CN104562863A - Dual-purpose railway double track - Google Patents
Dual-purpose railway double track Download PDFInfo
- Publication number
- CN104562863A CN104562863A CN201510010616.1A CN201510010616A CN104562863A CN 104562863 A CN104562863 A CN 104562863A CN 201510010616 A CN201510010616 A CN 201510010616A CN 104562863 A CN104562863 A CN 104562863A
- Authority
- CN
- China
- Prior art keywords
- track
- rail
- broad gauge
- arc
- dual
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B25/00—Tracks for special kinds of railways
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B5/00—Rails; Guard rails; Distance-keeping means for them
- E01B5/16—Distance keepers
Abstract
The invention discloses a dual-purpose railway double track; the dual-purpose railway double tracks comprises a group of broad gauge tracks, a group of auxiliary safe tracks and a group of standard tracks; the auxiliary safe tracks are arranged on the inner side of the broad gauge tracks; the distance between the safe track and the broad gauge track is less than the thickness of a standard gauge bogie strake; the broad gauge tracks and the auxiliary safe tracks are connected with the standard tracks by a section of arc-shaped transitional track; the transitional track comprises an arc-shaped broad gauge track and an arc-shaped auxiliary safe track; two ends of the arc-shaped broad gauge track are respectively connected with the broad gauge tracks and the standard tracks; the arc-shaped auxiliary safe track is connected with the auxiliary safe tracks; the initial end of the arc-shaped auxiliary safe track is arranged at the connection between the standard tracks and the arc-shaped broad gauge track. The dual-purpose railway double track can concurrently satisfy the bearing and running of standard gauge trains and broad gauge trains; the use is convenient, the universality is strong; the dual-purpose railway double track is safe and reliable; the manufacturing of temporary broad gauge tracks can be avoided when producing board gauge trains, thereby saving manpower, financial resources, and material resources, saving time, and increasing the work efficiency as well as shortening the construction period.
Description
Technical field
The present invention relates to railroad track technical field.
Background technology
In recent years, along with the continuous expansion of business newly made by my company's railway, obtain some outlet railway broad gauge lorry orders, the batch production of such as KZ75-1520 type stone tiny fragments of stone, coal, etc. hopper wagon, the trial-production of end enabling broad gauge open-top car.Because current company orbit is standard gauge, standard gauge is 1435mm, and the gauge of broad gauge lorry is 1520mm, therefore, broad gauge lorry cannot be debugged and run on the track of standard gauge, when broad gauge train needs commissioning test, need to make interim broad gauge track, debugged and removed broad gauge track again, wasted a large amount of time, manpower and material resources, add R&D costs, extend the duration.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of dual-purpose railway two-rail, carrying, the operation of standard gauge train and broad gauge train can be met simultaneously, easy to use, highly versatile, safe and reliable, the making of interim broad gauge track when avoiding production broad gauge train, save manpower, financial resources and material resources, save the time, improve operating efficiency, shorten the duration.
For solving the problems of the technologies described above, the technical solution used in the present invention is:
A kind of dual-purpose railway two-rail, comprise one group of broad gauge track, one group of auxiliary security track and one group of standard trajectory, described auxiliary security track is positioned at inside broad gauge track, the spacing of auxiliary security track and broad gauge track is less than standard gauge train bogie tire thickness, and described broad gauge track is connected with standard trajectory with the twilight orbit of auxiliary security track by one section of arc; Described twilight orbit comprises arc broad gauge road and arc auxiliary security track, the two ends in described arc broad gauge road are connected with broad gauge track and standard trajectory respectively, described arc auxiliary security track is connected with auxiliary security track, the initiating terminal of described arc auxiliary security track is positioned at the junction in standard trajectory and arc broad gauge road, and the spacing in described arc auxiliary security track and arc broad gauge road is less than standard gauge train bogie tire thickness.
Further technical scheme, described broad gauge track and the spacing of auxiliary security track are 70mm, and the width of described auxiliary security track is 1350mm.
Further technical scheme, described broad gauge track and auxiliary security orbital segment arrange a tie rod every ten meters, and the junction of broad gauge track and standard trajectory and twilight orbit is also provided with tie rod.
Further technical scheme, described twilight orbit is provided with interval iron.
Further technical scheme, the length of described twilight orbit is 2500mm.
Further technical scheme, described broad gauge track, auxiliary security track, twilight orbit and standard trajectory comprise rail, two row's trapezoidal pedestals and union pieces, and described trapezoidal pedestal is embedded in ground, and the cross section of trapezoidal pedestal is wide at the top and narrow at the bottom trapezoidal; Described union piece comprises stone bolt, pressing plate and orifice plate, and described stone bolt is each passed through pressing plate and rail is fixed on trapezoidal pedestal by orifice plate.
Further technical scheme, the upper surface of described trapezoidal pedestal lays the cement floor lower than rail height.
Further technical scheme, is filled with rubber between row's rail of described broad gauge track and auxiliary security orbital segment and cement floor.
Further technical scheme, described orifice plate comprises two orifice plates and three orifice plates, and described two orifice plates and three orifice plates include panel and are fixed on the leg of panel side, and described panel is provided with two or three through holes suitable with often arranging rail.
Further technical scheme, described pressing plate comprises center platen and side guide, and described stone bolt is fixed on adjacent two rail of same row through the mesopore of center platen and three orifice plates successively; Described stone bolt is fixed on the outside of adjacent two rail of same row successively through the side opening of side guide and two orifice plates or three orifice plates.
The beneficial effect adopting technique scheme to produce is: the present invention can meet carrying, the operation of standard gauge train and broad gauge train simultaneously, easy to use, highly versatile, safe and reliable, the making of interim broad gauge track when avoiding production broad gauge train, saves manpower, financial resources and material resources, saves the time, improve operating efficiency, shorten the duration; Distance between bearing track and safety track is less than the tire thickness of standard gauge train, can ensure that standard gauge train passes through smoothly on two-rail; The tie rod be provided with can ensure the lateral stability of two-rail, ensures the fastness between broad gauge track and auxiliary security track; Two-rail is embedded in cement floor, can ensure other equipment passing through smoothly in cement floor; The rubber of filling between rail cement floor can reduce train by time impact force to cement floor; Meanwhile, be provided with twilight orbit, ensure that standard gauge train is called in, recalled work area; And twilight orbit is designed to arc, ensure that the smooth transition of standard trajectory train, avoid the impact force of train wheel to track excessive; The interval iron that twilight orbit is provided with, when train passes through, for wheel provides certain bearing capacity, can avoid train to sink, ensures passing through smoothly of train, avoid damaging track.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is A-A sectional view in Fig. 1;
Fig. 3 is B-B sectional view in Fig. 1;
Fig. 4 is C-C sectional view in Fig. 1;
Fig. 5 is D-D sectional view in Fig. 1;
Fig. 6 is H-H sectional view in Fig. 1;
Fig. 7 is the front view of two orifice plates in Fig. 1;
Fig. 8 is the top view of two orifice plates in Fig. 1;
Fig. 9 is the present invention's application schematic diagram;
In the accompanying drawings: 1, broad gauge track, 2, auxiliary security track, 3, trapezoidal pedestal, 4, stone bolt, 5, three orifice plates, 6, center platen, 7, side guide, 8, rubber, 9, cement floor, 10, interval iron, 11, tie rod, 12, two orifice plates, 13, panel, 14, leg, 15, arc broad gauge road, 16 arc auxiliary security tracks, 17, standard trajectory.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is further detailed explanation.
As shown in Figure 1, a kind of dual-purpose railway two-rail, comprise one group of broad gauge track 1, one group of auxiliary security track 2 and one group of standard trajectory 17, auxiliary security track 2 is positioned at broad gauge track 1, auxiliary security track 2 is less than standard gauge train bogie rim thickness h with the distance of broad gauge track 1, and as shown in Figure 9, broad gauge track 1 is connected with standard trajectory 17 with the twilight orbit of auxiliary security track 2 by one section of arc.Twilight orbit comprises arc broad gauge road 15 and arc auxiliary security track 16, the two ends in arc broad gauge road 15 are connected with broad gauge track 1 and standard trajectory 17 respectively, arc auxiliary security track 16 is connected with auxiliary security track 2, and the initiating terminal of arc auxiliary security track 16 is positioned at the junction in standard trajectory 17 and arc broad gauge road 15.The spacing in arc auxiliary security track 16 and arc broad gauge road 15 is less than standard gauge train bogie tire thickness, and has certain spacing between arc auxiliary security track 16 and arc broad gauge road 15, to ensure that train wheel rim passes through.The distance of broad gauge track 1 and auxiliary security track 2 is 70mm, and the width of auxiliary security track 2 is 1350mm.Auxiliary security track 2, twilight orbit, broad gauge track 1 are consistent with the height of standard trajectory 17.Auxiliary security track 2 and arc auxiliary security track 16, for limiting train wheel rim, de-orbit when through twilight orbit and broad gauge track 1 to avoid train.Twilight orbit is designed to arc, and to avoid train operationally, the impact force of wheel to track is excessive, damages track.
As shown in Figure 2, broad gauge track 1, auxiliary security track 2, twilight orbit and standard trajectory 17 comprise rail, two row's trapezoidal pedestals 3 and union pieces, and trapezoidal pedestal 3 is embedded in ground, and the cross section of trapezoidal pedestal 3 is wide at the top and narrow at the bottom trapezoidal; Union piece comprises stone bolt 4, pressing plate and orifice plate, stone bolt 4 be each passed through pressing plate and rail is fixed on trapezoidal pedestal 3 by orifice plate.Trapezoidal pedestal 3 is made up of concrete, and the length of trapezoidal pedestal 3 is 440mm.There are certain thickness and hardness in cement floor 9, can carry the main equipments such as train and run on the ground.The upper surface of trapezoidal pedestal 3 lays the cement floor 9 lower than rail height.Orifice plate comprises the leg 14 that two orifice plates 12 and three orifice plate 5, two orifice plates 12 and three orifice plates 5 include panel 13 and are fixed on panel 13 side, and as shown in Figure 8, panel 13 is provided with two or three through holes suitable with often arranging rail, as shown in Figure 7.
As shown in Figure 3 and Figure 4, broad gauge track 1 and 2 sections, auxiliary security track arrange a tie rod 11 every 10m, and broad gauge track 1 and standard trajectory 17 are also provided with tie rod 11 with the junction of twilight orbit.Rubber 8 is filled with between one row's rail of broad gauge track 1 and 2 sections, auxiliary security track and cement floor 9.Rubber 8 for can reduce train by time impact force to cement floor 9.Left section and right section at twilight orbit is provided with interval iron 10, interval iron 10 mounted in pairs, and each interval iron 10 of left section is supporting is provided with splice bar, and the interval iron 10 of right section is supporting is provided with backing plate.Interval iron 10 is arranged on twilight orbit, for train by time support train wheel rim, avoid train sink.The length of twilight orbit is 2500mm.
Pressing plate comprises center platen 6 and side guide 7, and the middle part of center platen 6 is provided with through hole (mesopore), and two sides are provided with the depression of mating with side at the bottom of Rail; Be provided with through hole (side opening) in the middle part of side guide 7, a side is provided with the depression of mating with side at the bottom of Rail.Stone bolt 4 is fixed on adjacent two rail of same row through the mesopore of center platen 6 and three orifice plates 5 successively, as shown in Figure 1; Stone bolt 4 is fixed on the outside of adjacent two rail of same row successively through the side opening of side guide 7 and two orifice plates 12 or three orifice plates 5, as shown in Figure 5 and Figure 6.
Principle of the present invention is: when railway broad gauge train runs on this dual-purpose railway two-rail, and it is laterally travelling can rely on board gauge bogie to take turns two right side flange to retrain, ensure that broad gauge train derailment accident can not occur completely; When railway standard rail train runs on this dual-purpose railway two-rail, because the gauge in broad gauge track 1 and arc broad gauge road 15 reaches the horizontal free movement limiting value of standard gauge train, so design increases auxiliary security track 2 and arc auxiliary security track 16, arc broad gauge road 15 or arc auxiliary security track 16 can be relied on to act on standard gauge bogie wheel rim simultaneously, retrain standard gauge train is laterally travelling, thus ensure that it derailment accident can not occur.
The present invention is laid in factory building, the outer laying standard track 17 of factory building, and standard gauge train can freely be come in and gone out factory building; When broad gauge train needs to debug, the bogie of broad gauge train is placed in the present invention, again car body is placed on bogie, can carry out debugging and trying out, and then the making of interim broad gauge track when avoiding production broad gauge train, save manpower, financial resources and material resources, save the time, improve operating efficiency, shorten the duration.
Claims (10)
1. a dual-purpose railway two-rail, it is characterized in that comprising one group of broad gauge track (1), one group of auxiliary security track (2) and one group of standard trajectory (17), described auxiliary security track (2) is positioned at broad gauge track (1) inner side, auxiliary security track (2) is less than standard gauge train bogie tire thickness with the spacing of broad gauge track (1), and described broad gauge track (1) is connected with standard trajectory (17) with the twilight orbit of auxiliary security track (2) by one section of arc; Described twilight orbit comprises arc broad gauge road (15) and arc auxiliary security track (16), the two ends of described arc broad gauge road (15) are connected with broad gauge track (1) and standard trajectory (17) respectively, described arc auxiliary security track (16) is connected with auxiliary security track (2), the initiating terminal of described arc auxiliary security track (16) is positioned at the junction in standard trajectory (17) and arc broad gauge road (15), and the spacing in described arc auxiliary security track (16) and arc broad gauge road (15) is less than standard gauge train bogie tire thickness.
2. the dual-purpose railway two-rail of one according to claim 1, it is characterized in that the spacing of described broad gauge track (1) and auxiliary security track (2) is 70mm, the width of described auxiliary security track (2) is 1350mm.
3. the dual-purpose railway two-rail of one according to claim 1, it is characterized in that described broad gauge track (1) and auxiliary security track (2) section arrange a tie rod (11) every ten meters, broad gauge track (1) and standard trajectory (17) are also provided with tie rod (11) with the junction of twilight orbit.
4. the dual-purpose railway two-rail of one according to claim 1, is characterized in that described twilight orbit is provided with interval iron (10).
5. the dual-purpose railway two-rail of one according to claim 1, is characterized in that the length of described twilight orbit is 2500mm.
6. the dual-purpose railway two-rail of the one according to any one of claim 1-5, it is characterized in that described broad gauge track (1), auxiliary security track (2), twilight orbit and standard trajectory (17) comprise rail, the two trapezoidal pedestal of row (3) and union pieces, described trapezoidal pedestal (3) is embedded in ground, and the cross section of trapezoidal pedestal (3) is wide at the top and narrow at the bottom trapezoidal; Described union piece comprises stone bolt (4), pressing plate and orifice plate, and described stone bolt (4) is each passed through pressing plate and rail is fixed on trapezoidal pedestal (3) by orifice plate.
7. the dual-purpose railway two-rail of one according to claim 6, is characterized in that the upper surface of described trapezoidal pedestal (3) lays the cement floor (9) lower than rail height.
8. the dual-purpose railway two-rail of one according to claim 6, is characterized in that being filled with rubber (8) between row's rail of described broad gauge track (1) and auxiliary security track (2) section and cement floor (9).
9. the dual-purpose railway two-rail of one according to claim 6, it is characterized in that described orifice plate comprises two orifice plates (12) and three orifice plates (5), described two orifice plates (12) and three orifice plates (5) include panel (13) and are fixed on the leg (14) of panel (13) side, and described panel (13) is provided with two or three through holes suitable with often arranging rail.
10. the dual-purpose railway two-rail of one according to claim 6, it is characterized in that described pressing plate comprises center platen (6) and side guide (7), described stone bolt (4) is fixed on adjacent two rail of same row through the mesopore of center platen (6) and three orifice plates (5) successively; Described stone bolt (4) is fixed on the outside of adjacent two rail of same row successively through the side opening of side guide (7) and two orifice plates (12) or three orifice plates (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510010616.1A CN104562863B (en) | 2015-01-09 | 2015-01-09 | A kind of dual-purpose railway two-orbit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510010616.1A CN104562863B (en) | 2015-01-09 | 2015-01-09 | A kind of dual-purpose railway two-orbit |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104562863A true CN104562863A (en) | 2015-04-29 |
CN104562863B CN104562863B (en) | 2016-05-18 |
Family
ID=53079880
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510010616.1A Active CN104562863B (en) | 2015-01-09 | 2015-01-09 | A kind of dual-purpose railway two-orbit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104562863B (en) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106836875A (en) * | 2017-03-21 | 2017-06-13 | 安徽卓航展示用品有限公司 | Stage setting |
CN106869535A (en) * | 2017-03-21 | 2017-06-20 | 安徽卓航展示用品有限公司 | Stage structure |
CN106930567A (en) * | 2017-03-21 | 2017-07-07 | 安徽卓航展示用品有限公司 | Stage setting |
CN106939715A (en) * | 2017-03-21 | 2017-07-11 | 安徽卓航展示用品有限公司 | Stage equipment |
CN106939709A (en) * | 2017-03-21 | 2017-07-11 | 安徽卓航展示用品有限公司 | Stage mechanism |
CN107060391A (en) * | 2017-03-21 | 2017-08-18 | 安徽卓航展示用品有限公司 | Stage structure |
CN109162153A (en) * | 2018-10-22 | 2019-01-08 | 中设设计集团股份有限公司 | A kind of 1435/1520mm gauge orbit transfer linkage section suitable for gauge changing railway freight train |
CN109281236A (en) * | 2017-07-21 | 2019-01-29 | 吉林省天祥建筑材料有限公司 | A kind of dual scalable track of flat car for transportation and precast assembly piping lane mounting process |
CN110820434A (en) * | 2019-11-22 | 2020-02-21 | 中车长春轨道客车股份有限公司 | Multi-track-pitch track changing device |
CN111021156A (en) * | 2019-12-25 | 2020-04-17 | 重庆艾博瑞威轨道交通设备有限公司 | Novel main and auxiliary rail pressing plate |
CN112229655A (en) * | 2020-09-25 | 2021-01-15 | 中车长春轨道客车股份有限公司 | Rail train debugging layout and rail train dynamic debugging process |
CN112411270A (en) * | 2020-11-23 | 2021-02-26 | 齐齐哈尔哈铁装备制造有限公司 | Fixed point switch concrete sleeper single-opening turnout |
CN114032714A (en) * | 2021-11-08 | 2022-02-11 | 中车长春轨道客车股份有限公司 | Universal conveying track for wide and narrow rail and standard gauge wheel pair |
CN109281236B (en) * | 2017-07-21 | 2024-04-19 | 吉林省天祥建筑材料有限公司 | Dual-telescopic rail for transportation flat car and prefabricated assembly pipe gallery mounting process |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN87211137U (en) * | 1987-08-06 | 1988-04-13 | 兰州铁路分局天水机务段 | Rolling stock re-railing block |
CN2114674U (en) * | 1990-11-26 | 1992-09-02 | 宗学仕 | Universal frog for wide and standard rail |
CN1451576A (en) * | 2002-04-17 | 2003-10-29 | 郑仁晓 | Train wheel assembly |
CN101134466A (en) * | 2007-09-26 | 2008-03-05 | 中国北车集团北京二七机车厂有限责任公司 | Device for transferring non-standard track space engine on the standard track space circuitry |
KR101131628B1 (en) * | 2010-01-07 | 2012-04-12 | 삼표이앤씨 주식회사 | expansion joint for bridge tracks and this construction technique |
CN202669831U (en) * | 2012-06-30 | 2013-01-16 | 中国北车集团大连机车车辆有限公司 | Bogie for transportation of broad-gauge locomotive |
CN204530334U (en) * | 2015-02-25 | 2015-08-05 | 鞍钢股份有限公司 | Hot-metal ladle and carriage track check rail |
-
2015
- 2015-01-09 CN CN201510010616.1A patent/CN104562863B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN87211137U (en) * | 1987-08-06 | 1988-04-13 | 兰州铁路分局天水机务段 | Rolling stock re-railing block |
CN2114674U (en) * | 1990-11-26 | 1992-09-02 | 宗学仕 | Universal frog for wide and standard rail |
CN1451576A (en) * | 2002-04-17 | 2003-10-29 | 郑仁晓 | Train wheel assembly |
CN101134466A (en) * | 2007-09-26 | 2008-03-05 | 中国北车集团北京二七机车厂有限责任公司 | Device for transferring non-standard track space engine on the standard track space circuitry |
KR101131628B1 (en) * | 2010-01-07 | 2012-04-12 | 삼표이앤씨 주식회사 | expansion joint for bridge tracks and this construction technique |
CN202669831U (en) * | 2012-06-30 | 2013-01-16 | 中国北车集团大连机车车辆有限公司 | Bogie for transportation of broad-gauge locomotive |
CN204530334U (en) * | 2015-02-25 | 2015-08-05 | 鞍钢股份有限公司 | Hot-metal ladle and carriage track check rail |
Non-Patent Citations (1)
Title |
---|
吴慧娟: "出口蒙古国石砟漏斗车车体钢结构设计及强度分析", 《铁道车辆》 * |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106869535A (en) * | 2017-03-21 | 2017-06-20 | 安徽卓航展示用品有限公司 | Stage structure |
CN106930567A (en) * | 2017-03-21 | 2017-07-07 | 安徽卓航展示用品有限公司 | Stage setting |
CN106939715A (en) * | 2017-03-21 | 2017-07-11 | 安徽卓航展示用品有限公司 | Stage equipment |
CN106939709A (en) * | 2017-03-21 | 2017-07-11 | 安徽卓航展示用品有限公司 | Stage mechanism |
CN107060391A (en) * | 2017-03-21 | 2017-08-18 | 安徽卓航展示用品有限公司 | Stage structure |
CN106836875A (en) * | 2017-03-21 | 2017-06-13 | 安徽卓航展示用品有限公司 | Stage setting |
CN109281236B (en) * | 2017-07-21 | 2024-04-19 | 吉林省天祥建筑材料有限公司 | Dual-telescopic rail for transportation flat car and prefabricated assembly pipe gallery mounting process |
CN109281236A (en) * | 2017-07-21 | 2019-01-29 | 吉林省天祥建筑材料有限公司 | A kind of dual scalable track of flat car for transportation and precast assembly piping lane mounting process |
CN109162153A (en) * | 2018-10-22 | 2019-01-08 | 中设设计集团股份有限公司 | A kind of 1435/1520mm gauge orbit transfer linkage section suitable for gauge changing railway freight train |
CN110820434A (en) * | 2019-11-22 | 2020-02-21 | 中车长春轨道客车股份有限公司 | Multi-track-pitch track changing device |
CN111021156A (en) * | 2019-12-25 | 2020-04-17 | 重庆艾博瑞威轨道交通设备有限公司 | Novel main and auxiliary rail pressing plate |
CN112229655A (en) * | 2020-09-25 | 2021-01-15 | 中车长春轨道客车股份有限公司 | Rail train debugging layout and rail train dynamic debugging process |
CN112229655B (en) * | 2020-09-25 | 2022-09-02 | 中车长春轨道客车股份有限公司 | Rail train debugging layout and rail train dynamic debugging process |
CN112411270A (en) * | 2020-11-23 | 2021-02-26 | 齐齐哈尔哈铁装备制造有限公司 | Fixed point switch concrete sleeper single-opening turnout |
CN114032714A (en) * | 2021-11-08 | 2022-02-11 | 中车长春轨道客车股份有限公司 | Universal conveying track for wide and narrow rail and standard gauge wheel pair |
Also Published As
Publication number | Publication date |
---|---|
CN104562863B (en) | 2016-05-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104562863B (en) | A kind of dual-purpose railway two-orbit | |
CN206538637U (en) | A kind of track strengthening device for existing railway | |
CN103452018B (en) | Track gauge correction method for double-block type ballastless track construction | |
CN205035704U (en) | The whole cast's firm type railroad sleeper of antiskid | |
CN204551143U (en) | A kind of dual-purpose railway two-rail | |
CN203034311U (en) | Sleeper for ballastless track | |
CN103921353B (en) | A kind of track concrete mixer truck of Tape movement pay-off | |
CN106758565A (en) | It is a kind of to multiply more formula railway frog and the railway switch with the railway frog | |
EP2274486A1 (en) | Fixed track for rail-bound vehicles on a bridge | |
CN203769791U (en) | Small curvature radius steering sliding device for shield train equipment | |
CN206512527U (en) | It is a kind of to multiply more formula railway frog and the railway switch with the railway frog | |
CN202593554U (en) | Tunnel rerailer | |
CN206289524U (en) | The lift pillow device of track at a kind of beam seam | |
CN205077336U (en) | A embedded track structure for in tunnel | |
CN204998529U (en) | Special flatcar automobile body is maintained to railway contact net | |
CN204472598U (en) | A kind of foot of ladder retractor device for electrification railway contact net tool car ladder | |
CN207727366U (en) | Shuttle-type railcar turnout guard rail | |
CN106544934B (en) | A kind of railway shunting hump line reinforced construction method | |
CN203021922U (en) | Sliding support point assembly | |
CN203583307U (en) | Steel-structure heavy railway crossing slab | |
CN207079427U (en) | A kind of device for preventing point tongue from beating | |
CN104480807A (en) | Turnout switching device | |
CN205295816U (en) | Railway safety crowds switch device | |
CN207554104U (en) | A kind of multifunction railway is passed a bridge | |
CN204343110U (en) | A kind of turnout switch |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 051430 Shijiazhuang Province, Luancheng City, Shijiazhuang province equipment Industrial Park, Yu Xiang street, No. 168 Patentee after: CRRC SHIJIAZHUANG CO., LTD. Address before: 050000 No. 125, front street, Shijiazhuang vehicle factory, Hebei Patentee before: CSR SHIJIAZHUANG ROLLING STOCK WORKS |