gauze 22 form the supporting component 2 supporting and plant the carded sliver 4, and convenient installation fixedly plants the carded sliver 4.By S9) step installs active protecting net 32, and makes active protecting net 32 and reinforces anchor pole 31 and form reinforcement assembly 3, to rock matter slope body 11 and plant the carded sliver 4 and carry out reinforcement protection.By S10), S11) and S12) step provide good conditions and environment for plant growth, ensure plant germination, growth, realize restoration of the ecosystem and protection fast.
This rock matter slope body 11 is installed and reinforces anchor pole 31 and active protecting net 32, and the wire gauze 22 installing support anchors 21 on rock matter slope body 11 supports and plants the carded sliver 4, reinforcement protection is carried out by reinforcement assembly 3 pairs of rock matter slope bodies 11, reinforcement protection is carried out to plant bar simultaneously, and then also supporting component 2 is reinforced, and by reinforcement assembly 3, supporting component 2 and plant the carded sliver 4 to growth basic unit 5 carry out firmly, ensure the stable growth of plant, prevent from plant and growth basic unit 5 to be washed to come off, increase the safety of plant and the growth of growth basic unit 5.
The high precipitous rock slope ecological restoring method of the present embodiment is simple to operate, few to environmental disturbances, landscape effect is good, multiple green fast, the guard system life-span is long.The high precipitous rock slope restoration of the ecosystem structure of the embodiment of the present invention can be obtained, and there is above-mentioned each effect and the feature of the high precipitous rock slope restoration of the ecosystem structure of the embodiment of the present invention.
Rock matter slopes at different levels body 11 is installed and reinforces anchor pole 31 and active protecting net 32, carry out reinforcement protection by reinforcement assembly 3 pairs of rock matter slope bodies 11, ensure stability and the safety of rock matter slope body 11.Rock matter slope body 11 is installed the wire gauze 22 of support anchors 21, and the carded sliver 4 is fixedly planted on wire gauze 22, and make to plant the carded sliver 4 between wire gauze 22 and active protecting net 32, plant the carded sliver 4 to stablize and to firmly fix, to provide stable support and growing environment for plant growth.
Rock matter slopes at different levels body 11 to be sowed grass seeds by duster growth base material, form growth basic unit 5, and make growth basic unit 5 cover active protecting net 32, then grow basic unit 5 cover domatic 111, the supporting component 2 that these are on domatic 111 of corresponding rock matter slope body 11 simultaneously and plant the carded sliver 4, to provide the Nutrient medium layer material (as soil, fertilizer etc.) of adequate thickness for plant growth.The growth basic unit 5 formed simultaneously by supporting component 2, plant the carded sliver 4 and reinforcement assembly 3 supports and goes along with sb. to guard him, effectively can prevent growth basic unit 5 from being come off by rain drop erosion, ensure the growth conditions of plant.Growth basic unit 5 covers rock matter slope body 11, can slow down the weathering of rock matter slope body 11, aging, with the combination of reinforcement assembly 3, ensures the stability that rock matter slope body 11 is long-term and safety.And to sow grass seeds by duster seed mix in growth basic unit 5, with at growth basic unit 5 planting plants, by phytoremediation with beautify ecological environment.
At S5) in step fixing reinforce anchor pole 31 after, carry out S6 again) brill fixing hole in step, can be fixed by the installation of reinforcing anchor pole 31, to the reinforcing of rock matter slope body 11, prevent the stability destroying rock matter slope body 11 when boring fixing hole, prevent rock matter stone body from coming off, ensure construction safety further.
S4) in step, the diameter range of installing hole is 45-55mm, and depth ratio reinforces the short 10-20cm of length of anchor pole 31; And S5) diameter range of reinforcing anchor pole 31 in step is 30-35mm, the length of reinforcing anchor pole 31 is generally 2.5-3m, to ensure that reinforcing anchor pole 31 has enough intensity, make reinforcing anchor pole 31 be fixed to rock matter slope body 11 part simultaneously and have enough degree of depth, play rock matter slope body 11 reinforcement effect well.
In order to ensure the application life of reinforcing anchor pole 31, prevent its corrosion, reinforce on anchor pole 31 and be coated with zinc layers, namely this reinforcing anchor pole 31 is galvanized anchor rod.Certainly, conveniently active protecting net 32 is fixed on and reinforces on anchor pole 31, reinforce on one end that anchor pole 31 stretches out rock matter slope body 11 and can external screw thread be set.
In addition, in order to make the reinforcement effect that reinforcing anchor pole 31 pairs of rock matter slope bodies 11 are good, then on rock matter slope body 11, install reinforcing anchor pole 31 needs suitable density, thus when arranging installing hole, note the density of installing hole.At S4) be generally level interval 2.5-3.5m in step, and vertical interval 2-2.5m to arrange an installing hole comparatively suitable, two installing holes that namely level is adjacent are at a distance of 2.5-3.5m, and two vertically adjacent installing holes are at a distance of 2-2.5m.
S5), in step, in cement paste, cement-sand ratio is 1:1 ~ 1.2, water/binder ratio is 0.45 ~ 0.50:1.Thus ensure the constant intensity reinforcing anchor pole 31.After grout injection, maintenance at least three days, ensure to reinforce anchor pole 31 firm, ensure just can carry out subsequent processing to after the reinforcing of rock matter slope body 11.
In general domatic 111 areas of the rock matter slope body 11 of gentle slope belt 1 at different levels are larger, and protective screening generally makes relative narrower, thus, S9) in step in order to be paved with active protecting net 32 on rock matter slopes at different levels body 11, generally that polylith protective screening is overlapped, be paved with rock matter slope body 11, the active protecting net 32 namely on every one-level gentle slope belt 1 is overlapped by polylith protective screening and forms.And protective screening is generally relatively long, thus for ensureing the intensity of active protecting net 32, every block protective screening is laid from top to bottom along this gentle slope belt 1.
The lap width scope of adjacent two pieces of protective screenings is 10-15cm, and its overlapping regions is fixedly linked by wire rope 33 is interspersed from top to bottom; Namely use steel cable 33, at overlap these two pieces of protective screenings interspersed from top to bottom of adjacent two pieces of protective screenings, thus the protective screenings that two pieces overlap mutually are fixed up.And use steel cable 33 to carry out interspersed connection two pieces of protective screenings, the intensity connected can be ensured, this protective screening can also be held by wire rope 33, and then strengthen bonding strength and the stability of whole active protecting net 32.The diameter range of wire rope 33 is 10-12mm, through ensureing that wire rope 33 has enough intensity, ensures that wire rope 33 can conveniently intert fixing simultaneously.Certainly in order to fixedly secure active protecting net 32 further, iron wire line or steel wire can also be used, at portion, the wire gauze 22 of active protecting net 32 with supporting component 2 is fixedly linked, this connected mode, also active protecting net 32 can be made to fix and support wire gauze 22, increase the steadiness of wire gauze 22.Active protecting net 32 can random selecting with the link position of wire gauze 22.
The steel wire diameter scope of protective screening is 3-4mm, and the sizing grid scope of protective screening is 50*50mm-70*70mm, to ensure that protective screening has sufficient intensity, thus is combined with reinforcing anchor pole 31 and reinforces rock matter slope body 11 and grow basic unit 5.
Reinforce on anchor pole 31 in order to active protecting net 32 is securely fixed in, wire rope 33 can also be set in S9 step and laterally intert each protective screening (i.e. wire rope 33 level intert each protective screening), and wire rope 33 is fixed on reinforcing anchor pole 31, reinforce on anchor pole 31 to ensure that protective screening is securely fixed in.Like this, protective screening adopts high-tensile steel wires grids, carries out longitudinally, after (i.e. the above-below direction of wire rope 33 along domatic 111), laterally link, being fixed on rock matter slope body 11 by reinforcing anchor pole 31 through wire rope 33, form engineering protection, to prevent and treat all kinds of slope geological.And be that main active protecting net 32 carries out domatic 111 covered protections by wire rope 33 net or high-tensile steel wires grid, rock mass structure easily loose, broken, the scar weathering of high precipitous rock slope can be solved, cause the geological disaster such as falling rocks, landslide, and a difficult problem for system anchor bolt anchoring Hou Pen Quan bank protection cannot be carried out.
In like manner, because domatic 111 areas of the rock matter slope body 11 of gentle slope belt 1 at different levels are larger, and wire gauze 22 generally makes relative narrower, at S7) in step, in order to be paved with wire gauze 22 on rock matter slopes at different levels body 11, be generally overlapped by wire gauze 22, be paved with rock matter slope body 11, the wire gauze 22 namely on every one-level gentle slope belt 1 is overlapped by polylith and forms.And wire gauze 22 is general relatively long, thus for ensureing the intensity of wire gauze 22, every block wire gauze 22 is laid from top to bottom along this gentle slope belt 1.The overlap of adjacent two pieces of wire gauze 22 is bundled by iron wire line and is fixedly linked.The lap width of adjacent two pieces of wire gauze 22 is generally 10-20cm, and iron wire line can choose the iron wire that diameter is 1.2mm, to reduce difficulty of construction and cost, ensures the bonding strength of wire gauze 22 simultaneously.In order to increase the application life of wire gauze 22, prevent wire gauze 22 corrosion, wire gauze 22 can use galvanized wire mesh 22.
The iron wire diameter range of wire gauze 22 is 2.8-3.5mm, and the sizing grid scope of wire gauze 22 is 50*50mm-70*70mm, plants the carded sliver 4 to ensure that wire gauze 22 has sufficient intensity to support.
Conveniently support and fixing wire gauze 22, support anchors 21 can be L-type, thus is conveniently hung in support anchors 21 by wire gauze 22.
At S6) in step, the depth bounds of fixing hole is 35-45cm, and the diameter range of fixing hole is 2-3cm.The support anchors 21 chosen generally selects diameter range to be the anchor pole of 16-22mm, to ensure the intensity of support anchors 21.The partial-length scope that support anchors 21 is fixed in rock matter slope body 11 is 35-45cm, and its height stretching out rock matter slope body 11 only needs 8-10cm, then need support anchors 21 to hammer in fixing hole, to ensure that support anchors 21 is fixed on rock matter slope body 11.
At S6) top, slope that is also included in rock side slope at different levels in step arranges row's fixing hole.To fix row's support anchors 21 on top, the slope of this rock side slope, to facilitate mounting wire gauze 22.And the density of fixing hole is generally 1-2 every square metre on domatic 111 of rock matter slope body 11, then the density of corresponding support anchors 21 is 1-2 every square metre, to ensure the stability of wire gauze 22.
At S8) in step, the diameter range of planting the carded sliver 4 is 8-10cm, and multiple carded sliver 4 of planting is fixed on wire gauze 22 from top to bottom, and covers whole wire gauze 22, and neighbouring two are planted the carded sliver 4 at a distance of 20-30cm.Plant the carded sliver 4 inside and planting soil and fertilizer are housed.
Further, the inside of rock side slope generally has some stowings, when there is ponding in these stowings, the structural strength of rock side slope can be affected, reduce its safety, for discharging these ponding, at S2) and S3) also comprise S2.5 between step) step: on domatic 111 of each rock matter slope body 11, also offer some drain holes 16.Drain hole 16 can be made perpendicular to domatic 111 of corresponding rock side slope.The depth bounds of these drain holes 16 generally can 70-100cm, and the diameter range of drain hole 16 is 3-4cm.The density of drain hole 16 is generally: two drain holes 16 2-2.5m apart that level is adjacent, and two neighbouring drain holes 16 are at a distance of 0.8-1.5m.Thus convenient ponding of discharging body 11 inside, rock matter slope, intensity and the steadiness of rock matter slope body 11 can not be affected simultaneously.
Because domatic 111 areas of the rock matter slope body 11 of gentle slope belt 1 at different levels are larger, for discharging the water on rock matter slope body 11 in time, at S2) in step or S2) also comprise step S2.0 before step): in the middle part of domatic 111 of the rock matter slope body 11 of every one-level gentle slope belt 1, also offer chute 15, chute 15 is arranged from top to bottom along this rock matter slope body 11, and chute 15 is connected with the gutter 13 of this gentle slope belt 1.
According to the runoff area pro form bill bit traffic of domatic 111, should then determine its standard such as width, the degree of depth when gutter 13 on gentle slope platform 12 is designed, and ensure that gutter 13 bottom of trench has certain gradient; Catchwater 14 should domatic 111 at least 2m of horizontal range corresponding rock matter slope body 11, ensure the bearing capacity of catchwater 14; The width of chute 15 is generally 1-2m; Higher level's rock matter slope body 11 domatic 111 width to be narrower than domatic 111 of subordinate's rock matter slope body 11; Drain hole 16 can use air drill to hole, and inserts gutter with fixing; Whole drainage system uses C15 steel concrete to build, and namely gutter 13, catchwater 14 and chute 15 can use C15 steel concrete to build.If execution conditions do not allow, block clitter also can be used to build, pointed with cement mortar and the face of painting, finally guarantee that drainage system is unobstructed, flow into bottom reservoir by design direction and also get rid of outside the venue or re-use.Gentle slopes at different levels platform 12 can also be arranged near the outside of domatic 111 of this gentle slope belt 1 and intercept wall 6, spill in growth basic unit 5 to prevent water in gutter 13.
At S10) in step, growth base material comprises planting soil, fertilizer, composite fertilizer, water-loss reducer, rubber powder and cement; Wherein the ratio of planting soil, fertilizer and composite fertilizer is planting soil is 100 parts, and fertilizer is 8-12 part, and composite fertilizer is 4-6 part, and the content of cement accounts for this growth base material overall percentage is 3%-5%.Thus provide good condition with plant growth, avoid again using simultaneously and excessively cause that surface soil alkalinity is higher affects plant growth.Preferentially, growth base material is made up of planting soil, fertilizer, composite fertilizer, water-loss reducer, rubber powder and cement, and the ratio of planting soil, fertilizer and composite fertilizer is planting soil is 100 parts, fertilizer is 8-12 part, composite fertilizer is 4-6 part, and the content of cement is when to account for this growth base material overall percentage be 3%-5%, and plant growth nutrient environment is best, plant growth is the fastest, and restoration of the ecosystem reaches best.
At S11) in step, seed mix comprises herbaceous plant seeds, shrub plant seed, liana seed and flowers and plants vegetable seeds.
Will ensure the uniformity and the use amount of seed when seed mix is sowed grass seeds by duster, being generally the total consumption of every square meter seed mix is 30g.In seed mix, herbaceous plant seeds, shrub plant seed, liana seed and flowers and plants vegetable seeds all at least will ensure one.Herbaceous plant seeds can be selected from the vegetable seeds such as Bermuda grass, paspalum notatum, molasses grass, Festuca Arundinacea; Shrub plant seed can be selected from the vegetable seeds such as crotalaria mucronata, pigeonpea (mountain green soy bean), white popinac, locust tree, aalii; Liana seed can be selected from the vegetable seeds such as kudzu, morning glory; Flowers and plants vegetable seeds can be selected from the vegetable seeds such as pot marigold, coreopsis.In seed mix, Bamboo resource quantity is 5 ~ 7 kinds and is advisable.
In order to accelerate germination, the growth of seed, at S11) in step, after seed mix has been sowed grass seeds by duster, be also included in the non-woven fabrics that growth basic unit 5 covers, and reinforced firmly, then carried out later stage maintenance.Rainwater comparatively multizone can cover two-layer nonwoven, with by non-woven fabrics exclusive segment rainwater, to protect growth basic unit 5 and plant.
The present invention chooses the experiment that above-mentioned high precipitous rock slope restoration of the ecosystem structure and method are carried out in quarry, South Mountain, Shenzhen, this high precipitous rock slope gradient is 70 ~ 90 °, individual month of 7-8 after construction, domatic 111 coverage scales reach more than 90%, the growing height of shrub, arbor reaches about 1m, reaches the effect of ecological protection fast.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, all any amendments done within the spirit and principles in the present invention, equivalent replacement and improvement etc., all should be included within protection scope of the present invention.

Claims (10)

1. a high precipitous rock slope restoration of the ecosystem structure, comprises the multistage gentle slope belt arranged along high precipitous rock slope from top to bottom, gentle slope belt described in every one-level comprises rock matter slope body and is positioned at the gentle slope platform at body top, described rock matter slope, described gentle slope platform is provided with gutter, described gutter is moved towards to arrange along the length of this gentle slope platform, the both sides of described rock matter slope body offer the catchwater be connected with described gutter, described rock matter slope body are also provided with somely plant the carded sliver, it is characterized in that, gentle slope belt described in every one-level is also provided with supporting component for planting the carded sliver described in supporting and for the rock matter slope body of reinforcing this gentle slope belt and described in plant the reinforcement assembly of the carded sliver, the growth basic unit that gentle slope belt described in every one-level being also provided with sows grass seeds by duster covers described reinforcement assembly and the seed mix be seeded in described growth basic unit, described supporting component comprises the wire gauze be installed on respectively on the body of described rock matter slopes at different levels and the many support anchors supporting described wire gauze, the described carded sliver of planting is fixed on described wire gauze, described reinforcement assembly comprise be layed in respectively described gentle slope belt at different levels corresponding described in plant the active protecting net of carded sliver opposite exterior lateral sides and described active protecting net be fixed on the body of described rock matter slope many and reinforce anchor poles.
2. high precipitous rock slope restoration of the ecosystem structure as claimed in claim 1, is characterized in that, the described active protecting net on gentle slope belt described in every one-level is overlapped by polylith protective screening and forms, and described in every block, protective screening is laid from top to bottom along this gentle slope belt.
3. high precipitous rock slope restoration of the ecosystem structure as claimed in claim 2, is characterized in that, the overlapping regions of adjacent two pieces of described protective screenings is fixedly linked by wire rope is interspersed from top to bottom.
4. high precipitous rock slope restoration of the ecosystem structure as claimed in claim 1, it is characterized in that, reinforcing rock-bolt length scope described in each root is 2.5-3m, and the diameter range of this reinforcing anchor pole is 30-35mm; The length range that the one end reinforcing anchor pole described in each root is stretched out outside this rock matter slope body is 10-20cm, and its other end is fixed in the body of described rock matter slope.
5. the high precipitous rock slope restoration of the ecosystem structure as described in any one of claim 1-4, it is characterized in that, described wire gauze on gentle slope belt described in every one-level is overlapped by polylith and forms, described in every block, wire gauze is laid from top to bottom along this gentle slope belt, and the overlap of adjacent two pieces of described wire gauze is bundled by iron wire line and is fixedly linked.
6. the high precipitous rock slope restoration of the ecosystem structure as described in any one of claim 1-4, is characterized in that, described rock matter slope body domatic on also offer some drain holes for discharging the inner ponding of this rock matter slope body.
7. the high precipitous rock slope restoration of the ecosystem structure as described in any one of claim 1-4, it is characterized in that, the domatic middle part of the rock matter slope body of gentle slope belt described in every one-level also offers chute, described chute is arranged from top to bottom along this rock matter slope body, and described chute is connected with the described gutter of this gentle slope belt.
8. a high precipitous rock slope ecological restoring method, is characterized in that, comprises the following steps:
S1) on high precipitous rock slope, offer multistage gentle slope platform, make the rock matter cyphosomatic between this gentle slope platform and the described gentle slope platform of the next stage of this gentle slope platform become gentle slope belt;
S2) the length trend along this gentle slope platform on the platform of described gentle slopes at different levels offers gutter, and offer catchwater in the both sides of described rock matter slopes at different levels body, the gutter on the gentle slope platform that described catchwater is corresponding with this rock matter slope body is connected;
S3) surface dust on described gentle slope belt at different levels, float stone are cleared up, and domatic finishing the to corresponding rock matter slope body;
S4) described rock matter slopes at different levels body domatic on get some installing holes, and at the bottom of the Po Ding, slope of this rock matter slope body each one row described installing hole;
S5) in each described installing hole, insert reinforcing anchor pole respectively, one end of each described reinforcing anchor pole is stretched out outside corresponding described installing hole, and to grout injection in each described installing hole with fixing reinforcing anchor pole;
S6) described rock matter slopes at different levels body domatic on bore some fixing holes, and in each described fixing hole respectively plug-in mounting fixed support anchor pole, and one end of each described support anchors is stretched out outside corresponding described fixing hole;
S7) described rock matter slopes at different levels body domatic on lay wire gauze respectively, described wire gauze domaticly to be laid from top to bottom along described, and is fixed in described support anchors by described wire gauze;
S8) fixedly mount on the described wire gauze of described rock matter slopes at different levels body and multiplely plant the carded sliver;
S9) lay active protecting net respectively in the upper of described rock matter slopes at different levels body, and make described active protecting net be placed on described in plant the outside away from described wire gauze of the carded sliver, described active protecting net is fixed on described reinforcing anchor pole;
S10) to sow grass seeds by duster on the body of described rock matter slopes at different levels growth base material, make described growth base material cover described active protecting net, form growth basic unit;
S11) to sow grass seeds by duster in described growth basic unit seed mix, and carry out maintenance.
9. high precipitous rock slope ecological restoring method as claimed in claim 8, it is characterized in that, described growth base material comprises planting soil, fertilizer, composite fertilizer, water-loss reducer, rubber powder and cement; Wherein the ratio of planting soil, fertilizer and composite fertilizer is planting soil is 100 parts, and fertilizer is 8-12 part, and composite fertilizer is 4-6 part, and the content of cement accounts for this growth base material overall percentage is 3%-5%.
10. high precipitous rock slope ecological restoring method as claimed in claim 8, it is characterized in that, described seed mix comprises herbaceous plant seeds, shrub plant seed, liana seed and flowers and plants vegetable seeds.
CN201410563757.1A 2014-10-21 2014-10-21 High and steep rock slope ecological restoration structure and method Pending CN104452781A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410563757.1A CN104452781A (en) 2014-10-21 2014-10-21 High and steep rock slope ecological restoration structure and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410563757.1A CN104452781A (en) 2014-10-21 2014-10-21 High and steep rock slope ecological restoration structure and method

Publications (1)

Publication Number Publication Date
CN104452781A true CN104452781A (en) 2015-03-25

Family

ID=52899481

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410563757.1A Pending CN104452781A (en) 2014-10-21 2014-10-21 High and steep rock slope ecological restoration structure and method

Country Status (1)

Country Link
CN (1) CN104452781A (en)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104929139A (en) * 2015-06-25 2015-09-23 天津市建筑科学研究院有限公司 Abrupt slope massif slope surface vegetation ecological protection construction method
CN105064380A (en) * 2015-07-08 2015-11-18 甘肃路桥建设集团有限公司 Rich underwater high slope water control antiskid composition
CN105220759A (en) * 2015-09-08 2016-01-06 北京林丰源生态环境规划设计院有限公司 Pipe-line engineering passes through the method that mountain construction does the prevention and control of soil erosion of industrial belt later stage
CN105684591A (en) * 2016-01-05 2016-06-22 中山大学 Ecological protection structure suitable for south rack slope drainage waterlogging prevention
CN105862888A (en) * 2016-04-20 2016-08-17 中国水利水电第十工程局有限公司 Comprehensive protecting method for high and steep rock slopes
CN106351238A (en) * 2016-10-17 2017-01-25 三峡大学 Vegetation-concrete double-layer protective screening side slope ecological greening system and method for performing side slope ecological greening by using system
CN106522247A (en) * 2016-11-25 2017-03-22 广东中联兴环保科技有限公司 Water and soil conservation method for ion-adsorbed type rare earth ore in-situ leaching abandoned mining land
CN109329259A (en) * 2018-09-04 2019-02-15 湖北二零九工程有限公司 A kind of granule capsule for water and soil conservation is sowed grass seeds by duster plant measures method
CN109555139A (en) * 2018-12-29 2019-04-02 内蒙古蒙草生态环境(集团)股份有限公司 Extremely frigid zones collapsibility refuse dump abrupt slope means of defence
CN109853593A (en) * 2019-03-22 2019-06-07 浙江交工集团股份有限公司 A kind of protection of greening high precipitous rock slope and construction method
CN110249813A (en) * 2019-07-15 2019-09-20 大连地拓环境科技有限公司 One kind cheating method for greening high precipitous rock slope in mining
CN110777822A (en) * 2019-11-14 2020-02-11 中钢集团马鞍山矿山研究院有限公司 Collection and drainage system of water is gushed in easy weathering rock matter side slope crack
CN112166930A (en) * 2020-10-23 2021-01-05 湖南省常德西湖区地林草业园林绿化工程有限公司 Method for cultivating landscaping grass and trees
CN112211203A (en) * 2020-10-19 2021-01-12 北京绿矿联合工程技术研究院(有限合伙) High-strength structure organic fiber composite repair method for high and steep slope
CN112523231A (en) * 2020-12-07 2021-03-19 南昌工程学院 Vegetation ecological concrete slope protection structure and construction method
CN112647517A (en) * 2020-12-07 2021-04-13 浙江佳途勘测设计有限公司 Ecological side slope protection device
CN113026772A (en) * 2021-03-12 2021-06-25 中国水利水电第四工程局有限公司 Landslide body reinforcing method
CN113356133A (en) * 2021-05-21 2021-09-07 三峡大学 Bank protection structure suitable for rocky bank slope of hydro-fluctuation belt and construction method
CN113981999A (en) * 2021-11-19 2022-01-28 宁夏宁苗生态园林(集团)股份有限公司 Rock mass side slope ecological restoration structure and method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090095233A (en) * 2008-03-05 2009-09-09 한국지질자원연구원 Revegetation method
CN101818499A (en) * 2010-03-05 2010-09-01 深圳市如茵生态环境建设有限公司 Revegetation system on steep rocky slopes and implementing method thereof
CN102677684A (en) * 2012-05-07 2012-09-19 青岛高次团粒生态技术有限公司 Spraying and sowing greening method for concrete anchoring and shotcreting slope
CN102926390A (en) * 2012-11-09 2013-02-13 北京北林绿源生态技术研究院有限责任公司 Method of shallow reinforcement and surface reinforcement of loess slope
CN103343542A (en) * 2013-07-25 2013-10-09 广西桂海高速公路有限公司 Reorganization and expansion highway slope protection system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090095233A (en) * 2008-03-05 2009-09-09 한국지질자원연구원 Revegetation method
CN101818499A (en) * 2010-03-05 2010-09-01 深圳市如茵生态环境建设有限公司 Revegetation system on steep rocky slopes and implementing method thereof
CN102677684A (en) * 2012-05-07 2012-09-19 青岛高次团粒生态技术有限公司 Spraying and sowing greening method for concrete anchoring and shotcreting slope
CN102926390A (en) * 2012-11-09 2013-02-13 北京北林绿源生态技术研究院有限责任公司 Method of shallow reinforcement and surface reinforcement of loess slope
CN103343542A (en) * 2013-07-25 2013-10-09 广西桂海高速公路有限公司 Reorganization and expansion highway slope protection system

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104929139A (en) * 2015-06-25 2015-09-23 天津市建筑科学研究院有限公司 Abrupt slope massif slope surface vegetation ecological protection construction method
CN105064380A (en) * 2015-07-08 2015-11-18 甘肃路桥建设集团有限公司 Rich underwater high slope water control antiskid composition
CN105220759A (en) * 2015-09-08 2016-01-06 北京林丰源生态环境规划设计院有限公司 Pipe-line engineering passes through the method that mountain construction does the prevention and control of soil erosion of industrial belt later stage
CN105684591A (en) * 2016-01-05 2016-06-22 中山大学 Ecological protection structure suitable for south rack slope drainage waterlogging prevention
CN105862888A (en) * 2016-04-20 2016-08-17 中国水利水电第十工程局有限公司 Comprehensive protecting method for high and steep rock slopes
CN105862888B (en) * 2016-04-20 2018-05-11 中国水利水电第十一工程局有限公司 A kind of comprehensive protecting method of high precipitous rock slope
CN106351238A (en) * 2016-10-17 2017-01-25 三峡大学 Vegetation-concrete double-layer protective screening side slope ecological greening system and method for performing side slope ecological greening by using system
CN106522247A (en) * 2016-11-25 2017-03-22 广东中联兴环保科技有限公司 Water and soil conservation method for ion-adsorbed type rare earth ore in-situ leaching abandoned mining land
CN109329259A (en) * 2018-09-04 2019-02-15 湖北二零九工程有限公司 A kind of granule capsule for water and soil conservation is sowed grass seeds by duster plant measures method
CN109329259B (en) * 2018-09-04 2021-08-27 湖北二零九工程有限公司 Granular capsule spray-seeding plant measure method for water and soil conservation
CN109555139A (en) * 2018-12-29 2019-04-02 内蒙古蒙草生态环境(集团)股份有限公司 Extremely frigid zones collapsibility refuse dump abrupt slope means of defence
CN109853593A (en) * 2019-03-22 2019-06-07 浙江交工集团股份有限公司 A kind of protection of greening high precipitous rock slope and construction method
CN110249813B (en) * 2019-07-15 2021-05-25 大连地拓环境科技有限公司 Method for greening high and steep rocky slope in mining pit
CN110249813A (en) * 2019-07-15 2019-09-20 大连地拓环境科技有限公司 One kind cheating method for greening high precipitous rock slope in mining
CN110777822B (en) * 2019-11-14 2021-05-25 中钢集团马鞍山矿山研究总院股份有限公司 Collection and drainage system of water is gushed in easy weathering rock matter side slope crack
CN110777822A (en) * 2019-11-14 2020-02-11 中钢集团马鞍山矿山研究院有限公司 Collection and drainage system of water is gushed in easy weathering rock matter side slope crack
CN112211203A (en) * 2020-10-19 2021-01-12 北京绿矿联合工程技术研究院(有限合伙) High-strength structure organic fiber composite repair method for high and steep slope
CN112166930A (en) * 2020-10-23 2021-01-05 湖南省常德西湖区地林草业园林绿化工程有限公司 Method for cultivating landscaping grass and trees
CN112523231A (en) * 2020-12-07 2021-03-19 南昌工程学院 Vegetation ecological concrete slope protection structure and construction method
CN112647517A (en) * 2020-12-07 2021-04-13 浙江佳途勘测设计有限公司 Ecological side slope protection device
CN113026772A (en) * 2021-03-12 2021-06-25 中国水利水电第四工程局有限公司 Landslide body reinforcing method
CN113356133A (en) * 2021-05-21 2021-09-07 三峡大学 Bank protection structure suitable for rocky bank slope of hydro-fluctuation belt and construction method
CN113356133B (en) * 2021-05-21 2022-12-20 三峡大学 Bank protection structure suitable for rocky bank slope of hydro-fluctuation belt and construction method
CN113981999A (en) * 2021-11-19 2022-01-28 宁夏宁苗生态园林(集团)股份有限公司 Rock mass side slope ecological restoration structure and method

Similar Documents

Publication Publication Date Title
CN104452781A (en) High and steep rock slope ecological restoration structure and method
CN105484275B (en) A kind of high steep waste side slope reinforcement anchoring Ecosystem restoration system of mountain area wind power plant
CN105961120B (en) One kind being suitable for arid biogeographic zone ecological restoration of mine side slope vegetation quick recovery method
CN104314087B (en) A kind of side-slope greening and protection structure and construction method thereof
CN105113518B (en) Construction method for ecological slope protecting base material by arranging slot pits in slope surface
CN107893422B (en) A kind of reinforcement type ecological slope protection structure and its construction method
CN101622931B (en) Greening sloping surface for rock side slope facing wall and construction method thereof
CN206736931U (en) Highway Lithological Slope liana ecological safeguard structure
CN109183817A (en) A kind of construction method of the tall and big effective soil horizon of precipitous rock slope ecological safeguard structure
CN110593281A (en) High-steep rock slope ecological protection system and construction method thereof
CN109594567A (en) A kind of shotcrete protection rock slope ecological safeguard structure arrangement and its method
CN103343542A (en) Reorganization and expansion highway slope protection system
CN112075249A (en) Slope greening planting V-shaped groove and construction method thereof
CN204059376U (en) The slope protection greening structure of the steep exposed rock side slope of a kind of urgency
CN205475264U (en) High sediment side slope of abandoning suddenly in mountain area wind -powered electricity generation field adds muscle anchor ecological remediation structure
CN113585296B (en) Artificial slope assembly type flexible support ecological comprehensive treatment structure and construction method thereof
CN105780788A (en) SNS flexible greening protective net for rock slope treatment and construction method thereof
CN215290192U (en) Green ecological city side slope supporting construction
CN211849496U (en) High steep rock slope ecological protection system
CN205530299U (en) Ecological slope protection structure in ion type rare earth mine mountain
CN112942384A (en) Landform and landform treatment method based on waste stone mine
CN211703057U (en) Ecological greening device suitable for high and steep rock face of mine
CN204412594U (en) A kind of serrir soil screen cloth of adjustable inclination
CN110144849A (en) A kind of hung type greening plate and rock side slope ecological slope protection system
CN212324853U (en) Slope planting technique V type groove

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 518000 Shenzhen, Luohu District Huang Bei street, No. two, No. 58, building a layer of road, No. 1

Applicant after: Donghua Shenzhen garden Limited by Share Ltd

Address before: 518000 Shenzhen, Luohu District Huang Bei street, No. two, No. 58, building a layer of road, No. 1

Applicant before: SHENZHEN DONGHUA LANDSCAPING CO., LTD.

COR Change of bibliographic data
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150325