CN104294715A - Safe and rapid combined shield tunneling light sleeper - Google Patents

Safe and rapid combined shield tunneling light sleeper Download PDF

Info

Publication number
CN104294715A
CN104294715A CN201410475202.1A CN201410475202A CN104294715A CN 104294715 A CN104294715 A CN 104294715A CN 201410475202 A CN201410475202 A CN 201410475202A CN 104294715 A CN104294715 A CN 104294715A
Authority
CN
China
Prior art keywords
sleeper
shield tunneling
section steel
transport vehicle
shield driving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410475202.1A
Other languages
Chinese (zh)
Other versions
CN104294715B (en
Inventor
王宗勇
毋海军
武明静
雷军
赵香萍
曹志勇
安宏斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN201410475202.1A priority Critical patent/CN104294715B/en
Publication of CN104294715A publication Critical patent/CN104294715A/en
Application granted granted Critical
Publication of CN104294715B publication Critical patent/CN104294715B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B23/00Easily dismountable or movable tracks, e.g. temporary railways; Details specially adapted therefor
    • E01B23/10Shiftable tracks for heavy loads, e.g. carrying excavators
    • E01B23/12Sleepers

Abstract

The invention relates to the field of construction of shield tunneling sleepers, in particular to a safe and rapid combined shield tunneling light sleeper. The safe and rapid combined shield tunneling light sleeper solves the problems that according to an existing light sleeper, installation needs great effort, rail disengagement occurs during operation, maintenance needs a long time, and disassembly needs a large amount of labor after construction. The safe and rapid combined shield tunneling light sleeper comprises transport cart box iron sleeper bodies and shield tunneling sleeper bodies, wherein the shield tunneling sleeper bodies are assembled together with the two ends of the transport cart box iron sleeper bodies. The two ends of each transport cart box iron sleeper body is each provided with a U-shaped groove, and transport cart rails are arranged in the U-shaped grooves in the two sides of each transport cart box iron sleeper body. Each shield tunneling sleeper body comprises arc steel plates and arc step sleeper bodies, wherein the arc steel plates are attached to a tunnel bottom segment and are identical in radian, and the arc step sleeper bodies are fixed to the high ends of the arc steel plates. The lower end of each arc steel plate is provided with a protruding portion which is inserted into the corresponding transport cart box iron sleeper body. Each arc step sleeper body is provided with a clamping groove formed by two opposite rail clamping locating plates. Shield tunneling rails are arranged in the rail clamping grooves. By the adoption of the safe and rapid combined shield tunneling light sleeper, the frequency of rail disengagement during operation is reduced, construction safety is guaranteed, and the situation that personnel are specially assigned to conduct maintenance is avoided; the safe and rapid combined shield tunneling light sleeper has the advantages that the technology is simple and advanced, and the practicability is high.

Description

Light-duty sleeper is combined in shield driving safely and fast
Technical field
The present invention relates to Shield Construction Method Used field, be specially a kind of shield driving and combine light-duty sleeper safely and fast.
Background technology
China's shield tunnel starts to long distance, little curve evolution, during shield driving, shield machine and construction haulage vehicle all need sleeper, tradition sleeper with pressing plate, rail is fixed on i iron, connect with pull bar between two one steel rails, to ensure track space, because driving distance is long, curve is little, i iron dislocation is serious, pressing plate and pull bar often loosen, rail is caused often to be shifted, after finally making shield machine, supporting roller and wheel-track type locomotive fall rail, special messenger is needed to carry out maintenance, not only shield driving potential safety hazard is large, construction cost is high, and effort is installed, maintain time-consuming in operation, rear bolt corrosion of having constructed is removed and is taken a lot of work, and major part needs to use destructiveness to cut off, cannot reuse, this is a shield driving urgent problem.
Summary of the invention
The present invention falling rail to solve in existing sleeper installation effort, operation, maintaining the difficult problems such as time-consuming, the rear dismounting of construction is taken a lot of work, and provides a kind of shield driving to combine light-duty sleeper safely and fast.
The present invention adopts following technical scheme to realize: light-duty sleeper is combined in shield driving safely and fast, comprise along the laying of interval, tunnel piercing direction, be positioned at the transport vehicle channel-section steel sleeper in centre position, tunnel bottom section of jurisdiction and shield driving sleeper assembled with transport vehicle channel-section steel sleeper two ends respectively, U-type groove is all offered in same position in adjacent transport vehicle channel-section steel sleeper two ends, places transport vehicle track respectively in the U-type groove of each transport vehicle channel-section steel sleeper both sides; Shield driving sleeper comprises to fit with tunnel bottom section of jurisdiction and the identical curved plate of radian and be fixed on the arc-shaped step sleeper at the high-end place of curved plate, curved plate lower end is provided with the protuberance with the grafting of transport vehicle channel-section steel sleeper, arc-shaped step sleeper is arranged the card rail groove formed by the card rail location-plate that two positions are relative, in the card rail groove on each shield driving sleeper, place shield driving track.
In the middle part of described transport vehicle channel-section steel sleeper, lower end is fixed with the junction plate in strap bolt hole, and available bolt plate is fixed on tunnel bottom section of jurisdiction, has stopped shield driving and transported battery truck not fall rail, ensure that construction safety.
Described transport vehicle channel-section steel sleeper two ends and be positioned at U-type groove place and curved plate rounding off, ensure that transport vehicle channel-section steel sleeper and curved plate are all well fitted with tunnel bottom section of jurisdiction, guarantee reliably connects between the two.
Adopt structure design of the present invention, first adopt 100# channel-section steel to do haulage vehicle sleeper, be placed on by rail in the groove of channel-section steel two ends well cutting, channel-section steel two coxostermum just in time plays the effect of clip rail; Then use steel plate processing belt radian steel plate, curved plate is fixed arc-shaped step sleeper, the protuberance of curved plate is inserted on channel-section steel sleeper, and channel-section steel two coxostermum just in time plays the effect of clip curved plate.The last junction plate welded in the middle part of channel-section steel with bolt hole, and be fixed on segment bolt at the bottom of tunnel.Not only realize convenient and flexible installation, ensure shield driving and haulage vehicle security of operation, and realize intact fast dismantling and remove.
Compared with prior art, shield driving combine safely and fast light-duty sleeper invention have the following advantages:
1) in the U-type groove of channel-section steel two ends well cutting, install transport vehicle rail, not only reduce pressing plate and junction plate, and reduce operating maintenance maintenance;
2) insert arc-shaped step shield driving sleeper at channel-section steel two ends, not only realize peace and tear open flexibly and easily, and realize shield driving sleeper turnover use, reduce construction cost;
3) be connected on segment bolt at the bottom of tunnel with bolt weld the junction plate with bolt hole in the middle part of channel-section steel after, stopped shield driving and transported battery truck not fall rail, ensure that construction safety;
In a word, the present invention makes full use of the advantage of thin-wall channel, self U-type groove and plug-in type arc-shaped step shield driving sleeper, not only reduces special messenger and maintains track, decrease the impact of rail on shield driving, ensure that construction safety.And achieve by tearing open conveniently, improve shield driving work efficiency, reduce construction cost.Have that technique is simple, advanced technology, the advantage such as practical.
Adopt this technology to have successfully completed Shenyang Metro No. 9 lines 7 and mark the interval 4400m driving of shield structure, filled up the blank of China's shield driving composite sleeper technology safely and fast, achieved good economic benefit and social benefit.The present invention is applicable to all shield tunnels driving sleeper.
Accompanying drawing explanation
Fig. 1 is the floor map of sleeper of the present invention;
Fig. 2 is the sectional drawing of invention sleeper;
In figure: 1-transport vehicle channel-section steel sleeper; 2-U-type groove; 3-transport vehicle track; 4-arc-shaped step sleeper; 5-card rail location-plate; 6-shield driving track; The junction plate in 7-strap bolt hole; 8-tunnel bottom section of jurisdiction; 9-tunnel bottom segment bolt; 10-curved plate; 11-protuberance.
Detailed description of the invention
Light-duty sleeper is combined in shield driving safely and fast, as shown in Figure 1, 2, comprise along the laying of interval, tunnel piercing direction, be positioned at the transport vehicle channel-section steel sleeper 1 in centre position, tunnel bottom section of jurisdiction 8 and shield driving sleeper assembled with transport vehicle channel-section steel sleeper two ends respectively, U-type groove 2 is all offered in same position in adjacent transport vehicle channel-section steel sleeper two ends, places transport vehicle track 3 respectively in the U-type groove of each transport vehicle channel-section steel sleeper both sides; Shield driving sleeper comprises to fit with tunnel bottom section of jurisdiction and the identical curved plate 10 of radian and be fixed on the arc-shaped step sleeper 4 at the high-end place of curved plate, curved plate lower end is provided with the protuberance 11 with the grafting of transport vehicle channel-section steel sleeper, arc-shaped step sleeper is arranged the card rail groove formed by the card rail location-plate 5 that two positions are relative, in the card rail groove on each shield driving sleeper, place shield driving track 6.
In the middle part of transport vehicle channel-section steel sleeper 1, lower end is fixed with the junction plate 7 in strap bolt hole.Transport vehicle channel-section steel sleeper two ends and be positioned at U-type groove 2 place and curved plate 10 rounding off.
During concrete enforcement, comprise the following steps:
Step one, transport vehicle channel-section steel sleeper are processed
A, according to transport battery truck gauge cutting channel-section steel; B, cut into U-type groove at rail place, channel-section steel two ends; C, with bending machine, channel-section steel two ends to be bent at U-type groove place; D, in the middle part of channel-section steel the steel plate of welded bands bolt hole.
Step 2, shield driving sleeper are processed
A, according to channel-section steel width cutting steel plate; B, according to section of jurisdiction internal diameter bending machine, steel plate is processed into arc; C, on curved plate, weld arc-shaped step sleeper; D, on arc-shaped step sleeper with Plate Welding card rail location-plate, form card rail groove.
Step 3, composite sleeper are installed
With bolt, channel-section steel sleeper is fixed on section of jurisdiction, bottom when A, shield duct piece are spelled; B, be plugged in the groove at channel-section steel sleeper two ends self with the protuberance of curved plate; C, transport vehicle track is installed in channel-section steel U-type groove successively, simultaneously shield driving track installation in the card rail groove of arc-shaped step sleeper.
case history
This shield driving is combined light-duty sleeper safely and fast and is reached shield structure interval for Shenyang Metro No. 9 line 7 marks, and Excavation Length is 4500m driving, adopts channel-section steel two ends to cut into U-type groove to settle transport vehicle track, decreases rail pressing plate and track connecting rod.Channel-section steel two ends are inserted and are processed into arc-shaped step sleeper, and welding steel fixes shield driving track on sleeper, achieve track flexible by tearing open.In the middle part of channel-section steel, weld Interal fixation with bolt hole on tunnel bottom segment bolt, guarantee that sleeper is firm, stop shield driving and transport vehicle falls rail, prove this advanced technology, methodological science is reasonable.
This invention has been generalized to my other metro shield projects of company, and greatly reduce construction cost, stopped to fall rail, achieved good economic benefit and social benefit, facts have proved, this technical scheme is practical, and promotion prospect is good.
Adopt this technology to fill up blank that light-duty sleeper technology is combined in China's shield driving safely and fast, the present invention is applicable to all shield tunnels driving.

Claims (3)

1. light-duty sleeper is combined in a shield driving safely and fast, it is characterized in that comprising along the laying of interval, tunnel piercing direction, be positioned at the transport vehicle channel-section steel sleeper (1) in tunnel bottom section of jurisdiction (8) centre position and shield driving sleeper assembled with transport vehicle channel-section steel sleeper two ends respectively, U-type groove (2) is all offered in same position in adjacent transport vehicle channel-section steel sleeper two ends, places transport vehicle track (3) respectively in the U-type groove of each transport vehicle channel-section steel sleeper both sides; Shield driving sleeper comprises to fit with tunnel bottom section of jurisdiction and the identical curved plate (10) of radian and be fixed on the arc-shaped step sleeper (4) at the high-end place of curved plate, curved plate lower end is provided with the protuberance (11) with the grafting of transport vehicle channel-section steel sleeper, arc-shaped step sleeper is arranged the card rail groove formed by the card rail location-plate (5) that two positions are relative, in the card rail groove on each shield driving sleeper, place shield driving track (6).
2. light-duty sleeper is combined in shield driving according to claim 1 safely and fast, it is characterized in that lower end, transport vehicle channel-section steel sleeper (1) middle part is fixed with the junction plate (7) in strap bolt hole.
3. light-duty sleeper is combined in shield driving according to claim 1 and 2 safely and fast, it is characterized in that transport vehicle channel-section steel sleeper (1) two ends and is positioned at U-type groove (2) place and curved plate (10) rounding off.
CN201410475202.1A 2014-09-18 2014-09-18 Safe and rapid combined shield tunneling light sleeper Active CN104294715B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410475202.1A CN104294715B (en) 2014-09-18 2014-09-18 Safe and rapid combined shield tunneling light sleeper

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410475202.1A CN104294715B (en) 2014-09-18 2014-09-18 Safe and rapid combined shield tunneling light sleeper

Publications (2)

Publication Number Publication Date
CN104294715A true CN104294715A (en) 2015-01-21
CN104294715B CN104294715B (en) 2017-01-11

Family

ID=52314645

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410475202.1A Active CN104294715B (en) 2014-09-18 2014-09-18 Safe and rapid combined shield tunneling light sleeper

Country Status (1)

Country Link
CN (1) CN104294715B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105002788A (en) * 2015-07-24 2015-10-28 中国水利水电第十四工程局有限公司 Round tunnel track bracing support and construction method
CN105937194A (en) * 2016-06-27 2016-09-14 北京城建集团有限责任公司 Sleeper for separate starting of small shield and use method of sleeper
CN107447598A (en) * 2017-08-17 2017-12-08 中铁十局集团第三工程有限公司 A kind of building method of railway roadbed changeover portion support meanss and railway roadbed changeover portion support system
CN109356597A (en) * 2018-11-19 2019-02-19 中铁第四勘察设计院集团有限公司 A kind of track deformation control structure in the shield tunnel for being set to bottom gallery
CN110333133A (en) * 2019-07-04 2019-10-15 湖北崇高交通科技有限公司 Sleeper detection method, device, equipment and storage medium
CN113550181A (en) * 2021-07-07 2021-10-26 上海市基础工程集团有限公司 Shield tunnel is fallen to ground sleeper for rail transport vechicle

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10331104A (en) * 1997-06-02 1998-12-15 Izumi:Kk Sleeper for tunnel construction works
CN1888392A (en) * 2006-02-23 2007-01-03 上海市第二市政工程有限公司 Method for setting up sleeper separately for truck jumbo and electric locomotive
CN202881780U (en) * 2012-11-15 2013-04-17 中铁五局(集团)有限公司城市轨道交通工程分公司 Temporary sleeper for tunnel shield construction
CN203284703U (en) * 2013-05-23 2013-11-13 中铁十一局集团城市轨道工程有限公司 Improved combined type shield sleeper
CN203475253U (en) * 2013-08-29 2014-03-12 中铁十七局集团第六工程有限公司 Simple battery car sleeper for shield tunneling

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10331104A (en) * 1997-06-02 1998-12-15 Izumi:Kk Sleeper for tunnel construction works
CN1888392A (en) * 2006-02-23 2007-01-03 上海市第二市政工程有限公司 Method for setting up sleeper separately for truck jumbo and electric locomotive
CN202881780U (en) * 2012-11-15 2013-04-17 中铁五局(集团)有限公司城市轨道交通工程分公司 Temporary sleeper for tunnel shield construction
CN203284703U (en) * 2013-05-23 2013-11-13 中铁十一局集团城市轨道工程有限公司 Improved combined type shield sleeper
CN203475253U (en) * 2013-08-29 2014-03-12 中铁十七局集团第六工程有限公司 Simple battery car sleeper for shield tunneling

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105002788A (en) * 2015-07-24 2015-10-28 中国水利水电第十四工程局有限公司 Round tunnel track bracing support and construction method
CN105937194A (en) * 2016-06-27 2016-09-14 北京城建集团有限责任公司 Sleeper for separate starting of small shield and use method of sleeper
CN107447598A (en) * 2017-08-17 2017-12-08 中铁十局集团第三工程有限公司 A kind of building method of railway roadbed changeover portion support meanss and railway roadbed changeover portion support system
CN109356597A (en) * 2018-11-19 2019-02-19 中铁第四勘察设计院集团有限公司 A kind of track deformation control structure in the shield tunnel for being set to bottom gallery
CN109356597B (en) * 2018-11-19 2023-12-15 中铁第四勘察设计院集团有限公司 Track deformation control structure arranged in shield tunnel with bottom gallery
CN110333133A (en) * 2019-07-04 2019-10-15 湖北崇高交通科技有限公司 Sleeper detection method, device, equipment and storage medium
CN113550181A (en) * 2021-07-07 2021-10-26 上海市基础工程集团有限公司 Shield tunnel is fallen to ground sleeper for rail transport vechicle

Also Published As

Publication number Publication date
CN104294715B (en) 2017-01-11

Similar Documents

Publication Publication Date Title
CN104294715B (en) Safe and rapid combined shield tunneling light sleeper
CN103061213B (en) Independent shield trolley sleeper and construction method thereof
CN106120488B (en) For the battery truck sleeper of shield-tunneling construction
CN206752216U (en) A kind of shield machine trolley and electric locomotive pin-connected panel sleeper with lower arcuate surface
CN104047630B (en) A kind of fully-mechanized mining working mechanization mounting process method
CN102635042A (en) Method for welding seamless steel rail by moving flash welding on site
CN105369699B (en) The follow-up chassis of light shield machine and electromobile system divide tie to rest the head on construction method
CN107747257B (en) Vibration-damping compression-resistant anti-slip sleeper for subsequent transport of power transmission bottle truck of shield tunneling machine and construction method of vibration-damping compression-resistant anti-slip sleeper
CN104562870B (en) Portable combined shield machine sleeper
CN205804055U (en) A kind of small-sized shield separate launching sleeper
CN208072106U (en) A kind of positioning of non-fragment orbit transponder and auxiliary installation device
CN102556086B (en) Special vehicle for switches
CN204417928U (en) The most advanced and sophisticated frame rail reinforcement tools of rail yard point tongue
CN216474267U (en) Rail pillow fixing device for shield tunnel storage battery car
CN209508725U (en) Horizontal transport track combined type sleeper in a kind of shield tunnel
CN204919235U (en) Two gauges combination narrow gauge railway switch for coal mine
CN203427789U (en) Turnout rope pressing apparatus of endless rope
CN102817625B (en) Anchor cable loader transporter
CN107338690B (en) Rail replacing operation vehicle
CN215856962U (en) Prefabricated part for tunnel sleeper construction
CN207212401U (en) Temporary track fixed system in a kind of tunnel
CN205257747U (en) Wire rope protection device in pit
CN206127748U (en) Abrasionproof guard rail tie plae of installation on concrete pillow circuit
CN202139517U (en) Fast dismounting mounting sleeper
CN107489447B (en) Temporary track fixing system in tunnel and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant