CN103510864B - One kind three saves hydraulically extensible suit derrick - Google Patents

One kind three saves hydraulically extensible suit derrick Download PDF

Info

Publication number
CN103510864B
CN103510864B CN201310516973.6A CN201310516973A CN103510864B CN 103510864 B CN103510864 B CN 103510864B CN 201310516973 A CN201310516973 A CN 201310516973A CN 103510864 B CN103510864 B CN 103510864B
Authority
CN
China
Prior art keywords
derrick
stage casing
epimere
carrier block
hypomere
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310516973.6A
Other languages
Chinese (zh)
Other versions
CN103510864A (en
Inventor
杨维彪
邬柯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Honghua Petroleum Equipment Co Ltd
Original Assignee
Sichuan Honghua Petroleum Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Honghua Petroleum Equipment Co Ltd filed Critical Sichuan Honghua Petroleum Equipment Co Ltd
Priority to CN201310516973.6A priority Critical patent/CN103510864B/en
Publication of CN103510864A publication Critical patent/CN103510864A/en
Application granted granted Critical
Publication of CN103510864B publication Critical patent/CN103510864B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to oil and gas well drilling field, particularly one kind three to save hydraulically extensible suit derrick;Its derrick geometry form is K shape open fronts, some oil cylinders for changing the various working conditions of derrick are installed on derrick, quadruple board platform is installed in front of derrick, derrick rear, side are provided with oil cylinder centralizer, it is characterized in that, the derrick is divided into three sections, respectively derrick epimere, derrick stage casing, derrick hypomere, derrick epimere coordinates in derrick stage casing inwall, derrick stage casing coordinates in derrick hypomere inwall, derrick holding extended state can be made and be capable of the bogey of remote control by being provided with derrick, and all oil cylinders on derrick being capable of remote control;The goal of the invention of the present invention be to provide it is a kind of it is more intelligent, meet more duty requirements, convenience in transport and placement, improve drillng operation efficiency, scientific structure, stable three section hydraulically extensibles suit derricks.

Description

One kind three saves hydraulically extensible suit derrick
Technical field
The present invention relates to oil and gas well drilling field, particularly one kind three to save hydraulically extensible suit derrick.
Background technology
The derrick that domestic petroleum industry truck-mounted drilling rig is equipped with present is the mast shape open-front tower with the rope that jumps mostly, and two save hydraulic pressure It is flexible, derrick small angle inclination.Derrick hypomere upper end and a total of 12 of overhead traveling crane and quadruple board platform, which jump to restrict, to be connected, and the rope that jumps is to well Frame provides stability force, and spring rope structure is needed in the large number of ground anchor pit of ground configuration to provide support reaction, and the every rope that jumps needs Hanging degree is adjusted, larger human error be present, causes spring rope unbalance stress to cause derrick unbalance stress.Due to using the rope that jumps Structure, if increase clear derrick height, meet three section thribble requirements, every section of derrick is required for spring rope stable, can so caused The rope quantity that jumps further increases, and the increase of derrick paragraph number, and unbalance stress can have a strong impact on the stability of derrick, so traditional vehicle Carry derrick and be designed as two nodule structures, effective depth is 38 meters.The type derrick bulk is small, and traveling system is transported outside derrick OK.Due to height-limited, the type safety platform can only discharge binodal drilling rod, cause drillng operation, lower driller's condition to take It is longer, it is less efficient, and the installation for pushing up drive system is inconvenient, so that rig does not possess stronger down-hole accident disposal ability.
The content of the invention
The problem of existing for prior art, goal of the invention of the invention are to provide a kind of more intelligent, satisfaction more Duty requirements, convenience in transport and placement, improve drillng operation efficiency, scientific structure, stable three section hydraulically extensible suit derricks.
To achieve these goals, the technical solution adopted by the present invention is:
One kind three saves hydraulically extensible suit derrick, and its derrick geometry form is K shape open fronts, is provided with derrick for turning Become some oil cylinders of the various working conditions of derrick, quadruple board platform is installed in front of derrick, derrick rear, side are provided with oil cylinder righting Device, the derrick are divided into three sections, respectively derrick epimere, derrick stage casing, derrick hypomere, and derrick epimere coordinates in derrick stage casing Wall, derrick stage casing, which coordinates to be provided with derrick hypomere inwall, derrick, can make derrick keep extended state and can be long-range The bogey of control, all oil cylinders on derrick being capable of remote control;Derrick uses three sections of stretching structures, makes derrick full More convenient transport and placement while foot more duty requirements, also clear derrick height greatly promotes, the quadruple board platform energy on derrick The enough section of discharge three drilling rods, reduce drillng operation, lower driller's condition takes, raising efficiency;Bogey and in addition to bogey All oil cylinders can remote control make derrick more intelligent, prior art mast shape cantilever mast be with jump rope beat earth anchor Can be stable, this derrick is K shape open fronts, and without jumping, rope just can be stable.
As the preferred scheme of the present invention, the derrick epimere is provided with for lower derrick epimere limit of derrick extended state Bogey A of the position on derrick stage casing, the derrick hypomere is provided with spacing for lower derrick stage casing of derrick extended state Bogey B on derrick hypomere;Being provided with the bogey A can be turned to above the crossbeam of derrick stage casing both sides Carrier block, the carrier block that can be turned to derrick stage casing both sides below the crossbeam is provided with the bogey B;By tilting out Carrier block, carrier block is set to be stuck between each crossbeam, derrick reaches steady operation under the deadweight in derrick epimere Yu derrick stage casing State.
As the preferred scheme of the present invention, the oil cylinder centralizer is separately mounted to derrick stage casing, the side of derrick hypomere Crossbeam and rear below the crossbeam, it is made up of centralizing bracket, torsion spring, is set installed in the centralizing bracket front end of rear below the crossbeam Roller is equipped with, the centralizing bracket is ejected under derrick extended state and coordinated on the piston rod of corresponding jacking cylinder;Oil cylinder is helped The setting of positive device effectively prevents the radially bending of the jacking cylinder under derrick extended state.
As the preferred scheme of the present invention, the quadruple board platform is arranged in front of the derrick stage casing, and quadruple board platform is used to discharge Drilling rod, derrick of the present invention use three sections of stretching structures, greatly promote clear derrick height, the quadruple board platform on derrick can discharge Three section drilling rods.
As the preferred scheme of the present invention, the derrick hypomere rear is provided with the derrick back leg being hinged on vehicle frame, institute State to be hinged between derrick hypomere trailing outside and vehicle frame makes derrick be changed into working condition from travel position for derrick telescoping Lift oil tank, front strut is connected between base table top in front of derrick hypomere under working condition;It is place under derrick travel position In horizontal low level, when the base of vehicle frame and rig floor, which connects, to be completed, control lift oil tank makes derrick vertical, and front strut makes in connection Derrick is fixed, and derrick enters working condition.
As the preferred scheme of the present invention, the epimere jacking cylinder of jacking derrick epimere is installed on the derrick stage casing, The derrick hypomere is provided with the stage casing jacking cylinder in jacking derrick stage casing, and the epimere jacking cylinder, stage casing jacking cylinder are equal On the inside of the rear of affiliated derrick section;In derrick drawing process, operating personnel's remote control epimere jacking cylinder, stage casing top Oil running is risen, derrick epimere and the displacement needed for completion in the presence of jacking cylinder of derrick stage casing can be made.
As the preferred scheme of the present invention, the epimere jacking cylinder, stage casing jacking cylinder quantity are than or equal to two, Vertical direction is installed in, horizontal equidistantly distributed is surveyed in the rear of affiliated derrick;This setup makes each section of derrick Between stress it is uniform altogether, derrick is more stable.
As the preferred scheme of the present invention, the bogey A is arranged on the mounting rail between the crossbeam of derrick epimere both sides Lower section, derrick epimere both sides below the crossbeam have been respectively articulated with left carrier block A, right carrier block A, the left carrier block A, right carrier block Connected between A by the connecting rod module being hinged by some connecting rods, the contiguous block module centers are hinged on peace Fill in the middle part of beam, it is described so as to control that drive connection block block motion is also equipped between the contiguous block module and the mounting rail Left carrier block A, right carrier block A are outwards routed up or the stretching oil cylinder to contract;When needing derrick retracting epimere, operator Member's remote control stretching oil cylinder stretches, and makes left carrier block A, right carrier block A retractions mounting rail lower section, then control epimere jacking cylinder Running makes in derrick epimere derrick retracting stage casing, and when needing to stretch out derrick epimere, operating process is contrary to the above.
As the preferred scheme of the present invention, the bogey B includes left carrier block B, right carrier block B, left oil cylinder, right oil Cylinder, same level high degree of symmetry is arranged on the both sides of derrick hypomere top exterior walls respectively by the left carrier block B, right carrier block B, described Left carrier block B, the right carrier block B crossbeam of one end and derrick hypomere both sides are hinged, and the other end passes through left oil cylinder, right oil cylinder and well The outer wall of frame hypomere both sides is hinged;When needing derrick retracting stage casing, the left oil cylinder of operating personnel's remote control, right oil cylinder stretch, Make left carrier block B, the both sides of right carrier block B derrick retractings hypomere top exterior walls, then control stage casing jacking cylinder running to make derrick In the derrick retracting hypomere of stage casing, when needing to stretch out derrick stage casing, operating process is contrary to the above.
As the preferred scheme of the present invention, the epimere jacking cylinder, stage casing jacking cylinder are pacified respectively by some U-shaped cards On derrick stage casing, derrick hypomere, it is simple in construction, stably, save material.
The beneficial effects of the invention are as follows:
1st, all working process can be more intelligent by tele-control system in terrestrial operation.
2nd, derrick uses three sections of stretching structures, derrick is more convenient transport while more duty requirements are met with putting Put.
3rd, derrick uses three sections of stretching structures, greatly promotes clear derrick height, the quadruple board platform on derrick can discharge Three section drilling rods, reduce drillng operation, lower driller's condition takes, raising efficiency.
4th, derrick is flexible using hydraulic principle driving, and more stable, structure is more scientific.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention.
Fig. 2 is bogey A of the present invention structural representation.
Fig. 3 is bogey B of the present invention structural representation.
Fig. 4 is retracted mode side view and crown view when the present invention is horizontal positioned.
Fig. 5 is travel position schematic diagram of the present invention.
Fig. 6 is working state schematic representation of the present invention.
Fig. 7 is stage casing jacking cylinder of the present invention, upper end jacking cylinder scheme of installation.
Fig. 8 is the oil cylinder centralizer structure schematic diagram on derrick stage casing of the present invention.
Fig. 9 is the oil cylinder centralizer structure schematic diagram on derrick hypomere of the present invention.
Figure 10 is the partial enlarged drawing at A in Fig. 9.
Figure 11 is the structural representation under extended state of the present invention.
Marked in figure:1- derrick epimeres, 2- derricks stage casing, 3- oil cylinder centralizers, 4- derrick hypomeres, 5- bogeys A, 6- Quadruple board platform, 7- bogeys B, 8- derrick epimere left side beams, 9- stretching oil cylinders, 10- connection bearing pin A, 11- mounting rails, 12- wells Crossbeam on the right side of frame epimere, 13- carrier block bearing pins, the right carrier block A of 14-, 15- derricks stage casing right side crossbeam, 16- connecting rod modules, The left carrier block A of 17-, 18- derricks stage casing left side beams, the left oil cylinder of 19- bars A, 20- bar B, 21- bar C, 22-, the left carrier block B of 23-, 24- derrick hypomere left side beams, 25- derricks hypomere right side crossbeam, the right carrier block B of 26-, the right oil cylinders of 27-, 28- derrick back legs, 29- base table tops, 30- table top otic placodes, 31- bases, 32- vehicle frame ear mounts, 33- connection wire rods, 34- connection bearing pin C, 35- raisings Oil cylinder, 36- vehicle frames, 37- carriage bases, 38- bars D, 39- front strut, 40- connection bearing pin D, 41- stage casings jacking cylinder, on 42- Section jacking cylinder, 43-U shape cards, 44- oil cylinder outer barrels, 45- piston rods, 46- torsion springs, 47- rollers, 48- centralizing brackets, 49- connect Pin axle B.
Embodiment
With reference to embodiment and embodiment, the present invention is described in further detail.But this should not be understood Following embodiment is only limitted to for the scope of the above-mentioned theme of the present invention, the technology that all content of the invention based on the present invention are realized is equal Belong to the scope of the present invention.
Embodiment 1
One kind three saves hydraulically extensible suit derrick, and its derrick geometry form is K shape open fronts, is provided with derrick for turning Become some oil cylinders of the various working conditions of derrick, quadruple board platform 6 is installed in front of derrick, derrick rear, side are provided with oil cylinder and helped Positive device 3, the derrick are divided into three sections, and respectively derrick epimere 1, derrick stage casing 2, derrick hypomere 4, derrick epimere 1 coordinates in well The inwall of frame stage casing 2, derrick stage casing 2, which coordinates to be provided with the inwall of derrick hypomere 4, derrick, can make derrick keep extended state simultaneously And it is capable of the bogey of remote control, all oil cylinders on derrick being capable of remote control.
In the present embodiment, the derrick epimere 1 is provided with spacing in derrick for lower derrick epimere 1 of derrick extended state Bogey A5 on stage casing 2, the derrick hypomere 4 are provided with spacing in well for lower derrick stage casing 2 of derrick extended state Bogey B7 on frame hypomere 4;Being provided with the bogey A5 can be turned to above the crossbeam of derrick stage casing both sides Carrier block, the carrier block that can be turned to derrick stage casing both sides below the crossbeam is provided with the bogey B7.
In the present embodiment, the oil cylinder centralizer 3 be separately mounted to derrick stage casing 2, derrick hypomere 1 side crossbeam and Rear below the crossbeam, it is made up of centralizing bracket 48, torsion spring 46, is set installed in the front end of centralizing bracket 48 of rear below the crossbeam There is roller 47, the centralizing bracket 48 is ejected under derrick extended state and coordinated on the piston rod 45 of corresponding jacking cylinder, when When derrick is in retracted mode, oil cylinder centralizer 3 is in retracted mode, during jacking derrick stage casing 2 with derrick epimere 1, When the retracted mode of oil cylinder centralizer 3 is no longer limited, oil cylinder centralizer 3 under the effect of torsion spring 46 automatic turning to working position Put, the mutual cooperation righting of oil cylinder centralizer 3 of rear and side corresponds to piston rod 45.
In the present embodiment, the quadruple board platform 6 is arranged on the front of derrick stage casing 2, and the one end of quadruple board platform 6 is left with derrick stage casing The front end of crossbeam 15 is hinged on the right side of side crossbeam 18 and derrick stage casing, the other end by oil cylinder be hinged on derrick stage casing 2 it is described before The lower section of one articulated position, the side length of quadruple board platform 6 are less than the length of the oil cylinder.
In the present embodiment, the rear of derrick hypomere 4 is provided with the derrick back leg 28 being hinged on vehicle frame, under the derrick Section 4 trailing outsides and vehicle frame 36 between be hinged with for derrick telescoping make derrick from travel position be changed into working condition raising oil Cylinder 35, front strut 39 is connected between the front of derrick hypomere 4 and base table top 29 under working condition, the derrick under travel position When preparation is converted to working condition, vehicle frame 36 is placed in carriage base 37, and carriage base 37 is by connecting bearing pin C34 and base Connection, is connected, base 31 is arranged on drilling well base, and connection wire rod 33 is pushed up between vehicle frame 36 and base 31 by connection wire rod 33 Also it is hinged on derrick back leg 28 outside being fixedly connected between the vehicle frame ear mount 32 and vehicle frame in portion by bar D38, lift oil tank 35 When derrick telescoping is to working condition, the front strut 39 connected between the front of derrick hypomere 4 and base table top 29 is by connecting bearing pin D40 is hinged on table top otic placode 30, and table top otic placode 30 is arranged on the upper surface of base table top 29, and the connected mode is symmetrically in well The left and right sides of frame hypomere 4, can be without guy wire after the completion of connection, and derrick reaches vertical stand-up state.
In the present embodiment, the epimere jacking cylinder 42 of jacking derrick epimere 1, the well are installed on the derrick stage casing 2 Frame hypomere 4 is provided with the stage casing jacking cylinder 41 in jacking derrick stage casing 2, the epimere jacking cylinder 42, stage casing jacking cylinder 41 Belonging to being installed on the inside of the rear of derrick section, the epimere jacking cylinder 42, the quantity of stage casing jacking cylinder 41 are than or equal to Two, vertical direction is installed in, horizontal equidistantly distributed is surveyed in the rear of affiliated derrick, the epimere jacking cylinder 42nd, stage casing jacking cylinder 41 is separately mounted to derrick stage casing 2, on derrick hypomere 4 by some U-shaped cards 43, the horizontal card of U-shaped card 43 Live in the oil cylinder outer barrel 44 of section jacking cylinder 42, stage casing jacking cylinder 41, the epimere jacking cylinder 42, stage casing jacking cylinder 41 Piston rod 45 be connected to corresponding in derrick section.
In the present embodiment, the bogey A5 is arranged on the lower section of mounting rail 11 between the crossbeam of derrick epimere both sides, well The both sides below the crossbeam of frame epimere 1 has been respectively articulated with left carrier block A17, right carrier block A14, the left carrier block A17, right carrier block Connected between A14 by the connecting rod module 16 being hinged by some connecting rods, the contiguous block module centers are hinged At the middle part of mounting rail 11, be also equipped between the contiguous block module and the mounting rail 11 drive connection block block motion so as to The left carrier block A17, right carrier block A14 is controlled outwards to rout up or the stretching oil cylinder 9 to contract, connecting rod is mutual It is hinged by connection bearing pin A10, left carrier block A17, right carrier block A14 are hinged on derrick by carrier block bearing pin 13 respectively The lower section of crossbeam 12 on the right side of section left side beams 8, derrick epimere, when derrick extended state is fixed, left carrier block, which is routed up, to be stuck in derrick Between section left side beams 18 and derrick epimere left side beams 8, right carrier block, which is routed up, is stuck in crossbeam 15 and derrick on the right side of derrick stage casing On the right side of epimere between crossbeam 12;It is be hinged with the middle part of mounting rail 11 at bar A19 a quarter in the connecting rod module 16, bar It is hinged at A19 half between left carrier block by bar B20, passes through bar C21 between bar A19 end and right carrier block Be hinged, bar C21 is identical with bar B20 length, is hinged between bar the A19 other end and mounting rail 11 by stretching oil cylinder 9, drawing oil The setting direction of cylinder 9 is forever parallel with bar B20 in a vertical plane.
In the present embodiment, the bogey B7 includes left carrier block B23, right carrier block B26, left oil cylinder 22, right oil cylinder 27, same level high degree of symmetry is arranged on the two of the top exterior walls of derrick hypomere 4 respectively by the left carrier block B23, right carrier block B26 Side, the left carrier block B23, the right carrier block B26 crossbeam of one end and the both sides of derrick hypomere 4 are cut with scissors by carrier block bearing pin 13 Connect, the other end is hinged by left oil cylinder 22, right oil cylinder 27 and the outer wall of the both sides of derrick hypomere 4, and left oil cylinder 22, right oil cylinder 27 pass through Connection bearing pin B49 and the outer wall of the both sides of derrick hypomere 4 are hinged, and when derrick extended state is fixed, left carrier block, which is routed up, is stuck in derrick Between hypomere left side beams 24 and derrick stage casing left side beams 18, right carrier block, which is routed up, is stuck in crossbeam 25 and well on the right side of derrick hypomere On the right side of frame stage casing between crossbeam 15.

Claims (1)

1. one kind three saves hydraulically extensible suit derrick, its derrick geometry form is K shape open fronts, is provided with derrick for changing Some oil cylinders of derrick working condition, derrick front are provided with quadruple board platform, and derrick rear, side are provided with oil cylinder centralizer, its It is characterised by, the derrick is divided into three sections, respectively derrick epimere, derrick stage casing, derrick hypomere, and derrick epimere coordinates in derrick Stage casing inwall, derrick stage casing, which coordinates to be provided with derrick hypomere inwall, derrick, can make derrick keep extended state and energy The bogey of enough remote controls, all oil cylinders on derrick can remote control, the derrick epimere is provided with for well The spacing bogey A on derrick stage casing of derrick epimere, the derrick hypomere are provided with for derrick under frame extended state The spacing bogey B on derrick hypomere in derrick stage casing under extended state;
The carrier block that can be turned to above the crossbeam of derrick stage casing both sides, the bogey B are provided with the bogey A On be provided with the carrier block that can be turned to derrick stage casing both sides below the crossbeam, the oil cylinder centralizer is separately mounted in derrick Section, the side crossbeam of derrick hypomere and rear below the crossbeam, it is made up of centralizing bracket, torsion spring, installed in rear crossbeam The centralizing bracket front end of lower section is provided with roller, and the centralizing bracket is ejected under derrick extended state and coordinated in corresponding jacking cylinder Piston rod on, when derrick is in retracted mode, oil cylinder centralizer is in retracted mode, on jacking derrick stage casing and derrick During section, when oil cylinder centralizer retracted mode is no longer limited, oil cylinder centralizer under torsion spring effect automatic turning to work Make position, the oil cylinder centralizer mutual cooperation righting of rear and side corresponds to piston rod, and the quadruple board platform is arranged on the derrick In front of stage casing, quadruple board platform one end and the front end of crossbeam on the right side of derrick stage casing left side beams and derrick stage casing are hinged, and the other end passes through Oil cylinder is hinged on the lower section of the previous articulated position on derrick stage casing, and the side length of quadruple board platform is less than the length of the oil cylinder, The derrick hypomere rear is provided with the derrick back leg being hinged on vehicle frame, is cut with scissors between the derrick hypomere trailing outside and vehicle frame The lift oil tank for making derrick be changed into from travel position working condition for derrick telescoping is connected to, under working condition in front of derrick hypomere Front strut is connected between base table top, when the derrick under travel position prepares to be converted to working condition, vehicle frame is placed in In carriage base, carriage base is connected by connecting bearing pin C with base, is connected between vehicle frame and base by connection wire rod, bottom Seat is arranged on drilling well base, also be hinged outside being fixedly connected between the vehicle frame ear mount and vehicle frame at the top of connection wire rod by bar D On derrick back leg, when lift oil tank derrick telescoping is to working condition, before being connected in front of derrick hypomere between base table top Strut is hinged on table top otic placode by connecting bearing pin D, and table top otic placode is arranged on the upper surface of base table top, the connected mode , can be without guy wire after the completion of connection symmetrically in the left and right sides of derrick hypomere, derrick reaches vertical stand-up state, the derrick The epimere jacking cylinder of jacking derrick epimere is installed, the derrick hypomere is provided with the stage casing top in jacking derrick stage casing on stage casing Oil-lifting jar, the epimere jacking cylinder, stage casing jacking cylinder are installed on the inside of the rear of affiliated derrick section, the epimere jacking Oil cylinder, stage casing jacking cylinder quantity are than or equal to two, are installed in vertical direction, horizontal equidistantly distributed is in affiliated well Surveyed in the rear of frame, the bogey A is arranged on below the mounting rail between the crossbeam of derrick epimere both sides, derrick epimere both sides Below the crossbeam has been respectively articulated with left carrier block A, right carrier block A, if by by involvement between the left carrier block A, right carrier block A The connecting rod module connection that extension bar is hinged, the contiguous block module centers are hinged in the middle part of mounting rail, the connection Drive connection block block motion is also equipped between block module and the mounting rail so as to control the left carrier block A, right carrying Block A's outwards routs up or the stretching oil cylinder to contract, connecting rod are hinged by connection bearing pin A between each other, left carrier block A, right carrier block A respectively by carrier block hinge on the right side of derrick epimere left side beams, derrick epimere below the crossbeam, derrick When extended state is fixed, left carrier block, which is routed up, to be stuck between derrick stage casing left side beams and derrick epimere left side beams, right carrying Block, which is routed up, to be stuck on the right side of derrick stage casing between crossbeam and derrick epimere right side crossbeam;The connecting rod module includes:Four points of bar A One of it is be hinged in the middle part of place and mounting rail, be hinged at bar A half between left carrier block by bar B, bar A end with it is right It is hinged between carrier block by bar C, bar C is identical with bar B length, is cut with scissors between bar the A other end and mounting rail by stretching oil cylinder Connect, stretching oil cylinder setting direction is forever parallel with bar B in a vertical plane, and the bogey B includes left carrier block B, the right side Carrier block B, left oil cylinder, right oil cylinder, same level high degree of symmetry is arranged on derrick hypomere respectively by the left carrier block B, right carrier block B The both sides of top exterior walls, the left carrier block B, the right carrier block B crossbeam of one end and derrick hypomere both sides are hinged, and the other end leads to Cross left oil cylinder, right oil cylinder and the outer wall of derrick hypomere both sides to be hinged, left oil cylinder, right oil cylinder are by connecting bearing pin B and derrick hypomere The outer wall of both sides is hinged, and when derrick extended state is fixed, left carrier block, which is routed up, is stuck in derrick hypomere left side beams and derrick stage casing Between left side beams, right carrier block, which is routed up, to be stuck on the right side of derrick hypomere between crossbeam and derrick stage casing right side crossbeam, the epimere Jacking cylinder, stage casing jacking cylinder are separately mounted to derrick stage casing, on derrick hypomere by some U-shaped cards, and U-shaped card level is blocked The oil cylinder outer barrel of epimere jacking cylinder, stage casing jacking cylinder, the piston rod connection of the epimere jacking cylinder, stage casing jacking cylinder In corresponding derrick section.
CN201310516973.6A 2013-10-28 2013-10-28 One kind three saves hydraulically extensible suit derrick Active CN103510864B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310516973.6A CN103510864B (en) 2013-10-28 2013-10-28 One kind three saves hydraulically extensible suit derrick

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310516973.6A CN103510864B (en) 2013-10-28 2013-10-28 One kind three saves hydraulically extensible suit derrick

Publications (2)

Publication Number Publication Date
CN103510864A CN103510864A (en) 2014-01-15
CN103510864B true CN103510864B (en) 2018-02-02

Family

ID=49894229

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310516973.6A Active CN103510864B (en) 2013-10-28 2013-10-28 One kind three saves hydraulically extensible suit derrick

Country Status (1)

Country Link
CN (1) CN103510864B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178874A (en) * 2015-08-17 2015-12-23 宝鸡石油机械有限责任公司 Telescoping derrick with great width in bottom
CN105909179A (en) * 2016-05-31 2016-08-31 南阳二机石油装备集团股份有限公司 Automatic folding racking platform for drilling rig mast
CN106050162A (en) * 2016-05-31 2016-10-26 南阳二机石油装备集团股份有限公司 Automatic centering device for piston rods of telescopic hydraulic cylinders of drilling rig mast
CN109057720A (en) * 2018-10-18 2018-12-21 中石化四机石油机械有限公司 Hydraulic telescopic derrick
CN110029946B (en) * 2019-05-30 2020-08-28 宝鸡瑞通石油装备有限公司 Installation method of vertical lifting derrick

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4932175A (en) * 1988-12-08 1990-06-12 Donnally Robert B Telescopic drilling derrick apparatus
CN2405000Y (en) * 1999-09-08 2000-11-08 河南石油勘探局南阳石油机械厂 Derrick for petroleum drilling preparing equipment
CN2539831Y (en) * 2002-01-16 2003-03-12 中国石化集团江汉石油管理局第四机械厂 Telescopic three-section derrick for truck-mounted drilling and repairing equipment
CN2756808Y (en) * 2004-10-14 2006-02-08 南阳二机石油装备(集团)有限公司 Derrick for petroleum drilling and repair equipment
CN201588559U (en) * 2009-11-04 2010-09-22 宝鸡石油机械有限责任公司 Telescopic derrick locking device
CN201650135U (en) * 2010-03-11 2010-11-24 中国石化集团江汉石油管理局第四机械厂 Novel vertical telescopic derrick
CN201778661U (en) * 2010-08-13 2011-03-30 宝鸡石油机械有限责任公司 Hydraulic-cylinder-lifted slingshot derrick substructure
CN202578531U (en) * 2012-04-28 2012-12-05 辽宁石油机械制造有限公司 Centralizer for telescopic oil cylinder of derrick
CN203097737U (en) * 2012-09-18 2013-07-31 国民油井华高石油设备(上海)有限公司 Telescopic integral hoisting type headframe device
CN203531759U (en) * 2013-10-28 2014-04-09 四川宏华石油设备有限公司 Three-section hydraulic telescopic headframe

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4932175A (en) * 1988-12-08 1990-06-12 Donnally Robert B Telescopic drilling derrick apparatus
CN2405000Y (en) * 1999-09-08 2000-11-08 河南石油勘探局南阳石油机械厂 Derrick for petroleum drilling preparing equipment
CN2539831Y (en) * 2002-01-16 2003-03-12 中国石化集团江汉石油管理局第四机械厂 Telescopic three-section derrick for truck-mounted drilling and repairing equipment
CN2756808Y (en) * 2004-10-14 2006-02-08 南阳二机石油装备(集团)有限公司 Derrick for petroleum drilling and repair equipment
CN201588559U (en) * 2009-11-04 2010-09-22 宝鸡石油机械有限责任公司 Telescopic derrick locking device
CN201650135U (en) * 2010-03-11 2010-11-24 中国石化集团江汉石油管理局第四机械厂 Novel vertical telescopic derrick
CN201778661U (en) * 2010-08-13 2011-03-30 宝鸡石油机械有限责任公司 Hydraulic-cylinder-lifted slingshot derrick substructure
CN202578531U (en) * 2012-04-28 2012-12-05 辽宁石油机械制造有限公司 Centralizer for telescopic oil cylinder of derrick
CN203097737U (en) * 2012-09-18 2013-07-31 国民油井华高石油设备(上海)有限公司 Telescopic integral hoisting type headframe device
CN203531759U (en) * 2013-10-28 2014-04-09 四川宏华石油设备有限公司 Three-section hydraulic telescopic headframe

Also Published As

Publication number Publication date
CN103510864A (en) 2014-01-15

Similar Documents

Publication Publication Date Title
CN103510864B (en) One kind three saves hydraulically extensible suit derrick
CN111058618B (en) Combined type telescopic sleeve jacking device and method thereof
CN201778661U (en) Hydraulic-cylinder-lifted slingshot derrick substructure
CA2703803C (en) Land rig
RU2019103656A (en) MAST TOWER AND SUPPORT BASE
CN104632088B (en) Oil-well rig derrick set assembly/installation method
CN202864749U (en) Stretching arm type crane
CN105587328B (en) One kind suspension mining multi-arm roofboltier of beam type
CN209383292U (en) A kind of tower crane device
CN110306776A (en) A kind of hoistable platform for construction of elevator shaft in high-rise building
CN107447678A (en) A kind of erection crane of the two-way positioning of energy
CN103072900B (en) Loading frame dual-purpose vehicle under coal mine
CN203531759U (en) Three-section hydraulic telescopic headframe
CN103982141B (en) A kind of novel rapid transporting drilling machine derrick substructure structure
CN211115805U (en) Low-position racking platform lifting device
CN105520681B (en) Flexion-extension formula folding arm window cleaning equipment
CN201330565Y (en) Semi-trailing drilling platform for oil drilling and repairing equipment
CN103130103A (en) Lifting device suitable for underground ally and chamber
CN205421366U (en) A fold and to piece together formula strenghthened type and transfer mechanism of hanging down for reverse construction method stand perpendicularity adjusting
CN201635663U (en) Drilling platform of workover rig
CN105332659B (en) A kind of moveable rig substructure
CN205206751U (en) Portable drilling rig base
CN210264546U (en) Guide type lifting support base
CN203867478U (en) Novel structure for rapidly transporting derrick and substructure
CN202673191U (en) Multi-functional maintenance service device for petroleum drilling machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant