CN201671062U - D-type temporary beam for construction of dual-line portal type pier cap beam spanning existing line - Google Patents

D-type temporary beam for construction of dual-line portal type pier cap beam spanning existing line Download PDF

Info

Publication number
CN201671062U
CN201671062U CN2010201959802U CN201020195980U CN201671062U CN 201671062 U CN201671062 U CN 201671062U CN 2010201959802 U CN2010201959802 U CN 2010201959802U CN 201020195980 U CN201020195980 U CN 201020195980U CN 201671062 U CN201671062 U CN 201671062U
Authority
CN
China
Prior art keywords
crossbeam
beams
fall
longeron
type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201959802U
Other languages
Chinese (zh)
Inventor
朱雷敏
刘庭联
王树文
周玉兵
肖红武
杨福国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 20th Bureau Group Corp
Fourth Engineering Co Ltd of China Railway 20th Bureau Group Co Ltd
Third Engineering Co Ltd of China Railway 20th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 20th Bureau Group Co Ltd
Original Assignee
China Railway 20th Bureau Group Corp
Fifth Engineering Co Ltd of China Railway 20th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 20th Bureau Group Corp, Fifth Engineering Co Ltd of China Railway 20th Bureau Group Co Ltd filed Critical China Railway 20th Bureau Group Corp
Priority to CN2010201959802U priority Critical patent/CN201671062U/en
Application granted granted Critical
Publication of CN201671062U publication Critical patent/CN201671062U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a D-type temporary beam for construction of a dual-line portal type pier cap beam spanning an existing line, which comprises two longitudinal beams and a plurality of cross beams, wherein the longitudinal beams are distributed in parallel, the cross beams are arranged between the middle-lower portions of the two longitudinal beams, the left and the right end portions of the longitudinal beams are respectively erected on two support platforms which are distributed on the top portion of two groups of temporary support piers, two anti-falling beams which are distributed in parallel are erected between the two support platforms, the anti-falling beams and the longitudinal beams are arranged in parallel, the lower portions of the cross beams are provided with a left and a right blocking pieces, the distribution positions of the left and the right blocking pieces correspond to the distribution positions of the two anti-falling beams, when the two anti-falling beams and the left and the right blocking pieces correspondingly form an anti-slip device which prevents the cross beams from slipping on the traverse direction when dismantling the cross beams. The D-type temporary beam has simple structure, reasonable design, convenient mounting and distribution and convenient assembly, simultaneously is provided with the anti-slip device, can simply, conveniently, rapidly and safely dismantle the cross beams when dismantling the temporary beam after construction, and has extremely low danger coefficient.

Description

Cross over the double track bridge transom pier cap construction just beam of D type of existing line
Technical field
The utility model relates to a kind of bridge construction just beam of D type, especially relates to a kind of double track bridge transom pier cap construction just beam of D type of crossing over existing line.
Background technology
Along with reform and opening-up, economic develop rapidly, driven the development of high-speed railway, it is unavoidable that newly built railway is crossed over original circuit, be subjected to the job site ambient influnence, the design of adopting transom pier to cross over existing line also gets more and more, and how to guarantee transom pier leap existing line construction safety and quality, becomes the problem of each relevant unit's joint research.Nowadays, when crossing over the transom pier construction of existing line more, all have complex structural designs usually, require short, construction characteristic such as security risk is big, construction and the mutual interference of operation phase are big of construction period, thereby difficulty of construction is very big.
The utility model content
Technical problem to be solved in the utility model is at above-mentioned deficiency of the prior art, a kind of double track bridge transom pier cap construction just beam of D type of crossing over existing line is provided, its simple in structure, reasonable in design and processing and fabricating and installation laying convenience, easy to assembly, be provided with antisliding apparatus simultaneously, when removing just beam after feasible construction finishes, can be simple, convenient, fast, safely crossbeam is removed, danger coefficient is very low.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is: a kind of double track bridge transom pier cap construction just beam of D type of crossing over existing line, it is characterized in that: comprise that the longeron of two parallel layings and Duo Gen are installed in two crossbeams between the longeron middle and lower part, described crossbeam is vertical laying with longeron and many crossbeams are laid on the same horizontal plane; Connect by junction plate between adjacent two crossbeams, fixedly connected by linkage between longeron and crossbeam, the both ends, the left and right sides of described longeron set up respectively about on two platforms being laid of two groups of temporary rest pier tops, and longeron and crossbeam be assembled into the D type just the shape of cross section of beam be " H " shape; Two described interstations are erected with the anti-fall beam of two parallel layings, described anti-fall beam and longeron be arranged in parallel and two anti-fall beams between spacing less than the lateral length of crossbeam, two block pieces about described crossbeam bottom is provided with, about the installation position of two block pieces corresponding with the installation position of two anti-fall beams, about two anti-fall beam correspondences are installed between two block pieces, and two anti-fall beams with about two corresponding compositions of block piece prevent that crossbeam from the antisliding apparatus of horizontal slippage taking place when preventing to remove crossbeam; Described anti-fall beam is positioned at crossbeam below and its and has the gap between bottom crossbeam.
Described platform comprises laying many poles at grade, and described anti-fall beam is that H shaped steel and its are installed on the described pole by U bolt; Be parallel laying between described pole and crossbeam.
Described block piece is vertical to bolt or the reinforcement bar laid, corresponding bolt mounting holes or the reinforcement installation hole that is provided with for bolt or the installation of described reinforcement bar on the described crossbeam.
The utility model compared with prior art has the following advantages:
1, simple in structure, reasonable in design and processing and fabricating and installation laying convenience, cost of investment is low.
2, use is easy and simple to handle, easy to assembly.
3, the antisliding apparatus of described setting is simple in structure, laying is convenient and use easy and simple to handle, do not blocking under the circuit situation, for safety is removed crossbeam, below the distance horizontal stroke, lay 2 H shaped steel as anti-fall beam, actually carry out from two ends to the centre when crossbeam is removed, make crossbeam drop down onto at the bottom of the beam on the anti-fall beam after, haul out from anti-fall beam two ends again, safe and reliable.
In sum, it is convenient, easy to assembly that simple in structure, the reasonable in design and processing and fabricating of the utility model and installing is laid, and is provided with antisliding apparatus simultaneously, when removing just beam after making construction finish, can be simple, convenient, fast, safely crossbeam is removed, danger coefficient is very low.
Below by drawings and Examples, the technical solution of the utility model is described in further detail.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is the connection status schematic diagram between anti-fall beam of the utility model and pole.
Fig. 3 is the user mode reference diagram of the utility model antisliding apparatus.
Description of reference numerals:
The 1-longeron; The 2-crossbeam; The anti-fall beam of 3-;
4-pole; 5-U shape bolt; The 6-bolt.
The specific embodiment
As Fig. 1, Fig. 2 and shown in Figure 3, the utility model comprises that the longeron 1 of two parallel layings and Duo Gen are installed in two crossbeams 2 between longeron 1 middle and lower part, and described crossbeam 2 is vertical laying with longeron 1 and many crossbeams 2 are laid on the same horizontal plane.2 on adjacent two crossbeams connect by junction plate, longeron 1 is fixedlyed connected by linkage with 2 on crossbeam, the both ends, the left and right sides of described longeron 1 set up respectively about on two platforms being laid of two groups of temporary rest pier tops, and longeron 1 and crossbeam 2 be assembled into the D type just the shape of cross section of beam be " H " shape.Two described interstations are erected with the anti-fall beam 3 of two parallel layings, described anti-fall beam 3 and longeron 1 be arranged in parallel and the spacing of 3 on two anti-fall beams less than the lateral length of crossbeam 2, two block pieces about described crossbeam 2 bottoms are provided with, about the installation position of two block pieces corresponding with the installation position of two anti-fall beams 3, about two anti-fall beam 3 correspondences are installed between two block pieces, and two anti-fall beams 3 with about two corresponding compositions of block piece prevent that crossbeam 2 from the antisliding apparatus of horizontal slippage taking place when preventing to remove crossbeam 2.Described anti-fall beam 3 is positioned between crossbeam 2 belows and itself and crossbeam 2 bottoms and has the gap.
Described platform comprises laying many poles 4 at grade, and described anti-fall beam 3 is installed on the described pole 4 by U bolt 5 for H shaped steel and its.Described pole 4 is parallel laying with 2 on crossbeam.
Described block piece is vertical to bolt 6 or the reinforcement bar laid, corresponding bolt mounting holes or the reinforcement installation hole that is provided with for bolt 6 or the installation of described reinforcement bar on the described crossbeam 2.
After the cap construction finishes, when removing, before crossbeam 2 and longeron 1 disintegrate, the side supports end reinforcing diagonal brace of every longeron 1, anti-crossbeam 2 is toppled over longeron 1 disintegration floor side member 1.And earlier crossbeam 2 being removed, specifically is to utilize the skylight point that crossbeam 2 is removed construction, and the two ends of beam at one's convenience divide a plurality of sections to remove to span centre during dismounting: at first, utilize skylight point to remove 2 junction plates that connected of adjacent two crossbeams earlier; Secondly, utilize skylight point loosening and remove the linkage of 2 on connection longeron 1 and crossbeam; Afterwards, utilizing follow-up skylight to put beam at one's convenience two ends removes crossbeam 2 by root to span centre; Crossbeam 2 after the dismounting drops on earlier on the anti-fall beam 3, adopts the anchor clamps clamping afterwards and slide onto described temporary rest pier lateroretrusion along anti-fall beam 3.
In the present embodiment, described linkage is a connecting bolt, is specially vertical bolt, and when then crossbeam 2 being removed, first skylight point to be unloading vertical bolt, since just dismantling toward two ends in the girder span, and removes junction plate earlier, loosening more vertical bolt; Treat after whole vertical bolt loosenesses that again with vertical disassembling bolts, but each surplus vertical bolt of the two ends of every crossbeam 2 do not unload, and lays down when treating all to carry out slippage in these root crossbeam 2 demolishing process again.Take out the operation of crossbeam 2 and in follow-up skylight point, finish successively, remove by root to the span centre direction by just beam two ends.In crossbeam 2 demolishing process, about two block pieces skid off from anti-fall beam 3 can prevent effectively that crossbeam 2 from twitching the time, about two block pieces should before crossbeam 2 drops on the anti-fall beam 3, install, can effectively guarantee can freely not go here and there during crossbeam 2 drops on the anti-fall beam 3 and landing crashes into track.
The above; it only is preferred embodiment of the present utility model; be not that the utility model is imposed any restrictions; everyly any simple modification that above embodiment did, change and equivalent structure are changed, all still belong in the protection domain of technical solutions of the utility model according to the utility model technical spirit.

Claims (3)

1. a double track bridge transom pier cap construction of crossing over existing line is with just beam of D type, it is characterized in that: comprise longeron (1) and the many crossbeams (2) that are installed between two longerons (1) middle and lower part of two parallel layings, described crossbeam (2) is vertical laying with longeron (1) and many crossbeams (2) are laid on the same horizontal plane; Connect by junction plate between adjacent two crossbeams (2), fixedly connected by linkage between longeron (1) and crossbeam (2), the both ends, the left and right sides of described longeron (1) set up respectively about on two platforms being laid of two groups of temporary rest pier tops, and longeron (1) and crossbeam (2) be assembled into the D type just the shape of cross section of beam be " H " shape; Two described interstations are erected with the anti-fall beam (3) of two parallel layings, described anti-fall beam (3) and longeron (1) be arranged in parallel and two anti-fall beams (3) between spacing less than the lateral length of crossbeam (2), two block pieces about described crossbeam (2) bottom is provided with, about the installation position of two block pieces corresponding with the installation position of two anti-fall beams (3), about two anti-fall beams (3) correspondence is installed between two block pieces, and two anti-fall beams (3) with about two corresponding compositions of block piece prevent that crossbeam (2) from the antisliding apparatus of horizontal slippage taking place when preventing to remove crossbeam (2); Described anti-fall beam (3) is positioned at crossbeam (2) below and its and has the gap between bottom crossbeam (2).
2. construct according to the double track bridge transom pier cap of the described leap existing line of claim 1 and use just beam of D type, it is characterized in that: described platform comprises laying many poles (4) at grade, and described anti-fall beam (3) is installed on the described pole (4) by U bolt (5) for H shaped steel and its; Be parallel laying between described pole (4) and crossbeam (2).
3. construct according to the double track bridge transom pier cap of claim 1 or 2 described leap existing lines and use just beam of D type, it is characterized in that: to bolt (6) or the reinforcement bar laid, go up correspondence and be provided with bolt mounting holes or the reinforcement installation hole that supplies bolt (6) or described reinforcement bar to install by described crossbeam (2) for vertically for described block piece.
CN2010201959802U 2010-05-19 2010-05-19 D-type temporary beam for construction of dual-line portal type pier cap beam spanning existing line Expired - Fee Related CN201671062U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201959802U CN201671062U (en) 2010-05-19 2010-05-19 D-type temporary beam for construction of dual-line portal type pier cap beam spanning existing line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201959802U CN201671062U (en) 2010-05-19 2010-05-19 D-type temporary beam for construction of dual-line portal type pier cap beam spanning existing line

Publications (1)

Publication Number Publication Date
CN201671062U true CN201671062U (en) 2010-12-15

Family

ID=43328474

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201959802U Expired - Fee Related CN201671062U (en) 2010-05-19 2010-05-19 D-type temporary beam for construction of dual-line portal type pier cap beam spanning existing line

Country Status (1)

Country Link
CN (1) CN201671062U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102839578A (en) * 2012-08-30 2012-12-26 中铁十局集团有限公司 Construction method for manually longitudinally moving temporary beam in reinforcing multi-track line by use of D type temporary beam
CN107165062A (en) * 2017-07-07 2017-09-15 中铁七局集团第工程有限公司 A kind of method for removing Existing Railway Line gate-type pier capping beam protecting canopy frame
CN107366229A (en) * 2017-07-07 2017-11-21 中铁七局集团第工程有限公司 Both a kind of construction method of wired transom pier bent cap
CN114351572A (en) * 2022-01-26 2022-04-15 山东省交通规划设计院集团有限公司 Bridge system for small-angle crossing of operation road without interrupting traffic construction

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102839578A (en) * 2012-08-30 2012-12-26 中铁十局集团有限公司 Construction method for manually longitudinally moving temporary beam in reinforcing multi-track line by use of D type temporary beam
CN102839578B (en) * 2012-08-30 2014-12-10 中铁十局集团有限公司 Construction method for manually longitudinally moving temporary beam in reinforcing multi-track line by use of D type temporary beam
CN107165062A (en) * 2017-07-07 2017-09-15 中铁七局集团第工程有限公司 A kind of method for removing Existing Railway Line gate-type pier capping beam protecting canopy frame
CN107366229A (en) * 2017-07-07 2017-11-21 中铁七局集团第工程有限公司 Both a kind of construction method of wired transom pier bent cap
CN114351572A (en) * 2022-01-26 2022-04-15 山东省交通规划设计院集团有限公司 Bridge system for small-angle crossing of operation road without interrupting traffic construction

Similar Documents

Publication Publication Date Title
US11634877B2 (en) Method for removal of temporary support system for road bridge pre-fabricated small box girder-type concealed bent cap, and equipment therefor
CN203347251U (en) Movable protective canopy for road-spanning construction
CN202706503U (en) Electric lifting discharging platform for main building construction
CN103352429A (en) Bracket counter pull loading pre-pressing device and tensioning pre-pressing method thereof
CN201671062U (en) D-type temporary beam for construction of dual-line portal type pier cap beam spanning existing line
CN105386411A (en) Multifunctional portal device of suspension bridge pillar top
CN113585075A (en) Cast-in-place bridge deck formwork for steel-concrete composite beam
CN105714683A (en) Installation and dismantling method of high bent cast-in-situ aqueduct suspension type bailey frames
CN107165062A (en) A kind of method for removing Existing Railway Line gate-type pier capping beam protecting canopy frame
CN101122115A (en) A construction method for tower crane displacement
CN103382702B (en) A kind of support of cast-in-situ box girder and building method thereof
CN205205685U (en) Span wire pier is function portal device at most
CN103774838B (en) A kind of construction of lift well assembling safe operation platform and using method
CN205314590U (en) Special mechanism of main equipment dismouting in factory building and frame
CN104404883B (en) Workbench and construction method in a kind of bridge pier rapid construction
CN214006471U (en) Steel tube scaffold operation platform on four-beam traveling crane of industrial factory building
CN102425123A (en) A combined protective scaffolding and its construction method
CN109371846A (en) A kind of assembled Multifunction side is across cast-in-place support and its construction method
CN101440660A (en) Guiding-rail attached lifting scaffold
CN210589859U (en) Movable precast beam concrete cloth construction platform
CN208009267U (en) A kind of middle cross beam tensioning protective platform
CN102587649A (en) Template profiled bar supporting system of high and large cantilever structure
CN201826545U (en) Safety fire protection system device for core tube construction of super high-rise building
CN201141203Y (en) Guiding-rail attached lifting scaffold
CN104164838A (en) Light combined type beam moving trolley

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101215

Termination date: 20160519