CN203593944U - Connecting structure for steel bar hanging rod and concrete - Google Patents

Connecting structure for steel bar hanging rod and concrete Download PDF

Info

Publication number
CN203593944U
CN203593944U CN201320760627.8U CN201320760627U CN203593944U CN 203593944 U CN203593944 U CN 203593944U CN 201320760627 U CN201320760627 U CN 201320760627U CN 203593944 U CN203593944 U CN 203593944U
Authority
CN
China
Prior art keywords
steel plate
concrete
hanging rod
otic placode
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320760627.8U
Other languages
Chinese (zh)
Inventor
赵亮
欧阳辉来
许振中
陈刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Survey and Design Institute Group Ltd
Original Assignee
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Survey and Design Institute Group Ltd filed Critical China Railway First Survey and Design Institute Group Ltd
Priority to CN201320760627.8U priority Critical patent/CN203593944U/en
Application granted granted Critical
Publication of CN203593944U publication Critical patent/CN203593944U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a connecting structure for a steel bar hanging rod and concrete. According to a middle-lower-bear arch bridge of a traditional steel wire tendon or steel strand hanging rod, accidents are prone to being caused due to corrosion and fatigue of the hanging rod. The connecting structure comprises the steel bar hanging rod and a concrete beam, wherein the lower end of the steel bar hanging rod is fixed to a lug plate through a bolt pin, the face of the lug plate is parallel to the longitudinal direction of the bridge, the lower portion of the lug plate is pre-buried in the concrete beam, a plurality of connecting steel plates perpendicular to the lug plate are welded to the two faces of the pre-buried part of the lug plate, and the connecting steel plates are parallel to the transverse direction of the bridge. The connecting structure for connecting the two rigid components is provided for the structure form, of connecting the steel bar hanging rod with the concrete, in a continuous beam-arch-steel bar hanging rod combined structure of a railway, and the connecting structure is reasonable in stress, definite in force transmission, convenient to construct, safe and reliable.

Description

A kind of rod iron suspension rod and concrete syndeton
Technical field
the utility model belongs to bridge construction technical field of buildings, is specifically related to a kind of rod iron suspension rod and concrete syndeton.
Background technology
In recent years, some adopt traditional steel tendon or steel strand suspension rod in, the lower bearing arch bridge accident that causes due to suspension rod corrosion, fatigue caused the concern of the problems such as the design of people to suspension rod and anticorrosion, inspection, replacing.For adapting to the requirement of the stressed and functional performance of beam-arch composite bridge middle hanger, must improve traditional suspension rod, adopt novel rod iron suspension rod, study itself and concrete beam connected mode, the safety of raising structure.
Summary of the invention
The purpose of this utility model is to provide a kind of rod iron suspension rod and concrete syndeton that is more suitable for beam-arch composite bridge structure.
The technical scheme that the utility model adopts is:
A kind of rod iron suspension rod and concrete syndeton, include rod iron suspension rod and concrete beam, it is characterized in that:
Otic placode is fixed on by pin in rod iron suspension rod lower end; Otic placode plate face with vertical bridge to parallel;
The bottom of otic placode is embedded in concrete beam in advance, and the otic placode two sides of pre-buried part is all welded with the multiple tracks junction steel plate vertical with otic placode, and junction steel plate is parallel with direction across bridge.
On junction steel plate, be provided with perforate, between the perforate of the junction steel plate of adjacent parallel by vertical bridge to anchor bar form shear connector.
Junction steel plate top is embedded with the horizontal fixation steel plate that is parallel to concrete beam beam face, and laterally fixation steel plate bottom surface is welded with peg;
Peg lower end is lower than junction steel plate top, and is distributed in the direction across bridge both sides of junction steel plate and vertical bridge to both sides.
Otic placode two sides is provided with the otic placode reinforcement steel plate of being close to otic placode.
The utlity model has following advantage:
The utility model is for the form of structure that in railway continuous beam-arch-rod iron suspension rod combining structure, rod iron suspension rod is connected with concrete, and the syndeton of two stiffening members of a kind of connection is provided, reasonable stress, and power transmission is clear and definite, and easy construction, safe and reliable.
Accompanying drawing explanation
Fig. 1 is the utility model side structure schematic diagram.
Fig. 2 is the utility model cross-sectional drawing.
In figure, 1-rod iron suspension rod, 2-pin, 3-otic placode, 4-otic placode is strengthened steel plate, the horizontal fixation steel plate of 5-, 6-peg, 7-junction steel plate, 8-anchor bar, 9-concrete beam.
The specific embodiment
Below in conjunction with the specific embodiment, the utility model is described in detail.
A kind of rod iron suspension rod and concrete syndeton that the utility model relates to, the form of structure for rod iron suspension rod is connected with concrete in railway continuous beam-arch-rod iron suspension rod combining structure, being more suitable for the force request of beam-arch composite bridge structure, is a kind of syndeton form of utilizing the principle of shear connector to link together two stiffening members.Referring to Fig. 1 and Fig. 2, described syndeton includes rod iron suspension rod 1 and concrete beam 9, and otic placode 3 is fixed on by pin 2 in rod iron suspension rod 1 lower end, and otic placode 3 plate faces are with vertical bridge to parallel, and otic placode 3 two sides are provided with the otic placode reinforcement steel plate 4 of being close to otic placode 3.The bottom of otic placode 3 is embedded in concrete beam 9 in advance, and otic placode 3 two sides of pre-buried part are all welded with the multiple tracks junction steel plate vertical with otic placode 37, and junction steel plate 7 is parallel with direction across bridge.
On junction steel plate 7, be provided with perforate, between the perforate of the junction steel plate 7 of adjacent parallel by vertical bridge to anchor bar 8 form shear connector.
Junction steel plate 7 tops are embedded with the horizontal fixation steel plate 5 that is parallel to concrete beam 9 beam faces, and laterally fixation steel plate 5 bottom surfaces are welded with peg 6.Peg 6 lower ends are lower than junction steel plate 7 tops, and are distributed in the direction across bridge both sides of junction steel plate 7 and vertical bridge to both sides.
It is cited that content of the present utility model is not limited to embodiment, and the conversion of any equivalence that those of ordinary skills take technical solutions of the utility model by reading the utility model manual, is claim of the present utility model and contains.

Claims (4)

1. rod iron suspension rod and a concrete syndeton, includes rod iron suspension rod (1) and concrete beam (9), it is characterized in that:
Otic placode (3) is fixed on by pin (2) in rod iron suspension rod (1) lower end; Otic placode (3) plate face with vertical bridge to parallel;
The bottom of otic placode (3) is embedded in concrete beam (9) in advance, and otic placode (3) two sides of pre-buried part is all welded with the multiple tracks junction steel plate (7) vertical with otic placode (3), and junction steel plate (7) is parallel with direction across bridge.
2. a kind of rod iron suspension rod according to claim 1 and concrete syndeton, is characterized in that:
Junction steel plate is provided with perforate on (7), between the perforate of the junction steel plate (7) of adjacent parallel by vertical bridge to anchor bar (8) form shear connector.
3. a kind of rod iron suspension rod according to claim 2 and concrete syndeton, is characterized in that:
Junction steel plate (7) top is embedded with the horizontal fixation steel plate (5) that is parallel to concrete beam (9) beam face, and laterally fixation steel plate (5) bottom surface is welded with peg (6);
Peg (6) lower end is lower than junction steel plate (7) top, and is distributed in the direction across bridge both sides of junction steel plate (7) and vertical bridge to both sides.
4. a kind of rod iron suspension rod according to claim 3 and concrete syndeton, is characterized in that:
Otic placode (3) two sides is provided with the otic placode reinforcement steel plate (4) of being close to otic placode (3).
CN201320760627.8U 2013-11-28 2013-11-28 Connecting structure for steel bar hanging rod and concrete Expired - Lifetime CN203593944U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320760627.8U CN203593944U (en) 2013-11-28 2013-11-28 Connecting structure for steel bar hanging rod and concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320760627.8U CN203593944U (en) 2013-11-28 2013-11-28 Connecting structure for steel bar hanging rod and concrete

Publications (1)

Publication Number Publication Date
CN203593944U true CN203593944U (en) 2014-05-14

Family

ID=50674842

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320760627.8U Expired - Lifetime CN203593944U (en) 2013-11-28 2013-11-28 Connecting structure for steel bar hanging rod and concrete

Country Status (1)

Country Link
CN (1) CN203593944U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105586826A (en) * 2015-11-30 2016-05-18 湖州交通规划设计院 Connecting structure of anchorage ends of booms of concrete tied arch bridge and construction method of connecting structure
CN109577195A (en) * 2018-12-28 2019-04-05 武船重型工程股份有限公司 A kind of steel construction arch bridge anchor structure and its manufacturing method
CN110725203A (en) * 2019-11-18 2020-01-24 深圳市市政设计研究院有限公司 Fork ear formula jib anchor structure
CN113585038A (en) * 2021-06-24 2021-11-02 上海市政工程设计研究总院(集团)有限公司 Single-arch rib two-hinged arch bridge
CN114592420A (en) * 2022-03-15 2022-06-07 广西交科集团有限公司 Suspender system for simply replacing suspender and construction method for replacing suspender
CN114622598A (en) * 2022-03-02 2022-06-14 上海市隧道工程轨道交通设计研究院 Steel shell concrete immersed tube tunnel hoisting point structure connection structure and construction method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105586826A (en) * 2015-11-30 2016-05-18 湖州交通规划设计院 Connecting structure of anchorage ends of booms of concrete tied arch bridge and construction method of connecting structure
CN109577195A (en) * 2018-12-28 2019-04-05 武船重型工程股份有限公司 A kind of steel construction arch bridge anchor structure and its manufacturing method
CN110725203A (en) * 2019-11-18 2020-01-24 深圳市市政设计研究院有限公司 Fork ear formula jib anchor structure
CN113585038A (en) * 2021-06-24 2021-11-02 上海市政工程设计研究总院(集团)有限公司 Single-arch rib two-hinged arch bridge
CN114622598A (en) * 2022-03-02 2022-06-14 上海市隧道工程轨道交通设计研究院 Steel shell concrete immersed tube tunnel hoisting point structure connection structure and construction method thereof
CN114622598B (en) * 2022-03-02 2024-04-02 上海市隧道工程轨道交通设计研究院 Steel shell concrete immersed tube tunnel hanging point structure connection structure and construction method thereof
CN114592420A (en) * 2022-03-15 2022-06-07 广西交科集团有限公司 Suspender system for simply replacing suspender and construction method for replacing suspender

Similar Documents

Publication Publication Date Title
CN203593944U (en) Connecting structure for steel bar hanging rod and concrete
CN103061418A (en) Continuous variable-stiffness shear key type steel-concrete joint section
CN203006755U (en) Heavy-duty monorail crane rail
CN203559354U (en) Stay cable anchoring structure applied to prestressed concrete partially cable-stayed bridge
CN103074959A (en) Steel plate and high-strength concrete combination connecting beam
CN102677582B (en) Half-through bowstring arch bridge adopting partial rigid connection mode among arched girders
CN203080411U (en) Anchoring plate assembly used for cable-stayed bridge concrete main beam
CN203755460U (en) X-shaped T type connecting component
CN203080799U (en) Coupling beam combining steel plates and high-strength concrete
CN202688848U (en) Anchoring connecting structure for nodes of composite truss girder cable-stayed bridge
CN204644869U (en) Drag-line bridge tower anchoring structure
CN202809478U (en) Edge main grider structure shaped like Chinese character 'shang' of concrete superposed beam cable-stayed bridge
CN208545623U (en) Horizontal connection assembly type shear hinge
CN204112205U (en) The enhancing structure in large span prestressed concrete box beam cross section
CN209128882U (en) A kind of anchor of suspension cable and concrete girder
CN203420211U (en) Connecting structure of railroad bridge open bridge floor wooden sleeper and steel beam
CN209685126U (en) A kind of steel vestibule integrally promotes lifting lug device
CN205088560U (en) Joint construction of railway continuous beam - hunch combination bridge girder and arch rib
CN203603024U (en) High tower type railway concrete part cable-stayed bridge
CN208545621U (en) Floating ballast bed plate end large span shear hinge
CN202808120U (en) Triangular standard knot of building hoist
CN202945540U (en) Aluminum alloy structural member for pedestrian overcrossing
CN202913341U (en) Railway bridge main span and side span structure with unequal transverse pitches
CN206319410U (en) A kind of wind-resistant column and the fixed mechanism of girder steel for steel construction
CN205804174U (en) A kind of bridge tower structure adapting to the parallel suspension cable in double rope faces

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140514