CN104372731B - City crossing-fiver bridge traffic Landscape Design Method based on multifrequency color information - Google Patents

City crossing-fiver bridge traffic Landscape Design Method based on multifrequency color information Download PDF

Info

Publication number
CN104372731B
CN104372731B CN201310513679.XA CN201310513679A CN104372731B CN 104372731 B CN104372731 B CN 104372731B CN 201310513679 A CN201310513679 A CN 201310513679A CN 104372731 B CN104372731 B CN 104372731B
Authority
CN
China
Prior art keywords
bridge
white
crossing
alternate
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310513679.XA
Other languages
Chinese (zh)
Other versions
CN104372731A (en
Inventor
杜志刚
郑展骥
赵欣
肖尧
史晓花
王自入
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University of Technology WUT
Original Assignee
Wuhan University of Technology WUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University of Technology WUT filed Critical Wuhan University of Technology WUT
Priority to CN201310513679.XA priority Critical patent/CN104372731B/en
Publication of CN104372731A publication Critical patent/CN104372731A/en
Application granted granted Critical
Publication of CN104372731B publication Critical patent/CN104372731B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F9/00Arrangement of road signs or traffic signals; Arrangements for enforcing caution

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Signs Or Road Markings (AREA)

Abstract

The present invention relates to a kind of city crossing-fiver bridge Landscape Design Method based on multifrequency color information, arrange yellow black or blue white alternate lamppost object marking line every the both sides lamppost lower edge of 25~35m on bridge, corresponding road surface arranges horizontal visual illusion graticule, road surface protuberant guide post is set every 12.5~17.5m, collectively forms space intermediate frequency visual information stream;Secondly at kerbstone lower edge and top, yellow black or blue trackside object marking line alternate in vain, Special composition high frequency visual flow of information are set every 1.5~3m;Then the every 4 road lampposts of direction of advance arrange one group of road surface laterally white broken line, and trackside arranges Huang or blue bridge railing, Special composition low frequency visual information stream;Multifrequency color information stream can be effectively improved in driving driver's perception of velocity, visual sensitivity under distance perception and high and low illumination, it is achieved the unification of city crossing-fiver bridge coordination of landscape and traffic safety。

Description

City crossing-fiver bridge traffic Landscape Design Method based on multifrequency color information
Technical field
The present invention relates to Urban Bridge traffic design technical field, it is specifically related to a kind of city crossing-fiver bridge traffic Landscape Design Method promoting the control of driver's speed, spacing holding capacity, thus realizing the unification of city crossing-fiver bridge coordination of landscape and bridge traffic safety benefit。
Background technology
On the crossing-fiver bridge of city, overspeed of vehicle is general, knocks into the back, collision safety guardrail Frequent Accidents。City crossing-fiver bridge is generally long, short then hundreds of meters, long then thousands of rice。On bridge, traffic safety facilities and view are generally not enough, and environment is dull, and object of reference is few;Driver lacks direction sense, sense of speed, causes general hypervelocity phenomenon。Vehicle travels on bridge, and road speed is high, and following distance is less, when current vehicle is because stopping in emergency or slowing down, very easily causes pursuit-type vehicle not dodge in time, thus causing group generation of car rear-end collision。The domestic statistics to city crossing-fiver bridge accident shows that hypervelocity is major accident reason, and knocking into the back and colliding roadside barrier is major accident form, accounts for total accident more than 60%。
Existing city crossing-fiver bridge landscape setting specific aim is not strong, it is necessary to for cause of accident and Crash characteristics design city crossing-fiver bridge view。View be viewpoint place finding and in brains formed comprehensive eye impression, the crossing-fiver bridge landscape design of existing city often rests on aesthstic aspect, is largely because the cognition to road landscape and only rests on the beautifying of road itself and attached structure thereof。In the planning and designing and evaluation of road landscape, should only not only focus in the aesthstic aspect of road landscape itself, and the functional study of the visually-perceptible aspect of the constitutive characteristic person of being used for of road landscape self should be added。Therefore necessary according to Crash characteristics (knock into the back, hit side wall) and cause of accident (hypervelocity), by promoting driver's identification ability to railing guardrail, front vehicles under different illumination environment, it is specially speed control, spacing holding capacity, to reach the unification of city crossing-fiver bridge coordination of landscape and safety。
Method for controlling driving speed based on edge rate is applied。Edge rate is considered as the very important visual factor affecting speed perception。Edge rate is people when moving, and in space, each point is through the relative velocity of vision periphery。Chinese scholars makes for promoting highway environment perception of velocity by what edge rate " unconscious " carried out speed controlling in traffic, Liu Bing is (Wuhan University of Technology's Master of engineering paper in Master's thesis " speed based on driver's visual perception controls and track keeps study mechanism ", 2008) draw when edge rate is less than 2Hz by psychophysical testing, or during more than 32Hz, driver there will be speed and underestimates, edge rate is when 4Hz~16Hz, speed is created and over-evaluates by experimenter, and wherein edge rate is that 12Hz over-evaluates and reaches more than 30%。
The color impact on traffic safety。Color bleeding is to each corner of road traffic, and for driver, transport information has at least 80% from vision, and color is the easiest perception of vision (its priority level is more than shape, size, content), and directly affects safe driving。Current road mostly generally is Lycoperdon polymorphum Vitt or black, the nervous system of people is had calm effect by Lycoperdon polymorphum Vitt and black, but the Lycoperdon polymorphum Vitt road surface watching dullness for a long time attentively can make driver attention slow up, and brings out fatigue, even drowsy, make the dangerous increase of generation vehicle accident。The scenery of the environment of city crossing-fiver bridge periphery mostly is Lycoperdon polymorphum Vitt with light blue, the color and background contrast of guardrail is only small, so, on the one hand, guardrail can not play vision guide effect, and driver's sense of direction declines, on the other hand, when especially dim light under running at high speed, driver is likely to do not see guardrail or can not correctly judge that the position of guardrail makes distance perspective decline, and causes the generation of vehicle accident (particularly rear-end collision)。
Human eye is different to the sensitivity of different color under different illumination。Research shows that vision is to be completed by the joint activity of eyes, optic nerve and visual centre, and visual system major part is eyes, and eyes are the receptors of vision。It is that light arrives retina via pupil that people experiences the process of the stimulation of light, and the light experienced is conveyed to optic nerve by optic cells different in retina, and stimulation is sent to brain region of interest by optic nerve again。And the optic cell in retina mainly has two classes, one class is rod cell, one class is cone cell, wherein rod cell is distributed in amphiblestroid away from center, low level lighting is worked, act primarily as difference black and white effect, spectrum Green, blue portion is most sensitive, extremely weak stimulation is sensitive;And cone cell is more distributed in foveal region of retina place, high levels of illumination being worked, Main Function is difference color, to yellow in spectrum, red most sensitive, main identify locus and requires to see object observantly。In the crossing-fiver bridge of existing city, view kind is few, and density is low, and color arranges unalterable, very dull, it is not easy to causes driver excited, also easily brings out fatigue driving。
Summary of the invention
The technical problem to be solved in the present invention is: overcome existing city crossing-fiver bridge traffic landscape setting dull, view kind is few, density is low, color is unalterable, it is difficult to ensure driver's technical barrier to the precise knowledge of traffic environment under various illumination conditions, a kind of city crossing-fiver bridge traffic Landscape Design Method based on multifrequency color information is provided, contributes to the driving condition that driver keeps clear-headed, promote driver's cognitive competence under different light situation。
For solving above-mentioned technical problem, the technical solution adopted in the present invention is:
A kind of city crossing-fiver bridge Landscape Design Method based on multifrequency color information, on the city crossing-fiver bridge that speed limit is 60~80km/h, two-way all each at least two strands of runways of setting, adjacent to being isolation strip between runway, respectively footpath outside edge lines track, is bridge railing (4) outside each footpath;Footpath arranges lamppost;It is characterized in that: make full use of the various facility in space, road surface, the color information of high frequency, intermediate frequency, low frequency is set, utilize the color frequency range of various facility to arrange, the sense of speed of General Promotion driver, sense of direction, distance perspective;Specifically include following steps:
Each lamppost lower edge in two-direction road road direction of advance arranges yellow black alternate lamppost object marking line (3) with the white Interphase interval distribution of indigo plant, dotted line shape transverse direction visual illusion graticule (5) vertical with runway direction is set with lamppost object marking line (3) corresponding road surface, along the line in isolation strip and respectively along the line protuberant guide post (1) is set every 12.5~17.5m to runway outermost edges, lamppost object marking line (3), horizontal visual illusion graticule (5), protuberant guide post (1) collectively constitutes the intermediate frequency visual information stream that spatial frequency is 0.5~2.0Hz, promote the sense of direction of driver;
Each protuberant guide post (1) outside to runway outermost edges arranges kerbstone with footpath interval;Arranging yellow black alternate or blue trackside object marking line (2) alternate in vain in kerbstone lower edge and top, Special composition frequency is 8~12hz spatial high-frequency visual information stream, promotes the sense of speed of driver;
Every 4 the lamppost places of two-direction road road direction of advance, on two-way each stock runway road surface, horizontally set 2 road tip forms space confirmation line towards the white V-arrangement broken line (6) that direction of advance and front and back are stacked continuously, bridge railing (4) is arranged to Huang or blueness, collectively form the low frequency visual information stream that spatial frequency is 0.125~0.25Hz, improve the space confirmation ability of driver。
By technique scheme, isolation strip is along the line and is respectively located along the same line to three protuberant guide posts (1) that runway outermost edges is laterally corresponding along the line。
By technique scheme, the horizontal visual illusion graticule (5) on two-direction road road is located along the same line。
By technique scheme, the spacing distance of adjacent lamps intercolumniation is 25~35m。
By technique scheme, application yellow black alternate or blue white alternate respective application in lamppost bottom is highly respectively 0.5m, altogether respectively arranges 3 roads, and 3m is high altogether。
By technique scheme, 2 roads white V-arrangement broken line (6) on two-way each stock runway road surface are corresponding respectively and are laterally positioned on same straight line。
By technique scheme, black alternate to become indigo plant alternate in vain from Huang for trackside object marking line (2) every 100~140m;When trackside object marking line (2) be yellow black alternate time, bridge railing (4) is yellow;When trackside object marking line (2) be blue white alternate time, bridge railing (4) be blueness。
By technique scheme, for the length crossing-fiver bridge at more than 1000m, adding safety color red and white outside yellow black white alternate safe tone alternate, blue, now corresponding trackside object marking line (2) adopts red and white, and bridge railing (4) adopts white);Convert between 3 kinds of tones, with abundant crossing-fiver bridge view, driver fatigue of releiving。
In the method for the present invention, the intermediate frequency information of direction of improvement consciousness level is mainly lamppost object marking line (3) that lamppost bottom is arranged, and installation space frequency is 0.5~2.0Hz, and lamppost spacing is 25~35m;The application of lamppost bottom is that yellow black (or blue white) is alternate, and yellow black (or blue white) application is highly respectively 0.5m, altogether respectively arranges 3 roads, and 3m is high altogether;Road surface Lateral vision mistake graticule is dotted line, and width is 45cm, length along path 45cm, and interval 45cm(is with reference to the new national standard high speed toll station speed reduction marking technique of painting), every 6~15m, outside the crossing-fiver bridge edge line of city and in road, set up intermediate frequency protuberant guide post。Intermediate frequency information stimulates to provide medium psychoreaction, meets sense of direction and the sense of rhythm of driver。
In the method for the present invention, the low-frequency information promoting spacing consciousness level is mainly space confirmation graticule (namely white broken line (6)) and bridge railing color, realize with conversion bridge railing application color mainly through arranging pavement strip, installation space frequency is 0.125~0.25Hz, and spacing is that the every 4 road lampposts of 100~140m(are arranged together)。One group of space confirmation graticule is the 2 road graticule compositions arranged continuously。Bridge railing application is yellow (or blue), and every 100~140m then converts once;Space confirmation graticule in road surface is white broken line: graticule beam overall 300cm, lines width 45cm, 2 road distance between bench marks are 5m;Low-frequency information stream may insure that in driver's driving process and carries out space confirmation with front truck, meets the distance perspective of driver。
In the method for the present invention, the high-frequency information promoting perception of velocity level mainly includes kerbstone lower edge and top Huang black (blue white) alternate trackside object marking line (2), its spatial frequency is 8~12Hz, and Route for pedestrians kerb top indicator line width is 0.2~0.3m, and spacing takes 1.5~3m。Arranging of high frequency sensitive information stream can provide instantaneous velocity consciousness, increases Driver Vision psychological responses, and guarantees that the driver's perception velocities in vehicle operation is more than physical speed。
According in driving conditions, time under high-frequency information (8~12Hz) effect, perception velocities is more than physical speed, and under intermediate frequency, low frequency condition (< 2Hz), perception velocities is less than physical speed。In environment, desirable perception velocities more bigger than physical speed should be advisable (< 10% or 5%), multifrequency visual information stream is set it is thus desirable to high frequency, intermediate frequency, low-frequency information combined, coordinates mutually with physical speed reaching perception velocities, and realize the purpose of rate controlling。
The present invention is directed to the Crash characteristics of city crossing-fiver bridge (knock into the back, hit safety barrier) and cause of accident (hypervelocity), in low light situations that short wavelength's color (green, blue) is comparatively sensitive according to human eye, cognitive features under high light situation, long wavelength's color (red, yellow) is comparatively sensitive, is configured city crossing-fiver bridge traffic view。Make full use of the views such as bridge pavement, trackside kerb, railing, lamppost, build the visual information stream of multicolour, multi-frequency, stimulate the nervous system of driver, contribute to the driving condition that driver keeps clear-headed, promote driver's cognitive competence under different light situation。
Railing application by the different frequency arranged, the kerbstone object marking line of color, road surface horizontal marking, lamppost and city crossing-fiver bridge, sense of speed in General Promotion driver drives vehicle process, sense of direction, distance perspective, thus reaching specification and guiding driving behavior, it is prevented effectively from the purpose of the generation of accident。With yellow, blueness for mass-tone in the crossing-fiver bridge of city, yellow, blue city crossing-fiver bridge railing are set;Black and white is complementary colors, arranges the object marking that yellow black (or blue white) is alternate on crossing-fiver bridge Route for pedestrians kerb, bridge lamppost, to promote driver's light dark adaptation ability under different light situation and to improve driver drives vehicle spatial impression。
Show according to simulating lab test, adopt the city crossing-fiver bridge traffic engineering of this method, when 60~100km/h speed, the speed of perception of driver approximates physical speed, consciousness collision time (collision time is the key factor that spacing keeps) also approximates collision time simultaneously, and difference is all about 5%;Indicate the city crossing-fiver bridge traffic view according to this method design, can the sense of speed of General Promotion driver, sense of direction, distance perspective。
Relative to prior art, beneficial effects of the present invention is as follows:
1) design little yardstick, high-frequency Huang black (or blue white) alternate object marking line at city crossing-fiver bridge Route for pedestrians kerb, the instantaneous perception velocities of driver can be improved;
2) the lamppost bottom of intermediate frequency is set at city crossing-fiver bridge and yellow black (or blue white) alternate object marking line is set, tunnel road surface arranges the horizontal visual illusion graticule of equivalent density simultaneously, with road surface protuberant guide post combined effect, sense of direction and the distance perspective of driver can be promoted。
3) the space confirmation line of low frequency is set in city crossing-fiver bridge railing and Route for pedestrians kerb application colour switching and road surface, the distance perspective of driver can be increased, and banish the feeling of languor。
4) this method mainly adopts yellow and blue for mass-tone, black and white is complementary colors, driver's different vision response mechanism to light under high low-light (level) can be utilized, under high illumination long wavelength's color is comparatively sensitive, under low-light (level) short wavelength's color is more sensitive, it is possible to promote driver's spatial impression under different illumination。
5) yellow that this method adopts, blue railing application, blue black alternate kerbstone object marking line alternate, yellow in vain can effectively slow down the visual fatigue of driver, strengthens the contrast with bridge surrounding enviroment。Considering driver's differential responses to light under high low-light (level) simultaneously, adapt to all deposit in case human eye sensitivity at dusk, blue abnormal bright, yellow colors is relatively deep, adopts that indigo plant is alternate, yellow in vain black alternate can effectively strengthen vision adaptive。
6) this method is few mainly for general city crossing-fiver bridge object of reference, the traffic view that color is unalterable;Lifting driver's sense of direction, sense of speed are set by color, reach the unification of city crossing-fiver bridge coordination of landscape and safety。
7) this method adopts roadmarking and the vision inducible system of low cost, is not related to extensive road infrastructure, small investment, and construction is easy, and instant effect can improve the traffic safety of city crossing-fiver bridge。
Accompanying drawing explanation
Fig. 1: the city crossing-fiver bridge traffic engineering facilities floor plan design of the present invention;
Fig. 2: the city crossing-fiver bridge traffic engineering facilities design elevation of the present invention;
Fig. 3: the city crossing-fiver bridge traffic engineering facilities design cross-sectional view of the present invention;
Fig. 4: perception velocities and physical speed relation schematic diagram under different edge rates;
Fig. 5: desirable perception velocities, actual physics length velocity relation schematic diagram;
In accompanying drawing, Arabic numerals implication is as follows: 1-protuberant guide post;2-trackside object marking line;3-lamppost object marking line;4-bridge railing;5-transverse direction visual illusion graticule;6-white broken line。
Detailed description of the invention
As Figure 1-3, in the method for the present invention, on the city crossing-fiver bridge that speed limit is 60~80km/h, two-way all each at least two strands of runways of setting, adjacent to being isolation strip between runway, respectively footpath outside edge lines track, is bridge railing 4 outside each footpath;Footpath arranges lamppost;It is characterized in that: make full use of the various facility in space, road surface, the color information of high frequency, intermediate frequency, low frequency is set, utilize the color frequency range of various facility to arrange, the sense of speed of General Promotion driver, sense of direction, distance perspective;Specifically include following steps:
In a forward direction yellow black (blue white) alternate lamppost object marking line 3 is set every the lamppost bottom of 25~35m, road surface horizontally set transverse direction visual illusion graticule 5(dotted line), road surface protuberant guide post 1 is set in 12.5~17.5m trackside and road, composition spatial frequency is the intermediate frequency visual information stream of 0.5~2.0Hz, to improve the perceived distance ability of driver in driving。
In the method for the present invention, Route for pedestrians kerb lower edge and top arrange yellow black (blue white) alternate trackside object marking line 2, Special composition frequency is 8~12hz(spacing is 1.5~3.0m) high frequency visual flow of information, Route for pedestrians kerb top indicator line width is 0.2~0.3m, to promote the sense of speed of driver。
In the method for the present invention, in a forward direction every the every 4 road lampposts of 100~140m(), road surface horizontally set 2 road white broken line 6, bridge railing 4 color is yellow (or blue) color, and corresponding Route for pedestrians kerb trackside object marking line 3, lamppost object marking line 2 are also that yellow black (or blue white) is alternate。Collectively form the low frequency visual information stream that spatial frequency is 0.125~0.25Hz, to improve the ability of driver's space confirmation。
In the method for the present invention, the intermediate frequency information of direction of improvement consciousness level is mainly the lamppost object marking line 3 that lamppost bottom is arranged, and installation space frequency is 0.5~2.0Hz, and lamppost spacing is 25~35m;The application of lamppost bottom is that yellow black (or blue white) is alternate, and yellow black (or blue white) application is highly respectively 0.5m, altogether respectively arranges 3 roads, and 3m is high altogether;Road surface Lateral vision mistake graticule is dotted line, and width is 45cm, length along path 45cm, and interval 45cm(is with reference to the new national standard high speed toll station speed reduction marking technique of painting), every 6~15m, outside the crossing-fiver bridge edge line of city and in road, set up intermediate frequency protuberant guide post。Intermediate frequency information stimulates to provide medium psychoreaction, meets sense of direction and the sense of rhythm of driver。
In the method for the present invention, the low-frequency information promoting spacing consciousness level is mainly space confirmation graticule (namely white broken line 6) and bridge railing 4 color, realize with conversion bridge railing application color mainly through arranging pavement strip, installation space frequency is 0.125~0.25Hz, and spacing is that the every 4 road lampposts of 100~140m(are arranged together)。One group of space confirmation graticule is the 2 road graticule compositions arranged continuously。Bridge railing application is yellow (or blue), and every 100~140m then converts once;Space confirmation graticule in road surface is white broken line: graticule beam overall 300cm, lines width 45cm, 2 road distance between bench marks are 5m;Low-frequency information stream may insure that in driver's driving process and carries out space confirmation with front truck, meets the distance perspective of driver。
In the method for the present invention, the high-frequency information promoting perception of velocity level mainly includes kerbstone lower edge and top Huang black (blue white) alternate trackside object marking line 2, its spatial frequency is 8~12Hz, and Route for pedestrians kerb top indicator line width is 0.2~0.3m, and spacing takes 1.5~3m。Arranging of high frequency sensitive information stream can provide instantaneous velocity consciousness, increases Driver Vision psychological responses, and guarantees that the driver's perception velocities in vehicle operation is more than physical speed。
According in driving conditions, time under high-frequency information (8~12Hz) effect, perception velocities is more than physical speed, and under intermediate frequency, low frequency condition (< 2Hz), perception velocities is less than physical speed (referring to Fig. 4)。In environment, desirable perception velocities more bigger than physical speed should be advisable (< 10% or 5%), multifrequency visual information stream is set it is thus desirable to high frequency, intermediate frequency, low-frequency information combined, coordinates mutually with physical speed reaching perception velocities, and realize the purpose (referring to Fig. 5) of rate controlling。
The construction method of the present invention such as figure:
1) crossing-fiver bridge road surface, city is first cleaned, black alternate to become indigo plant alternate in vain from Huang to execute picture kurbstone and top lamppost object marking line 3 and the trackside object marking every 100~140m of line 2() and road surface protuberant guide post 1, in road, protuberant guide post should adopt Bidirectional reflective form, and trackside adopts one-way reflecting form;
2) executing the lateral route pallor color broken line 6(spacing of picture low frequency according to GB is 5m);
3) clean crossing-fiver bridge road surface, city, execute picture intermediate frequency transverse direction visual illusion graticule 5;
3) city crossing-fiver bridge railing 4 is cleaned, the paint of spraying Huang or (indigo plant) color, more become railing color every 100~140m;
4) clean city crossing-fiver bridge lamppost and Route for pedestrians kerb, and bottom lamppost and kerbstone side the object marking line that yellow black (blue white) is alternate, the yellow black alternate object marking line of yellow railing correspondence, the blue white alternate object marking line of blue railing correspondence are set。
Points for attention:
1) this method is applicable to the city crossing-fiver bridge that speed limit is 60~80km/h, is a kind of beneficial complement to city crossing-fiver bridge traffic safety facilities。
2) this method is applicable to the bridge length city crossing-fiver bridge at more than 300m, red white safety color (corresponding trackside object marking employing red and white can be added outside yellow white safe tone black, blue at the crossing-fiver bridge of more than 1000m for length, railing adopts white), convert between 3 kinds of tones, with abundant crossing-fiver bridge view, driver fatigue of releiving。

Claims (9)

1. the city crossing-fiver bridge Landscape Design Method based on multifrequency color information, on the city crossing-fiver bridge that speed limit is 60~80km/h, two-way all each at least two strands of runways of setting, adjacent to being isolation strip between runway, respectively footpath outside edge lines track, is bridge railing (4) outside each footpath;Footpath arranges lamppost;It is characterized in that: make full use of the various facility in space, road surface, the color information of high frequency, intermediate frequency, low frequency is set, utilize the color frequency range of various facility to arrange, the sense of speed of General Promotion driver, sense of direction, distance perspective;Specifically include following steps:
Each lamppost lower edge in two-direction road road direction of advance arranges yellow black alternate lamppost object marking line (3) with the white Interphase interval distribution of indigo plant, dotted line shape transverse direction visual illusion graticule (5) vertical with runway direction is set with lamppost object marking line (3) corresponding road surface, along the line in isolation strip and respectively along the line protuberant guide post (1) is set every 12.5~17.5m to runway outermost edges, lamppost object marking line (3), horizontal visual illusion graticule (5), protuberant guide post (1) collectively constitutes the intermediate frequency visual information stream that spatial frequency is 0.5~2.0Hz, promote the sense of direction of driver;
Each protuberant guide post (1) outside to runway outermost edges arranges kerbstone with footpath interval;Arranging yellow black alternate or blue trackside object marking line (2) alternate in vain in kerbstone lower edge and top, Special composition frequency is 8~12hz high frequency visual flow of information, promotes the sense of speed of driver;
Every 4 the lamppost places of two-direction road road direction of advance, on two-way each stock runway road surface, horizontally set 2 road tip forms space confirmation line towards the white V-arrangement broken line (6) that direction of advance and front and back are stacked continuously, bridge railing (4) is arranged to Huang or blueness, collectively form the low frequency visual information stream that spatial frequency is 0.125~0.25Hz, improve the space confirmation ability of driver。
2. the city crossing-fiver bridge Landscape Design Method based on multifrequency color information according to claim 1, it is characterised in that: isolation strip is along the line and is respectively located along the same line to three protuberant guide posts (1) that runway outermost edges is laterally corresponding along the line。
3. the city crossing-fiver bridge Landscape Design Method based on multifrequency color information according to claim 1, it is characterised in that: the horizontal visual illusion graticule (5) on two-direction road road is located along the same line。
4. the city crossing-fiver bridge Landscape Design Method based on multifrequency color information according to claim 1, it is characterised in that: the spacing distance of adjacent lamps intercolumniation is 25~35m。
5. the city crossing-fiver bridge Landscape Design Method based on multifrequency color information according to claim 4, it is characterised in that: application yellow black alternate or blue white alternate respective application in lamppost bottom is highly respectively 0.5m, altogether respectively arranges 3 roads, and 3m is high altogether。
6. the city crossing-fiver bridge Landscape Design Method based on multifrequency color information according to claim 1, it is characterised in that: 2 roads white V-arrangement broken line (6) on two-way each stock runway road surface are corresponding respectively and are laterally positioned on same straight line。
7. according to the city crossing-fiver bridge Landscape Design Method based on multifrequency color information one of claim 1-6 Suo Shu, it is characterised in that: black alternate to become indigo plant alternate in vain from Huang for trackside object marking line (2) every 100~140m;When trackside object marking line (2) be yellow black alternate time, bridge railing (4) is yellow;When trackside object marking line (2) be blue white alternate time, bridge railing (4) be blueness。
8. the city crossing-fiver bridge Landscape Design Method based on multifrequency color information according to claim 1, it is characterized in that: for the length crossing-fiver bridge at more than 1000m, safety color red and white is added outside yellow black white alternate safe tone alternate, blue, now corresponding trackside object marking line (2) adopts red and white, and bridge railing (4) adopts white;Convert between 3 kinds of tones, with abundant crossing-fiver bridge view, driver fatigue of releiving。
9. the city crossing-fiver bridge Landscape Design Method based on multifrequency color information according to claim 7, it is characterized in that: for the length crossing-fiver bridge at more than 1000m, safety color red and white is added outside yellow black white alternate safe tone alternate, blue, now corresponding trackside object marking line (2) adopts red and white, and bridge railing (4) adopts white;Convert between 3 kinds of tones, with abundant crossing-fiver bridge view, driver fatigue of releiving。
CN201310513679.XA 2013-10-25 2013-10-25 City crossing-fiver bridge traffic Landscape Design Method based on multifrequency color information Expired - Fee Related CN104372731B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310513679.XA CN104372731B (en) 2013-10-25 2013-10-25 City crossing-fiver bridge traffic Landscape Design Method based on multifrequency color information

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310513679.XA CN104372731B (en) 2013-10-25 2013-10-25 City crossing-fiver bridge traffic Landscape Design Method based on multifrequency color information

Publications (2)

Publication Number Publication Date
CN104372731A CN104372731A (en) 2015-02-25
CN104372731B true CN104372731B (en) 2016-06-22

Family

ID=52551902

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310513679.XA Expired - Fee Related CN104372731B (en) 2013-10-25 2013-10-25 City crossing-fiver bridge traffic Landscape Design Method based on multifrequency color information

Country Status (1)

Country Link
CN (1) CN104372731B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108660959A (en) * 2018-06-14 2018-10-16 武汉理工大学 A kind of highway long-span bridge bend section vision inducible system

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105002839B (en) * 2015-06-15 2017-03-08 武汉理工大学 Highway long and steep downgrade section vision speed control method and system
CN105019916B (en) * 2015-08-12 2017-12-29 武汉理工大学 Mountainous area highway bridge tunnel linkage section visual environment improves design method
CN105088984A (en) * 2015-08-18 2015-11-25 武汉理工大学 Integrated visual illusion tag system for expressway bridge
CN105220630A (en) * 2015-10-24 2016-01-06 谭健 Method using the graticule of different colours as highway speeds mark
CN105970752B (en) * 2016-07-01 2018-04-27 武汉理工大学 A kind of especially big highway bridge solid rhythm type of law information visual environment design method
CN107476214B (en) * 2017-08-11 2019-08-23 武汉理工大学 A kind of setting method of curve sign under ice and snow visual environment
CN107388085A (en) * 2017-08-29 2017-11-24 武汉理工大学 A kind of rural highway tunneluminescence inducible system
CN112176894A (en) * 2019-06-17 2021-01-05 内蒙古交通设计研究院有限责任公司 Safety facility setting method for preventing fatigue driving
CN110863446B (en) * 2019-11-25 2022-05-06 武汉理工大学 Low-position lighting sight line induction system for urban expressway super-large bridge in fog area
CN110863453B (en) * 2019-11-28 2021-06-22 武汉理工大学 Underground vertical convergence zone sight line induction system
CN111177361A (en) * 2019-12-22 2020-05-19 同济大学 Intelligent networking automobile accident reduction amount calculation method
CN111042014B (en) * 2019-12-30 2021-01-05 武汉理工大学 City tunnel entry shading and sight induction system
CN111648267A (en) * 2020-05-29 2020-09-11 武汉理工大学 No-signal control intersection group sign based on road right distribution
CN115094796A (en) * 2022-06-22 2022-09-23 浙江数智交院科技股份有限公司 Method for improving visual induction environment of highway

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1165223A (en) * 1996-05-13 1997-11-19 积水树脂株式会社 Road traffic sign of solid graphic pattern
JP2000120028A (en) * 1999-04-28 2000-04-25 Takeshi Hayano Road marking
CN103362083A (en) * 2012-03-26 2013-10-23 海洋王(东莞)照明科技有限公司 Guidepost projection device and guidepost projection road lamp

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1165223A (en) * 1996-05-13 1997-11-19 积水树脂株式会社 Road traffic sign of solid graphic pattern
JP2000120028A (en) * 1999-04-28 2000-04-25 Takeshi Hayano Road marking
CN103362083A (en) * 2012-03-26 2013-10-23 海洋王(东莞)照明科技有限公司 Guidepost projection device and guidepost projection road lamp

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108660959A (en) * 2018-06-14 2018-10-16 武汉理工大学 A kind of highway long-span bridge bend section vision inducible system

Also Published As

Publication number Publication date
CN104372731A (en) 2015-02-25

Similar Documents

Publication Publication Date Title
CN104372731B (en) City crossing-fiver bridge traffic Landscape Design Method based on multifrequency color information
CN102635076B (en) Tunnel back reflection illuminating system setting method based on train speed control and train distance keeping
CN106149584B (en) With the dynamic spike nail light and its control method of intersection signal machine linkage control
CN103557005B (en) Anti-dazzle principle based design method for traffic engineering facilities at road tunnel exit
CN104863612A (en) Visual environment improvement design method of big and long highway tunnel based on rhythmical image
CN101603294B (en) Method for joint design of colorized traffic sign and marked lines at intersection of urban road
CN105019916B (en) Mountainous area highway bridge tunnel linkage section visual environment improves design method
CN105002839B (en) Highway long and steep downgrade section vision speed control method and system
CN103062688A (en) Retroreflection information based method for improving lighting system in urban under-crossing short tunnel
CN105513388B (en) A kind of dynamic zebra stripes and its implementation with intersection signal machine coordinated signals
CN102912700A (en) Improving method for dark spot in accident at exit ramp of expressway based on retro-reflection illumination
CN206635672U (en) A kind of intelligent zebra stripes system
CN108374361A (en) Highway shunting zone rate controlling based on traffic conflict and implementation method is shunted in advance
CN103225245B (en) Based on the arterial highway No-shell culture driving at night safety facility design method of reflex reflection
CN107513952B (en) Method for setting photoelectric induction system of expressway tunnel
CN104929003A (en) Tunnel group visual environment improving method
CN107299602A (en) A kind of Long Tunnel of Expressway reflex reflection system method to set up
CN201288313Y (en) Electric control traffic reticule
CN110195387A (en) A kind of electronics road system of energy conservation and intelligence
CN207799904U (en) Zebra stripes passing intelligent management system
CN104088204B (en) A kind of combination area of city and country&#39;s traffic circle traffic safety devices and method for designing thereof
CN207473858U (en) A kind of right turning vehicle and Pedestrian conflicts&#39; pre-warning signal lamp system
CN203049495U (en) Sidewalk safe passage gate
CN102163374A (en) Road traffic signal prompt method and device convenient for color-blind person to identify
CN208969840U (en) A kind of intelligence zebra line apparatus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160622

Termination date: 20161025

CF01 Termination of patent right due to non-payment of annual fee