CN104295104A - Box-section crane girder high-strength bolt group field installation method - Google Patents

Box-section crane girder high-strength bolt group field installation method Download PDF

Info

Publication number
CN104295104A
CN104295104A CN201410597480.4A CN201410597480A CN104295104A CN 104295104 A CN104295104 A CN 104295104A CN 201410597480 A CN201410597480 A CN 201410597480A CN 104295104 A CN104295104 A CN 104295104A
Authority
CN
China
Prior art keywords
box
crane girder
section
section crane
strength bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410597480.4A
Other languages
Chinese (zh)
Other versions
CN104295104B (en
Inventor
单明
严春光
吴梦先
赵保华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FANGCHENGGANG ZHONGYI HEAVY INDUSTRY Co Ltd
Original Assignee
FANGCHENGGANG ZHONGYI HEAVY INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FANGCHENGGANG ZHONGYI HEAVY INDUSTRY Co Ltd filed Critical FANGCHENGGANG ZHONGYI HEAVY INDUSTRY Co Ltd
Priority to CN201410597480.4A priority Critical patent/CN104295104B/en
Publication of CN104295104A publication Critical patent/CN104295104A/en
Application granted granted Critical
Publication of CN104295104B publication Critical patent/CN104295104B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a box-section crane girder high-strength bolt group field installation method. The box-section crane girder high-strength bolt group field installation method comprises the following steps of 1 erecting a jig frame; 2 arranging a wedge-shaped iron liner on the jig frame in the location area of each section of a box-section crane girder; 3 firstly hoisting a middle section of the box-section crane girder onto the jig frame and then sequentially hoisting a head section and a tail section; 4 firstly installing connecting plates subjected to over coring and the middle section of the box-section crane girder and then using punching nails to fix the connecting plates and the middle section; 5 checking whether bolt holes of the connecting plates are aligned to bolt holes of the head section and bolt holes of the tail section of the box-section crane girder or not, directly using the punching nails to achieve fixing if alignment is determined, and if the alignment is not achieved, using jacks to jack and release the box-section crane girder in a small-amplitude mode till the alignment is achieved, using the punching nails to achieve fixing, adjusting the wedge-shaped iron liners so as to stabilize the box-section crane girder and then performing high-strength bolt installation work. By means of the method, hole enlargement, hole patching, repeat drilling works brought by non-alignment of the bolts holes are avoided, working amount is decreased, construction progress is accelerated, and the pass percent of installed high-strength bolts is guaranteed.

Description

Box-section crane girder high-strength bolt field installation process
Technical field
The invention belongs to About Construction Technology of Steel Configuration field, be specifically related to a kind of box-section crane girder high-strength bolt field installation process.
Background technology
The on-site consolidation of large volume box-section crane girder is a difficult problem of steel building industry always, and the high-strength bolt installation of enormous amount is the key point of an assembled difficult problem.In the past in work progress, run into when bolt hole is misfitted between junction plate and reamer can only be adopted to carry out reaming, both affected construction speed, in case of too much reaming amount does not meet design specifications requirement yet.The installation work how completing box-section crane girder high-strength bolt is at the scene one of the emphasis and difficult point of steel building industry.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of box-section crane girder high-strength bolt field installation process, can not be subject to the impact that on-the-spot lifting work is not convenient, install high-strength bolt quickly and efficiently.
For solving the problem, the invention provides following technical scheme:
Box-section crane girder high-strength bolt field installation process, comprises the following steps:
1) box-section crane girder on-site consolidation moulding bed is set up;
2) wedge shape parallels is set on the moulding bed in every sections box-section crane girder dropping place region;
3) first interlude box-section crane girder lifts after to moulding bed as control section, then hoisting head, rear successively;
4) first installing overlapping the junction plate bored with interlude box-section crane girder, using punch to fix;
5) check the bolt hole of junction plate and head, rear box-section crane girder bolt hole to hole situation; As all right in coincideing, then directly carry out punch and fix; As there is wrong hole situation, then use jack top by a small margin, fall box-section crane girder, when finding that box-section crane girder bolt hole and junction plate bolt hole coincide, stop adjustment immediately, use punch fixed connecting plate, and adjust wedge shape parallels with firm box-section crane girder, finally can start the installation work of high-strength bolt.
In technique scheme:
Step 2) in, the moulding bed in every sections box-section crane girder dropping place region arranges wedge shape parallels everywhere, preferably lays respectively at four angles in dropping place region;
Step 3) after, generally also to check moulding bed whether sedimentation, if any sedimentation then with the box-section crane girder jack-up of jack by sedimentation end, and adjust wedge shape parallels with firm box-section crane girder;
The invention has the beneficial effects as follows:
1) ensure that high-strength bolt installation qualification rate; 2) lifting appliance frequency of utilization and quantity is decreased; 3) avoid bolt hole misfit cause reaming, perforations adding, heavily to hole work, decrease workload, improve construction speed.
Accompanying drawing explanation
Schematic diagram when Fig. 1 is box-section crane girder high-strength bolt in-site installation.
Number in the figure is: 1, moulding bed; 2, wedge shape parallels; 3, jack; 4, junction plate; 5, punch; 6, head section box-section crane girder; 7, interlude box-section crane girder; 8, rear box-section crane girder.
Detailed description of the invention
Below the preferred embodiments of the present invention are described, should be appreciated that preferred embodiment described herein is only for instruction and explanation of the present invention, is not intended to limit the present invention.
As shown in Figure 1, box-section crane girder high-strength bolt field installation process, comprises the following steps:
1) box-section crane girder on-site consolidation moulding bed 1 is set up;
2) wedge shape parallels 2 is everywhere set on the moulding bed 1 in every sections box-section crane girder dropping place region, lays respectively at four angles in dropping place region;
3) first interlude box-section crane girder 7 lifts after to moulding bed 1 as control section, then hoisting head, rear box-section crane girder 6,8 successively, and the stitching portion of adjacent segment box-section crane girder is equipped with bolt hole;
4) check moulding bed 1 whether sedimentation, then use jack 3 by the box-section crane girder jack-up of sedimentation end if any sedimentation, and adjust wedge shape parallels 2 with firm box-section crane girder;
5) first installing overlapping the junction plate 4 bored with interlude box-section crane girder 7, using punch 5 to fix;
6) check the bolt hole of junction plate 4 and head, rear box-section crane girder 6,8 bolt hole to hole situation; As all right in coincideing, then directly carry out punch 5 and fix; As there is wrong hole situation, then use jack 3 top by a small margin, fall box-section crane girder, when finding that box-section crane girder bolt hole and junction plate 4 bolt hole coincide, stop adjustment immediately, use punch 5 fixed connecting plate, and adjust wedge shape parallels 2 with firm box-section crane girder, finally can start the installation work of high-strength bolt.

Claims (3)

1. box-section crane girder high-strength bolt field installation process, is characterized in that, comprises the following steps:
1) box-section crane girder on-site consolidation moulding bed is set up;
2) wedge shape parallels is set on the moulding bed in every sections box-section crane girder dropping place region;
3) first interlude box-section crane girder lifts after to moulding bed as control section, then hoisting head, rear successively;
4) first installing overlapping the junction plate bored with interlude box-section crane girder, using punch to fix;
5) check the bolt hole of junction plate and head, rear box-section crane girder bolt hole to hole situation; As all right in coincideing, then directly carry out punch and fix; As there is wrong hole situation, then use jack top by a small margin, fall box-section crane girder, when finding that box-section crane girder bolt hole and junction plate bolt hole coincide, stop adjustment immediately, use punch fixed connecting plate, and adjust wedge shape parallels with firm box-section crane girder, finally can start the installation work of high-strength bolt.
2. box-section crane girder high-strength bolt field installation process according to claim 1, it is characterized in that: completing steps 3) after also to check moulding bed whether sedimentation, if any sedimentation then with the box-section crane girder jack-up of jack by sedimentation end, and adjust wedge shape parallels with firm box-section crane girder.
3. box-section crane girder high-strength bolt field installation process according to claim 1 and 2, is characterized in that: step 2) in, the moulding bed in every sections box-section crane girder dropping place region arranges wedge shape parallels everywhere, lays respectively at four angles in dropping place region.
CN201410597480.4A 2014-10-29 2014-10-29 Box-section crane girder high-strength bolt field installation process Active CN104295104B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410597480.4A CN104295104B (en) 2014-10-29 2014-10-29 Box-section crane girder high-strength bolt field installation process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410597480.4A CN104295104B (en) 2014-10-29 2014-10-29 Box-section crane girder high-strength bolt field installation process

Publications (2)

Publication Number Publication Date
CN104295104A true CN104295104A (en) 2015-01-21
CN104295104B CN104295104B (en) 2016-03-23

Family

ID=52315027

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410597480.4A Active CN104295104B (en) 2014-10-29 2014-10-29 Box-section crane girder high-strength bolt field installation process

Country Status (1)

Country Link
CN (1) CN104295104B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110904857A (en) * 2019-12-30 2020-03-24 中国铁建投资集团有限公司 Temporary buckling tower installation method for self-anchored suspension bridge construction

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0748096A (en) * 1993-08-05 1995-02-21 Marufuji Shiitopairu Kk High lift work vehicle for upside-down construction method
JPH09209454A (en) * 1996-02-02 1997-08-12 Kajima Corp Building construction
CN201458547U (en) * 2009-07-16 2010-05-12 中冶东北建设有限公司工业炉建筑安装工程公司 High-tunnel crane beam for coke oven masonry with section-by-section assembly
CN101759098A (en) * 2008-11-28 2010-06-30 中冶成工上海五冶建设有限公司 Crane beam frame construction method
CN201778497U (en) * 2010-06-25 2011-03-30 中国二十冶集团有限公司 Multi-section column aloft spliced temporary fixing device
CN102086000A (en) * 2009-12-08 2011-06-08 中冶成工上海五冶建设有限公司 Onsite splicing and mounting method for extra-large and overweight box crane girders
CN202380401U (en) * 2011-11-18 2012-08-15 中铁四局集团钢结构有限公司 Assembly jig frame of plate blocks of steel-truss-beam flexible-arch orthotropic bridge deck
CN203320954U (en) * 2013-07-01 2013-12-04 杨桂云 Framework structure of long-span dual-curved type assembling box beams
CN103498559A (en) * 2013-10-11 2014-01-08 四川省第四建筑工程公司 Splicing movable bridge frame of steel structure industrial factory building and construction method for applying splicing movable bridge frame to roof construction
CN103711323A (en) * 2014-01-22 2014-04-09 芜湖天航科技(集团)股份有限公司 Construction method of sprung roof plates by use of movable type pipe truss platform

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0748096A (en) * 1993-08-05 1995-02-21 Marufuji Shiitopairu Kk High lift work vehicle for upside-down construction method
JPH09209454A (en) * 1996-02-02 1997-08-12 Kajima Corp Building construction
CN101759098A (en) * 2008-11-28 2010-06-30 中冶成工上海五冶建设有限公司 Crane beam frame construction method
CN201458547U (en) * 2009-07-16 2010-05-12 中冶东北建设有限公司工业炉建筑安装工程公司 High-tunnel crane beam for coke oven masonry with section-by-section assembly
CN102086000A (en) * 2009-12-08 2011-06-08 中冶成工上海五冶建设有限公司 Onsite splicing and mounting method for extra-large and overweight box crane girders
CN201778497U (en) * 2010-06-25 2011-03-30 中国二十冶集团有限公司 Multi-section column aloft spliced temporary fixing device
CN202380401U (en) * 2011-11-18 2012-08-15 中铁四局集团钢结构有限公司 Assembly jig frame of plate blocks of steel-truss-beam flexible-arch orthotropic bridge deck
CN203320954U (en) * 2013-07-01 2013-12-04 杨桂云 Framework structure of long-span dual-curved type assembling box beams
CN103498559A (en) * 2013-10-11 2014-01-08 四川省第四建筑工程公司 Splicing movable bridge frame of steel structure industrial factory building and construction method for applying splicing movable bridge frame to roof construction
CN103711323A (en) * 2014-01-22 2014-04-09 芜湖天航科技(集团)股份有限公司 Construction method of sprung roof plates by use of movable type pipe truss platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110904857A (en) * 2019-12-30 2020-03-24 中国铁建投资集团有限公司 Temporary buckling tower installation method for self-anchored suspension bridge construction

Also Published As

Publication number Publication date
CN104295104B (en) 2016-03-23

Similar Documents

Publication Publication Date Title
CN106013601A (en) Large-span roof steel truss structure and accumulative slipping construction technology
CN104929148B (en) The upside-down mounting hardened system of generation power foundation of wind power ring group plinth and reinforcement means thereof
CN203594213U (en) Flexible assembling and disassembling bearing truss
CN202299465U (en) Quick adjustment device for steel beam hoisting
CN104295104A (en) Box-section crane girder high-strength bolt group field installation method
KR20140065321A (en) Apparatus for pressing of pile and operation method of the same
CN206768833U (en) A kind of concrete support and steel lattice column attachment structure
CN104863266A (en) Prefabricated high-ductility beam-column joint for box column and I-beam
CN103835498A (en) Steel wedge hang mould convenient to demount
CN104074275A (en) Prefabricated concrete column connecting joint structure
CN107059635B (en) The method of High-strength bolt hole punching rate between guarantee steel box girder bridge segment
CN203092502U (en) Auxiliary concrete roof punching frame
CN202520011U (en) Floor shore device
CN102605945B (en) Manufacturing method of big wood formwork
CN205531319U (en) Prefabricated wallboard and precast beam piece plugging device and block structure
CN105275198A (en) A shear wall formwork reinforcing construction method
CN204081468U (en) A kind of shear-wall strengthening formwork structure
CN203783129U (en) Width-retractable formwork device
CN203830973U (en) Hanging basket steel framework chord member machining tool
CN203174625U (en) Small-section square reserved hole template
CN205224285U (en) Later stage bar planting is buried piece and is hugged closely structure
CN105220707A (en) A kind of continuous casting rise and fall roller hydraulic cylinder be connected and fixed method
CN204449790U (en) A kind of fast fixing tool of machine working roller balance cylinder
CN105625711A (en) Construction-purpose roof template
CN104358355A (en) Detachable column base fixing device and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant