CN104343393B - A-shaped drilling rig derrick with double racking platforms for construction - Google Patents

A-shaped drilling rig derrick with double racking platforms for construction Download PDF

Info

Publication number
CN104343393B
CN104343393B CN201310345110.7A CN201310345110A CN104343393B CN 104343393 B CN104343393 B CN 104343393B CN 201310345110 A CN201310345110 A CN 201310345110A CN 104343393 B CN104343393 B CN 104343393B
Authority
CN
China
Prior art keywords
derrick
quadruple board
drilling
platform
floor surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310345110.7A
Other languages
Chinese (zh)
Other versions
CN104343393A (en
Inventor
石林
方太安
周志雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING KEMBL PETROLEUM TECHNOLOGY DEVELOPMENT Co Ltd
China National Petroleum Corp
CNPC Engineering Technology R&D Co Ltd
Original Assignee
BEIJING KEMBL PETROLEUM TECHNOLOGY DEVELOPMENT Co Ltd
China National Petroleum Corp
CNPC Drilling Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING KEMBL PETROLEUM TECHNOLOGY DEVELOPMENT Co Ltd, China National Petroleum Corp, CNPC Drilling Research Institute Co Ltd filed Critical BEIJING KEMBL PETROLEUM TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN201310345110.7A priority Critical patent/CN104343393B/en
Publication of CN104343393A publication Critical patent/CN104343393A/en
Application granted granted Critical
Publication of CN104343393B publication Critical patent/CN104343393B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses an A-shaped drilling rig derrick with double racking platforms for construction, and belongs to the technical field of drilling rig derricks. A crown block platform is connected with a derrick main body; the derrick main body is connected with a high-position racking platform, a derrick attachment, a low-position racking platform and an A-frame; the A-frame is connected with a drill floor surface; L1 is a perpendicular distance from the low-position racking platform to the drill floor surface, L2 is a perpendicular distance from the high-position racking platform to the drill floor surface, and L3 is a perpendicular distance from the crown block platform to the drill floor surface. The A-shaped drilling rig derrick with double racking platforms for construction, disclosed by the invention, has the benefits as follows: 1. after one racking platform is additionally arranged, the double-racking-platform structure is used for storage and bearing of a stand column, so as to realize safe operation to a stand column formed by connecting four single stand columns; 2. the drilling rig derrick is used for drilling deep wells and extremely-deep wells, and can reduce stand column connecting and dismounting times, increase the downwards-drilling speed, improve the drilling efficiency, and shorten the drilling cycle; 3. other auxiliary facilities of the drilling rig can be fully used, the drilling rig derrick is reliable, and can save the capital.

Description

A kind of pair of quadruple board platform construction A type drilling derrick
Technical field
The A type drilling derrick the present invention relates to a kind of pair of quadruple board platform is constructed, belongs to drilling derrick technical field.It is related to increase by two Layer number of units amount, increase working place, the A type drilling derrick that more single columns connecting into can be operated.
Background technology
Drilling derrick is a kind of metal truss structure with certain altitude and span, is the important component part of rig, Mainly be made up of derrick main body, crown's nest, quadruple board platform, man-like shelf and derrick adnexa etc., be used for laying in drilling process overhead traveling crane, Hang traveling system, suspension drilling tool carries out removing drilling rod, setting of casing, processes the operations such as down-hole accident, subject various operations and carry Lotus.
A type drilling derrick is one kind of derrick, current A type drilling derrick only one of which quadruple board platform, be used for depositing column, Bear column weight, the column that the space that derrick provides at most can only single to 3 be linked to be operates.And standpipe operating board etc. Assistance platform, is the platform that standpipe etc. is operated, and does not have quadruple board platform and deposits column, bears the function of operating load.
Constructing operation is carried out using single quadruple board platform A type drilling derrick, it is single that derrick permits that the column of single safety operation connects Radical amount is few, and column is short, and just many, efficiency is low for column number of times of unloading, and is unfavorable for that wellbore construction carries the needs of effect.Double quadruple board platforms The column that construction A type drilling derrick can single to 4 be linked to be operates, and the column that single connects is long, can reduce column of unloading Number of times, saves drilling time, improves drilling efficiency.
The special derrick scheme of special construction rig mentioned by certain document, in order to meet the needs of different operating modes, can be for not Same operating mode setting different quadruple board platform, the double-jointing pipe quadruple board platform in its scheme and two quadruple board platform institutes of single drill pipe quadruple board platform Work identical, function overlaps each other, corresponding construction column is coupled single quantity to be reduced, and participates in every time in two quadruple board platforms Two installation sites that the only one of which quadruple board platform of work has been still essentially single quadruple board platform structure choice, are still substantially single Quadruple board platform is constructed, and is diverse concept with the construction of double quadruple board platforms.The quadruple board platform of the in-service rig of reality is all a quadruple board platform, Three installation position selection, are adjusted to position during use.Played a role using two quadruple board platforms simultaneously, jointly complete one The imagination of construction manipulation process not yet finds at present, and current applicable cases are:There is multipoint quadruple board platform, do not act as simultaneously Double quadruple board platform constructing structures.
Content of the invention
In order to overcome the deficiencies in the prior art, the present invention provides a kind of pair of quadruple board platform construction A type drilling derrick.
A kind of pair of quadruple board platform construction open front churn derrick, attached by crown's nest, derrick main body, high-order quadruple board platform, derrick Part, low level quadruple board platform, man-like shelf mutually assemble connection and form.Crown's nest connects derrick main body, and main body connects high-order quadruple board platform, well Shelf attachment, low level quadruple board platform and man-like shelf, man-like shelf connects drilling floor surface;L1 for low level quadruple board platform to drilling floor surface vertical dimension, L2 be high-order quadruple board platform to the vertical dimension of drilling floor surface, L3 for crown's nest to drilling floor surface vertical dimension.
Overhead traveling crane is installed on crown's nest, derrick main body and man-like shelf are arranged on base, and drilling floor surface is the work surface of base;
Man-like shelf plays fulcrum force and the effect of buffering in derrick telescoping and base, after raising completion frame and base Play the effect supporting righting, overhead traveling crane is mainly the effect installing assembly pulley, and derrick and base are main stressed members, quadruple board platform Play a supportive role, be the playground of high-altitude application personnel's constructing operation simultaneously;
Extend drilling derrick principal length size, vertical dimension L3 of crown's nest to drilling floor surface increases, and increases derrick operation Space, thus ensure that the stroke space of derrick enables the column that be linked to be single to 4 and operates;Increase a quadruple board platform, Form high-order and two quadruple board platforms of low level, so, when 4 single columns being linked to be are deposited, column lower end is placed on drilling floor surface, Side by being placed on two quadruple board platforms, makes two quadruple board platforms can be used for the storage support of column it is ensured that 4 single are linked to be column Safety deposit;Remove and deposit and can ensure safety, be achieved that the drilling derrick safety behaviour that is linked to be column single to 4 Make;
High-order quadruple board platform and two quadruple board platforms of low level quadruple board platform need to play a role simultaneously and could make 4 single upright column constructions Method is achieved;Two quadruple board platforms work, and its corresponding construction manipulation process has significant changes, the construction of double quadruple board platforms with Supporting new construction technology cooperation plays a role.
The invention has the beneficial effects as follows:1st, the double quadruple board platform structures after increasing a quadruple board platform are utilized all to be used for depositing of column Put and carry, realize the safety operation that be linked to be column single to 4.2nd, it is used for deep-well, ultra-deep well drilling, it is possible to reduce unload vertical Post number of times, improves the speed that makes a trip, and improves drilling efficiency, shortens drilling period.3rd, the other that can make full use of rig is supporting Facility, reliable, saving fund.
Brief description
When considered in conjunction with the accompanying drawings, by referring to detailed description below, can more completely more fully understand the present invention with And easily learn the adjoint advantage of many of which, but accompanying drawing described herein is used for providing a further understanding of the present invention, Constitute the part of the present invention, the schematic description and description of the present invention is used for explaining the present invention, does not constitute to this Bright improper restriction, such as figure are wherein:
Fig. 1 is the structural representation of the present invention.
The present invention is further described with reference to the accompanying drawings and examples.
Specific embodiment
Obviously, those skilled in the art belong to the guarantor of the present invention based on the many modifications and variations that spirit of the invention is done Shield scope.
Embodiment 1:The A type drilling derrick as shown in figure 1, double quadruple board platforms are constructed, by crown's nest 1, derrick main body 2, a high position two Layer platform 3, derrick adnexa 4, low level quadruple board platform 5, man-like shelf 6 mutually assembling connection form.Crown's nest 1 connects derrick main body 2, main body 2 connect high-order quadruple board platform 3, derrick adnexa 4, low level quadruple board platform 5 and man-like shelf 6, and man-like shelf 6 connects drilling floor surface 7;L1 is low level two Layer platform 5 arrives the vertical dimension of drilling floor surface 7, L2 is that high-order quadruple board platform 3 arrives the vertical dimension of drilling floor surface 7, L3 is crown's nest 1 to rig floor The vertical dimension in face 7.
In order to solve the problems, such as single quadruple board platform A type drilling derrick wellbore construction unload column often, efficiency low, the present invention There is provided one kind to utilize two quadruple board platforms, increase derrick working place simultaneously and realize what the column that be linked to be single to 4 was operated Double quadruple board platforms construction A type drilling derricks.
Drilling derrick of the present invention is by crown's nest 1, derrick main body 2, high-order quadruple board platform 3, derrick adnexa 4, low level quadruple board platform 5 and Man-like shelf 6 mutually assembling connection forms.
Overhead traveling crane is installed on crown's nest, derrick main body and man-like shelf are arranged on base, and drilling floor surface 7 is the work surface of base.
Man-like shelf plays fulcrum force and the effect of buffering in derrick telescoping and base, after raising completion frame and base Play the effect supporting righting, overhead traveling crane is mainly the effect installing assembly pulley, and derrick and base are main stressed members, quadruple board platform Play a supportive role, be the playground of high-altitude application personnel's constructing operation simultaneously.
Extend drilling derrick principal length size, vertical dimension L3 that crown's nest 1 arrives drilling floor surface increases, increase derrick operation Space, thus ensure that the stroke space of derrick enables the column that be linked to be single to 4 and operates.Increase a quadruple board platform, Form high-order and two quadruple board platforms of low level, so, when 4 single columns being linked to be are deposited, column lower end is placed on drilling floor surface 7 On, side by being placed on two quadruple board platforms, makes two quadruple board platforms can be used for the storage support of column it is ensured that 4 single are linked to be The safety of column is deposited.Remove and deposit and can ensure safety, be achieved that the drilling derrick safety that is linked to be column single to 4 Operation.
High-order quadruple board platform and two quadruple board platforms of low level quadruple board platform need to play a role simultaneously and could make 4 single upright column constructions Method is achieved.Two quadruple board platforms work, and its corresponding construction manipulation process has significant changes, the construction of double quadruple board platforms with Supporting new construction technology cooperation plays a role.
As described above, being explained to embodiments of the invention, but as long as essentially without depart from this Bright inventive point and effect can have a lot of deformation, and this will be readily apparent to persons skilled in the art.Therefore, this The variation of sample is also integrally incorporated within protection scope of the present invention.

Claims (1)

1. a kind of pair of quadruple board platform construction A type drilling derrick is it is characterised in that by crown's nest, derrick main body, high-order quadruple board platform, derrick Adnexa, low level quadruple board platform, man-like shelf mutually assemble connection and form;Crown's nest connects derrick main body, and derrick main body connects high-order two Layer platform, derrick adnexa, low level quadruple board platform and man-like shelf, man-like shelf connects drilling floor surface;L1 hanging down for low level quadruple board platform to drilling floor surface Straight distance, L2 be high-order quadruple board platform to the vertical dimension of drilling floor surface, L3 for crown's nest to drilling floor surface vertical dimension;
Overhead traveling crane is installed on crown's nest, derrick main body and man-like shelf are arranged on base, and drilling floor surface is the work surface of base;
Man-like shelf plays fulcrum force and the effect of buffering in derrick telescoping and base, plays after raising completion frame and base Support the effect of righting, overhead traveling crane is mainly the effect installing assembly pulley, and derrick and base are main stressed members, quadruple board platform rises and props up Support acts on, and is the playground of high-altitude application personnel's constructing operation simultaneously;
Drilling derrick principal length, crown's nest is made to ensure that derrick to vertical dimension L3 of drilling floor surface and derrick working place Stroke space enable the column that be linked to be single to 4 and operate;Form high-order and two quadruple board platforms of low level, so, 4 When the single column being linked to be is deposited, column lower end is placed on drilling floor surface, and side, by being placed on two quadruple board platforms, makes two quadruple board platforms Can be used for the storage support of column it is ensured that 4 single safety being linked to be column are deposited;Remove and deposit and can ensure to pacify Entirely, it is achieved that the drilling derrick safety operation that be linked to be column single to 4;
High-order quadruple board platform and two quadruple board platforms of low level quadruple board platform need to play a role simultaneously and could make 4 single upright column construction methods It is achieved.
CN201310345110.7A 2013-08-09 2013-08-09 A-shaped drilling rig derrick with double racking platforms for construction Active CN104343393B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310345110.7A CN104343393B (en) 2013-08-09 2013-08-09 A-shaped drilling rig derrick with double racking platforms for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310345110.7A CN104343393B (en) 2013-08-09 2013-08-09 A-shaped drilling rig derrick with double racking platforms for construction

Publications (2)

Publication Number Publication Date
CN104343393A CN104343393A (en) 2015-02-11
CN104343393B true CN104343393B (en) 2017-02-15

Family

ID=52499781

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310345110.7A Active CN104343393B (en) 2013-08-09 2013-08-09 A-shaped drilling rig derrick with double racking platforms for construction

Country Status (1)

Country Link
CN (1) CN104343393B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4684306A (en) * 1982-08-23 1987-08-04 Pressure Services, Inc. Auxiliary workover rig
CN2075255U (en) * 1990-08-29 1991-04-17 兰州石油机械研究所 Ordinary h shaped steel derrick
CN201024903Y (en) * 2006-12-21 2008-02-20 河北建设勘察研究院有限公司钻探机械厂 An artesian well tower
CN201087698Y (en) * 2007-07-02 2008-07-16 宝鸡石油机械有限责任公司 Double-layer composite racking platform for drilling and repairing pump derrick

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4684306A (en) * 1982-08-23 1987-08-04 Pressure Services, Inc. Auxiliary workover rig
CN2075255U (en) * 1990-08-29 1991-04-17 兰州石油机械研究所 Ordinary h shaped steel derrick
CN201024903Y (en) * 2006-12-21 2008-02-20 河北建设勘察研究院有限公司钻探机械厂 An artesian well tower
CN201087698Y (en) * 2007-07-02 2008-07-16 宝鸡石油机械有限责任公司 Double-layer composite racking platform for drilling and repairing pump derrick

Also Published As

Publication number Publication date
CN104343393A (en) 2015-02-11

Similar Documents

Publication Publication Date Title
CN103556627B (en) A kind of hanging cage structure for large diameter bored pile reinforcing bar cage hoisting
CN101284628B (en) Hoisting method for framework of large tonnage pressing machine
CN101974913A (en) Parallel construction method of bridge deepwater foundation bored pile and cofferdam
CN103510864B (en) One kind three saves hydraulically extensible suit derrick
CN204662951U (en) High tower hydraulic climbing scaffold
CN103603426B (en) A kind of bracing or strutting arrangement for frame construction
CN202012071U (en) Work platform for boring in water
CN104343393B (en) A-shaped drilling rig derrick with double racking platforms for construction
CN103291083A (en) Repair method for old wooden tower
CN102535830A (en) Machine position adhesion device for monolithic climbing scaffold for constructing prefabricated building
CN201826320U (en) Assembling and sinking device for double wall steel cofferdam
CN101660660B (en) Novel installing method of gas cabinet
CN201133219Y (en) Sea derrick for drilling and repairing
CN203420643U (en) Double-racking-platform constructed A-type drilling derrick
CN104343394B (en) A kind of pair of quadruple board platform construction open front churn derrick
CN203452658U (en) Front-opening drilling rig derrick with double racking platforms for construction
CN204728983U (en) A kind of adjustable elevator maintenance platform
CN201013249Y (en) Novel oil-well rig lifting foundation
CN203669721U (en) Hanging type inclined ladder
CN202866354U (en) Auxiliary balance lifting device
CN204662932U (en) High tower hydraulic climbing scaffold hydraulic system
CN201087698Y (en) Double-layer composite racking platform for drilling and repairing pump derrick
CN205668902U (en) There is attachment self tower crane of foundation underpinning device
CN205205860U (en) Automatic all hoist device of module system that fall of reverse construction method
CN202926225U (en) Oil drilling and repairing machine capable of pulling double joints or three joints

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant