CN202881780U - Temporary sleeper for tunnel shield construction - Google Patents

Temporary sleeper for tunnel shield construction Download PDF

Info

Publication number
CN202881780U
CN202881780U CN 201220604096 CN201220604096U CN202881780U CN 202881780 U CN202881780 U CN 202881780U CN 201220604096 CN201220604096 CN 201220604096 CN 201220604096 U CN201220604096 U CN 201220604096U CN 202881780 U CN202881780 U CN 202881780U
Authority
CN
China
Prior art keywords
sleeper
arch
supporting plate
triangular
temporary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220604096
Other languages
Chinese (zh)
Inventor
槐荣国
王敏
曾学刚
刘忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 5 Engineering Group Co Ltd
Original Assignee
China Railway No 5 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 5 Engineering Group Co Ltd filed Critical China Railway No 5 Engineering Group Co Ltd
Priority to CN 201220604096 priority Critical patent/CN202881780U/en
Application granted granted Critical
Publication of CN202881780U publication Critical patent/CN202881780U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model provides a temporary sleeper for tunnel shield construction. The temporary sleeper comprises an arch-shaped sleeper and a triangular sleeper, wherein the triangular sleeper and the arch-shaped sleeper are connected in an inserting way; the arch-shaped sleeper comprises an arch-shaped panel, sleeper shoulders and steel rail pressing plates; two sleeper shoulders are fixedly arranged at two ends of the arch-shaped panel; the sleeper shoulders are provided with the steel rail pressing plates; the triangular sleeper comprises a triangular sleeper arch-shaped panel, a vertical supporting plate, a horizontal supporting plate, clamping plates and steel rail pressing plates; the vertical supporting plate, the horizontal supporting plate and the triangular sleeper arch-shaped panel form a triangular cambered surface structure; the clamping plates are arranged at two sides of the left end of the vertical supporting plate; and the steel rail pressing plates are arranged on the horizontal supporting plate. The temporary sleeper has the beneficial effects that single parts are light in weight and convenient to mount and dismount, the usage amount of steel is small, the temporary sleeper is energy-saving and environment-friendly, the temporary sleeper can be guaranteed to be located in a central position of a tunnel, two steel rails are located at the same horizontal position to ensure traveling safety; and the temporary sleeper is unlikely to deposit mud and water in a use process, facilitates civilized construction and hardly wears a duct piece of a forming tunnel.

Description

The interim sleeper that a kind of shield-tunneling construction is used
[technical field]
The utility model relates to a kind of working interim sleeper, relates in particular to the interim sleeper that a kind of shield-tunneling construction is used.
[background technology]
In the shield-tunneling construction, mine car and shield machine trolley running mainly adopt I16a i iron sleeper at present, the about 2.3m of joint length, and the about 35kg of single-piece weight, during use, single-piece weight is large, is not easy to installation and removal; The steel material that uses is large, is unfavorable for energy-conservation and environmental protection; Easily deposition, ponding are unfavorable for civilized construction in the use procedure; Section of jurisdiction wearing and tearing to the moulding tunnel are larger, affect attractive in appearance.
[utility model content]
It is large that the utility model purpose is to solve the interim sleeper single-piece weight that shield-tunneling construction uses, be not easy to installation and removal, steel material is large, be unfavorable for energy-conservation and environmental protection, easily deposition, ponding, be unfavorable for civilized construction, and larger to the wearing and tearing of the section of jurisdiction in moulding tunnel, affect deficiency attractive in appearance and provide a kind of Novel shield working interim sleeper.
The utility model is achieved through the following technical solutions: comprise arc sleeper and triangle sleeper, described triangle sleeper plugs together with the arc sleeper and is connected.
Further, described arc sleeper comprises curved panel, pillow shoulder, rail pressing plate, and the two ends of described curved panel are fixedly installed two pillow shoulders, and the pillow shoulder is provided with the rail pressing plate.
Further, described triangle sleeper comprises triangle sleeper curved panel, vertical support plate, horizontal supporting plate, clamping plate, rail pressing plate, described vertical support plate, horizontal support and triangle sleeper curved panel consist of cambered surface triangle shape structure, vertical support plate left end both sides are provided with clamping plate, are provided with the rail pressing plate on the horizontal supporting plate.
Further, described pillow shoulder is provided with the tension rib circular hole.
During use: the curved track occipitalia divides for fixing mine car traveling steel rail, its arcuate structure can guarantee that the sleeper integral position is in the middle, tunnel, the arris rail occipitalia divides and is stuck in the two ends that the curved track occipitalia divides, be used for fixedly trolley running rail, when guaranteeing the shield machine trolley running, can not slide behind the triangle pressurized, deviate from.
Center to center distance 1m between sleeper, two ends adopt the round steel of Φ 12 to connect, and guarantee that sleeper is not offset, does not slide.The arris rail occipitalia divides switches use from back to front, guarantees that the shield machine chassis moves ahead smoothly.
Sleeper is connected the employing pressing plate and compresses with rail, can finely tune gauge according to the crooked situation in tunnel, guarantees traffic safety.
The beneficial effects of the utility model are:
1. greatly alleviate the weight of single-piece sleeper;
2. this sleeper is easy for installation, quick, greatly improves work efficiency, and dismounting is also very convenient after using;
3. the employed steel material of the relative i iron sleeper of this sleeper is saved greatly, and can repetitive cycling use, and has good versatility;
4. during shield-tunneling construction, use this structure sleeper, can guarantee that sleeper is in the tunnel center position, guarantee that two one steel rails are in the same level position, guarantee traffic safety;
5. this sleeper adopts arcuate structure, is conducive to tunnel internal drainage blowdown, effectively raises on-the-spot civilized construction degree.
[description of drawings]
Fig. 1 is the interim concrete sleeper schematic diagram that the utility model shield-tunneling construction is used;
Reference numeral: 1, arc sleeper; 2, triangle sleeper; 11, curved panel; 12, pillow shoulder; 13, rail pressing plate; 14, tension rib circular hole; 21, triangle sleeper curved panel; 22, vertical support plate; 23, horizontal supporting plate; 24, clamping plate.
[specific embodiment]
Below in conjunction with the drawings and the specific embodiments the utility model is described further:
Embodiment 1:
As shown in Figure 1, the interim sleeper that a kind of shield-tunneling construction is used comprises arc sleeper 1 and triangle sleeper 2, and described triangle sleeper 2 plugs together with arc sleeper 1 and is connected.
Preferably, described arc sleeper comprises curved panel 11, pillow shoulder 12, rail pressing plate 13, and the two ends of described curved panel 11 are fixedly installed two pillow shoulders 12, and pillow shoulder 12 is provided with rail pressing plate 13.
Preferably, described triangle sleeper comprises triangle sleeper curved panel 21, vertical support plate 22, horizontal supporting plate 23, clamping plate 24, rail pressing plate 13, described vertical support plate 22, horizontal supporting plate 23 consist of cambered surface triangle shape structure with triangle sleeper curved panel 21, vertical support plate 22 left end both sides are provided with clamping plate 24, are provided with rail pressing plate 13 on the horizontal supporting plate 23.
Preferably, described pillow shoulder 12 is provided with tension rib circular hole 14.
During use: the curved track occipitalia divides for fixing mine car traveling steel rail, its arcuate structure can guarantee that the sleeper integral position is in the middle, tunnel, the arris rail occipitalia divides and is stuck in the two ends that the curved track occipitalia divides, be used for fixedly trolley running rail, when guaranteeing the shield machine trolley running, can not slide behind the triangle pressurized, deviate from.
Center to center distance 1m between sleeper, two ends adopt the round steel of Φ 12 to connect, and guarantee that sleeper is not offset, does not slide.The arris rail occipitalia divides switches use from back to front, guarantees that the shield machine chassis moves ahead smoothly.
Sleeper is connected the employing pressing plate and compresses with rail, can finely tune gauge according to the crooked situation in tunnel, guarantees traffic safety.
Embodiment 2:
Clamping plate on the triangle sleeper also can be arranged on arc sleeper two ends, and the arris rail occipitalia is divided in the clamping plate that are inserted into curved track occipitalia minute two ends.
The according to the above description announcement of book and instruction, the utility model those skilled in the art can also carry out suitable change and modification to above-mentioned embodiment.Therefore, the specific embodiment that discloses and describe above the utility model is not limited to also should fall in the protection domain of claim of the present utility model modifications and changes more of the present utility model.In addition, although used some specific terms in this manual, these terms do not consist of any restriction to the utility model just for convenience of description.

Claims (4)

1. interim sleeper that shield-tunneling construction is used, it is characterized in that: comprise arc sleeper and triangle sleeper, described triangle sleeper plugs together with the arc sleeper and is connected.
2. the interim sleeper used of shield-tunneling construction according to claim 1, it is characterized in that: described arc sleeper comprises curved panel, pillow shoulder, rail pressing plate, and the two ends of described curved panel are fixedly installed two pillow shoulders, and the pillow shoulder is provided with the rail pressing plate.
3. the interim sleeper used of shield-tunneling construction according to claim 1, it is characterized in that: described triangle sleeper comprises triangle sleeper curved panel, vertical support plate, horizontal supporting plate, clamping plate, rail pressing plate, described vertical support plate, horizontal support and triangle sleeper curved panel consist of cambered surface triangle shape structure, vertical support plate left end both sides are provided with clamping plate, are provided with the rail pressing plate on the horizontal supporting plate.
4. the interim sleeper used of shield-tunneling construction according to claim 2, it is characterized in that: described pillow shoulder is provided with the tension rib circular hole.
CN 201220604096 2012-11-15 2012-11-15 Temporary sleeper for tunnel shield construction Expired - Fee Related CN202881780U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220604096 CN202881780U (en) 2012-11-15 2012-11-15 Temporary sleeper for tunnel shield construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220604096 CN202881780U (en) 2012-11-15 2012-11-15 Temporary sleeper for tunnel shield construction

Publications (1)

Publication Number Publication Date
CN202881780U true CN202881780U (en) 2013-04-17

Family

ID=48073221

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220604096 Expired - Fee Related CN202881780U (en) 2012-11-15 2012-11-15 Temporary sleeper for tunnel shield construction

Country Status (1)

Country Link
CN (1) CN202881780U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104294715A (en) * 2014-09-18 2015-01-21 中铁十二局集团有限公司 Safe and rapid combined shield tunneling light sleeper
CN104562870A (en) * 2015-01-29 2015-04-29 中铁十九局集团轨道交通工程有限公司 Portable assembled shield tunneling machine sleeper
CN106245471A (en) * 2016-10-17 2016-12-21 中建交通建设集团有限公司 A kind of light-duty sleeper of rapid-assembling/disassembling and using method thereof
CN106835866A (en) * 2017-01-25 2017-06-13 中铁隧道集团有限公司 A kind of Open TBM walking side rail separates the method that assembling is recycled with central track
CN107447598A (en) * 2017-08-17 2017-12-08 中铁十局集团第三工程有限公司 A kind of building method of railway roadbed changeover portion support meanss and railway roadbed changeover portion support system
CN108103857A (en) * 2017-12-29 2018-06-01 上海市机械施工集团有限公司 Sleeper and its application construction method in tunnel
CN109235161A (en) * 2018-10-17 2019-01-18 中建八局轨道交通建设有限公司 Horizontal connection device and device for fixing running tracks for sleeper in shield tunnel
CN110375911A (en) * 2019-07-11 2019-10-25 宁波六希格码建筑科技有限公司 A kind of railway sleeper stress detection method and its optimization structure

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104294715A (en) * 2014-09-18 2015-01-21 中铁十二局集团有限公司 Safe and rapid combined shield tunneling light sleeper
CN104294715B (en) * 2014-09-18 2017-01-11 中铁十二局集团有限公司 Safe and rapid combined shield tunneling light sleeper
CN104562870A (en) * 2015-01-29 2015-04-29 中铁十九局集团轨道交通工程有限公司 Portable assembled shield tunneling machine sleeper
CN104562870B (en) * 2015-01-29 2016-03-30 中铁十九局集团轨道交通工程有限公司 Portable combined shield machine sleeper
CN106245471A (en) * 2016-10-17 2016-12-21 中建交通建设集团有限公司 A kind of light-duty sleeper of rapid-assembling/disassembling and using method thereof
CN106835866A (en) * 2017-01-25 2017-06-13 中铁隧道集团有限公司 A kind of Open TBM walking side rail separates the method that assembling is recycled with central track
CN107447598A (en) * 2017-08-17 2017-12-08 中铁十局集团第三工程有限公司 A kind of building method of railway roadbed changeover portion support meanss and railway roadbed changeover portion support system
CN108103857A (en) * 2017-12-29 2018-06-01 上海市机械施工集团有限公司 Sleeper and its application construction method in tunnel
CN109235161A (en) * 2018-10-17 2019-01-18 中建八局轨道交通建设有限公司 Horizontal connection device and device for fixing running tracks for sleeper in shield tunnel
CN110375911A (en) * 2019-07-11 2019-10-25 宁波六希格码建筑科技有限公司 A kind of railway sleeper stress detection method and its optimization structure
CN110375911B (en) * 2019-07-11 2021-04-16 宁波六希格码建筑科技有限公司 Rail sleeper stress detection method and optimization structure thereof

Similar Documents

Publication Publication Date Title
CN202881780U (en) Temporary sleeper for tunnel shield construction
CN202881776U (en) Turnout for urban railway traffic
CN205954411U (en) Trapezoidal switch
CN202370544U (en) Installation equipment for back-stick type waterstop for tunnel construction joint
CN201627594U (en) Column shoe
CN202730638U (en) Mounting support
CN204567348U (en) Electrified railway aluminum alloy suspension clamp
CN206493858U (en) I-shaped conductor rail insulation support device
CN201893496U (en) Retractable enclosed busbar bridge for switch cabinet
CN202644314U (en) Concrete sleeper
CN211106981U (en) Store up brick and transport special electrically conductive wheel of dolly
CN203013827U (en) Portable-type battery box for electric bicycle
CN203470861U (en) Vacuum smelting casting drainage device
CN206237085U (en) A kind of composite material cable rack for installing anchor ear
CN216973055U (en) Cast-in-place concrete pavement template
CN208469599U (en) A kind of charging pile device for intelligent garage
CN203218681U (en) Bridge type crane power supply slide block
CN216949247U (en) Decorate stone material and hang mounting structure futilely
CN215854685U (en) Gantry crane walking rail fixing device
CN201738230U (en) Transverse arc-shaped sloping bridge pier
CN208237578U (en) A kind of concrete storehouse surface lighting device
CN210707187U (en) Novel driving electricity-saving appliance
CN202797854U (en) Cable trench dustproof device
CN202340110U (en) Novel composite material cable trench device
CN201850892U (en) Novel sliding door slide way

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130417

Termination date: 20141115

EXPY Termination of patent right or utility model