JPH09209454A - Building construction - Google Patents

Building construction

Info

Publication number
JPH09209454A
JPH09209454A JP1757896A JP1757896A JPH09209454A JP H09209454 A JPH09209454 A JP H09209454A JP 1757896 A JP1757896 A JP 1757896A JP 1757896 A JP1757896 A JP 1757896A JP H09209454 A JPH09209454 A JP H09209454A
Authority
JP
Japan
Prior art keywords
steel
floor
steel frame
structural steel
lift
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP1757896A
Other languages
Japanese (ja)
Inventor
Koichi Suzuki
宏一 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP1757896A priority Critical patent/JPH09209454A/en
Publication of JPH09209454A publication Critical patent/JPH09209454A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To facilitate the execution of work by joining a beam structural steel with a joint steel plate, using a column structural steel as an erection and lifting up a floor area along the column structural steel and driving a wedge into the clearance between the joint steel plate and the column structural steel at a desired elevation so as to fix. SOLUTION: A column structural steel 3 is used as an erection. Joint steel plates 6a and 6b are penetrated through the column structural steel by way of a through hole, thereby sandwiching the end of a beam structural steel with the joint steel plate 6a positioned on the lower side and the joint steel plate 6b positioned on the upper side and fasten the steel with a high strength bolt. A floor is further constructed on the beam structural steel 4, thereby assembling a floor site 10 of a first floor portion on the ground and lifting up the floor site along the column structural steel so that the floor site 10 may be fixed at a desired elevation by driving a wedge into the clearance between the joint steel plates 6a and 6b and the column structural steel 3. It is, therefore, possible to execute construction work with ease even by means of a very simple device.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、鉄骨架構による建
築物の構築工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing a building with a steel frame.

【0002】[0002]

【従来の技術】鉄骨架構の構築工法の1つとしてリフト
アップ施工法やプッシュアップ施工法が数多く提案・実
施されている。
2. Description of the Related Art Many lift-up construction methods and push-up construction methods have been proposed and implemented as one of construction methods for steel frame structures.

【0003】図7、図8に従来のリフトアップ施工法を
示すと、リフトアップ支持躯体1を先に立ち上げ、この
リフトアップ支持躯体1間でリフトアップする躯体2の
全体を組立て、躯体2の全体をまとめてリフトアップす
るようにしている。
7 and 8 show a conventional lift-up construction method, the lift-up support body 1 is first started up, and the whole body 2 which is lifted up between the lift-up support bodies 1 is assembled to form the body 2 I try to lift up the whole of it.

【0004】このリフトアップ施工法は、危険な鉄骨架
構の高所組立て作業を主に地上での作業とすることがで
きるため、作業効率が高い優れた施工法である。
This lift-up construction method is an excellent construction method with high work efficiency because it can mainly perform dangerous work for assembling a steel frame at a high place on the ground.

【0005】[0005]

【発明が解決しようとする課題】しかし、前記従来のリ
フトアップ施工法は、リフトアップする躯体を地上で組
立て、まとめてリフトアップを行っていたため、リフト
アップ作業や装置が大掛かりなものとなり、また、リフ
トアップ前後で十分な躯体精度が要求される。
However, in the above-mentioned conventional lift-up construction method, since the skeletons to be lifted up are assembled on the ground and the lift-ups are collectively performed, the lift-up work and the device become large-scale. However, sufficient body accuracy is required before and after the lift-up.

【0006】本発明の目的は前記従来例の不都合を解消
し、リフトアップまたはプッシュアップするのに、非常
に軽微な装置で、簡便な施工ができる構築工法を提供す
ることにある。
An object of the present invention is to solve the above-mentioned disadvantages of the prior art, and to provide a construction method capable of performing simple construction with a very small device for lifting or pushing up.

【0007】[0007]

【課題を解決するための手段】本発明は前記目的を達成
するため、柱鉄骨を建方し、貫通孔を介して柱鉄骨を貫
通させる接合用鋼板で梁鉄骨を接合し、これに床を施工
したフロア部位を地上で組立て、このフロア部位を柱鉄
骨に沿って上昇させ、所定の高さで前記貫通孔での接合
用鋼板と柱鉄骨との隙間に楔を打って固定すること、お
よび、フロア部位の上昇は接合用鋼板部分にフックを設
け、柱鉄骨上端または上層梁鉄骨下端から吊り支するこ
とを要旨とするものである。
Means for Solving the Problems In order to achieve the above-mentioned object, the present invention constructs a pillar steel frame, and joins a beam steel frame with a steel plate for joining which penetrates the column steel frame through a through hole, and a floor to this. Assembling the constructed floor part on the ground, raising this floor part along the pillar steel frame, and fixing it by striking a wedge in the gap between the steel plate for connection at the through hole and the pillar steel frame at a predetermined height, and In order to raise the floor portion, a gist is to provide a hook on the joining steel plate portion and suspend it from the upper end of the column steel frame or the lower end of the upper beam steel frame.

【0008】請求項1記載の本発明によれば、接合用鋼
板を用い、楔で着脱することで柱と梁とを必要に応じて
固定・自由にでき、簡便なリフトアップ(またはプッシ
ュアップ)の施工が可能となる。また、建物の各フロア
毎に地上で組立て、リフトアップ(またはプッシュアッ
プ)できるため、建物全体をリフトアップする従来の方
法に比べて非常に軽微な装置で施工が可能となる。
According to the first aspect of the present invention, a steel plate for joining is used, and by attaching and detaching it with a wedge, the pillar and the beam can be fixed and freely fixed as needed, and a simple lift-up (or push-up) is possible. Can be constructed. Further, since each floor of the building can be assembled on the ground and lifted up (or pushed up), the construction can be performed with a very small device as compared with the conventional method of lifting up the entire building.

【0009】さらに、リフトアップ中の任意の時点でも
接合用鋼板と柱鉄骨との隙間に楔を挿入することで固定
できるため、リフトアップを何段階にも分けるより自由
度の高いリフトアップ施工を行うことができる。
Further, since it can be fixed at any time during the lift-up by inserting a wedge into the gap between the steel plate for joining and the column steel frame, the lift-up construction having a higher degree of freedom than dividing the lift-up into multiple stages. It can be carried out.

【0010】最終的に柱鉄骨に固定する場合にも、柱鉄
骨と接合用鋼板とのクリアランスに楔を挿入して固定す
るため、4方向から挿入する楔の挿入深さ等をそれぞれ
適切に変えることで、柱鉄骨と接合用鋼板との芯ずれ等
も容易に調整することができる。
Even when it is finally fixed to the column steel frame, the wedge is inserted and fixed in the clearance between the column steel frame and the joining steel plate, so that the insertion depths of the wedges inserted from four directions are appropriately changed. Thus, misalignment between the column steel frame and the joining steel plate can be easily adjusted.

【0011】このように楔だけで固定・接合できるた
め、最終的には柱・梁接合部の溶接や高力ボルト接合作
業が不要となるだけでなく、リフトアップ途中でも必要
に応じて柱への固定・取外しを容易に行うことができ、
より多様なリフトアップ施工法が実現できる。
Since it can be fixed and joined only by the wedges as described above, not only the welding of the column / beam joints and the work of joining the high-strength bolts are finally unnecessary, but also during the lift-up, the pillars can be joined as needed. Can be easily fixed and removed,
More diverse lift-up construction methods can be realized.

【0012】請求項2記載の本発明によれば、前記作用
に加えて、リフトアップするのに、接合用鋼板部分を吊
り支して引き上げることで、柱鉄骨に沿って安定した状
態で上昇させることができる。
According to the second aspect of the present invention, in addition to the above-mentioned action, in order to lift up, the joining steel plate portion is suspended and pulled up, so that it is stably raised along the pillar steel frame. be able to.

【0013】[0013]

【発明の実施の形態】以下、図面について本発明の実施
の形態を詳細に説明する。図1、図2は本発明の構築工
法の1実施形態を示す各工程の正面図で、図中3は角鋼
管柱である柱鉄骨である。
Embodiments of the present invention will be described below in detail with reference to the drawings. 1 and 2 are front views of respective steps showing one embodiment of the construction method of the present invention, in which 3 is a column steel frame which is a square steel pipe column.

【0014】この柱鉄骨3を建方し、この柱鉄骨3に貫
通孔5を介して接合用鋼板6a,6bを貫通させる。該
接合用鋼板6a,6bは図6に示すように中央に柱鉄骨
3が通る矩形の貫通孔5を開けてあり、また、本実施形
態では梁鉄骨4の上フランジ4a,下フランジ4bとの
ボルト止めのためのボルト孔8を周辺部から中央に向け
て並べて設けている。図中9は楔である。
The pillar steel frame 3 is erected, and the joining steel plates 6a and 6b are passed through the pillar steel frame 3 through the through holes 5. As shown in FIG. 6, the joining steel plates 6a and 6b are provided with a rectangular through hole 5 through which the column steel frame 3 passes, and in the present embodiment, the beam flange 4 has an upper flange 4a and a lower flange 4b. Bolt holes 8 for bolting are provided side by side from the peripheral portion toward the center. In the figure, 9 is a wedge.

【0015】このような接合用鋼板6a,6bを予め立
設する柱鉄骨3の根元部に、必要とされるフロア数の組
数分を積み重ねて載置しておく。なお、図1においては
このようなストック分の接合用鋼板6a,6bの図示は
省略した。
Such joining steel plates 6a, 6b are stacked and placed on the base of the pillar steel frame 3 which is erected upright, in the required number of floors. It should be noted that illustration of such joining steel plates 6a and 6b is omitted in FIG.

【0016】下側に位置させる接合用鋼板6aと上側に
位置させる接合用鋼板6bとで梁鉄骨4端を挟み込み、
梁鉄骨4の上フランジ4a,下フランジ4bを高力ボル
トにより締結する。このボルト締結の代わりに溶接接合
することも考えられる。
The end of the beam steel frame 4 is sandwiched between the lower joining steel plate 6a and the upper joining steel plate 6b.
The upper flange 4a and the lower flange 4b of the beam steel frame 4 are fastened with high-strength bolts. It is also conceivable to carry out welding joining instead of the bolt fastening.

【0017】さらに、図2に示すように接合用鋼板6
a,6bで連続させ、また、必要に応じて小梁を組み込
んだ梁鉄骨2の上に床7を施工して一階分のフロア部位
10を地上で組立てる。この床7にはデッキプレートによ
るコンクリートスラブ等が適する。また、外壁12を取り
付けるようにしてよい。
Further, as shown in FIG. 2, a steel plate 6 for joining is used.
a and 6b are continuous, and if necessary, a floor 7 is constructed on the beam steel frame 2 incorporating a beam, and a floor portion for the first floor
Assemble 10 on the ground. A concrete slab made of a deck plate is suitable for the floor 7. Further, the outer wall 12 may be attached.

【0018】そして、このフロア部位10を柱鉄骨3に沿
って上昇させ、所定の高さで前記貫通孔5での接合用鋼
板6a,6bと柱鉄骨3との隙間に楔9を下側から打っ
て固定する。この上昇は図3にも示すように接合用鋼板
6bの上面部分にフック11を設け、柱鉄骨3の上端に設
けたリフトアップ装置13で吊り支することにより行う。
この図3のリフトアップ装置13は一例を示したもので、
上層梁鉄骨下端などの設けることも可能である。
Then, the floor portion 10 is elevated along the pillar steel frame 3, and a wedge 9 is inserted from below to a gap between the steel plates 6a, 6b for joining in the through hole 5 and the pillar steel frame 3 at a predetermined height. Hit and fix. As shown in FIG. 3, this raising is performed by providing a hook 11 on the upper surface of the joining steel plate 6b and suspending and supporting it by a lift-up device 13 provided at the upper end of the pillar steel frame 3.
The lift-up device 13 of FIG. 3 shows an example,
It is also possible to provide the lower end of the upper beam steel frame.

【0019】このようにして最上階のフロア部位10を固
定したならば、さらに、同様な工程を繰り返して、順次
下方階のフロア部位10の施工を行っていく。
After the floor part 10 on the uppermost floor is fixed in this manner, the same process is further repeated to successively construct the floor part 10 on the lower floor.

【0020】なお、他の実施形態としてリフトアップの
代わりにジャッキ等のプッシュアップ工法としてフロア
部位10を上昇させることも可能である。
As another embodiment, the floor portion 10 can be lifted by a push-up construction method such as a jack instead of the lift-up.

【0021】[0021]

【発明の効果】以上述べたように本発明の構築工法は、
リフトアップまたはプッシュアップするのに、非常に軽
微な装置で、簡便な施工ができるものである。
As described above, the construction method of the present invention is
It is a very small device for lift-up or push-up, and can be installed easily.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の構築工法の1実施形態を示すリフトア
ップ前の前段階の工程を示す正面図である。
FIG. 1 is a front view showing a pre-stage process before lift-up showing one embodiment of a construction method of the present invention.

【図2】本発明の構築工法の1実施形態を示すリフトア
ップの前後の工程を示す正面図である。
FIG. 2 is a front view showing steps before and after lift-up showing an embodiment of the construction method of the present invention.

【図3】本発明の構築工法の1実施形態を示すリフトア
ップ前の前段階の要部の平面図である。
FIG. 3 is a plan view of an essential part of a pre-stage before a lift-up showing one embodiment of the construction method of the present invention.

【図4】本発明の構築工法の1実施形態を示すリフトア
ップ後の要部の縦断側面図である。
FIG. 4 is a vertical cross-sectional side view of an essential part after lift-up showing one embodiment of the construction method of the present invention.

【図5】本発明の構築工法の1実施形態を示すリフトア
ップ後の要部の平面図である。
FIG. 5 is a plan view of an essential part after lift-up showing one embodiment of the construction method of the present invention.

【図6】本発明の構築工法での部材相互の結合を示す斜
視図である。
FIG. 6 is a perspective view showing the mutual connection of members in the construction method of the present invention.

【図7】従来例でリフトアップ前の正面図である。FIG. 7 is a front view of a conventional example before lift-up.

【図8】従来例でリフトアップ後の正面図である。FIG. 8 is a front view after lift-up in a conventional example.

【符号の説明】[Explanation of symbols]

1…リフトアップ支持躯体 2…躯体 3…柱鉄骨 4…梁鉄骨 4a…上フランジ 4b…下フランジ 5…貫通孔 6a,6b…接合用
鋼板 7…床 8…ボルト孔 9…楔 10…フロア部位 11…フック 12…外壁 13…リフトアップ装置
1 ... Lift-up support frame 2 ... Frame 3 ... Column steel frame 4 ... Beam steel frame 4a ... Upper flange 4b ... Lower flange 5 ... Through holes 6a, 6b ... Joining steel plate 7 ... Floor 8 ... Bolt hole 9 ... Wedge 10 ... Floor part 11 ... Hook 12 ... Outer wall 13 ... Lift-up device

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 柱鉄骨を建方し、貫通孔を介して柱鉄骨
を貫通させる接合用鋼板で梁鉄骨を接合し、これに床を
施工したフロア部位を地上で組立て、このフロア部位を
柱鉄骨に沿って上昇させ、所定の高さで前記貫通孔での
接合用鋼板と柱鉄骨との隙間に楔を打って固定すること
を特徴とした構築工法。
1. A pillar steel frame is erected, a beam steel frame is joined with a steel plate for joining which penetrates the column steel frame through a through hole, and a floor portion where a floor is constructed is assembled on the ground, and this floor portion is a pillar. A construction method characterized by raising along a steel frame and fixing a wedge at a predetermined height in a gap between a joining steel plate and a column steel frame in the through hole.
【請求項2】 フロア部位の上昇は接合用鋼板部分にフ
ックを設け、柱鉄骨上端または上層梁鉄骨下端から吊り
支する請求項1記載の構築工法。
2. The construction method according to claim 1, wherein a hook is provided on a steel plate portion for joining to raise the floor portion, and the floor steel portion is suspended and supported from the upper end of the column steel frame or the lower end of the upper beam steel frame.
JP1757896A 1996-02-02 1996-02-02 Building construction Pending JPH09209454A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1757896A JPH09209454A (en) 1996-02-02 1996-02-02 Building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1757896A JPH09209454A (en) 1996-02-02 1996-02-02 Building construction

Publications (1)

Publication Number Publication Date
JPH09209454A true JPH09209454A (en) 1997-08-12

Family

ID=11947801

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1757896A Pending JPH09209454A (en) 1996-02-02 1996-02-02 Building construction

Country Status (1)

Country Link
JP (1) JPH09209454A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103806669A (en) * 2013-12-24 2014-05-21 大立建设集团有限公司 Construction method for H-type steel stiff column with cross fracture surface
CN104295104A (en) * 2014-10-29 2015-01-21 防城港中一重工有限公司 Box-section crane girder high-strength bolt group field installation method
JP2016061086A (en) * 2014-09-18 2016-04-25 大成建設株式会社 Temporary beam connection member and structure construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103806669A (en) * 2013-12-24 2014-05-21 大立建设集团有限公司 Construction method for H-type steel stiff column with cross fracture surface
JP2016061086A (en) * 2014-09-18 2016-04-25 大成建設株式会社 Temporary beam connection member and structure construction method
CN104295104A (en) * 2014-10-29 2015-01-21 防城港中一重工有限公司 Box-section crane girder high-strength bolt group field installation method

Similar Documents

Publication Publication Date Title
US20230265646A1 (en) System and apparatus for securing a floorplate to a structure
JPH05502073A (en) Steel useful structure and its assembly method
JPH09209454A (en) Building construction
JP3514887B2 (en) Shoring system
JP3589329B2 (en) Construction method
JP2002047662A (en) Portable columnar foundation body and its installation method
JP2005015159A (en) Climbing method of climbing crane
JP3029324B2 (en) Temporary enclosures and foundations for temporary enclosures
JP6464459B2 (en) Column base bracket, building unit including column base bracket, and installation method thereof
JPH08113982A (en) Device for joining column and beam of steel framed building
KR200358247Y1 (en) Downward construction structure using bracket support type
JPH10131508A (en) Material transport device of temporarily set curing body
JPH08114302A (en) Boiler installing method and boiler installation structural body
JP3225455B2 (en) How to build a building
JP3715378B2 (en) Automatic roof raising device and method of building a building by raising the roof
JP2009002035A (en) Foldable working platform and method of assembling the same
JP2000320006A (en) Joining structure of unit building
JP2939752B2 (en) Lift-up method in which an outer wall plate is attached to the floor plate
JP2022177571A (en) Construction method of structure
JP2542018Y2 (en) End support frame of stacked temporary support frame
JP2792806B2 (en) Construction method and capital piece of steel frame house
JPH09291604A (en) Unit building and execution thereof
JP2946372B2 (en) Construction method of structure
JPH11303218A (en) Construction method of floor building frame utilizing steel pipe column
JP2000144921A (en) Connecting structure and connecting method of building unit