CN104389358B CN201410656022.3A CN201410656022A CN104389358B CN 104389358 B CN104389358 B CN 104389358B CN 201410656022 A CN201410656022 A CN 201410656022A CN 104389358 B CN104389358 B CN 104389358B
Authority
CN
China
Prior art keywords
wall
fire hydrant
concrete slab
hydrant box
back side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410656022.3A
Other languages
Chinese (zh)
Other versions
CN104389358A (en
Inventor
潘新荣
周正宇
张勇
潘云云
徐利亚
厉奇山
何忠魁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Construction Engineering Group Co Ltd
Original Assignee
Zhejiang Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Construction Engineering Group Co Ltd filed Critical Zhejiang Construction Engineering Group Co Ltd
Priority to CN201410656022.3A priority Critical patent/CN104389358B/en
Publication of CN104389358A publication Critical patent/CN104389358A/en
Application granted granted Critical
Publication of CN104389358B publication Critical patent/CN104389358B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The invention provides a kind of fire hydrant box back side body of wall and construction method thereof, its brick wall body of wall has reserving hole for embedding fire hydrant box, in reserving hole, multiple concrete slab placed up and down is built at the fire hydrant box back side by laying bricks or stones, and use Bar Anchorage prefabricated in concrete slab in brick wall body of wall, topmost concrete slab is built with crossing beam slab top, foot concrete slab exceeds fire hydrant casing bottom, the two ends, left and right of described concrete slab are all beyond the fire hydrant casing left and right sides, stagger in the transverse slot between transverse slot and brick wall between described concrete slab, stagger in vertical gap between vertical gap and fire hydrant box side and the body of wall of described concrete slab end.The present invention can make the steadiness of fire hydrant box back side body of wall more preferably, can avoid using putting on full scale steel wire net, and operation is simple, and solves the problem that fire hydrant box back side body of wall produces rendering crack.

Description

A kind of fire hydrant box back side body of wall and construction method thereof
Technical field
The present invention relates to a kind of fire hydrant box back side body of wall and construction method thereof, belong to technical field of building construction.
Background technology
nullAccording to design and code requirement,All different materials for wall junctions and body of wall are embedded with equipment box、When cabinet equivalent body of wall is wide,Layer of steel wire net is overlayed in junction and box back surface before painting,By conventional construction method,Putting on full scale steel wire net is used at the fire hydrant box back side,Periphery stretches out casing 150mm,Layering is plastered,Employing putting on full scale steel wire net can be by the material of varying strength with connecting together,Structure is integral,Make expansion and contraction uniform,Decrease the drawing crack of wall face,As the patent No. 201320198063.3 provides a kind of wall internal corner insulation construction,Base course wall and exterior wall intersect composition wall internal corner,Screed it is provided with on wall face,Layer of steel wire net it is equipped with outside screed,Steel wire is extended to base course wall by exterior wall and covers whole wall internal corner,And use expansion bolt to be anchored on base course wall and exterior wall by steel wire,This patent has the advantages that body of wall is the most easy to crack.
But it is also required to certain operative skill when floated coat is carried additionally steel wire construction, complex steps, typically requiring attention problems with: the mesh plaster of (1) metope should accomplish that selection is reasonable, linked network is smooth, nail net is firm, it is closely knit to plaster, and can carry out after hidden item inspection is qualified.(2) matrix should be cleared up before linked network, repair levelling metope, and keep certain humidity.(3) linked network should flatten, and can fix with nailing or with built-in fitting with beam, post or wall connecting, should ensure that the indeformable arch camber of steel mesh;(4) web material overlap joint should be smooth, continuous, firm, and the lap of splice is not preferably less than 100mm;(5) in linked network must be placed in coat of plaster, web material is preferably greater than 5mm with the spacing of matrix, but must not expose, and should prevent web material and fixture from getting rusty and corroding;(6) coat of plaster must be firmly bonded with matrix, and matrix surface should use polymer water mud bottoming, plasters and should divide all over compacting.Additionally, steel wire by brick wall can use iron nail to fix in hammering into brick wall mortar joint, but by concrete walls, beam, cylinder steel wire is but high due to concrete strength, can not directly use and hammer into iron nail and fix, general employing hammers into iron nail again after concrete surface is holed and is fixed, in sum, obviously putting on full scale steel wire net labour intensity is big, when not only having taken a lot of work but also be awkward, and when the density of steel wire Yu the point of metope colligation is inadequate, the most easily produce rendering layer hollowing, cracking, the phenomenons such as peeling, the steel wire currently used is sandwiched between metope and mortar, hole is there is on steel wire, mortar thickness in Steel Wire Surface and mesh is the most inconsistent, particularly when mortar is thicker, the fastness of the screed spread is the most worse, often occur that mortar stream falls, the situation such as drop;Even if completing float work, after Practical Completion, due to expanding with heat and contract with cold or slight deformation, External Force Acting etc. of steel wire, box back surface coat of plaster cracking in various degree all can be caused, come off under serious conditions, cavity, had a strong impact on the normal of building and used and aesthetic.
Therefore, metope putting on full scale steel wire net still can't resolve the problem painting crack, and steel wire can only be surface action to cracking of wall surface, and metope to be truly realized does not ftractures, and is also intended to from matrix, it is simply that masonry project is started with.
Summary of the invention
For the problems referred to above, it is an object of the invention to provide a kind of fire hydrant box back side body of wall and construction method thereof, the steadiness that can make fire hydrant box back side body of wall is more preferable, can avoid using putting on full scale steel wire net, operation is simple, solves fire hydrant box back side body of wall and produces the problem painting crack.
In order to achieve the above object, the present invention adopts the following technical scheme that a kind of fire hydrant box back side body of wall, brick wall body of wall has reserving hole for embedding fire hydrant box, in reserving hole, the body of wall position corresponding to the fire hydrant box back side builds multiple concrete slab placed up and down by laying bricks or stones, and use Bar Anchorage prefabricated in concrete slab in brick wall body of wall, topmost concrete slab is built with crossing beam slab top, foot concrete slab exceeds fire hydrant casing bottom, the two ends, left and right of described concrete slab are all beyond the fire hydrant casing left and right sides, stagger in the transverse slot between transverse slot and brick wall between described concrete slab, described concrete slab is left, the vertical gap of right part is left with fire hydrant box, stagger in vertical gap between right flank and body of wall.
As the most preferably, described reinforcing bar inserts in the puzzle joint of brick wall body of wall.
As the most preferably, described bar spacing is arranged by institute's use fragment of brick modulus, and described every concrete slab is prefabricated with upper and lower two groups of reinforcing bars the most wherein, often organizes each two.
As the most preferably, the one side that described concrete slab does not contacts with fire hydrant box is hair side, as face to be painted, is more beneficial for rendering layer laminating.
As the most preferably, after using half brick masonry in the space between fire hydrant box and brick wall body of wall, mortar is used to fill up again.
As the most preferably, the hair side that the plurality of concrete slab does not contacts with fire hydrant box flushes with the masonry of brick wall body of wall, and the brick wall wall plastering on side can be carried out simultaneously.
As the most preferably, described concrete slab is cuboid.
As the most preferably, foot and topmost two concrete slab increase 55mm than other concrete slab, definition above-below direction is short transverse herein, foot concrete slab exceeds fire hydrant box casing bottom 100mm, and the two ends, left and right of described concrete slab are all beyond fire hydrant box casing left and right sides 120mm;The height of described reserving hole is that casing height adds 100mm, and a length of casing length both sides respectively add 120mm.
The construction method of a kind of fire hydrant box back side body of wall, comprises the steps: that (1), when brick wall building wall, is reserved with hole for embedding fire hydrant box, its size fire hydrant box to be slightly larger than;(2) in reserving hole, multiple concrete slab placed up and down is built by laying bricks or stones at the back side of described fire hydrant box, described concrete slab length and the consistent size of reserving hole, topmost concrete slab is built with crossing beam slab top, foot concrete slab exceeds fire hydrant casing bottom, the two ends, left and right of described concrete slab are all beyond the fire hydrant casing left and right sides, after definition fire hydrant box is placed herein, direction is length direction around, its above-below direction is short transverse, the one side that described concrete slab does not contacts with fire hydrant box is face to be painted, for hair side;(3) fire hydrant box embedding is built by laying bricks or stones the reserving hole of concrete slab, uses half brick masonry by the space between fire hydrant box and brick wall body of wall afterwards, and fill up with mortar.
As the most preferably, also include step (4), painting the back side body of wall at concrete slab hair side place after structure acceptance is qualified on demand, paint the front body of wall at the bat place between fire hydrant box and brick wall body of wall simultaneously, the rendering of the brick wall body of wall on side is carried out the most simultaneously.
As the most preferred, in step (2), when building by laying bricks or stones, described concrete slab is prefabricated with reinforcing bar, being put into by described reinforcing bar on the brick face of both sides brick wall body of wall, and push down end reinforced while adjacent brick masonry, the brick wall body of wall on described concrete slab and side is built by laying bricks or stones simultaneously.
As the most preferably, staggering in the transverse slot between transverse slot and brick wall between described concrete slab, staggers in the vertical gap between vertical gap and fire hydrant box left and right side and the body of wall of the left and right end of described concrete slab.
As the most preferably, in step (2), described every concrete slab is prefabricated with upper and lower two groups of reinforcing bars the most wherein, often organizes each two.
As the most preferably, in step (2), described foot concrete slab exceeds fire hydrant box casing bottom 100mm, and the two sides of all concrete slabs are respectively beyond casing 120mm, the height of described reserving hole is that casing height adds 100mm, and a length of casing length both sides respectively add 120mm.
As the most preferably, foot and topmost two concrete slab increase 55mm than other concrete slabs, and the reinforcing bar of described concrete slab is just facing to brickwork joint, and the seam between concrete slab also staggers with brickwork joint.
As the most preferably, between described each concrete slab, there is the mortar of 10mm thickness.
As the most preferably, the hair side that the plurality of concrete slab does not contacts with fire hydrant box flushes with the masonry of brick wall body of wall.
nullThe invention has the beneficial effects as follows: the body of wall employing polylith armoured concrete slab at the fire hydrant box back side of the present invention is built by laying bricks or stones with the brick wall body of wall on side simultaneously,And polylith armoured concrete slab is by respective Bar Anchorage brick wall body of wall aside,Thus the concrete wall at the fire hydrant box back side links into an integrated entity,And be fixed in brick wall body of wall,And stagger in the transverse slot between transverse slot and the brick wall between described concrete slab,Stagger in vertical gap between vertical gap and fire hydrant box side and the body of wall of described concrete slab end,Make steadiness more preferable,And the fissure of displacement is also beneficial to the fixing of rendering layer,It is not required to use steel wire,It is experimentally verified that,During plastering above and using,All do not have wall plaster layer cracking、The situations such as coat of plaster drops,Can reach normally to use and aesthetic,Solve the quality problems that China is pre-buried or build-in occurs after plastering in the body of wall internal box back side.And use half way around and mortar that the gap between fire hydrant box and body of wall has been also carried out tight process.The present invention can avoid using putting on full scale steel wire net, saves operation, directly plasters at concrete wall surface, and use concrete slab, is also greatly saved cost.
Accompanying drawing explanation
Fig. 1 is embodiment of the present invention fire hydrant box front body of wall structural representation.
Fig. 2 is the sectional view of Fig. 1.
Fig. 3 is embodiment of the present invention fire hydrant box back side wall body structure schematic diagram.
The explanation of mark in accompanying drawing: 1-brick wall body of wall, 2-reserving hole, 3-fire hydrant box, 3.1-fire hydrant box rear wall, 4(4.1,4.2,4.3,4.4,4.5,4.6,4.7,4.8)-concrete slab, 5-reinforcing bar, 6-crosses beam slab, 7-bat.
Detailed description of the invention
The realization of the object of the invention, functional characteristics and beneficial effect, be described further below in conjunction with specific embodiment and accompanying drawing.
Being described in further detail technical scheme of the present invention with specific embodiment below in conjunction with the accompanying drawings, so that those skilled in the art can be better understood from the present invention and can be practiced, but illustrated embodiment is not as a limitation of the invention.
nullAs Figure 1-3,The structure of embodiment of the present invention fire hydrant box back side body of wall is as follows: brick wall body of wall 1 has reserving hole 2 for embedding fire hydrant box 3,About the 8 pieces cuboid concrete slab 4(4.1 placed are built by laying bricks or stones at the fire hydrant box back side (rear wall 3.1)、4.2、4.3、4.4、4.5、4.6、4.7、4.8),And use reinforcing bar 5 prefabricated in concrete slab 4 to be anchored in brick wall body of wall,Described reinforcing bar 5 spacing is arranged by institute's use fragment of brick modulus,Every concrete slab 4 is prefabricated with upper and lower two groups、Often organize each 2 reinforcing bars 5,Described reinforcing bar 5 inserts in the puzzle joint of brick wall body of wall 1,Stagger in the transverse slot between transverse slot and brick wall between described concrete slab 4,Described concrete slab 4(4.1-4.8) end vertical gap and fire hydrant box side and brick wall body of wall 1 between vertical gap stagger.The face that described concrete slab 4 is to be painted is hair side, and the hair side that the plurality of concrete slab 4 does not contacts with fire hydrant box 3 flushes with the masonry of brick wall body of wall 1.
Topmost concrete slab 4.8 is built with crossing beam slab 6 top, foot 4.1 and 4.8 liang of concrete slab of topmost increase 55mm than other concrete slab, definition above-below direction is short transverse herein, foot concrete slab 4.1 is beyond fire hydrant casing bottom 100mm, the two ends, left and right of described concrete slab 4 all beyond fire hydrant casing left and right sides 120mm, use bat 7 to use mortar to fill up again after building by laying bricks or stones in fire hydrant box 3 and the gap of brick wall body of wall 1.
Topmost and foot concrete slab 4.8,4.1 a size of 940*245*40 in the present embodiment;Other concrete slab 4.2-4.7 a size of 940*190*40;Having 10mm thickness mortar, fire hydrant box 3 size: 1600*700 between each concrete slab 4, it is different that fire hydrant box thickness presses thickness of wall body, reserving hole 2 size: 1700*940.
The construction method of embodiment of the present invention fire hydrant box back side body of wall as Figure 1-3 comprises the following steps:
(1) when brick wall body of wall 1 is built by laying bricks or stones, it is provided with reserving hole 2(size 1700*940) be used for embedding fire hydrant box 3(size 1600*700), its size fire hydrant box to be slightly larger than 3, the height of described reserving hole 2 is that fire hydrant box 3 casing height adds 100mm, and a length of fire hydrant box 3 casing length both sides respectively add 120mm;
(2) in reserving hole 2, multiple concrete slab 4(4.1-4.8 placed up and down is built by laying bricks or stones) at the back side of described fire hydrant box 3, described concrete slab 4 length 940mm and the consistent size of reserving hole 2, topmost concrete slab 4.8 is built with crossing beam slab 6 top, foot concrete slab 4.1 is beyond fire hydrant casing 3 bottom 100mm, the two ends, left and right of described concrete slab 4 are all beyond fire hydrant casing 3 left and right sides 120mm so that stagger in the vertical gap between vertical gap and fire hydrant box side and the brick wall body of wall 1 of described concrete slab 4 end.After definition fire hydrant box 3 is placed herein, direction is length direction around, and its above-below direction is short transverse;When building by laying bricks or stones, the most prefabricated upper and lower two groups of totally 4 reinforcing bars 5 of described concrete slab 4, being put on the brick face of both sides brick wall body of wall 1 by described reinforcing bar 5, and push down reinforcing bar 5 end while adjacent brick masonry, the brick wall body of wall 1 on described concrete slab 4 and side is built by laying bricks or stones simultaneously.Foot and topmost two concrete slab 4.8,4.1 increase 55mm than other concrete slabs, make the reinforcing bar 5 of described concrete slab 4 just facing to brickwork joint, and also stagger with brickwork joint in the transverse slot between each concrete slab 4, the mortar of 10mm thickness, the hair side that the plurality of concrete slab 4 does not contacts with fire hydrant box 3 is had to flush with the masonry of brick wall body of wall 1 between described each concrete slab 4.
(3) fire hydrant box 3 embedding is built by laying bricks or stones the reserving hole 2 of concrete slab 4, bat 7 will be used in the space between fire hydrant box 3 and brick wall body of wall 1 to build by laying bricks or stones afterwards, and fill up with mortar;
(4) paint the back side body of wall at concrete slab hair side place after structure acceptance is qualified on demand, the front body of wall at the bat place between fire hydrant box 3 and brick wall body of wall 1 is painted simultaneously.The rendering of the brick wall body of wall 1 on side is carried out the most simultaneously.

Claims (9)

1. the construction method of a fire hydrant box back side body of wall, it is characterised in that: comprising the steps: that (1), when brick wall building wall, is reserved with hole for embedding fire hydrant box, its size is greater than fire hydrant box;(2) in reserving hole, multiple concrete slab placed up and down is built by laying bricks or stones at the back side of described fire hydrant box, described concrete slab length and the consistent size of reserving hole, topmost concrete slab is built with crossing beam slab top, foot concrete slab exceeds fire hydrant casing bottom, the two ends, left and right of described concrete slab are all beyond the fire hydrant casing left and right sides, and the one side that described concrete slab does not contacts with fire hydrant box is face to be painted, for hair side ;(3) fire hydrant box embedding is built by laying bricks or stones the reserving hole of concrete slab, uses half brick masonry by the space between fire hydrant box and brick wall body of wall afterwards, and fill up with mortar;(4) paint the back side body of wall at concrete slab hair side place after structure acceptance is qualified on demand, the front body of wall at the bat place between fire hydrant box and brick wall body of wall is painted simultaneously;
In step (2), when building by laying bricks or stones, being prefabricated with reinforcing bar in described concrete slab, put into by described reinforcing bar on the brick face of both sides brick wall body of wall, and push down end reinforced while adjacent brick masonry, the brick wall body of wall on described concrete slab and side is built by laying bricks or stones simultaneously;Staggering in the transverse slot between transverse slot and brick wall between described concrete slab, staggers in the vertical gap between vertical gap and fire hydrant box side and the body of wall of described concrete slab end.
The construction method of the fire hydrant box back side the most according to claim 1 body of wall, it is characterised in that: in step (2), described every concrete slab is prefabricated with upper and lower two groups of reinforcing bars the most wherein, often organizes each two.
The construction method of the fire hydrant box back side the most according to claim 2 body of wall, it is characterized in that: in step (2), described foot concrete slab exceeds fire hydrant box casing bottom 100mm, the two sides of all concrete slabs are respectively beyond casing 120mm, the height of described reserving hole is that casing height adds 100mm, a length of casing length both sides respectively add 120mm, foot and topmost two concrete slab and increase 55mm than other concrete slabs.
The construction method of the fire hydrant box back side the most according to claim 2 body of wall, it is characterised in that: the hair side that the plurality of concrete slab does not contacts with fire hydrant box flushes with the masonry of brick wall body of wall.
5. a kind of fire hydrant box back side body of wall made according to the construction method of the fire hydrant box back side body of wall described in any one of claim 1-4, brick wall body of wall has reserving hole for embedding fire hydrant box, it is characterized in that: in reserving hole, the body of wall position corresponding to the fire hydrant box back side builds multiple concrete slab placed up and down by laying bricks or stones, and use Bar Anchorage prefabricated in concrete slab in brick wall body of wall, topmost concrete slab is built with crossing beam slab top, foot concrete slab exceeds fire hydrant casing bottom, the two ends, left and right of described concrete slab are all beyond the fire hydrant casing left and right sides, stagger in the transverse slot between transverse slot and brick wall between described concrete slab, stagger in vertical gap between vertical gap and fire hydrant box side and the body of wall of described concrete slab end.
The fire hydrant box back side the most according to claim 5 body of wall, it is characterised in that: described reinforcing bar inserts in the puzzle joint of brick wall body of wall, and described every concrete slab is prefabricated with upper and lower two groups of reinforcing bars the most wherein, often organizes each two.
The fire hydrant box back side the most according to claim 6 body of wall, it is characterised in that: the one side that described concrete slab does not contacts with fire hydrant box is hair side, as face to be painted.
The fire hydrant box back side the most according to claim 7 body of wall, it is characterised in that: half way around and mortar are filled in the space between described fire hydrant box and brick wall body of wall.
The fire hydrant box back side the most according to claim 8 body of wall, it is characterized in that: foot and topmost two concrete slab increase 55mm than other concrete slab, foot concrete slab exceeds fire hydrant box casing bottom 100mm, the two ends, left and right of described concrete slab are all beyond fire hydrant box casing left and right sides 120mm, the height of described reserving hole is that casing height adds 100mm, and a length of casing length both sides respectively add 120mm.
CN201410656022.3A 2014-11-18 2014-11-18 A kind of fire hydrant box back side body of wall and construction method thereof Active CN104389358B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410656022.3A CN104389358B (en) 2014-11-18 2014-11-18 A kind of fire hydrant box back side body of wall and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410656022.3A CN104389358B (en) 2014-11-18 2014-11-18 A kind of fire hydrant box back side body of wall and construction method thereof

Publications (2)

Publication Number Publication Date
CN104389358A CN104389358A (en) 2015-03-04
CN104389358B true CN104389358B (en) 2016-08-24

Family

ID=52607311

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410656022.3A Active CN104389358B (en) 2014-11-18 2014-11-18 A kind of fire hydrant box back side body of wall and construction method thereof

Country Status (1)

Country Link
CN (1) CN104389358B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110094059A (en) * 2018-01-30 2019-08-06 江苏建筑职业技术学院 Alcove structure and production method on a kind of construction wall
CN113117279A (en) * 2021-04-02 2021-07-16 戴工建设集团有限公司 Back plate for mounting fire hydrant box and construction method thereof
CN113062497B (en) * 2021-05-13 2022-07-15 广东大鼎建设工程有限公司 Masonry wall secretly adorns fire hydrant case backing cement board and prevents structure that ftractures
CN114182846A (en) * 2021-11-18 2022-03-15 中铁十九局集团第五工程有限公司 Wall structure and manufacturing method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3713257A (en) * 1970-10-19 1973-01-30 Design Prod Inc Free-standing panel system
WO2002096339A1 (en) * 2001-05-25 2002-12-05 Hill-Rom Services, Inc. Patient care apparatus and method
CN101168977A (en) * 2007-07-26 2008-04-30 吴淑环 Plastering composite wall with reinforcing steel bar and/or metal net equipped at inter and outer or two-side
CN101509283A (en) * 2009-03-19 2009-08-19 吴淑环 External thermal insulation composite wall of exterior wall with support
CN102493648A (en) * 2011-12-28 2012-06-13 厦门源昌城建集团有限公司 Pre-embedding construction method for distribution box with rows of pipes, and support device
CN103276916A (en) * 2013-05-30 2013-09-04 东莞市彩丽建筑维护技术有限公司 Constructing method and infill board for solidly sealed lightweight concrete board wall hole
CN204225307U (en) * 2014-11-18 2015-03-25 浙江天力建设集团有限公司 A kind of fire hydrant box back side body of wall

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3713257A (en) * 1970-10-19 1973-01-30 Design Prod Inc Free-standing panel system
WO2002096339A1 (en) * 2001-05-25 2002-12-05 Hill-Rom Services, Inc. Patient care apparatus and method
CN101168977A (en) * 2007-07-26 2008-04-30 吴淑环 Plastering composite wall with reinforcing steel bar and/or metal net equipped at inter and outer or two-side
CN101509283A (en) * 2009-03-19 2009-08-19 吴淑环 External thermal insulation composite wall of exterior wall with support
CN102493648A (en) * 2011-12-28 2012-06-13 厦门源昌城建集团有限公司 Pre-embedding construction method for distribution box with rows of pipes, and support device
CN103276916A (en) * 2013-05-30 2013-09-04 东莞市彩丽建筑维护技术有限公司 Constructing method and infill board for solidly sealed lightweight concrete board wall hole
CN204225307U (en) * 2014-11-18 2015-03-25 浙江天力建设集团有限公司 A kind of fire hydrant box back side body of wall

Also Published As

Publication number Publication date
CN104389358A (en) 2015-03-04

Similar Documents

Publication Publication Date Title
CN104005502B (en) A kind of precast light building cover board and industrialized building house floor slab structure
CN104358341B (en) Building brickwork and masonry construction method of building brickwork
CN104314204B (en) Non-form stripping lightweight internal partition board and overall grouting construction method thereof
CN102094470B (en) Composite exterior wall decorated with energy-saving blocks and construction method thereof
CN102116061A (en) Masonry construction method for filling wall core pillar, core girder and building blocks into framework structure
CN104389358B (en) A kind of fire hydrant box back side body of wall and construction method thereof
CN211229052U (en) Hoist and mount ALC wallboard with outer wall tile structure
CN108842944A (en) A kind of assembled light composite thermo-insulating wall board and preparation method thereof and installation method
CN112459291A (en) Prefabricated heat insulation structure integrated wall structure and construction process thereof
CN101074579A (en) Double-hardware cloth external-wall thermal-insualting system of mechanical anchor fastening
CN110565974A (en) method for transforming existing building structure
CN106894538A (en) Filling wall and agent structure concrete integral shaping method
CN206467824U (en) A kind of assembly concrete frame wall filled with masonry
CN108560949A (en) Adobe wall alien invasion ruggedized construction and adobe wall alien invasion reinforcement means
CN103821263A (en) Precast assembly self-heat preservation concrete shear wall system and construction method thereof
CN204001278U (en) A kind of prefabricated assembled self-insulating concrete shear wall system
CN103790168A (en) Application method of soil nailing wall in deep foundation pit supporting
KR101609249B1 (en) slope retaing wall using precast concrete and method therefore
CN218714288U (en) Decoration-free building structure
CN204225307U (en) A kind of fire hydrant box back side body of wall
CN215670510U (en) Light-weight form-removal-free multifunctional wall body for prefabricated building
JP2011069151A (en) Concrete panel form
CN109505422B (en) Reinforcing method for ancient building wall
CN102251671B (en) Exterior heat insulation on-site construction process of exterior wall based on foaming cement material
CN201495643U (en) Thermal insulating framework for interior wall body

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: The invention relates to a back wall of a fire hydrant box and a construction method thereof

Effective date of registration: 20211222

Granted publication date: 20160824

Pledgee: Zhejiang Tailong Commercial Bank Co.,Ltd. Huzhou balidian small and micro enterprise franchise sub branch

Pledgor: ZHEJIANG TIANLI CONSTRUCTION GROUP CO.,LTD.