CN104404883B - Workbench and construction method in a kind of bridge pier rapid construction - Google Patents

Workbench and construction method in a kind of bridge pier rapid construction Download PDF

Info

Publication number
CN104404883B
CN104404883B CN201410668270.XA CN201410668270A CN104404883B CN 104404883 B CN104404883 B CN 104404883B CN 201410668270 A CN201410668270 A CN 201410668270A CN 104404883 B CN104404883 B CN 104404883B
Authority
CN
China
Prior art keywords
steel structure
bridge pier
structure framework
layer
workbench
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410668270.XA
Other languages
Chinese (zh)
Other versions
CN104404883A (en
Inventor
肖维
居治安
冯国耀
莫宏武
廖世强
毕莉莉
黄小妙
王慎光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd Of Cccc Fourth Harbor Enginering Co ltd
Original Assignee
Third Engineering Co Ltd Of Cccc Fourth Harbor Enginering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd Of Cccc Fourth Harbor Enginering Co ltd filed Critical Third Engineering Co Ltd Of Cccc Fourth Harbor Enginering Co ltd
Priority to CN201410668270.XA priority Critical patent/CN104404883B/en
Publication of CN104404883A publication Critical patent/CN104404883A/en
Application granted granted Critical
Publication of CN104404883B publication Critical patent/CN104404883B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention provides workbench and construction method in a kind of bridge pier rapid construction, wherein interior workbench comprises the unit module of at least one vertical pile, and each unit module comprises steel structure framework, fixed platform, movable skeleton, movable platform, stair and guard rail; Steel structure framework adopts shaped steel to be welded, the steel structure framework of each unit module is made as double-layer structure, the top of steel structure framework and bottom respectively correspondence are provided with fixing hole, and the steel structure framework of the unit module that adjacent two layers stacks connects through fixing hole by latch or bolt; Fixed platform is laid on every layer of structure of steel structure framework; Movable skeleton is movably connected on the both sides of steel structure framework by latch, the both sides of every layer of structure are all connected with a movable skeleton; Movable platform is laid on movable skeleton; Between the double-layer structure of steel structure framework, be connected with stair; Stair are provided with guard rail around. The present invention can effectively improve efficiency of construction and construction quality.

Description

Workbench and construction method in a kind of bridge pier rapid construction
Technical field
The present invention relates to Construction Technology field, be specifically related to work in a kind of bridge pier rapid constructionMake platform and construction method.
Background technology
High-speed railway bridge engineering accounts for sizable proportion, and the structure of bridge pier adopts round end type bridge morePier, bridge pier height is from several meters to tens meters, even more than 20 meter. Simple supported box beam bridge pier adopts twoLine round ended pier, is made up of pinner, top cap and pier shaft, bridge pier height from 6m~20m not etc.,Vertical main muscle is Φ 16 screw-thread steels, and stirrup is φ 10 round steel, the horizontal lacing wire φ 10 of pier shaft, top capConfiguring multi-layer reinforced mesh. Such bridge pier structure is relatively simple, and when construction, repetitive operation is many,Often can not cause most personnel's great attention. Construction method of the prior art is first to set upSteel pipe scaffold in the outer or bridge pier of bridge pier, utilizes scaffold to carry out reinforcing bar binding and template is installed.
There is larger defect in said method. There is larger danger in the process of scaffold building,And scaffold building quality the check on danger that the existence of bad scaffold itself is caved in, greatly impactOperating personnel's personal safety. The working space that scaffold can provide is narrow, reinforcing bar binding effectRate is low, and the time is long. The main muscle diameter of bridge pier is little, and framework of steel reinforcement rigidity is little, and easily distortion, needsIncrease a lot of bearing rods, adopt the method for scaffold construction greatly to affect workmen's normal workIndustry, reduces efficiency of construction and construction quality. After reinforcing bar binding completes, due to the impact of scaffold,The narrow space of installation form, affects the normal operation that template is installed, and causes template installation effectivenessLow, the time is long. And the template of easily slinging in work progress collision scaffold, causes pinThe danger that hand frame caves in.
Being not difficult to find out, also there is certain defect in prior art.
Summary of the invention
Technical problem to be solved by this invention is to provide workbench in a kind of bridge pier rapid constructionAnd construction method, replace scaffold with workbench, effectively improve efficiency of construction and construction quality.
For achieving the above object, the present invention is by the following technical solutions:
Workbench in a kind of bridge pier rapid construction, comprises the unit mould of at least one vertical pilePiece, each unit module comprise steel structure framework, fixed platform, movable skeleton, movable platform,Stair and guard rail; Steel structure framework adopts shaped steel to be welded, the steel of each unit moduleStructural framework is made as double-layer structure, and the top of steel structure framework and bottom respectively correspondence are provided with fixingHole, the steel structure framework of the unit module that adjacent two layers stacks passes fixing by latch or boltHole connects; Fixed platform is laid on every layer of structure of steel structure framework; Movable skeleton passes throughLatch is movably connected on the both sides of steel structure framework, and the both sides of every layer of structure are all connected with oneIndividual movable skeleton; Movable platform is laid on movable skeleton; The double-layer structure of steel structure frameworkBetween be connected with stair; Stair are provided with guard rail around.
Further, described fixed platform or movable platform are plank or steel plate.
Further, every layer of described steel structure framework structure is high 1.8 meters-2 meters.
Further, the bottom that is positioned at the steel structure framework of bottom is fixed on mixed by expansion boltSolidifying soil surface.
Further, described movable skeleton is rectangular, trapezoidal or semicircle.
A kind of bridge pier rapid constructing method, comprises the following steps:
S01, make above-mentioned interior workbench, in job location beyond according to the outline line of bridge pierWelding production steel structure framework and movable skeleton, require steel structure framework and movable skeleton to be positioned atIn bridge pier outline line;
The concrete surface at S02, cleaning bridge pier place, job location, guarantees surfacing foreign;
Workbench in S03, installation, passes through loop wheel machine layer by the unit module of interior workbenchLayer is lifted into the concrete surface at bridge pier place and is connected and installed;
S04, utilize sash weight positioned edge bridge pier pier shaft short transverse to tie up 2~3 road positioning bars, locationMuscle and interior workbench are fixed;
On every layer of platform of S05, interior workbench, arrange a bar bender, then together by main muscleHold up and spacer bar colligation; Main muscle has all been tied up rear colligation stirrup and nose circle " Eight characters " hoopMuscle, when colligation stirrup, the top layer of interior workbench is arranged 2 bar benders, is responsible for specially with 2Rope is pinioned stirrup two ends stirrup is mentioned, and other bar benders stand on interior workbench and carry outColligation, then colligation protective layer cushion block; Several main muscle are vacated in attention in bottom and stirrup is waited untilRear colligation, as operating personnel's import and export;
S06, installation form, after template installation, hang out interior workbench, then colligation pierThe horizontal lacing wire of body or top cap reinforcing bar, complete reinforcing bar form work engineering;
S07, carry out pouring concrete, from lower to upper merogenesis cast bridge pier pier shaft.
Further, described step S03 comprises:
S031, by loop wheel machine by bottom floor units module hoisting the concrete surface to bridge pier place, andAnd by expansion bolt, the steel structure framework bottom of bottom floor units module is connected with concrete surfaceFixing;
S032, successively lift remaining unit module, the steel construction bone of adjacent two layers unit moduleBetween frame, be connected and fixed by latch or bolt.
Further, described step S06 comprises:
S061, installation form;
S062, dismantle the connecting bolt between steel structure framework layer by layer, pack up movable skeleton;
S063, utilize loop wheel machine successively to hang out unit module;
The horizontal lacing wire of S064, colligation pier shaft or top cap reinforcing bar.
In a kind of bridge pier rapid construction provided by the present invention, workbench and construction method, haveFollowing advantage:
Replace scaffold with workbench, significantly improve efficiency of construction and construction quality;
Ensure preferably the personal security of work high above the ground, effectively improved the comfortableness of working environment,Reduce operating personnel's labour intensity, ensure the stability of bridge pier reinforcing bar;
Interior workbench modularized design, installs simply, reduces the mounting or dismounting cycle, and stability is high;
Can reduce the input of labour, plant equipment, template etc., save construction cost.
Brief description of the drawings
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, belowTo the accompanying drawing of required use in embodiment or description of the Prior Art be briefly described, aobvious andEasily insight, the accompanying drawing in the following describes is only some embodiments of the present invention, for this areaThose of ordinary skill, is not paying under the prerequisite of creative work, can also be according to theseAccompanying drawing obtains other accompanying drawing.
Fig. 1 is the structural representation of steel structure framework.
Fig. 2 is the top view of unit module.
Description of reference numerals:
1, steel structure framework 2, stair
3, movable skeleton 4, fixed platform
5, movable platform 6, latch
Detailed description of the invention
For making object, technical scheme and the advantage of the embodiment of the present invention clearer, will tie belowClose the embodiment of the present invention and accompanying drawing, the technical scheme in the embodiment of the present invention is carried out clear, completeDescribe wholely. It should be noted that, described embodiment is only that the present invention's part is implementedExample, instead of whole embodiment. Based on the embodiment in the present invention, ordinary skillPersonnel, not making the every other embodiment obtaining under creative work prerequisite, belong toThe scope of protection of the invention.
Embodiment mono-
Refer to Fig. 1 and Fig. 2, the present invention specifically discloses work in a kind of bridge pier rapid construction and puts downPlatform, comprises the unit module of at least one vertical pile, and each unit module comprises steel construction boneFrame 1, fixed platform 4, movable skeleton 3, movable platform 5, stair 2 and guard rail; SteelStructural framework 1 adopts shaped steel to be welded, and the steel structure framework 1 of each unit module is made as twoLayer structure, the top of steel structure framework 1 and bottom respectively correspondence are provided with fixing hole, adjacent two layersThe steel structure framework 1 of the unit module stacking connects through fixing hole by latch 6 or bolt;Fixed platform 4 is laid on every layer of structure of steel structure framework 1; Movable skeleton 3 is by insertingPin 6 is movably connected on the both sides of steel structure framework 1, and the both sides of every layer of structure are all connected withA movable skeleton 3; Movable platform 5 is laid on movable skeleton 3; Steel structure framework 1Double-layer structure between be connected with stair 2; Stair 2 are provided with guard rail around.
Between movable skeleton 3 and fixing skeleton, be flexibly connected, allow movable skeleton 3 to receiveReceive. When constructing, operating personnel need to stand in fixed platform 4 and movable platform 5.Fixing skeleton and movable skeleton 3 are all in addition by angle steel, channel-section steel, I-steel in job locationCarry out welding production Deng shaped steel, preferably prefabricated in the comparatively superior place of the environment such as factory, then transportThe job location that is passed to outfield is to be installed. Only need to be by loop wheel machine by unit in job locationModule vertical pile is also connected and fixed by latch 6 or bolt, can assemble one completeWhole interior workbench. Similarly, after construction is complete, interior workbench can successively carry outDismantle and reclaim, wait until construction next time and use.
Different from general scaffold, interior workbench has dangerous without carry out loaded down with trivial details at every turnBuilding of property, and interior workbench can provide and stablize the broad plane of standing, and makes construction operationDifficulty reduces greatly, also can effectively improve construction quality. Every layer of structure is equipped with stair 2 convenienceOperating personnel moves between different aspects, and guard rail shields to operating personnel,Effective guarantee operating personnel's personal safety.
As preferably, described fixed platform 4 or movable platform 5 are plank or steel plate. Fixing flatThe Main Function of platform 4 and movable platform 5 is for operating personnel provides the plane of standing, and is ensureing knotStructure firmly preferably adopts plank or the steel plate of lightweight under prerequisite.
As preferably, every layer of structure of described steel structure framework 1 is high 1.8 meters-2 meters. This heightDegree meets general job personnel's height, ensures to save most again to reduce space and manufacture and fortune simultaneouslyDefeated cost. Meanwhile, ensure that operating personnel can be freely reduces as far as possible floor height when activity and hasHelp the convenience that ensures construction, there will not be between double-layer structure and exist operating personnel to touchRegion.
As preferably, the bottom that is positioned at the steel structure framework 1 of bottom is fixed on by expansion boltConcrete surface. Apparently, the stability that is positioned at the steel structure framework 1 of bottom is most important, the stability of the steel structure framework 1 that is positioned at upper strata is had to material impact. In order to ensure interior workThe integral installation of making platform is firm, need to be by the external force of expansion bolt the steel construction bone to bottomFrame 1 is fixed, and the steel structure framework 1 of bottom is taken root.
As preferably, described movable skeleton 3 is rectangular, trapezoidal or semicircle. Semicircular workMoving skeleton 3 is especially applicable to round ended pier, and the profile of itself and round ended pier is the most identical, andThe entire area of the movable platform 5 causing is also maximum, thereby most convenient operating personnel construction.Trapezoidal and movable skeleton 3 rectangle is convenient to manufacture most. The type selecting of movable skeleton 3 should basisPhysical condition is chosen.
Embodiment bis-
The present embodiment specifically discloses a kind of bridge pier rapid constructing method, comprises the following steps:
S01, make above-mentioned interior workbench, in job location beyond according to the outline line of bridge pierWelding production steel structure framework 1 and movable skeleton 3, require steel structure framework 1 and movable boneFrame 3 is positioned in bridge pier outline line;
The concrete surface at S02, cleaning bridge pier place, job location, guarantees surfacing foreign;
Workbench in S03, installation, passes through loop wheel machine layer by the unit module of interior workbenchLayer is lifted into the concrete surface at bridge pier place and is connected and installed;
S04, utilize sash weight positioned edge bridge pier pier shaft short transverse to tie up 2~3 road positioning bars, locationMuscle and interior workbench are fixed;
On every layer of platform of S05, interior workbench, arrange a bar bender, then together by main muscleHold up and spacer bar colligation; Main muscle has all been tied up rear colligation stirrup and nose circle " Eight characters " hoopMuscle, when colligation stirrup, the top layer of interior workbench is arranged 2 bar benders, is responsible for specially with 2Rope is pinioned stirrup two ends stirrup is mentioned, and other bar benders stand on interior workbench and carry outColligation, then colligation protective layer cushion block; Several main muscle are vacated in attention in bottom and stirrup is waited untilRear colligation, as operating personnel's import and export;
S06, installation form, after template installation, hang out interior workbench, then colligation pierThe horizontal lacing wire of body or top cap reinforcing bar, complete reinforcing bar form work engineering;
S07, carry out pouring concrete, from lower to upper merogenesis cast bridge pier pier shaft.
Particularly, described step S03 comprises:
S031, by loop wheel machine by bottom floor units module hoisting the concrete surface to bridge pier place, andAnd by expansion bolt, the steel structure framework of bottom floor units module 1 bottom and concrete surface are connectedConnect fixing;
S032, successively lift remaining unit module, the steel construction bone of adjacent two layers unit moduleBetween frame 1, be connected and fixed by latch 6 or bolt.
Particularly, described step S06 comprises:
S061, installation form;
S062, dismantle the connecting bolt between steel structure framework 1 layer by layer, pack up movable skeleton 3;
S063, utilize loop wheel machine successively to hang out unit module;
The horizontal lacing wire of S064, colligation pier shaft or top cap reinforcing bar.
Workbench and construction method in a kind of bridge pier rapid construction provided by the invention, to workPlatform replaces scaffold, significantly improves efficiency of construction and construction quality. Interior workbench can provideBetter working environment, has ensured the personal security of work high above the ground effectively to improve work preferablyEnvironmental amenity, carries out bridge pier rapid construction by interior workbench and can effectively reduce operation peopleMember's labour intensity, the stability of guarantee bridge pier reinforcing bar. Interior workbench modularized design, peaceDress is simple, reduces the mounting or dismounting cycle, and stability is high. Adopting interior workbench to carry out Bridge Pier Construction canReduce the input of labour, plant equipment, template etc., save construction cost.
The above embodiment has only expressed several embodiment of the present invention, and it describes comparatively toolBody and detailed, but can not therefore be interpreted as the restriction to the scope of the claims of the present invention. Should refer toGo out, for the person of ordinary skill of the art, do not depart from the present invention design beforePut, can also make some distortion and improvement, these all belong to protection scope of the present invention.Therefore, the protection domain of patent of the present invention should be as the criterion with claims.

Claims (6)

1. a bridge pier rapid constructing method, is characterized in that, comprises the following steps:
Workbench in S01, the rapid construction of making bridge pier, in described bridge pier rapid construction, workbench comprises the unit module of at least one vertical pile, and each unit module comprises steel structure framework, fixed platform, movable skeleton, movable platform, stair and guard rail; The steel structure framework of each unit module is made as double-layer structure, and the top of steel structure framework and bottom respectively correspondence are provided with fixing hole, and the steel structure framework of the unit module that adjacent two layers stacks connects by fixing hole; Fixed platform is laid on every layer of structure of steel structure framework; Movable skeleton is movably connected on the both sides of steel structure framework by latch, the both sides of every layer of structure are all connected with a movable skeleton; Movable platform is laid on movable skeleton; Between the double-layer structure of steel structure framework, be connected with stair; Stair are provided with guard rail around; Beyond in job location, according to outline line welding production steel structure framework and the movable skeleton of bridge pier, require steel structure framework and movable skeleton to be positioned in bridge pier outline line;
The concrete surface at S02, cleaning bridge pier place, job location, guarantees surfacing foreign;
Workbench in S03, installation, is lifted into the unit module of interior workbench layer by layer the concrete surface at bridge pier place and is connected and installed by loop wheel machine;
S04, utilize sash weight positioned edge bridge pier pier shaft short transverse to tie up 2~3 road positioning bars, positioning bar and interior workbench are fixed;
On every layer of platform of S05, interior workbench, arrange a bar bender, then together main muscle is holded up and spacer bar colligation; Main muscle has all been tied up rear colligation stirrup and nose circle " Eight characters " stirrup, in when colligation stirrup, the top layer of workbench is arranged 2 bar benders, be responsible for specially and pinion stirrup two ends with 2 ropes stirrup is mentioned, other bar benders stand in and on interior workbench, carry out colligation, then colligation protective layer cushion block; Several main muscle are vacated in attention in bottom and stirrup is waited until last colligation, as operating personnel's import and export;
S06, installation form, after template installation, hang out interior workbench, and then the horizontal lacing wire of colligation pier shaft or top cap reinforcing bar, complete reinforcing bar form work engineering;
S07, carry out pouring concrete, from lower to upper merogenesis cast bridge pier pier shaft.
2. bridge pier rapid constructing method according to claim 1, is characterized in that, described step S03 comprises:
S031, by loop wheel machine by bottom floor units module hoisting the concrete surface to bridge pier place, and by expansion bolt, the steel structure framework bottom of bottom floor units module and concrete surface are connected and fixed;
S032, successively lift remaining unit module, between the steel structure framework of adjacent two layers unit module, be connected and fixed by latch or bolt.
3. bridge pier rapid constructing method according to claim 2, is characterized in that, described step S06 comprises:
S061, installation form;
S062, dismantle the connecting bolt between steel structure framework layer by layer, pack up movable skeleton;
S063, utilize loop wheel machine successively to hang out unit module;
The horizontal lacing wire of S064, colligation pier shaft or top cap reinforcing bar.
4. bridge pier rapid constructing method according to claim 1, is characterized in that, described fixed platform or movable platform are plank or steel plate.
5. bridge pier rapid constructing method according to claim 1, is characterized in that, every layer of structure of described steel structure framework is high 1.8 meters-2 meters.
6. bridge pier rapid constructing method according to claim 1, is characterized in that, described movable skeleton is rectangular, trapezoidal or semicircle.
CN201410668270.XA 2014-11-19 2014-11-19 Workbench and construction method in a kind of bridge pier rapid construction Expired - Fee Related CN104404883B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410668270.XA CN104404883B (en) 2014-11-19 2014-11-19 Workbench and construction method in a kind of bridge pier rapid construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410668270.XA CN104404883B (en) 2014-11-19 2014-11-19 Workbench and construction method in a kind of bridge pier rapid construction

Publications (2)

Publication Number Publication Date
CN104404883A CN104404883A (en) 2015-03-11
CN104404883B true CN104404883B (en) 2016-05-25

Family

ID=52642544

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410668270.XA Expired - Fee Related CN104404883B (en) 2014-11-19 2014-11-19 Workbench and construction method in a kind of bridge pier rapid construction

Country Status (1)

Country Link
CN (1) CN104404883B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672137B (en) * 2016-03-22 2018-04-13 中国水利水电第八工程局有限公司 A kind of construction method and framework of steel reinforcement of bridge pier pier shaft reinforcing bar
CN106988221B (en) * 2017-03-15 2018-10-19 中铁上海工程局集团有限公司 Unit construction bridge beam construction method based on BIM
CN108547227B (en) * 2018-06-07 2024-02-06 宁波交通工程建设集团有限公司 Modular pier surrounding cage structure and construction method
CN111472305B (en) * 2018-12-07 2022-04-01 杭州江润科技有限公司 Middle pier anti-collision system and construction method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008240410A (en) * 2007-03-28 2008-10-09 Kawasaki Heavy Ind Ltd Bridge construction method, steel structure, and bridge
CN100476076C (en) * 2007-09-17 2009-04-08 中铁二局股份有限公司 Mobile integral construction platform, construction method thereof and special sling for the same
US8430004B2 (en) * 2008-11-27 2013-04-30 Mapal Fabrik Fur Prazisionswerkzeuge Dr. Kress Kg Tool holder
CN202227276U (en) * 2011-09-08 2012-05-23 中铁上海工程局有限公司 Mobile platform applied on bridge pier template
CN103031812B (en) * 2013-01-16 2016-01-13 中铁二局股份有限公司 The construction method of bridge No. 0 section
CN204298741U (en) * 2014-11-19 2015-04-29 中交四航局第三工程有限公司 Working platform in a kind of bridge pier rapid construction

Also Published As

Publication number Publication date
CN104404883A (en) 2015-03-11

Similar Documents

Publication Publication Date Title
CN102677889B (en) System for alternatively supporting whole lifting steel platform formwork by steel column casing rack and construction method
CN104404883B (en) Workbench and construction method in a kind of bridge pier rapid construction
CN203924696U (en) Backform hanger fast-assembling system
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN102535845A (en) Construction method of bearing frame of corridor structure
CN105350454B (en) Steel arch rib outer wrapped concrete construction method for steel trussed arch bridge
CN106592826A (en) Construction method for cylindrical frame supporting type hydraulic-climbing integral steel platform formwork shear steel plate layer
CN103352429A (en) Bracket counter pull loading pre-pressing device and tensioning pre-pressing method thereof
CN102605717A (en) Pier-top longitudinal support scaffolding method
CN201420385Y (en) Overhanging type unloading platform for building construction
CN114575589B (en) Construction method for electric hoist lifting formwork of steel reinforced concrete structural column
CN104989111A (en) Construction method for steel structure high-rise hoisting
CN202064281U (en) Slip form frame
CN203795311U (en) Multi-leg high pier and slip form construction device
CN113833263A (en) Integral lantern type support circulating hoisting construction method for frame column
CN102777050A (en) Assembly type jig frame for longspan pipe truss roof girder
CN102691267A (en) High pier construction method for external whole operation platform
CN204298741U (en) Working platform in a kind of bridge pier rapid construction
CN204212065U (en) Bridge crossing anticollision barrier punching block erection equipment
CN201671062U (en) D-type temporary beam for construction of dual-line portal type pier cap beam spanning existing line
CN206513003U (en) A kind of steel-structure factory building installs auxiliary steel frame construction
CN108518071A (en) The installation method of the double-deck large-span steel vestibule
CN104131635A (en) Method and platform for constructing peripheral shear wall of prefabricated staircase
CN204185146U (en) Construction of Steel Structure overhang crane between skyscraper two tall buildings
CN103669219B (en) Many limbs height pier is with sliding construction equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Shovey

Inventor after: Feng Guoyao

Inventor after: Huang Xiaomiao

Inventor after: Bi Lili

Inventor after: Liao Shiqiang

Inventor after: Mo Hongwu

Inventor after: Wang Shenguang

Inventor after: Chen Xin

Inventor before: Shovey

Inventor before: Ju Zhian

Inventor before: Feng Guoyao

Inventor before: Mo Hongwu

Inventor before: Liao Shiqiang

Inventor before: Bi Lili

Inventor before: Huang Xiaomiao

Inventor before: Wang Shenguang

COR Change of bibliographic data
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160525