CN204417928U - The most advanced and sophisticated frame rail reinforcement tools of rail yard point tongue - Google Patents
The most advanced and sophisticated frame rail reinforcement tools of rail yard point tongue Download PDFInfo
- Publication number
- CN204417928U CN204417928U CN201520032486.7U CN201520032486U CN204417928U CN 204417928 U CN204417928 U CN 204417928U CN 201520032486 U CN201520032486 U CN 201520032486U CN 204417928 U CN204417928 U CN 204417928U
- Authority
- CN
- China
- Prior art keywords
- switch tie
- equal leg
- switch
- leg angle
- rail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model relates to the most advanced and sophisticated frame rail reinforcement tools of rail yard point tongue, the switch tie that effectively can solve point of switch place cannot bear the problem of the effect of rail power transmission and the opposing circuit ability of displacement in length and breadth, technical scheme is, comprise switch tie, before and after switch tie the corner of two side lower parts respectively spiral-lock have equal leg angle, the two ends of switch tie are stretched out at the two ends of equal leg angle, two groups of connecting angles linked together by the equal leg angle of both sides, front and back the two ends of stretching out are equipped with all successively, the connecting angle of inner side and the both ends of the surface of switch tie are close to, the boatswain chair of level is equipped with in the outside of switch tie both sides slide plate on switch tie, the U-bolt for equal leg angle and switch tie being closely fixed together boatswain chair is equipped with, the utility model novel structure is unique, advantages of simple, easy production, use material is simple and easy to get, peace is torn open quick, labor intensive is little, the steel wood mixing switch tie whole structure formed is good, cost is low, safe and reliable, easy to use, effective.
Description
Technical field
The utility model relates to the most advanced and sophisticated frame rail reinforcement tools of a kind of rail yard point tongue for rail yard point tongue tip place.
Background technology
Track switch is the necessaries that locomotive changes between two railway lines, and primarily of steering unit, railway frog and guard rail part and coupling part composition are one of links the weakest during railway line is formed.Rolling stock turnover track switch, by tongue pilot engine, adjusts to location or antiposition according to the instruction of driving; The transition operation of tongue is made a connection to have come by pull bar by electricity entirely.
Railway is very strict to the quality requirement of turnout switch part, and railway " skill rule " regulation turnout rail is apart from static allowable error value+3.-2mm, and the point of switch gauge allowable variation installing electricity favourable turn must not more than 1mm., wearing and tearing large to the impact of tongue at the situation Train of circuit instability greatly also very easily damage, and directly affect transport.
The impact that between the switch tie under the changing points part point of switch, (sleeper box) makes a connection because track switch is electric cannot penetrate horizontal beam of lifting and reinforce, cause stock rail and the point of switch nearly 1.2m length unsettled, the switch tie at point of switch place has lost the ability of the effect of bearing rail power transmission and opposing circuit displacement in length and breadth.Traditional work mode takes bundle rail method to reinforce, but the part that bends up that the longitudinal rail of bundle rail may collide electricity favourable turn pull bar causes device damage and potential safety hazard.How convenient and swift, handling these problems safely and effectively well is problems that those skilled in the art are concerned about.
Summary of the invention
For above-mentioned situation, for overcoming the defect of prior art, the object of the utility model is just to provide the most advanced and sophisticated frame rail reinforcement tools of a kind of rail yard point tongue, and the switch tie that effectively can solve point of switch place cannot bear the problem of the effect of rail power transmission and the opposing circuit ability of displacement in length and breadth.
The technical scheme that the utility model solves is, comprise switch tie, before and after switch tie the corner of two side lower parts respectively spiral-lock have equal leg angle, the two ends of switch tie are stretched out at the two ends of equal leg angle, two groups of connecting angles linked together by the equal leg angle of both sides, front and back the two ends of stretching out are equipped with all successively, the connecting angle of inner side and the both ends of the surface of switch tie are close to, the boatswain chair of level is equipped with in the outside of switch tie both sides slide plate on switch tie, boatswain chair is equipped with the U-bolt for equal leg angle and switch tie being closely fixed together.
The utility model novel structure is unique, and advantages of simple, easily produces, and use material simple and easy to get, peace is torn open quick, and labor intensive is little, and the steel wood mixing switch tie whole structure of formation is good, and cost is low, safe and reliable, easy to use, effective.
Accompanying drawing explanation
Fig. 1 is front view of the present utility model (only showing the switch tie of half).
Fig. 2 is top view of the present utility model (only showing the switch tie of half).
Fig. 3 is cross sectional side view of the present utility model.
Fig. 4 is using state figure of the present utility model (only display is provided with one end of electricity favourable turn).
Detailed description of the invention
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is described in further detail.
Provided by Fig. 1-4, the utility model comprises switch tie, before and after switch tie 6 corner of two side lower parts respectively spiral-lock have equal leg angle 5, the two ends of switch tie 6 are stretched out at the two ends of equal leg angle 5, two groups of connecting angle 1a, 1b linked together by the equal leg angle of both sides, front and back the two ends of stretching out are equipped with all successively, the connecting angle 1b of inner side and the both ends of the surface of switch tie 6 are close to, the boatswain chair 3 of level is equipped with in the outside of switch tie 6 both sides slide plate 2 on switch tie, boatswain chair 3 is equipped with the U-bolt 4 for equal leg angle 5 and switch tie being closely fixed together.
For ensureing result of use, described equal leg angle 5 has identical two groups, and its specification is 100 × 100 × 12mm, long 4.5m, the corner of two groups of difference spiral-locks, two side lower parts before and after switch tie 6;
The equal leg angle of described connecting angle 1a, 1b to be specification be 100 × 100 × 12mm, length is 230mm, and the outside of a connecting angle 1b vertical plane and the end face of switch tie 6 of inner side are close to;
The steel plate of described boatswain chair 3 to be specifications be 100 × 350 × 16mm;
The diameter of described U-bolt 4 is 20mm.
When the utility model uses (as shown in Figure 4), according to the frame rail scheme formulated, first the equal leg angle 5 that 4.5m long size is 100 × 100 × 12mm is intercepted, remove ballast aggregate around switch tie, equal leg angle 5 is passed below the fixing steel framework 9 being used for installing electricity favourable turn 7, equal leg angle is held in the corner of two side lower parts before and after switch tie, shelves or hang and indulge on girder steel 8 in frame rail; Withstand switch tie two ends with the long connecting angle 1b of 230mm and weld together with equal leg angle 5; The boatswain chair 3 coordinating 16mm thick at the U-bolt 4 of the outside φ 20 of the slide plate 2 of switch tie is fastening, adopts pad nut to fix; The equal leg angle two ends of finally shelving or hanging on longeron are welded and fixed with connecting angle 1a again, form an overall steel wood mixing switch tie, thus utilize the gap of the lower 105mm of electricity favourable turn, equal leg angle crosses electricity favourable turn, is placed in or hangs on railway line frame rail steel longeron 8, fix frame rail with U-bolt, after the end of job, cut off connecting angle, equal leg angle is extracted out, for having enough to meet the need use; Compared with prior art, the utility model uses material simple and easy to get, and peace is torn open quick, and labor intensive is little, change the reinforcing mode that tradition adopts rail bundle rail, the switch tie at effective solution point of switch place cannot bear the problem of the effect of rail power transmission and the opposing circuit ability of displacement in length and breadth, and the steel wood mixing switch tie whole structure of formation is good, and cost is low, safety is guaranteed, easy to use, effective, there is good Social and economic benef@.
Claims (5)
1. the most advanced and sophisticated frame rail reinforcement tools of rail yard point tongue, comprise switch tie, it is characterized in that, before and after switch tie (6) corner of two side lower parts respectively spiral-lock have equal leg angle (5), the two ends of switch tie (6) are stretched out at the two ends of equal leg angle (5), two groups of connecting angle (1a linked together by the equal leg angle of both sides, front and back the two ends of stretching out are equipped with all successively, 1b), the connecting angle (1b) of inner side is close to the both ends of the surface of switch tie (6), the boatswain chair (3) of level is equipped with in the outside of switch tie (6) both sides slide plate (2) on switch tie, the U-bolt (4) for equal leg angle (5) and switch tie being closely fixed together boatswain chair (3) is equipped with.
2. the most advanced and sophisticated frame rail reinforcement tools of rail yard point tongue according to claim 1, it is characterized in that, described equal leg angle (5) has identical two groups, and its specification is 100 × 100 × 12mm, long 4.5m, the corner of two groups of difference spiral-locks, two side lower parts before and after switch tie (6).
3. the most advanced and sophisticated frame rail reinforcement tools of rail yard point tongue according to claim 1, it is characterized in that, the equal leg angle of described connecting angle (1a, 1b) to be specification be 100 × 100 × 12mm, length is 230mm, and the outside of connecting angle (1b) vertical plane of inner side and the end face of switch tie (6) are close to.
4. the most advanced and sophisticated frame rail reinforcement tools of rail yard point tongue according to claim 1, is characterized in that, the steel plate of described boatswain chair (3) to be specification be 100 × 350 × 16mm.
5. the most advanced and sophisticated frame rail reinforcement tools of rail yard point tongue according to claim 1, it is characterized in that, the diameter of described U-bolt (4) is 20mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520032486.7U CN204417928U (en) | 2015-01-19 | 2015-01-19 | The most advanced and sophisticated frame rail reinforcement tools of rail yard point tongue |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520032486.7U CN204417928U (en) | 2015-01-19 | 2015-01-19 | The most advanced and sophisticated frame rail reinforcement tools of rail yard point tongue |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204417928U true CN204417928U (en) | 2015-06-24 |
Family
ID=53468315
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520032486.7U Expired - Fee Related CN204417928U (en) | 2015-01-19 | 2015-01-19 | The most advanced and sophisticated frame rail reinforcement tools of rail yard point tongue |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204417928U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107700284A (en) * | 2017-09-27 | 2018-02-16 | 中铁六局集团天津铁路建设有限公司 | Using the box-body jacking method of slide plate enhancement line consolidation effect |
CN107974878A (en) * | 2017-11-29 | 2018-05-01 | 中铁第四勘察设计院集团有限公司 | A kind of rail yard track switch reinforcement means and structure |
-
2015
- 2015-01-19 CN CN201520032486.7U patent/CN204417928U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107700284A (en) * | 2017-09-27 | 2018-02-16 | 中铁六局集团天津铁路建设有限公司 | Using the box-body jacking method of slide plate enhancement line consolidation effect |
CN107974878A (en) * | 2017-11-29 | 2018-05-01 | 中铁第四勘察设计院集团有限公司 | A kind of rail yard track switch reinforcement means and structure |
CN107974878B (en) * | 2017-11-29 | 2019-07-05 | 中铁第四勘察设计院集团有限公司 | A kind of rail yard track switch reinforcement means and structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104562863A (en) | Dual-purpose railway double track | |
CN204417928U (en) | The most advanced and sophisticated frame rail reinforcement tools of rail yard point tongue | |
CN207712048U (en) | A kind of assembled gapless line transport vehicle | |
CN203593944U (en) | Connecting structure for steel bar hanging rod and concrete | |
CN204938791U (en) | A kind of support connecting structure of tower crane support beam | |
CN103395690A (en) | Light-weight solid-web I-shaped steel crane girder | |
CN204139004U (en) | Rail can't harm ruggedized equipment | |
CN202039289U (en) | Temporary steel bridge device for bulky cargo transportation | |
CN107720542B (en) | Hoisting track composite beam | |
CN203907010U (en) | Flexible connection device for pipe jacking construction in soft soil layer | |
CN204509373U (en) | Sectional type oxygen rifle fixed guide | |
CN203307730U (en) | Pump pipe fixing device for bridge tower concrete construction | |
CN204529208U (en) | A kind of improved type wheel drop mechanism transfer bridge interlock system | |
CN203428753U (en) | Light-weight solid-web I-shaped steel crane girder | |
CN204589729U (en) | Compound railway slip switch stabilising arrangement | |
CN203977300U (en) | A kind of attaching protection canopy of cradle construction continuous beam | |
CN204623801U (en) | A kind of scaffold clamp | |
CN204453664U (en) | The horizontal safety guyrope switch of a kind of belt feeder | |
CN204551143U (en) | A kind of dual-purpose railway two-rail | |
CN208329369U (en) | A kind of steel construction elevator hanging ring girder connection | |
CN217203390U (en) | Simple track gauge pull rod device for tunnel construction | |
CN205777528U (en) | A kind of lift-on/lift-off type metal form | |
CN105059296A (en) | Special flatcar body for railway catenary maintenance | |
CN204530334U (en) | Hot-metal ladle and carriage track check rail | |
CN204324743U (en) | A kind of transfer crane being applicable to the long shape article of handling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150624 Termination date: 20160119 |
|
EXPY | Termination of patent right or utility model |