CN205077336U - A embedded track structure for in tunnel - Google Patents
A embedded track structure for in tunnel Download PDFInfo
- Publication number
- CN205077336U CN205077336U CN201520764781.1U CN201520764781U CN205077336U CN 205077336 U CN205077336 U CN 205077336U CN 201520764781 U CN201520764781 U CN 201520764781U CN 205077336 U CN205077336 U CN 205077336U
- Authority
- CN
- China
- Prior art keywords
- rail
- noise reduction
- plane
- tunnel
- reduction block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000000295 complement effect Effects 0.000 claims abstract description 4
- 239000000463 material Substances 0.000 claims description 11
- 239000011376 self-consolidating concrete Substances 0.000 claims description 6
- 241001669679 Eleotris Species 0.000 claims description 5
- 238000002347 injection Methods 0.000 claims description 3
- 239000007924 injection Substances 0.000 claims description 3
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000005056 compaction Methods 0.000 abstract 1
- 229920000642 polymer Polymers 0.000 abstract 1
- 230000015556 catabolic process Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000002159 abnormal effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Abstract
The utility model discloses an embedded track structure for in tunnel, including prefabricated integral ballastless track board, support rail groove is vertically seted up respectively to prefabricated integral ballastless track board top both sides, and all the other positions of upper surface are the plane, the embedded setting of rail and sets up a plurality of pieces of making an uproar that fall respectively in its both sides in support rail groove, set up horizontal adjustment wedge piece between make an uproar piece and the support rail groove lateral wall falling, and its complementary space is packed and is had the polymer to pour into a mould to expect in the support rail groove, prefabricated integral ballastless track board bottom sets up the cavity and installs on the protruding type piece at convex basis top, and is fixed with the two from the clearance that the injected hole on the prefabricated integral ballastless track board pours into into between the two with the self -compaction concrete. The utility model discloses beneficial effect: the rail adopts the whole embed formula, and out of use tradition fastener has reduced the whole height of track system, makes things convenient for fire control, rescue vehicle to get into.
Description
Technical field
The utility model relates to a kind of for the embedded tracks structure in tunnel, belongs to technical field of rail traffic.
Background technology
In traditional tunnel inner orbit system, no matter be Ballast track system or ballastless track system, rail is all higher than sleeper or the Prefabricated integral fragment-free track slab of bottom.The weak point of this structure is, wheeled vehicle travels very inconvenient in tunnel, when particularly having an accident in tunnel, common fire-fighting will be had a strong impact on, breakdown lorry enter in tunnel implement fire-fighting and rescue.
In the embedded tracks disclosed at present, the transverse direction adjustment of rail is by adjusting the relative sliding of wedge on retainer to promote retainer and rail transverse shifting.But vertical adjustment wedge may cause the movement of rail vertical position, has an impact to rail absolute altitude.Therefore, this embedded tracks is not easy to construction.
Utility model content
Goal of the invention of the present utility model is: for above-mentioned Problems existing, provides a kind of for the embedded tracks structure in tunnel, with overcome current conventional rails structure exist surface be uneven thus affect fire-fighting, breakdown lorry pass through shortcoming.In addition, the utility model also by providing noise reduction block and laterally adjusting wedge, solves the problem that can affect rail absolute altitude when laterally adjustment wedge adjusts in current embedded tracks.
The technical solution adopted in the utility model is such:
A kind of for the embedded tracks structure in tunnel, comprise Prefabricated integral fragment-free track slab, rail support groove is longitudinally offered respectively in both sides, described Prefabricated integral fragment-free track slab top, all the other positions of upper surface are plane, resilient sleeper-bearing under rail is set in described rail support groove from bottom to top, height adjusting cushion plate under rail, rail, described rail both sides arrange some noise reduction block respectively, fit in one side of noise reduction block described in every block and steel rail web surface, arrange between another side and rail support groove sidewall and laterally adjust wedge, in rail support groove, its complementary space is filled with Macromolecular pouring material, bottom described Prefabricated integral fragment-free track slab, cavity is set and be arranged on convex basis top convex block on realize horizontal longitudinal spacing, the degree of depth of described cavity is less than the height of convex block, the length and width of cavity are greater than the length and width of convex block respectively, after the convex block embedding Prefabricated integral fragment-free track slab bottom cavity at top, convex basis, by self-compacting concrete from the injected hole injection gap therebetween Prefabricated integral fragment-free track slab.Convex basis and Prefabricated integral fragment-free track slab are connected in one by self-compacting concrete.
As preferably, described rail support groove cross section is U-shaped, and the bottom surface of rail support groove is downward-sloping towards the horizontal middle part of Prefabricated integral fragment-free track slab.Rail support groove bottom angled is equivalent to the effect of rail cant, has rail cant can improve the contact relation of rail and car wheel-set, reduces rail abnormal wear
As preferably, the up-small and down-big flowing facilitating self-compacting concrete of described injected hole.
As preferably, along rail, longitudinally some noise reduction block are set at equal intervals.Carry out further preferably, described noise reduction block is divided into the band noise reduction block on inclined-plane and the noise reduction block not with inclined-plane, noise reduction block not with inclined-plane and laterally to adjust the one side that wedge contacts be plane, noise reduction block with inclined-plane and laterally adjust the one side that wedge contacts and divide three sections, two end portions is the plane of band gradient, and mid portion is a perpendicular.Some noise reduction block not with inclined-plane are evenly arranged between the noise reduction block on two pieces of band inclined-planes.Prefabricated noise reduction block effectively can reduce the workload of cast-in-site Macromolecular pouring material, and can reach the object of adjustment rail lateral stiffness.The macromolecular material of cast-in-site and the modulus of elasticity of prefabricated noise reduction block different, one is softer, and one is harder.The object of adjustment rail system rigidity can be reached by collocation that is soft, hard material.Noise reduction block with inclined-plane is with laterally adjusting wedge coordinates the effect adjusting rail lateral attitude in addition.
As preferably, the Macromolecular pouring material in described rail support groove differs at rail both sides height, shorter inside rail, higher outside rail.The design that inside Macromolecular pouring material, low outside is high, can meet the normal pass of Railway wheelset wheel rim.
In sum, owing to have employed technique scheme, the beneficial effects of the utility model are:
By in rail embed wholly track plates, do not re-use traditional fastener, and effectively reduce rail system whole height;
Very be applicable to common fire-fighting, breakdown lorry travels and enters, overcome the shortcoming existing for track structure conventional at present.
Use and vertically move along track the noise reduction block adjusting rail lateral attitude, the impact on rail absolute altitude when overcoming current embedded tracks system call interception rail lateral attitude.
Accompanying drawing explanation
Fig. 1 is cross-sectional profile schematic diagram of the present invention.
Fig. 2 is the rail support groove place enlarged diagram in the present invention.
Fig. 3 is the Prefabricated integral fragment-free track slab top view in the present invention.
Fig. 4 be figure Prefabricated integral fragment-free track slab in the middle part of cross-sectional view.
Mark in figure: 1 is Prefabricated integral fragment-free track slab, and 2 is Macromolecular pouring material, and 3 is rail, and 4 is noise reduction block, 5 for laterally adjusting wedge, and 6 is height adjusting cushion plate under rail, and 7 is resilient sleeper-bearing under rail, and 8 is self-compacting concrete, 9 is convex basis, and 1-1 is rail support groove, and 1-2 is cavity.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in detail.
Most preferred embodiment:
As Fig. 1, 2, shown in 3, a kind of for the embedded tracks structure in tunnel, comprise Prefabricated integral fragment-free track slab 1, rail support groove 1-1 is longitudinally offered respectively in both sides, described Prefabricated integral fragment-free track slab 1 top, all the other positions of upper surface are plane, resilient sleeper-bearing 7 under rail is set in described rail support groove 1-1 from bottom to top, height adjusting cushion plate 6 under rail, rail 3, described rail 3 both sides arrange some noise reduction block 4 respectively, fit in one side of noise reduction block 4 described in every block and rail 3 web of the rail surface, arrange between another side and rail support groove 1-1 sidewall and laterally adjust wedge 5, in rail support groove 1-1, its complementary space is filled with Macromolecular pouring material 2, bottom described Prefabricated integral fragment-free track slab 1, cavity 1-2 is set and be arranged on convex basis 9 tops convex block on realize horizontal longitudinal spacing, the degree of depth of described cavity 1-2 is less than the height of convex block, the length and width of cavity 1-2 are greater than the length and width of convex block respectively, after the convex block embedding Prefabricated integral fragment-free track slab 1 bottom cavity 1-2 at 9 tops, convex basis, by self-compacting concrete 8 from the injected hole injection gap therebetween Prefabricated integral fragment-free track slab 1.
Described rail support groove 1-1 cross section is U-shaped, and the bottom surface of rail support groove 1-1 is downward-sloping towards the horizontal middle part of Prefabricated integral fragment-free track slab 1.
Described injected hole is up-small and down-big.
Along rail 3, longitudinally some noise reduction block 4 are set at equal intervals.Carry out further preferably, described noise reduction block 4 is divided into the band noise reduction block on inclined-plane and the noise reduction block not with inclined-plane, noise reduction block not with inclined-plane and laterally to adjust the one side that wedge 5 contacts be plane, noise reduction block 4 with inclined-plane and laterally adjust the one side that wedge 5 contacts and divide three sections, two end portions is the plane of band gradient, and mid portion is a perpendicular.Some noise reduction block not with inclined-plane are evenly arranged between the noise reduction block on two pieces of band inclined-planes.
Macromolecular pouring material 2 in described rail support groove 1-1 differs at rail 3 both sides height, shorter inside rail 3, higher outside rail 2.
Claims (7)
1. one kind for the embedded tracks structure in tunnel, comprise Prefabricated integral fragment-free track slab (1), it is characterized in that: described Prefabricated integral fragment-free track slab (1) both sides, top longitudinally offer rail support groove (1-1) respectively, all the other positions of upper surface are plane, resilient sleeper-bearing (7) under rail is set in described rail support groove (1-1) from bottom to top, height adjusting cushion plate (6) under rail, rail (3), described rail (3) both sides arrange some noise reduction block (4) respectively, fit in one side of noise reduction block (4) described in every block and rail (3) web of the rail surface, arrange between another side and rail support groove (1-1) sidewall and laterally adjust wedge (5), in rail support groove (1-1), its complementary space is filled with Macromolecular pouring material (2), described Prefabricated integral fragment-free track slab (1) bottom arranges cavity (1-2) and is arranged on the height that the degree of depth convex block at convex basis (9) top realizing cavity (1-2) described in horizontal longitudinal spacing is less than convex block, the length and width of cavity (1-2) are greater than the length and width of convex block respectively, after convex block embedding Prefabricated integral fragment-free track slab (1) bottom cavity (1-2) at convex basis (9) top, by self-compacting concrete (8) from the injected hole injection gap therebetween Prefabricated integral fragment-free track slab (1).
2. according to claim 1 a kind of for the embedded tracks structure in tunnel, it is characterized in that: described rail support groove (1-1) cross section is U-shaped, and the bottom surface of rail support groove (1-1) is downward-sloping towards Prefabricated integral fragment-free track slab (1) horizontal middle part.
3. according to claim 1 a kind of for the embedded tracks structure in tunnel, it is characterized in that: described injected hole is up-small and down-big.
4. according to claim 1 a kind of for the embedded tracks structure in tunnel, it is characterized in that: along rail (3), longitudinally some noise reduction block (4) are set at equal intervals.
5. a kind of for the embedded tracks structure in tunnel according to claim 1 or 4, it is characterized in that: described noise reduction block (4) is divided into the band noise reduction block on inclined-plane and the noise reduction block not with inclined-plane, noise reduction block not with inclined-plane and laterally to adjust the one side that wedge (5) contacts be plane, noise reduction block (4) with inclined-plane and laterally adjust the one side that wedge (5) contacts and divide three sections, two end portions is the plane of band gradient, and mid portion is a perpendicular.
6. according to claim 5 a kind of for the embedded tracks structure in tunnel, it is characterized in that: between the noise reduction block on every two pieces of band inclined-planes, be evenly arranged some noise reduction block not with inclined-plane.
7. according to claim 1 a kind of for the embedded tracks structure in tunnel, it is characterized in that: the Macromolecular pouring material (2) in described rail support groove (1-1) differs at rail (3) both sides height, rail (3) inner side is shorter, and rail (3) outside is higher.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520764781.1U CN205077336U (en) | 2015-09-30 | 2015-09-30 | A embedded track structure for in tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520764781.1U CN205077336U (en) | 2015-09-30 | 2015-09-30 | A embedded track structure for in tunnel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205077336U true CN205077336U (en) | 2016-03-09 |
Family
ID=55429752
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520764781.1U Active CN205077336U (en) | 2015-09-30 | 2015-09-30 | A embedded track structure for in tunnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205077336U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105155364A (en) * | 2015-09-30 | 2015-12-16 | 成都市新筑路桥机械股份有限公司 | Embedded track structure used in tunnel |
CN106592344A (en) * | 2016-12-23 | 2017-04-26 | 成都市新筑路桥机械股份有限公司 | Curve track system convenient to adjust and replace |
-
2015
- 2015-09-30 CN CN201520764781.1U patent/CN205077336U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105155364A (en) * | 2015-09-30 | 2015-12-16 | 成都市新筑路桥机械股份有限公司 | Embedded track structure used in tunnel |
CN106592344A (en) * | 2016-12-23 | 2017-04-26 | 成都市新筑路桥机械股份有限公司 | Curve track system convenient to adjust and replace |
CN106592344B (en) * | 2016-12-23 | 2018-04-24 | 成都市新筑路桥机械股份有限公司 | A kind of convenient curved section rail system adjusted and replace |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205024544U (en) | A embedded track system for in tunnel | |
CN105256669A (en) | Embedded track system used in tunnel | |
CN206396559U (en) | A kind of embedded tracks system for curved section | |
CN206308555U (en) | A kind of novel embedded rail system of subway | |
CN104562863A (en) | Dual-purpose railway double track | |
CN205035704U (en) | The whole cast's firm type railroad sleeper of antiskid | |
CN107724188A (en) | A kind of prefabricated floating plate railway roadbed vibrating isolation system | |
CN205077336U (en) | A embedded track structure for in tunnel | |
CN206328642U (en) | A kind of board-like track structure of framework in tunnel | |
CN105155364A (en) | Embedded track structure used in tunnel | |
US3643864A (en) | Railroad grade crossing | |
CN202107997U (en) | Ballastless track structure on bridge | |
CN202073037U (en) | Bridge ballastless track structure | |
CN107805977A (en) | Elastic shoe and resilient sleeper-bearing component and non-fragment orbit for non-fragment orbit | |
TW201344010A (en) | Track section for a rail and method for increasing the elastic bedding | |
CN207176403U (en) | Elastic shoe and resilient sleeper-bearing component and non-fragment orbit for non-fragment orbit | |
CN203559311U (en) | Steel bar truss sleeper | |
CN203238500U (en) | Anti-disengaging damping pad layer of ballastless track | |
CN204325816U (en) | Rail joint height-adjustable fastener | |
CN206204704U (en) | A kind of W shape springs for there is shoulder arrangement non-fragment orbit | |
CN206015437U (en) | A kind of rail brace used for high-speed railway | |
CN204530333U (en) | Ballastless track on bridge guard rail constructs | |
CN206308557U (en) | A kind of subway is with embedded non-fragment orbit frame plate | |
CN203654094U (en) | Sleeper | |
CN210657802U (en) | Road bed |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20240116 Address after: 611400 No. 799, hope road, Wujin street, Xinjin District, Chengdu, Sichuan (Industrial Park) Patentee after: Chengdu Xinzhu Transportation Technology Co.,Ltd. Address before: 611430 Xinjin Industrial Park, Sichuan, Chengdu Patentee before: CHENGDU XINZHU ROAD & BRIDGE MACHINERY Co.,Ltd. |