CN104295104B - Box-section crane girder high-strength bolt field installation process - Google Patents

Box-section crane girder high-strength bolt field installation process Download PDF

Info

Publication number
CN104295104B
CN104295104B CN201410597480.4A CN201410597480A CN104295104B CN 104295104 B CN104295104 B CN 104295104B CN 201410597480 A CN201410597480 A CN 201410597480A CN 104295104 B CN104295104 B CN 104295104B
Authority
CN
China
Prior art keywords
box
crane girder
hole
installation
moulding bed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410597480.4A
Other languages
Chinese (zh)
Other versions
CN104295104A (en
Inventor
单明
严春光
吴梦先
赵保华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FANGCHENGGANG ZHONGYI HEAVY INDUSTRY Co Ltd
Original Assignee
FANGCHENGGANG ZHONGYI HEAVY INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FANGCHENGGANG ZHONGYI HEAVY INDUSTRY Co Ltd filed Critical FANGCHENGGANG ZHONGYI HEAVY INDUSTRY Co Ltd
Priority to CN201410597480.4A priority Critical patent/CN104295104B/en
Publication of CN104295104A publication Critical patent/CN104295104A/en
Application granted granted Critical
Publication of CN104295104B publication Critical patent/CN104295104B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of box-section crane girder high-strength bolt field installation process, comprise the following steps: 1) set up moulding bed; 2) wedge shape parallels is set on the moulding bed in every sections box-section crane girder dropping place region; 3) interlude box-section crane girder is first lifted on moulding bed, then hoisting head, rear successively; 4) first installing overlapping the junction plate bored with interlude box-section crane girder, using punch to fix; 5) junction plate bolt hole and head, rear box-section crane girder bolt hole whether hole situation is coincide is checked; As coincideing, then directly punch is fixed; As there is wrong hole, then using jack top by a small margin, falling box-section crane girder to coincideing, then fix by punch, and adjust wedge shape parallels with stable box-section crane girder, the installation work of high-strength bolt can be started subsequently.Present invention, avoiding bolt hole misfit cause reaming, perforations adding, heavily to hole work, decrease workload, improve construction speed, ensure that high-strength bolt installation qualification rate.

Description

Box-section crane girder high-strength bolt field installation process
Technical field
The invention belongs to About Construction Technology of Steel Configuration field, be specifically related to a kind of box-section crane girder high-strength bolt field installation process.
Background technology
The on-site consolidation of large volume box-section crane girder is a difficult problem of steel building industry always, and the high-strength bolt installation of enormous amount is the key point of an assembled difficult problem.In the past in work progress, run into when bolt hole is misfitted between junction plate and reamer can only be adopted to carry out reaming, both affected construction speed, in case of too much reaming amount does not meet design specifications requirement yet.The installation work how completing box-section crane girder high-strength bolt is at the scene one of the emphasis and difficult point of steel building industry.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of box-section crane girder high-strength bolt field installation process, can not be subject to the impact that on-the-spot lifting work is not convenient, install high-strength bolt quickly and efficiently.
For solving the problem, the invention provides following technical scheme:
Box-section crane girder high-strength bolt field installation process, comprises the following steps:
1) box-section crane girder on-site consolidation moulding bed is set up;
2) wedge shape parallels is set on the moulding bed in every sections box-section crane girder dropping place region;
3) first interlude box-section crane girder lifts after to moulding bed as control section, then hoisting head, rear successively;
4) first installing overlapping the junction plate bored with interlude box-section crane girder, using punch to fix;
5) check the bolt hole of junction plate and head, rear box-section crane girder bolt hole to hole situation; As all right in coincideing, then directly carry out punch and fix; As there is wrong hole situation, then use jack top, fall box-section crane girder, when finding that box-section crane girder bolt hole and junction plate bolt hole coincide, stop adjustment immediately, use punch fixed connecting plate, and adjust wedge shape parallels with firm box-section crane girder, finally can start the installation work of high-strength bolt.
In technique scheme:
Step 2) in, the moulding bed in every sections box-section crane girder dropping place region arranges wedge shape parallels everywhere, preferably lays respectively at four angles in dropping place region;
Step 3) after, generally also to check moulding bed whether sedimentation, if any sedimentation then with the box-section crane girder jack-up of jack by sedimentation end, and adjust wedge shape parallels with firm box-section crane girder;
The invention has the beneficial effects as follows:
1) ensure that high-strength bolt installation qualification rate; 2) lifting appliance frequency of utilization and quantity is decreased; 3) avoid bolt hole misfit cause reaming, perforations adding, heavily to hole work, decrease workload, improve construction speed.
Accompanying drawing explanation
Schematic diagram when Fig. 1 is box-section crane girder high-strength bolt in-site installation.
Number in the figure is: 1, moulding bed; 2, wedge shape parallels; 3, jack; 4, junction plate; 5, punch; 6, head section box-section crane girder; 7, interlude box-section crane girder; 8, rear box-section crane girder.
Detailed description of the invention
Below the preferred embodiments of the present invention are described, should be appreciated that preferred embodiment described herein is only for instruction and explanation of the present invention, is not intended to limit the present invention.
As shown in Figure 1, box-section crane girder high-strength bolt field installation process, comprises the following steps:
1) box-section crane girder on-site consolidation moulding bed 1 is set up;
2) wedge shape parallels 2 is everywhere set on the moulding bed 1 in every sections box-section crane girder dropping place region, lays respectively at four angles in dropping place region;
3) first interlude box-section crane girder 7 lifts after to moulding bed 1 as control section, then hoisting head, rear box-section crane girder 6,8 successively, and the stitching portion of adjacent segment box-section crane girder is equipped with bolt hole;
4) check moulding bed 1 whether sedimentation, then use jack 3 by the box-section crane girder jack-up of sedimentation end if any sedimentation, and adjust wedge shape parallels 2 with firm box-section crane girder;
5) first installing overlapping the junction plate 4 bored with interlude box-section crane girder 7, using punch 5 to fix;
6) check the bolt hole of junction plate 4 and head, rear box-section crane girder 6,8 bolt hole to hole situation; As all right in coincideing, then directly carry out punch 5 and fix; As there is wrong hole situation, jack 3 is then used to push up, fall box-section crane girder, when finding that box-section crane girder bolt hole and junction plate 4 bolt hole coincide, stop adjustment immediately, use punch 5 fixed connecting plate, and adjust wedge shape parallels 2 with firm box-section crane girder, finally can start the installation work of high-strength bolt.

Claims (2)

1. box-section crane girder high-strength bolt field installation process, is characterized in that, comprises the following steps:
1) box-section crane girder on-site consolidation moulding bed is set up;
2) wedge shape parallels is everywhere set on the moulding bed in every sections box-section crane girder dropping place region, lays respectively at four angles in dropping place region;
3) first interlude box-section crane girder lifts after to moulding bed as control section, then hoisting head, rear successively;
4) first installing overlapping the junction plate bored with interlude box-section crane girder, using punch to fix;
5) check the bolt hole of junction plate and head, rear box-section crane girder bolt hole to hole situation; As all right in coincideing, then directly carry out punch and fix; As there is wrong hole situation, then use jack top, fall box-section crane girder, when finding that box-section crane girder bolt hole and junction plate bolt hole coincide, stop adjustment immediately, use punch fixed connecting plate, and adjust wedge shape parallels with firm box-section crane girder, finally can start the installation work of high-strength bolt.
2. box-section crane girder high-strength bolt field installation process according to claim 1, it is characterized in that: completing steps 3) after also to check moulding bed whether sedimentation, if any sedimentation then with the box-section crane girder jack-up of jack by sedimentation end, and adjust wedge shape parallels with firm box-section crane girder.
CN201410597480.4A 2014-10-29 2014-10-29 Box-section crane girder high-strength bolt field installation process Active CN104295104B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410597480.4A CN104295104B (en) 2014-10-29 2014-10-29 Box-section crane girder high-strength bolt field installation process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410597480.4A CN104295104B (en) 2014-10-29 2014-10-29 Box-section crane girder high-strength bolt field installation process

Publications (2)

Publication Number Publication Date
CN104295104A CN104295104A (en) 2015-01-21
CN104295104B true CN104295104B (en) 2016-03-23

Family

ID=52315027

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410597480.4A Active CN104295104B (en) 2014-10-29 2014-10-29 Box-section crane girder high-strength bolt field installation process

Country Status (1)

Country Link
CN (1) CN104295104B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110904857A (en) * 2019-12-30 2020-03-24 中国铁建投资集团有限公司 Temporary buckling tower installation method for self-anchored suspension bridge construction

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0748096A (en) * 1993-08-05 1995-02-21 Marufuji Shiitopairu Kk High lift work vehicle for upside-down construction method
JPH09209454A (en) * 1996-02-02 1997-08-12 Kajima Corp Building construction
CN101759098B (en) * 2008-11-28 2011-11-09 五冶集团上海有限公司 Crane beam frame construction method
CN201458547U (en) * 2009-07-16 2010-05-12 中冶东北建设有限公司工业炉建筑安装工程公司 High-tunnel crane beam for coke oven masonry with section-by-section assembly
CN102086000B (en) * 2009-12-08 2012-11-07 五冶集团上海有限公司 Onsite splicing and mounting method for extra-large and overweight box crane girders
CN201778497U (en) * 2010-06-25 2011-03-30 中国二十冶集团有限公司 Multi-section column aloft spliced temporary fixing device
CN202380401U (en) * 2011-11-18 2012-08-15 中铁四局集团钢结构有限公司 Assembly jig frame of plate blocks of steel-truss-beam flexible-arch orthotropic bridge deck
CN203320954U (en) * 2013-07-01 2013-12-04 杨桂云 Framework structure of long-span dual-curved type assembling box beams
CN103498559A (en) * 2013-10-11 2014-01-08 四川省第四建筑工程公司 Splicing movable bridge frame of steel structure industrial factory building and construction method for applying splicing movable bridge frame to roof construction
CN103711323B (en) * 2014-01-22 2016-04-06 芜湖天航科技(集团)股份有限公司 Utilize the anti-ceiling board construction method of portable tubular truss stage+module roofing

Also Published As

Publication number Publication date
CN104295104A (en) 2015-01-21

Similar Documents

Publication Publication Date Title
CN204747364U (en) Automatic steel wire alignment cutting device
CN203992141U (en) A kind of angle-bender
CN202291523U (en) Sandwich plate drilling device
CN203145950U (en) Support for monolithic horizontal movement station-crossing of shield tunneling machine
CN204112696U (en) For the electric hoist elevator shaft platform of main building construction
CN104563126B (en) A kind of churning driven bored pile construction method
CN204266590U (en) Sump, hoistway formwork bed die anti-floating system
CN204657532U (en) A kind of Electric drill support for building
CN205289814U (en) Panel positioning and punching device
CN204118627U (en) A kind of pre-buried wiring electricity box being exclusively used in xoncrete structure
CN103233588B (en) With the shift method of raft foundation building
CN203199939U (en) Secondary lifting trolley for four-post lifting machine for parking
CN203654299U (en) Steel support loose end
CN202324191U (en) Rolling slip hinge support connecting structure for steel structure
CN105926808B (en) A kind of precast shear wall perps connection structure and construction method
CN204953946U (en) Cylinder drilling equipment
CN204627001U (en) PC structure floor assembled prefabricated post diagonal brace support system
CN203119712U (en) Vehicle permanent magnet motor rotor embedded magnetic steel assembly fixture
CN203626261U (en) Construction structure of concrete spreader in aluminum alloy formwork system
CN204139566U (en) A kind of wood flooring erecting tools
CN103803394B (en) The hoisting method of large-scale box type steel structure derrick erect by cement concrete headframe overcoat dress
CN204371387U (en) A kind of arc hydraulic prop anchor pole
CN204356766U (en) A kind of damping sheet pile
CN202039851U (en) Lifting device of shaft sleeve inner wall construction assembling template
CN202207879U (en) A sleeve conjunction weld device

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
GR01 Patent grant