CN104331775A - 一种计量资产全寿命周期质量分析方法 - Google Patents
一种计量资产全寿命周期质量分析方法 Download PDFInfo
- Publication number
- CN104331775A CN104331775A CN201410649661.7A CN201410649661A CN104331775A CN 104331775 A CN104331775 A CN 104331775A CN 201410649661 A CN201410649661 A CN 201410649661A CN 104331775 A CN104331775 A CN 104331775A
- Authority
- CN
- China
- Prior art keywords
- asset
- quality
- life cycle
- measuring asset
- index
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004458 analytical method Methods 0.000 title claims abstract description 28
- 238000013441 quality evaluation Methods 0.000 claims abstract description 32
- 238000000034 method Methods 0.000 claims abstract description 17
- 238000001514 detection method Methods 0.000 claims abstract description 8
- 238000009434 installation Methods 0.000 claims abstract description 8
- 238000003860 storage Methods 0.000 claims abstract description 8
- 238000011156 evaluation Methods 0.000 claims description 8
- 230000002349 favourable effect Effects 0.000 claims description 2
- 238000005516 engineering process Methods 0.000 abstract description 3
- 238000013178 mathematical model Methods 0.000 abstract description 3
- 238000012854 evaluation process Methods 0.000 abstract 1
- 238000007689 inspection Methods 0.000 abstract 1
- 238000012384 transportation and delivery Methods 0.000 abstract 1
- 238000012795 verification Methods 0.000 abstract 1
- 238000007726 management method Methods 0.000 description 31
- 238000012797 qualification Methods 0.000 description 13
- 239000011159 matrix material Substances 0.000 description 5
- 238000003556 assay Methods 0.000 description 4
- 238000011056 performance test Methods 0.000 description 4
- 238000013461 design Methods 0.000 description 2
- 238000000556 factor analysis Methods 0.000 description 2
- 238000011900 installation process Methods 0.000 description 2
- 238000011835 investigation Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000013459 approach Methods 0.000 description 1
- 238000007630 basic procedure Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 238000001303 quality assessment method Methods 0.000 description 1
- 238000011002 quantification Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000005070 sampling Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06395—Quality analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- Development Economics (AREA)
- Health & Medical Sciences (AREA)
- Educational Administration (AREA)
- Marketing (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Game Theory and Decision Science (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
采购到货阶段指标层 | 生产前全性能试验合格率 | 生产前样品比对合格率 |
生产前全性能试验合格率 | 1 | 3 |
生产前样品比对合格率 | 1/3 | 1 |
设备拆除阶段指标层 | 拆回计量资产检定合格率 | 拆除故障类型占比 |
拆回计量资产检定合格率 | 1 | 5 |
拆除故障类型占比 | 1/5 | 1 |
指标层C | 指标类型 |
生产前全性能试验合格率C1 | 正向指标 |
生产前样品比对合格率C2 | 正向指标 |
供货前样品比对合格率C3 | 正向指标 |
供货前全性能试验合格率C4 | 正向指标 |
到货后样品比对合格率C5 | 正向指标 |
到货后抽检试验合格率C6 | 正向指标 |
检定合格率(全检验收合格率)C7 | 正向指标 |
电能表复检合格率(库存)C8 | 正向指标 |
检定检测故障类型占比C9 | 逆向指标 |
新品库龄C10 | 逆向指标 |
成品库龄C11 | 逆向指标 |
指标层C | 指标类型 |
领出待装时间C12 | 逆向指标 |
配送在途时间C13 | 逆向指标 |
领出待装次数C14 | 逆向指标 |
入库次数C15 | 逆向指标 |
配送故障率C16 | 逆向指标 |
安装过程中智能电能表故障率C17 | 逆向指标 |
安装过程中智能电能表质量故障类型占比C18 | 逆向指标 |
(质量因素)故障类型占比C19 | 逆向指标 |
运行表临检不合格率C20 | 逆向指标 |
运行表抽检合格率C21 | 正向指标 |
运行表故障率C22 | 逆向指标 |
运行表现场校验合格率C23 | 正向指标 |
监督抽检合格率C24 | 正向指标 |
(实际运行)表龄C25 | 逆向指标 |
拆回计量资产检定合格率C26 | 正向指标 |
拆除故障类型占比C27 | 逆向指标 |
质量因素导致的计量资产报废率C28 | 逆向指标 |
质量因素导致报废的原因类型占比C29 | 逆向指标 |
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410649661.7A CN104331775A (zh) | 2014-11-14 | 2014-11-14 | 一种计量资产全寿命周期质量分析方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410649661.7A CN104331775A (zh) | 2014-11-14 | 2014-11-14 | 一种计量资产全寿命周期质量分析方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104331775A true CN104331775A (zh) | 2015-02-04 |
Family
ID=52406496
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410649661.7A Pending CN104331775A (zh) | 2014-11-14 | 2014-11-14 | 一种计量资产全寿命周期质量分析方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104331775A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110516886A (zh) * | 2019-09-02 | 2019-11-29 | 云南电网有限责任公司电力科学研究院 | 基于rfid和设备评价的仓储优化配置方法和系统 |
CN111680962A (zh) * | 2020-04-30 | 2020-09-18 | 国网吉林省电力有限公司电力科学研究院 | 一种带电检测仪器比对实验管理方法 |
CN111784198A (zh) * | 2020-07-20 | 2020-10-16 | 国网山东省电力公司鄄城县供电公司 | 计量资产的监控方法、装置以及计算机设备 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101540018A (zh) * | 2009-01-23 | 2009-09-23 | 浙江师范大学 | 一种企业信息技术应用程度评价方法及系统 |
CN102521511A (zh) * | 2011-12-14 | 2012-06-27 | 中国科学院科技政策与管理科学研究所 | 城镇绿地生态综合评估信息系统 |
-
2014
- 2014-11-14 CN CN201410649661.7A patent/CN104331775A/zh active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101540018A (zh) * | 2009-01-23 | 2009-09-23 | 浙江师范大学 | 一种企业信息技术应用程度评价方法及系统 |
CN102521511A (zh) * | 2011-12-14 | 2012-06-27 | 中国科学院科技政策与管理科学研究所 | 城镇绿地生态综合评估信息系统 |
Non-Patent Citations (2)
Title |
---|
何蓓 等: "基于闭环供应链的电能计量资产全寿命周期管理体系与策略", 《物流工程与管理》 * |
羌丁建: "考虑微电网的配电网规划综合评价体系研究", 《中国优秀硕士学位论文全文数据库工程科技II辑》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110516886A (zh) * | 2019-09-02 | 2019-11-29 | 云南电网有限责任公司电力科学研究院 | 基于rfid和设备评价的仓储优化配置方法和系统 |
CN111680962A (zh) * | 2020-04-30 | 2020-09-18 | 国网吉林省电力有限公司电力科学研究院 | 一种带电检测仪器比对实验管理方法 |
CN111784198A (zh) * | 2020-07-20 | 2020-10-16 | 国网山东省电力公司鄄城县供电公司 | 计量资产的监控方法、装置以及计算机设备 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106444703B (zh) | 基于故障模式发生概率的动设备运行状态模糊评价及预测方法 | |
CN102622473B (zh) | 基于贝叶斯理论的步进应力加速退化试验优化设计方法 | |
CN107563601A (zh) | 一种智能电能表运行状态评价方法 | |
CN109359894A (zh) | 一种基于rpn的电力计量设备风险评价方法及装置 | |
CN104200288A (zh) | 一种基于因素与事件间相关关系识别的设备故障预测方法 | |
CN102411339A (zh) | 一种数控装备性能可靠性评估方法 | |
CN106372660A (zh) | 一种基于大数据分析的航天产品装配质量问题分类方法 | |
CN114971403A (zh) | 一种基于大数据的物流供应链智能调度系统 | |
CN112508679A (zh) | 一种小微企业贷款风险评估方法、装置及存储介质 | |
CN116862289A (zh) | 一种工程造价指标管理方法、系统、终端设备及存储介质 | |
CN104331775A (zh) | 一种计量资产全寿命周期质量分析方法 | |
Zhang et al. | Long‐term bridge performance assessment using clustering and Bayesian linear regression for vehicle load and strain mapping model | |
CN118115189A (zh) | 航空物流成本预测方法、装置及存储介质 | |
Wang et al. | Probabilistic model of traffic scenarios for extreme load effects in long-span bridges | |
CN111931425A (zh) | 一种基于rf算法的热轧q355b钢种的性能预测系统 | |
CN107862476A (zh) | 一种基于数据分析的计量用表需求计算方法 | |
CN116957534A (zh) | 一种预测智能电表更换数量的方法 | |
CN106845755A (zh) | 一种停电检修计划编制业务水平评估方法及系统 | |
CN101629407A (zh) | 一种路面结构强度预测方法 | |
CN107527141A (zh) | 开关柜质量的检测方法和系统 | |
CN114037144A (zh) | 一种电网工程运维成本预测方法及系统 | |
CN103733041A (zh) | 管理装置、管理方法、程序及记录介质 | |
Avdeeva et al. | Forecasting of key indicators of the manufacturing system in changing external environment | |
Xia et al. | Reliability evaluation for the running state of the manufacturing system based on poor information | |
CN109739671A (zh) | 一种电子设备贮存可靠度预测方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20151103 Address after: 210061 D11 building, hi tech Development Zone, Jiangsu, Nanjing Applicant after: Nanjing Nari Co., Ltd. Applicant after: NARI Technology Development Co., Ltd. Applicant after: SGCC NARI Nanjing Control System Co., Ltd. Address before: High road high tech Zone of Nanjing City, Jiangsu Province, No. 20 210061 Applicant before: NARI Technology Development Co., Ltd. Applicant before: SGCC NARI Nanjing Control System Co., Ltd. |
|
CB03 | Change of inventor or designer information |
Inventor after: Ye Jianbin Inventor after: Peng Chuning Inventor after: Du Xingang Inventor after: Ge Dehui Inventor after: Xu Shiming Inventor after: Liu Aihua Inventor after: An Tai Inventor after: Li Tianyang Inventor after: Wang Liang Inventor after: Chu Pengfei Inventor after: Dai Rui Inventor after: Li Yanman Inventor after: Gao Chunlei Inventor after: Hou Yanli Inventor after: Du Shuwei Inventor before: Ye Jianbin Inventor before: Li Tianyang Inventor before: Wang Liang Inventor before: Chu Pengfei Inventor before: Dai Rui Inventor before: Li Yanman Inventor before: Gao Chunlei Inventor before: Hou Yanli |
|
COR | Change of bibliographic data | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150204 |