CN104340900A - 一种起重机端部全程干预双折线起升机构卷筒排绳方法 - Google Patents
一种起重机端部全程干预双折线起升机构卷筒排绳方法 Download PDFInfo
- Publication number
- CN104340900A CN104340900A CN201410560916.2A CN201410560916A CN104340900A CN 104340900 A CN104340900 A CN 104340900A CN 201410560916 A CN201410560916 A CN 201410560916A CN 104340900 A CN104340900 A CN 104340900A
- Authority
- CN
- China
- Prior art keywords
- rope
- reel
- double
- folding
- layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66D—CAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
- B66D1/00—Rope, cable, or chain winding mechanisms; Capstans
- B66D1/28—Other constructional details
- B66D1/30—Rope, cable, or chain drums or barrels
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66D—CAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
- B66D1/00—Rope, cable, or chain winding mechanisms; Capstans
- B66D1/28—Other constructional details
- B66D1/36—Guiding, or otherwise ensuring winding in an orderly manner, of ropes, cables, or chains
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66D—CAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
- B66D2700/00—Capstans, winches or hoists
- B66D2700/01—Winches, capstans or pivots
- B66D2700/0183—Details, e.g. winch drums, cooling, bearings, mounting, base structures, cable guiding or attachment of the cable to the drum
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明公开一种起重机端部全程干预双折线起升机构卷筒排绳方法,卷筒轮缘安装在双折线筒体两端,挡绳台设置在双折线筒体与卷筒轮缘的交接处;排绳层数为N;卷筒轮缘向两端各移(N-1)*0.5个绳槽的距离,将占据半个绳槽的挡绳台向轮缘延伸至整个绳槽的宽度,再将另半个圈增加半个绳槽宽度;第一层钢丝绳从双折线筒体的一侧开始缠绕,绕到另一侧边缘爬升进入第二层时,在挡绳台作用下顺势完成本次折线;继续缠绕,在二层绳径高的挡绳台的阻挡下,完成向回程方向的折线,至此确定了钢丝绳的回程秩序;往返重复直到钢丝绳缠绕完毕。通过对双折线筒体的改进,使得第二层以后钢丝绳双折线排绳也如同第一层一样有序,减少起升机构乱绳现象。
Description
技术领域
本发明涉及一种排绳方法,具体涉及一种起重机端部全程干预双折线起升机构卷筒排绳方法。
背景技术
起升机构是塔式起重机工作的核心部分。卷筒是起升机构一种不可缺少的装置, 它需要确保钢丝绳在其上排列整齐, 减轻钢丝绳相互之间的挤压,降低其磨损程度, 延长钢丝绳的寿命。目前市场上的起升机构卷筒分为单折线卷筒与光面卷筒,起升钢丝绳在这两种卷筒上缠绕,都很容易出现局部凸起现象,我们形象地称之为“牛眼”,这种现象会使起升机构产生乱绳现象,减少钢丝绳的使用寿命。
凸起现象产生的原因解释:图1是钢丝绳在光面卷筒上挠绳产生的自然折线效果(卷筒展开图),图2是钢丝绳在单折线卷筒上挠绳产生的折线效果(卷筒展开图),图3是钢丝绳在双折线卷筒上挠绳产生的折线效果(卷筒展开图)。图1-3示均为卷筒第一层的排绳情况,其中A点为绕绳起始位置。B点为第一层绕绳结束,准备爬升进入第二层的位置。
对于光面卷筒而言,后一层的每一匝钢丝绳都与前一层重合,只是在折线处变换绕绳路线。然而就是在这一匝的周长内,随着外面一层的钢丝绳对下面一层钢丝绳的不断辗压,使下面一层钢丝绳逐步伸长。尤其到达折线处时,由于下层钢丝绳已被上一层钢丝绳的前一匝压住,伸长的下层钢丝绳就挣脱其两侧的摩擦约束向上拱起,形成“牛眼”。
单折线卷筒与光面卷筒的情况基本一样。只是在折线槽的强制作用下,使折线处法向绳距变小,两侧钢丝绳对伸长钢丝绳的摩擦约束增大,减少了钢丝绳突起的可能性。而双折线卷筒除有强制折线的有利因素外,还由于二次折线使上层钢丝绳对下层钢丝绳的辗压变为了半周,减少了一半,大大减少了钢丝绳的伸长量,使钢丝绳不再易于突起。不可否认,双折线卷筒大大改善了钢丝绳挠绳时的乱绳现象。然而以上三种卷筒形式,都只是解决了第一层的排绳问题。从第二层起都会恢复到如光面卷筒那样的自然折线状态。也就是说“牛眼”现象没有得到根本解决。
发明内容
针对上述现有技术存在的问题,本发明提供一种起重机端部全程干预双折线起升机构卷筒排绳方法,实现第二层以后钢丝绳双折线排绳效果,减少起升机构乱绳现象。
为了实现上述目的,本发明采用的技术方案是:一种全起重机端部全程干预双折线起升机构卷筒排绳方法,包括双折线筒体、卷筒轮缘和挡绳台,卷筒轮缘安装在双折线筒体的两端,挡绳台设置在双折线筒体与卷筒轮缘的交接处;
排绳层数为N;
a.卷筒轮缘向两端各移(N-1)*0.5个绳槽的距离,将占据半个绳槽的挡绳台向轮缘延伸至整个绳槽的宽度,再将另半个圈增加半个绳槽宽度;
b.第一层钢丝绳从双折线筒体的一侧开始缠绕,绕到另一侧边缘爬升进入第二层时,在挡绳台作用下顺势完成本次折线;
c.继续缠绕,在二层绳径高的挡绳台的阻挡下,完成向回程方向的折线,至此确定了钢丝绳的回程秩序;
d.往返重复直到钢丝绳缠绕完毕。
本发明的有益效果是:通过对双折线筒体的改进,使得第二层以后钢丝绳双折线排绳也如同第一层一样有序,减少起升机构乱绳现象。
附图说明
图1为背景技术中钢丝绳在光面卷筒上挠绳产生的自然折线效果图;
图2为背景技术中钢丝绳在单折线卷筒上挠绳产生的折线效果图;
图3为背景技术中钢丝绳在双折线卷筒上挠绳产生的折线效果图;
图4为本发明排绳层数为四层时卷筒结构示意图;
图5为图4中C-C向剖视图;
图6为图4中D-D剖视图;
图中:1、双折线筒体,2、卷筒轮缘,3、挡绳台。
具体实施方式
下面结合附图对本发明作进一步说明。
如图4和图6所示,本起重机端部全程干预双折线起升机构卷筒排绳方法,包括双折线筒体1、卷筒轮缘2和挡绳台3,卷筒轮缘2安装在双折线筒体1的两端,挡绳台3设置在双折线筒体1与卷筒轮缘2的交接处;
排绳层数为N;
a.卷筒轮缘2向两端各移(N-1)*0.5个绳槽的距离,将占据半个绳槽的挡绳台3向轮缘延伸至整个绳槽的宽度,再将另半个圈增加半个绳槽宽度;
b.第一层钢丝绳从双折线筒体1的一侧开始缠绕,绕到另一侧边缘爬升进入第二层时,在挡绳台3作用下顺势完成本次折线;
c.继续缠绕,在二层绳径高的挡绳台3的阻挡下,完成向回程方向的折线,至此确定了钢丝绳的回程秩序;
d.往返重复直到钢丝绳缠绕完毕。
实施例:
如图4至图6所示,钢丝绳在A1点处开始缠绕,当第一层钢丝绳缠绕到图中B1点爬升进入第二层时,在挡绳台3端部特殊结构作用下顺势完成本次折线,在图4中涂黑部分上面向下排绳。当钢丝绳绕至下方B2处时,在图4中网线处二层绳径高的挡绳台3的阻挡下,完成向左的折线,至此确定了钢丝绳的回程秩序,以此类推到其余各层,使卷筒上每一层钢丝绳都能像第一层那样的有序排列,减少起升机构乱绳现象。根据排绳的层数,可以设置挡绳台3的层数。
以此类推,如果卷筒一共排绳三层,卷筒轮缘2向两端各移一个绳槽,如果卷筒一共排绳四层,卷筒轮缘2向两端各移一个半绳槽。
Claims (1)
1.一种起重机端部全程干预双折线起升机构卷筒排绳方法,包括双折线筒体(1)、卷筒轮缘(2)和挡绳台(3),卷筒轮缘(2)安装在双折线筒体(1)的两端,挡绳台(3)设置在双折线筒体(1)与卷筒轮缘(2)的交接处;
其特征在于,排绳层数为N;
a.卷筒轮缘(2)向两端各移(N-1)*0.5个绳槽的距离,将占据半个绳槽的挡绳台(3)向轮缘延伸至整个绳槽的宽度,再将另半个圈增加半个绳槽宽度;
b.第一层钢丝绳从双折线筒体(1)的一侧开始缠绕,绕到另一侧边缘爬升进入第二层时,在挡绳台(3)作用下顺势完成本次折线;
c.继续缠绕,在二层绳径高的挡绳台(3)的阻挡下,完成向回程方向的折线,至此确定了钢丝绳的回程秩序;
d.往返重复直到钢丝绳缠绕完毕。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410560916.2A CN104340900A (zh) | 2014-10-21 | 2014-10-21 | 一种起重机端部全程干预双折线起升机构卷筒排绳方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410560916.2A CN104340900A (zh) | 2014-10-21 | 2014-10-21 | 一种起重机端部全程干预双折线起升机构卷筒排绳方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104340900A true CN104340900A (zh) | 2015-02-11 |
Family
ID=52497450
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410560916.2A Pending CN104340900A (zh) | 2014-10-21 | 2014-10-21 | 一种起重机端部全程干预双折线起升机构卷筒排绳方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104340900A (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107200281A (zh) * | 2017-07-14 | 2017-09-26 | 南京市特种设备安全监督检验研究院 | 一种双折线式卷筒的导向抬升垫块的设计方法 |
CN110065898A (zh) * | 2019-05-29 | 2019-07-30 | 河南锐思特科技有限公司 | 一种风力发电机维修用起重机提升机 |
CN110127502A (zh) * | 2019-06-19 | 2019-08-16 | 重庆大学 | 一种用于绳索缠绕的过渡装置及其使用方法 |
CN110255413A (zh) * | 2019-04-24 | 2019-09-20 | 武汉船用机械有限责任公司 | 爬绳块定位安装方法 |
CN116553413A (zh) * | 2023-04-04 | 2023-08-08 | 徐州博远传动机械有限公司 | 一种具有防爬绳结构的起升设备 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1984604A (en) * | 1933-01-21 | 1934-12-18 | Columbus Mckinnon Chain Compan | Hoist drum |
GB819273A (en) * | 1956-05-24 | 1959-09-02 | Nat Supply Co | Improvements relating to grooved cable drums |
US4071205A (en) * | 1976-08-27 | 1978-01-31 | Harnischfeger Corporation | Spooling drum including stepped flanges |
CN2488896Y (zh) * | 2001-07-06 | 2002-05-01 | 国营华南船舶机械厂 | 顺绕式卷筒 |
CN201367326Y (zh) * | 2009-02-13 | 2009-12-23 | 长沙中联重工科技发展股份有限公司 | 一种用于卷扬机的卷筒 |
CN101885453A (zh) * | 2010-06-25 | 2010-11-17 | 上海三一科技有限公司 | 多层缠绕绳槽整体机加工卷筒 |
-
2014
- 2014-10-21 CN CN201410560916.2A patent/CN104340900A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1984604A (en) * | 1933-01-21 | 1934-12-18 | Columbus Mckinnon Chain Compan | Hoist drum |
GB819273A (en) * | 1956-05-24 | 1959-09-02 | Nat Supply Co | Improvements relating to grooved cable drums |
US4071205A (en) * | 1976-08-27 | 1978-01-31 | Harnischfeger Corporation | Spooling drum including stepped flanges |
CN2488896Y (zh) * | 2001-07-06 | 2002-05-01 | 国营华南船舶机械厂 | 顺绕式卷筒 |
CN201367326Y (zh) * | 2009-02-13 | 2009-12-23 | 长沙中联重工科技发展股份有限公司 | 一种用于卷扬机的卷筒 |
CN101885453A (zh) * | 2010-06-25 | 2010-11-17 | 上海三一科技有限公司 | 多层缠绕绳槽整体机加工卷筒 |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107200281A (zh) * | 2017-07-14 | 2017-09-26 | 南京市特种设备安全监督检验研究院 | 一种双折线式卷筒的导向抬升垫块的设计方法 |
CN110255413A (zh) * | 2019-04-24 | 2019-09-20 | 武汉船用机械有限责任公司 | 爬绳块定位安装方法 |
CN110255413B (zh) * | 2019-04-24 | 2021-04-13 | 武汉船用机械有限责任公司 | 爬绳块定位安装方法 |
CN110065898A (zh) * | 2019-05-29 | 2019-07-30 | 河南锐思特科技有限公司 | 一种风力发电机维修用起重机提升机 |
CN110127502A (zh) * | 2019-06-19 | 2019-08-16 | 重庆大学 | 一种用于绳索缠绕的过渡装置及其使用方法 |
CN110127502B (zh) * | 2019-06-19 | 2023-10-27 | 重庆大学 | 一种用于绳索缠绕的过渡装置及其使用方法 |
CN116553413A (zh) * | 2023-04-04 | 2023-08-08 | 徐州博远传动机械有限公司 | 一种具有防爬绳结构的起升设备 |
CN116553413B (zh) * | 2023-04-04 | 2024-01-30 | 徐州博远传动机械有限公司 | 一种具有防爬绳结构的起升设备 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104340900A (zh) | 一种起重机端部全程干预双折线起升机构卷筒排绳方法 | |
CN102107824A (zh) | 双层卷绕钢丝绳卷筒 | |
CN101955137B (zh) | 一种折线绳槽卷筒 | |
CN204131006U (zh) | 新型牵引滑轮 | |
CN204713132U (zh) | 纺织推车 | |
CN103523697B (zh) | 一种折线绳槽多层缠绕卷筒 | |
CN203513152U (zh) | 一种折线绳槽多层缠绕卷筒 | |
CN103715632B (zh) | 一种输电线路作业吊挂装置及输电线路作业方法 | |
CN201201874Y (zh) | 整体式绞车滚筒 | |
CN203246987U (zh) | 基于无级绳的升降系统以及具有这种升降系统的电梯和卷扬机 | |
CN203728462U (zh) | 一种旋挖钻机用卷筒 | |
CN202358862U (zh) | 水电站超高扬程卷扬式启闭机 | |
CN208897905U (zh) | 一种大容量垂直储带装置 | |
CN107200281B (zh) | 一种双折线式卷筒的导向抬升垫块的设计方法 | |
US20180208444A1 (en) | Hoisting device | |
CN205151622U (zh) | 双层钢丝绳电动葫芦 | |
CN107697233B (zh) | 一种登船梯 | |
CN206580419U (zh) | 电梯装置 | |
CN202011712U (zh) | 双层卷绕钢丝绳卷筒 | |
CN210064875U (zh) | 一种用于绳索缠绕的过渡装置 | |
CN110127502A (zh) | 一种用于绳索缠绕的过渡装置及其使用方法 | |
CN204117813U (zh) | 一种树脂绝缘干式电力变压器的高压线圈 | |
CN203529830U (zh) | 高扬程启闭机 | |
KR101446690B1 (ko) | 고가 사다리차의 사다리 인출장치 | |
CN208700301U (zh) | 线盘 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150211 |