CN203420643U - Double-racking-platform constructed A-type drilling derrick - Google Patents

Double-racking-platform constructed A-type drilling derrick Download PDF

Info

Publication number
CN203420643U
CN203420643U CN201320484922.5U CN201320484922U CN203420643U CN 203420643 U CN203420643 U CN 203420643U CN 201320484922 U CN201320484922 U CN 201320484922U CN 203420643 U CN203420643 U CN 203420643U
Authority
CN
China
Prior art keywords
derrick
platform
racking
drilling
quadruple board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320484922.5U
Other languages
Chinese (zh)
Inventor
石林
方太安
周志雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING KEMBL PETROLEUM TECHNOLOGY DEVELOPMENT Co Ltd
China National Petroleum Corp
CNPC Engineering Technology R&D Co Ltd
Original Assignee
BEIJING KEMBL PETROLEUM TECHNOLOGY DEVELOPMENT Co Ltd
China National Petroleum Corp
CNPC Drilling Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING KEMBL PETROLEUM TECHNOLOGY DEVELOPMENT Co Ltd, China National Petroleum Corp, CNPC Drilling Research Institute Co Ltd filed Critical BEIJING KEMBL PETROLEUM TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN201320484922.5U priority Critical patent/CN203420643U/en
Application granted granted Critical
Publication of CN203420643U publication Critical patent/CN203420643U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model provides a double-racking-platform constructed A-type drilling derrick and belongs to the technical field of drilling derricks. A crown block table is connected with a derrick body, the derrick body is connected with a high-level racking platform, a derrick accessory, a low-level racking platform and a reversed-Y-shaped frame, and the reversed-Y-shaped frame is connected with a drill block face. L1 is the perpendicular distance from the low-level racking platform to the drill block face, L2 is the perpendicular distance from the high-level racking platform to the drill block face, and L3 is the perpendicular distance from the crown block table to the drill block face. The double-racking-platform constructed A-type drilling derrick has the advantages that a double-racking-platform structure is used for storing and bearing uprights after one racking platform is additionally arranged, and therefore safe operation that four single rods are connected to one upright is achieved; the double-racking-platform constructed A-type drilling derrick is used for drilling a deep well and an ultra-deep well, so that the frequency of upright connection and disconnection is reduced, the tripping speed is increased, the well drilling efficiency is improved, and the well drilling period is shortened; other supporting facilities of a drilling machine can be thoroughly used, so that the double-racking-platform constructed A-type drilling derrick is reliable and capable of saving capital.

Description

A kind of pair of quadruple board platform construction A type drilling derrick
Technical field
The utility model relates to a kind of pair of quadruple board platform construction A type drilling derrick, belongs to drilling derrick technical field.Relate to and increase quadruple board platform quantity, increase operating space, the A type drilling derrick that can operate the how single column connecting into.
Background technology
Drilling derrick is a kind of metal truss structure with certain altitude and span, it is the important component part of rig, mainly by derrick main body, crown's nest, quadruple board platform, man-like shelf and derrick annex etc., formed, in drilling process for laying overhead traveling crane, hang traveling system, hang drilling tool and remove the operations such as drilling rod, setting of casing, processing down-hole accident, bearing various operating loads.
A type drilling derrick is a kind of of derrick, and current A type drilling derrick only has a quadruple board platform, and for depositing column, bearing column weight, the space that derrick provides can only operate 3 single columns that are linked to be at most.And the assistance platforms such as standpipe operating desk are the platforms that standpipe etc. is operated, and do not have the function that quadruple board platform is deposited column, born operating load.
Adopt single quadruple board platform A type drilling derrick to carry out constructing operation, it is few that the column of derrick license single safety operation connects single quantity, and column is short, the column number of times of unloading just many, efficiency is low, is unfavorable for that wellbore construction carries the needs of effect.Two quadruple board platform construction A type drilling derricks can operate 4 single columns that are linked to be, and the column that single connects is long, can reduce the column number of times of unloading, and saves drilling time, improves drilling efficiency.
Certain document is mentioned the special derrick scheme of special construction rig, in order to meet the needs of different operating modes, can different quadruple board platforms be set for different operating modes, two quadruple board platform roles of double-jointing pipe quadruple board platform in its scheme and single drilling rod quadruple board platform are identical, function overlaps each other, corresponding construction column connects single quantity to be reduced, in two quadruple board platforms, each participation work only has a quadruple board platform, say in essence two installation sites that have been still single quadruple board platform structure choice, be still in fact single quadruple board platform construction, constructing with two quadruple board platforms is diverse concept.The quadruple board platform of the in-service rig of reality is all a quadruple board platform, and three installation position selection, adjust position during use.Utilize two quadruple board platforms to play a role simultaneously, jointly complete the imagination not yet discovery at present of a construction manipulation process, current applicable cases is: have multipoint quadruple board platform, the two quadruple board platform constructing structures that simultaneously do not work.
Summary of the invention
In order to overcome the deficiencies in the prior art, the utility model provides a kind of pair of quadruple board platform construction A type drilling derrick.
A quadruple board platform construction open front churn derrick, mutually assembles connection by crown's nest, derrick main body, high-order quadruple board platform, derrick annex, low level quadruple board platform, man-like shelf and forms.Crown's nest connecting well frame body, main body connects high-order quadruple board platform, derrick annex, low level quadruple board platform and man-like shelf, and man-like shelf connects drilling floor surface; L1 is low level quadruple board platform to vertical distance, the L2 of drilling floor surface, be high-order quadruple board platform is that crown's nest is to the vertical distance of drilling floor surface to vertical distance, the L3 of drilling floor surface.
Overhead traveling crane is installed on crown's nest, and derrick main body and man-like shelf are arranged on base, and drilling floor surface is the work plane of base;
Man-like shelf plays the effect of stressed fulcrum and buffering when derrick telescoping and base, after hoist completion frame and base, play the effect of supporting righting, overhead traveling crane is mainly the effect that assembly pulley is installed, derrick and base are main stressed members, quadruple board platform plays a supportive role, and is the playground of high-altitude application personnel constructing operation simultaneously;
Extend drilling derrick principal length size, crown's nest strengthens to the vertical distance L3 of drilling floor surface, increases derrick operating space, thereby the stroke space of assurance derrick can be realized 4 single columns that are linked to be are operated; Increase a quadruple board platform; form high-order and two quadruple board platforms of low level; like this; when 4 single columns that are linked to be are deposited; column lower end is placed on drilling floor surface; side, by being placed on two quadruple board platforms, makes two quadruple board platforms for the storage support of column, guarantee 4 single safe storage that are linked to be column; Remove and deposit and can guarantee safety, just realized drilling derrick to 4 single safety operations that are linked to be column;
High-order quadruple board platform and two quadruple board platforms of low level quadruple board platform need to play a role simultaneously and just can make 4 single upright column job practicess be achieved; Two quadruple board platforms work, and its corresponding construction manipulation process has marked change, and the construction of two quadruple board platforms coordinates and plays a role with supporting new construction technology.
The beneficial effects of the utility model are: 1, utilize to increase two quadruple board platform structures after a quadruple board platform all for the depositing and carrying of column, realization is to 4 single safety operations that are linked to be column.2, for deep-well, ultradeep well drilling well, can reduce the column number of times of unloading, improve the speed that makes a trip, improve drilling efficiency, shorten drilling period.3, can make full use of other ancillary facility of rig, reliable, economize on the use of funds.
Accompanying drawing explanation
When considered in conjunction with the accompanying drawings, by the detailed description with reference to below, can more completely understand better the utility model and easily learn wherein many advantages of following, but accompanying drawing described herein is used to provide further understanding of the present utility model, form a part of the present utility model, schematic description and description of the present utility model is used for explaining the utility model, do not form improper restriction of the present utility model, as schemed wherein:
Fig. 1 is structural representation of the present utility model.
Below in conjunction with drawings and Examples, the utility model is further illustrated.
The specific embodiment
Obviously, the many modifications and variations that those skilled in the art do based on aim of the present utility model belong to protection domain of the present utility model.
Embodiment 1: as shown in Figure 1, two quadruple board platform construction A type drilling derricks, are mutually assembled to connect and formed by crown's nest 1, derrick main body 2, high-order quadruple board platform 3, derrick annex 4, low level quadruple board platform 5, man-like shelf 6.Crown's nest 1 connecting well frame body 2, main body 2 connects high-order quadruple board platform 3, derrick annex 4, low level quadruple board platform 5 and man-like shelf 6, and man-like shelf 6 connects drilling floor surface 7; L1 is low level quadruple board platform 5 to vertical distance, the L2 of drilling floor surface 7, be high-order quadruple board platform 3 is that crown's nest 1 is to the vertical distance of drilling floor surface 7 to vertical distance, the L3 of drilling floor surface 7.
For solve single quadruple board platform A type drilling derrick wellbore construction unload column often, inefficient problem, the utility model provides a kind of two quadruple board platforms that utilize, and increases derrick operating space simultaneously and realizes two quadruple board platform construction A type drilling derricks that 4 single columns that are linked to be are operated.
The utility model drilling derrick is mutually assembled to connect by crown's nest 1, derrick main body 2, high-order quadruple board platform 3, derrick annex 4, low level quadruple board platform 5 and man-like shelf 6 and is formed.
Overhead traveling crane is installed on crown's nest, and derrick main body and man-like shelf are arranged on base, and drilling floor surface 7 is work planes of base.
Man-like shelf plays the effect of stressed fulcrum and buffering when derrick telescoping and base, after hoist completion frame and base, play the effect of supporting righting, overhead traveling crane is mainly the effect that assembly pulley is installed, derrick and base are main stressed members, quadruple board platform plays a supportive role, and is the playground of high-altitude application personnel constructing operation simultaneously.
Extend drilling derrick principal length size, crown's nest 1 strengthens to the vertical distance L3 of drilling floor surface, increases derrick operating space, thereby the stroke space that guarantees derrick can be realized 4 single columns that are linked to be are operated.Increase a quadruple board platform, form high-order and two quadruple board platforms of low level, like this, when 4 single columns that are linked to be are deposited, column lower end is placed on drilling floor surface 7, side, by being placed on two quadruple board platforms, makes two quadruple board platforms for the storage support of column, guarantee 4 single safe storage that are linked to be column.Remove and deposit and can guarantee safety, just realized drilling derrick to 4 single safety operations that are linked to be column.
High-order quadruple board platform and two quadruple board platforms of low level quadruple board platform need to play a role simultaneously and just can make 4 single upright column job practicess be achieved.Two quadruple board platforms work, and its corresponding construction manipulation process has marked change, and the construction of two quadruple board platforms coordinates and plays a role with supporting new construction technology.
As mentioned above, embodiment of the present utility model is explained, but as long as not departing from fact inventive point of the present utility model and effect can have a lot of distortion, this will be readily apparent to persons skilled in the art.Therefore, within such variation is also all included in protection domain of the present utility model.

Claims (1)

1. two quadruple board platform construction A type drilling derricks, is characterized in that mutually being assembled to connect by crown's nest, derrick main body, high-order quadruple board platform, derrick annex, low level quadruple board platform, man-like shelf forming; Crown's nest connecting well frame body, main body connects high-order quadruple board platform, derrick annex, low level quadruple board platform and man-like shelf, and man-like shelf connects drilling floor surface; L1 is low level quadruple board platform to vertical distance, the L2 of drilling floor surface, be high-order quadruple board platform is that crown's nest is to the vertical distance of drilling floor surface to vertical distance, the L3 of drilling floor surface.
CN201320484922.5U 2013-08-09 2013-08-09 Double-racking-platform constructed A-type drilling derrick Expired - Fee Related CN203420643U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320484922.5U CN203420643U (en) 2013-08-09 2013-08-09 Double-racking-platform constructed A-type drilling derrick

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320484922.5U CN203420643U (en) 2013-08-09 2013-08-09 Double-racking-platform constructed A-type drilling derrick

Publications (1)

Publication Number Publication Date
CN203420643U true CN203420643U (en) 2014-02-05

Family

ID=50019742

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320484922.5U Expired - Fee Related CN203420643U (en) 2013-08-09 2013-08-09 Double-racking-platform constructed A-type drilling derrick

Country Status (1)

Country Link
CN (1) CN203420643U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107489382A (en) * 2016-03-16 2017-12-19 刘玉友 Well drilling top drive and the application method of safety platform protection device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107489382A (en) * 2016-03-16 2017-12-19 刘玉友 Well drilling top drive and the application method of safety platform protection device
CN107489382B (en) * 2016-03-16 2019-06-21 东营市汉德自动化集成有限公司 The application method of well drilling top drive and safety platform collision-proof protector

Similar Documents

Publication Publication Date Title
CN107055342A (en) A kind of traveling cradle of workshop appliance transhipment
CN103603426B (en) A kind of bracing or strutting arrangement for frame construction
CN103821356A (en) Construction equipment and system of elevator shaft shear wall
CN203420643U (en) Double-racking-platform constructed A-type drilling derrick
CN202012071U (en) Work platform for boring in water
CN203452658U (en) Front-opening drilling rig derrick with double racking platforms for construction
CN204938800U (en) Tower crane rood beam basis
CN104343394A (en) Front opening type drilling rig derrick with double racking platforms for construction
CN104343393A (en) A-shaped drilling rig derrick with double racking platforms for construction
CN201961968U (en) Hoisting frame for chemical equipment overhaul
CN203684394U (en) Supporting device for framework structure
CN205276843U (en) Instrument formula protection frame suitable for assemble protruding type component of integral concrete
CN204569238U (en) Omnipotent bracing or strutting arrangement bottom a kind of tower crane
CN201062431Y (en) Lifting device for cantilever scaffold
CN203156100U (en) Drilling instrument for suspended ceiling construction
CN203568661U (en) Built-in tail-sliding lifting lug
CN203373983U (en) Discharging platform capable of rising and falling along with climbing frame
CN203008819U (en) Leaping type catwalk capable of moving along with drilling machine
CN201762664U (en) Bracket for mounting guardrail templates in bridge building
CN103410330A (en) Asymmetric variable cross-section different-curve extra-heavy-duty large-span steel truss hoisting method
CN203961810U (en) A kind of bearing diagonal device for rig
CN204609422U (en) Three pipe tower platform structures
CN203603771U (en) Telescopic petroleum rig derrick racking board operating platform
CN203856241U (en) Integral-wallboard heat-preserving shed of drill stand
CN204436270U (en) Derrick lifting downward putting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140205

Termination date: 20210809

CF01 Termination of patent right due to non-payment of annual fee