CN206538637U - A kind of track strengthening device for existing railway - Google Patents
A kind of track strengthening device for existing railway Download PDFInfo
- Publication number
- CN206538637U CN206538637U CN201720128160.3U CN201720128160U CN206538637U CN 206538637 U CN206538637 U CN 206538637U CN 201720128160 U CN201720128160 U CN 201720128160U CN 206538637 U CN206538637 U CN 206538637U
- Authority
- CN
- China
- Prior art keywords
- beams
- improved
- existing
- rail
- buckle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005728 strengthening Methods 0.000 title 1
- 238000010276 construction Methods 0.000 claims abstract description 28
- 230000002787 reinforcement Effects 0.000 claims abstract description 27
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 16
- 239000010959 steel Substances 0.000 claims abstract description 16
- 241001669679 Eleotris Species 0.000 claims abstract description 6
- 230000000694 effects Effects 0.000 abstract description 4
- 238000000034 method Methods 0.000 description 19
- 238000010586 diagram Methods 0.000 description 4
- 230000003014 reinforcing effect Effects 0.000 description 4
- 230000005641 tunneling Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000945 filler Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Machines For Laying And Maintaining Railways (AREA)
Abstract
本实用新型公开了一种用于既有铁路的线路加固装置,属交通设施施工技术领域。该装置包括D24型施工便梁、支撑桩和扣轨梁。其中,D24型施工便梁包括纵梁、改进横梁、牛腿和连接板,扣轨梁包括轨束梁、钢扣板和U型螺栓。纵梁与改进横梁通过牛腿和连接板连接,纵梁位于设置在线路两侧的支撑桩上,改进横梁等间距穿设在行车轨下,且与既有线路垂直设置,改进横梁顶面与既有混凝土轨枕等高,其上铺设扣轨梁,扣轨梁采用5根钢轨组成的轨束梁,扣轨梁与其下面的改进横梁用钢扣板和U型螺栓联在一起。本实用新型的既有铁路线路的加固装置承载能力强、操作简单、安全稳定、能适应较复杂环境、保证了既有铁路对线路平顺性的要求、加固效果良好。
The utility model discloses a line reinforcement device for existing railways, which belongs to the technical field of traffic facility construction. The device includes D24 construction convenience beams, support piles and buckle rail beams. Among them, the D24 construction convenience beam includes longitudinal beams, improved beams, corbels and connecting plates, and the fastening rail beams include rail beams, steel buckle plates and U-shaped bolts. Longitudinal beams and improved beams are connected through corbels and connecting plates. Longitudinal beams are located on support piles arranged on both sides of the line. Improved beams are installed under the running rails at equal intervals and vertical to the existing line. The top surface of the improved beams and the The existing concrete sleeper is of equal height, on which is laid buckle rail beam, the buckle rail beam is composed of 5 steel rails, and the buckle rail beam and the improved beam below are connected together with steel buckle plate and U-shaped bolts. The reinforcement device for existing railway lines of the utility model has strong bearing capacity, simple operation, safety and stability, can adapt to complex environments, ensures the smoothness requirements of existing railway lines, and has good reinforcement effect.
Description
技术领域technical field
本实用新型涉及一种用于既有铁路的线路加固装置,属于交通设施施工技术领域。The utility model relates to a line reinforcing device for existing railways, which belongs to the technical field of traffic facility construction.
背景技术Background technique
随着我国经济建设的不断发展,铁路与城市地铁的建设不断增加,隧道或盾构下穿既有铁路线路、既有线桥涵顶进施工等情况时有发生,为达到施工目的,并确保既有铁路能安全畅通运输,对既有铁路线路进行可靠加固方式是必需面对的问题。With the continuous development of my country's economic construction, the construction of railways and urban subways continues to increase, and tunnels or shields pass through existing railway lines, and existing bridges and culverts are jacked up from time to time. In order to achieve the construction purpose and ensure the existing In order for the railway to be transported safely and smoothly, a reliable reinforcement method for the existing railway lines is a problem that must be faced.
目前既有运营铁路的加固方法主要有扣轨梁法、纵挑横抬法、D型便梁加固法、连续施工便梁法等方法。扣轨梁法简单易操作但加固的效果较差;纵挑横抬加固法采用支承桩支承工字钢或轨束纵梁,再通过U型螺栓将纵梁和底下的工字钢横抬梁连接固定,形成横抬纵挑式加固线路,结构复杂且不稳定,安全风险较大,现已不建议使用;D型便梁加固法是将钢便梁的纵梁构件支承在支承桩或墩上、横梁构件横抬轨道,纵横梁拼装连接成整体架空线路的线路加固方法,该方法结构简单,安全稳定,但便梁宽度固定,在双线铁路区段线间距较小的情况下和曲线半径较小时无法使用;连续施工便梁法将固定模数的大型工字钢梁采用等强度连接的方法组成长大跨度的连续梁,中间设一个或多个支点形成了超静定结构,该方法所用大型工字钢梁横向刚度不足,稳定性较差,对行车安全不利。At present, the reinforcement methods of existing railways in operation mainly include buckling rail beam method, vertical lifting and horizontal lifting method, D-shaped concrete beam reinforcement method, continuous construction concrete beam method and other methods. The buckle rail beam method is simple and easy to operate, but the reinforcement effect is poor; the vertical lifting and horizontal lifting reinforcement method uses support piles to support the I-beam or rail beam longitudinal beam, and then the longitudinal beam and the lower I-beam horizontal beam are lifted by U-shaped bolts. The connection is fixed to form a horizontal lifting and vertical lifting reinforcement line. The structure is complex and unstable, and the safety risk is relatively high. It is not recommended to use it; the D-shaped beam reinforcement method is to support the longitudinal beam components of the steel beam on the support pile or pier The line reinforcement method in which the upper and cross beam members lift the track horizontally, and the vertical and horizontal beams are assembled and connected to form an overall overhead line. It cannot be used when the radius is small; the continuous construction convenient beam method uses the method of equal-strength connection of large-scale I-beams with fixed modulus to form a long-span continuous beam, and sets one or more fulcrums in the middle to form a statically indeterminate structure. The large I-beams used in the method have insufficient lateral rigidity and poor stability, which is unfavorable to driving safety.
实用新型内容Utility model content
本实用新型要解决的技术问题是提供了一种操作简单、安全稳定、承载能力强、适应双线铁路区段线间距较小和跨度较大的线路加固装,以解决既有铁路下盾构、桥涵顶进等施工对线路影响的技术问题。The technical problem to be solved by the utility model is to provide a line reinforcement device with simple operation, safety and stability, strong bearing capacity, and adapting to the small line spacing and large span of the double-line railway section, so as to solve the problem of shield tunneling under the existing railway. , Bridge and culvert jacking and other technical issues affecting the line.
为解决上述技术问题,本实用新型所采取的技术方案是:一种用于既有铁路的线路加固装置,其关键技术在于:其包括D型施工便梁、设置于既有铁路线路两侧的支撑桩和扣轨梁;In order to solve the above technical problems, the technical solution adopted by the utility model is: a line reinforcement device for existing railways, the key technology of which is: it includes D-shaped construction beams, which are arranged on both sides of the existing railway lines Support piles and buckle rail beams;
所述D型施工便梁包括设置于所述支撑桩上的纵梁以及与纵梁垂直设置的改进横梁,所述纵梁与改进横梁之间通过牛腿和连接板连接;The D-shaped construction beam includes a longitudinal beam arranged on the support pile and an improved crossbeam perpendicular to the longitudinal beam, and the longitudinal beam and the improved crossbeam are connected by a corbel and a connecting plate;
所述扣轨梁包括设于改进横梁上的轨束梁,所述轨束梁借助钢扣板和U型螺栓与改进横梁连接。The fastening rail beam includes a rail beam arranged on the improved beam, and the rail beam is connected with the improved beam by means of a steel buckle plate and U-shaped bolts.
优选的,所述D型施工便梁为D24型施工便梁。Preferably, the D-shaped construction girder is a D24-type construction girder.
所述既有铁路线路包括混凝土轨枕和行车轨。The existing railway line includes concrete sleepers and running rails.
优选的,所述纵梁与改进横梁通过牛腿和连接板使用螺栓连接。Preferably, the longitudinal beam and the improved cross beam are connected by bolts through corbels and connecting plates.
优选的,所述改进横梁长为2.96m,比原D24型施工便梁的横梁短1m,其余尺寸、结构不变。Preferably, the improved beam is 2.96m long, which is 1m shorter than the beam of the original D24 type construction beam, and the other dimensions and structures remain unchanged.
优选的,所述改进横梁等间距穿设在行车轨下,且与既有铁路线路垂直设置,并在与行车轨交界处增设有绝缘胶垫和垫板。Preferably, the improved crossbeams are installed under the running rail at equal intervals, and are arranged perpendicular to the existing railway line, and insulating rubber pads and backing plates are added at the junction with the running rail.
优选的,所述改进横梁顶面与混凝土轨枕等高。Preferably, the top surface of the improved beam is at the same height as the concrete sleeper.
优选的,所述轨束梁是由5根60kg/m钢轨组成。Preferably, the rail beam is composed of five 60kg/m steel rails.
优选的,所述U型螺栓由Φ22圆钢制成,两端为M22螺纹。Preferably, the U-shaped bolts are made of Φ22 round steel, with M22 threads at both ends.
采用上述技术方案所产生的有益效果在于:The beneficial effects produced by adopting the above-mentioned technical scheme are:
本实用新型综合扣轨梁法、纵挑横抬法、D型便梁加固法、连续施工便梁法等多种线路的优缺点研发而出,能够满足铁路对线路平顺性的高要求,同时具备结构相对简单、安全稳定、加固效果更好、适应双线铁路区段线间距较小和跨度较大等优点,提供了一种能够不影响线路下方施工的用于既有铁路的线路加固装置。The utility model is developed based on the advantages and disadvantages of various lines such as the buckle rail beam method, the vertical and horizontal lifting method, the D-shaped convenient beam reinforcement method, and the continuous construction convenient beam method, which can meet the high requirements of the railway for smoothness of the line. It has the advantages of relatively simple structure, safety and stability, better reinforcement effect, and adapts to the smaller line spacing and larger span of double-track railway sections. It provides a line reinforcement device for existing railways that does not affect the construction below the line. .
1)该装置同时使用扣轨梁和D型便梁,在高稳定性的D型便梁结构上添加扣轨梁,使长范围架空线路有更高的稳定性,保证了铁路对线路平顺性的要求,可以很好的确保线路的加固效果和行车安全。1) The device uses buckle rail beams and D-shaped beams at the same time, and adds buckle rail beams to the high-stability D-type beam structure to make the long-range overhead lines more stable and ensure the smoothness of the railway lines It can ensure the reinforcement effect of the line and the safety of driving.
2)改进横梁缩短了原D24型便梁的横梁长度,能够适应双线铁路区段线间距较小的情况。2) The improved crossbeam shortens the length of the original D24 type beam, which can adapt to the situation where the line spacing of the double-track railway section is small.
3)该装置的纵梁能满足跨度不大于24米的下穿施工作业。3) The longitudinal beam of the device can meet the underpass construction with a span of no more than 24 meters.
4)加固后,可在不影响行车安全又不中断行车的条件下进行线路下的施工,如盾构掘进、桥涵顶进等,节省工期。4) After reinforcement, the construction under the line can be carried out without affecting the driving safety and without interrupting the driving, such as shield tunneling, bridge and culvert jacking, etc., saving the construction period.
附图说明Description of drawings
图1是本实用新型的示意图;Fig. 1 is the schematic diagram of the utility model;
图2是本实用新型的侧视示意图;Fig. 2 is a schematic side view of the utility model;
图3是牛腿的示意图;Fig. 3 is the schematic diagram of corbel;
图4是图3的侧视示意图;Fig. 4 is a schematic side view of Fig. 3;
图5是U型螺栓的示意图;Fig. 5 is the schematic diagram of U-bolt;
图6是图5的俯视示意图;Figure 6 is a schematic top view of Figure 5;
图7是连接板的示意图;Fig. 7 is the schematic diagram of connecting plate;
图8是图7的俯视示意图;Figure 8 is a schematic top view of Figure 7;
其中,1-1为纵梁,1-2为改进横梁,1-3为牛腿,1-4为连接板;2为支撑桩;3为扣轨梁,3-1为轨束梁,3-2为钢扣板,3-3为U型螺栓;4-1为既有混凝土轨枕,4-2为行车轨。Among them, 1-1 is the longitudinal beam, 1-2 is the improved beam, 1-3 is the corbel, 1-4 is the connecting plate; 2 is the supporting pile; 3 is the fastening rail beam, 3-1 is the rail beam, 3 -2 is the steel gusset, 3-3 is the U-shaped bolt; 4-1 is the existing concrete sleeper, and 4-2 is the driving rail.
具体实施方式detailed description
下面结合附图和具体实施方式对本实用新型作进一步详细的说明:Below in conjunction with accompanying drawing and specific embodiment, the utility model is described in further detail:
参见附图1-附图8,本实施例在既有铁路线路的基础上包括D24型施工便梁、支撑桩2和扣轨梁3。其中,D24型施工便梁包括纵梁1-1、改进横梁1-2、牛腿1-3和连接板1-4,扣轨梁3包括轨束梁3-1、钢扣板3-2和U型螺栓3-3,既有铁路线路包括既有混凝土轨枕4-1和行车轨4-2。纵梁1-1与改进横梁1-2通过牛腿1-3和连接板1-4使用螺栓连接,纵梁1-1位于设置在线路两侧的支撑桩2上,改进横梁1-2等间距穿设在行车轨4-2下,且与既有线路垂直设置,改进横梁1-2顶面与既有混凝土轨枕4-1等高,其上铺设扣轨梁3,扣轨梁3采用5根60kg/m钢轨组成的轨束梁3-1,扣轨梁与其下面的改进横梁1-2用钢扣板3-2和Φ22U型螺栓3-3联在一起。Referring to accompanying drawing 1-accompanying drawing 8, present embodiment comprises D24 type construction convenient beam, support pile 2 and fastening rail beam 3 on the basis of existing railway line. Among them, the D24 construction convenience beam includes longitudinal beam 1-1, improved beam 1-2, corbel 1-3 and connecting plate 1-4, buckle rail beam 3 includes rail beam 3-1, steel buckle plate 3-2 and U-shaped bolts 3-3, the existing railway line includes existing concrete sleepers 4-1 and driving rails 4-2. The longitudinal beam 1-1 and the improved beam 1-2 are connected by bolts through the corbel 1-3 and the connecting plate 1-4, the longitudinal beam 1-1 is located on the supporting piles 2 arranged on both sides of the line, the improved beam 1-2, etc. The spacing is set under the driving rail 4-2, and it is set perpendicular to the existing line. The top surface of the improved beam 1-2 is equal to the existing concrete sleeper 4-1, and the buckle rail beam 3 is laid on it, and the buckle rail beam 3 adopts The rail bundle beam 3-1 that 5 60kg/m steel rails forms, buckle rail beam and the improved beam 1-2 below it are connected together with steel buckle plate 3-2 and Φ22U type bolt 3-3.
所述改进横梁1-2长为2.96m,比原D24型施工便梁的横梁短1m,其余尺寸、结构不变。The improved crossbeam 1-2 is 2.96m long, which is 1m shorter than the crossbeam of the original D24 type construction beam, and the other dimensions and structures remain unchanged.
所述改进横梁1-2与行车轨4-2交界处增设绝缘胶垫和垫板,以加固轨面及减少对电气信号的干扰。Insulating rubber pads and backing plates are added at the junction of the improved beam 1-2 and the driving rail 4-2 to strengthen the rail surface and reduce interference to electrical signals.
所述支撑桩2不仅满足便梁的承载要求,同时能起到加固铁路路基的作用。The support piles 2 not only meet the bearing requirements of the beam, but also can play the role of reinforcing the railway subgrade.
每一处连接纵梁与改进横梁1-2的牛腿均由左右两件牛腿组成。所述U型螺栓由Φ22圆钢制成,两端为M22螺纹。所述扣轨梁与U型螺栓连接处的间隙由木屑填块填充,以保证各根扣轨梁之间不发生相互错动。Each corbel connecting the longitudinal beam and the improved beam 1-2 is composed of two left and right corbels. The U-shaped bolts are made of Φ22 round steel, with M22 threads at both ends. The gap between the buckle rail beam and the U-bolt joint is filled with sawdust filler blocks to ensure that the buckle rail beams do not shift each other.
下面通过具体实施例来说明这种用于既有铁路线路的加固装置的安装过程。The installation process of this reinforcing device for existing railway lines will be described below through specific examples.
安装前应对基床进行捣固,以保证道床稳定,且需对无缝线路进行应力放散和焊接,并监测轨温变化。The foundation bed should be tamped before installation to ensure the stability of the ballast bed, and the stress relief and welding of the seamless line should be carried out, and the change of rail temperature should be monitored.
(1)设置支撑桩2(1) Set support pile 2
利用列车封锁时间在既有线路两侧设置支撑桩2,严格按设计尺寸及要求施工,达到强度后放可使用。这些支撑桩2应不仅满足便梁的承载要求,同时能起到加固铁路路基的作用。Set support piles 2 on both sides of the existing line by using the train blockage time, and construct in strict accordance with the design size and requirements, and put it into use after reaching the strength. These supporting piles 2 should not only meet the load-bearing requirements of the beams, but also play a role in reinforcing the railway embankment.
(2)下穿改进横梁1-2(2) The improved crossbeam 1-2 is worn under
在尽量不扰动混凝土轨枕4-1的情况下穿入改进横梁1-2,且应提前振捣横梁下道砟,改进横梁1-2在与行车轨4-2交界处增设绝缘胶垫和垫板,以加固轨面及减少对电气信号的干扰。Penetrate the improved beam 1-2 without disturbing the concrete sleeper 4-1 as far as possible, and vibrate the ballast under the beam in advance, and add insulating pads and pads at the junction of the improved beam 1-2 and the driving rail 4-2 plate to strengthen the rail surface and reduce interference to electrical signals.
(3)铺设扣轨梁3(3) Lay buckle rail beam 3
在改进横梁上铺设扣轨梁3。扣轨梁3采用5根60kg/m钢轨的轨束梁3-1,接头错开2m以上,与其下的改进横梁1-2用钢扣板3-2和Φ22U型螺栓3-3连接在一起。Lay the buckle rail beam 3 on the improved beam. The buckle rail beam 3 adopts the rail beam 3-1 of five 60kg/m rails, the joints are staggered by more than 2m, and the improved crossbeam 1-2 below it is connected together with a steel buckle plate 3-2 and a Φ22 U-shaped bolt 3-3.
(4)铺设纵梁1-1(4) laying stringer 1-1
将D24型施工便梁1的纵梁1-1安置在制好的支撑桩2上,同时,将纵梁1-1与改进横梁1-2进行通过牛腿1-3和连接板1-4使用螺栓连接。Place the longitudinal beam 1-1 of the D24 type construction convenience beam 1 on the prepared support pile 2, and at the same time, pass the longitudinal beam 1-1 and the improved beam 1-2 through the corbel 1-3 and the connecting plate 1-4 Use bolts.
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720128160.3U CN206538637U (en) | 2017-02-13 | 2017-02-13 | A kind of track strengthening device for existing railway |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720128160.3U CN206538637U (en) | 2017-02-13 | 2017-02-13 | A kind of track strengthening device for existing railway |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206538637U true CN206538637U (en) | 2017-10-03 |
Family
ID=59949445
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720128160.3U Expired - Fee Related CN206538637U (en) | 2017-02-13 | 2017-02-13 | A kind of track strengthening device for existing railway |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206538637U (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107974878A (en) * | 2017-11-29 | 2018-05-01 | 中铁第四勘察设计院集团有限公司 | A kind of rail yard track switch reinforcement means and structure |
CN109723443A (en) * | 2018-12-30 | 2019-05-07 | 中铁十四局集团有限公司 | Method for tunnel construction |
CN109869154A (en) * | 2019-02-26 | 2019-06-11 | 朔黄铁路发展有限责任公司 | Under wear existing railway technique and lower penetrating device |
CN110374018A (en) * | 2019-06-17 | 2019-10-25 | 中铁六局集团呼和浩特铁路建设有限公司 | A kind of combined steel cross bearer sets up multispan just beam track strengthening method |
CN110629684A (en) * | 2018-06-22 | 2019-12-31 | 郑州中原铁道工程有限责任公司 | Construction method for spliced railway construction temporary beam |
CN111417756A (en) * | 2017-12-07 | 2020-07-14 | 普拉塞-陶伊尔铁路机械出口股份有限公司 | Method and system for monitoring the load of a tamping unit |
CN113174789A (en) * | 2021-05-14 | 2021-07-27 | 中铁二十四局集团有限公司 | Railway fastening rail reinforcing process and equipment |
CN114182583A (en) * | 2021-11-30 | 2022-03-15 | 上海同济工程咨询有限公司 | Supporting structure of temporary beam |
CN114541479A (en) * | 2021-12-31 | 2022-05-27 | 四川省铁路建设有限公司 | In-situ reinforcing structure with small curve radius for existing rail transit without stopping and construction method |
CN115305751A (en) * | 2022-09-03 | 2022-11-08 | 江苏雷威建设工程有限公司 | Steel bar base reinforced line construction method |
CN115434191A (en) * | 2022-10-17 | 2022-12-06 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | Deep deformation treatment method for ballast track subgrade of operation railway |
-
2017
- 2017-02-13 CN CN201720128160.3U patent/CN206538637U/en not_active Expired - Fee Related
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107974878A (en) * | 2017-11-29 | 2018-05-01 | 中铁第四勘察设计院集团有限公司 | A kind of rail yard track switch reinforcement means and structure |
CN107974878B (en) * | 2017-11-29 | 2019-07-05 | 中铁第四勘察设计院集团有限公司 | A kind of rail yard track switch reinforcement means and structure |
CN111417756B (en) * | 2017-12-07 | 2022-10-04 | 普拉塞-陶伊尔铁路机械出口股份有限公司 | Method and system for monitoring the load of a tamping unit |
CN111417756A (en) * | 2017-12-07 | 2020-07-14 | 普拉塞-陶伊尔铁路机械出口股份有限公司 | Method and system for monitoring the load of a tamping unit |
CN110629684A (en) * | 2018-06-22 | 2019-12-31 | 郑州中原铁道工程有限责任公司 | Construction method for spliced railway construction temporary beam |
CN109723443B (en) * | 2018-12-30 | 2021-07-20 | 中铁十四局集团有限公司 | Tunnel construction method |
CN109723443A (en) * | 2018-12-30 | 2019-05-07 | 中铁十四局集团有限公司 | Method for tunnel construction |
CN109869154B (en) * | 2019-02-26 | 2020-08-11 | 朔黄铁路发展有限责任公司 | Underpass device for existing railway |
CN109869154A (en) * | 2019-02-26 | 2019-06-11 | 朔黄铁路发展有限责任公司 | Under wear existing railway technique and lower penetrating device |
CN110374018A (en) * | 2019-06-17 | 2019-10-25 | 中铁六局集团呼和浩特铁路建设有限公司 | A kind of combined steel cross bearer sets up multispan just beam track strengthening method |
CN113174789A (en) * | 2021-05-14 | 2021-07-27 | 中铁二十四局集团有限公司 | Railway fastening rail reinforcing process and equipment |
CN114182583A (en) * | 2021-11-30 | 2022-03-15 | 上海同济工程咨询有限公司 | Supporting structure of temporary beam |
CN114182583B (en) * | 2021-11-30 | 2024-05-10 | 上海同济工程咨询有限公司 | Support structure of toilet beam |
CN114541479A (en) * | 2021-12-31 | 2022-05-27 | 四川省铁路建设有限公司 | In-situ reinforcing structure with small curve radius for existing rail transit without stopping and construction method |
CN114541479B (en) * | 2021-12-31 | 2024-06-11 | 四川省铁路建设有限公司 | Small curve radius existing rail transit non-stop in-situ reinforcing structure and construction method |
CN115305751A (en) * | 2022-09-03 | 2022-11-08 | 江苏雷威建设工程有限公司 | Steel bar base reinforced line construction method |
CN115305751B (en) * | 2022-09-03 | 2024-10-15 | 江苏雷威建设工程有限公司 | Steel bar base reinforced line construction method |
CN115434191A (en) * | 2022-10-17 | 2022-12-06 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | Deep deformation treatment method for ballast track subgrade of operation railway |
CN115434191B (en) * | 2022-10-17 | 2024-10-29 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | Deep deformation renovation method for ballast track subgrade of operation railway |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206538637U (en) | A kind of track strengthening device for existing railway | |
CN102926299B (en) | Railway elevating and fixing device and railway bridge and culvert construction method adopting railway elevating and fixing device | |
WO2017125028A1 (en) | Rail support beam low track and viaduct transition section structure for medium-low-speed magnetic suspension traffic project | |
WO2017125029A1 (en) | Joggle joint type rail support beam structure for middle and low-speed magnetic suspension traffic engineering low line | |
CN102979041B (en) | Soft overhead reinforcing jacking method for construction of span box bridge of jacking block of underpass turnout group of railway | |
CN203487475U (en) | Line suspending and reinforcing structure for existing line jacking bridge and culvert construction | |
CN203960700U (en) | The closed road structure of stake holder U-lag | |
CN201843076U (en) | Groove-shaped steel bridge deck structure of high-speed railway steel tied arched bridge | |
CN204940141U (en) | The reinforcement system of existing line in Framed underpass bridge process | |
CN106192620B (en) | A kind of railway ballastless track supporting layer and substructure change method | |
CN204356595U (en) | Medium-and low-speed maglev railway is low puts circuit continuous arch support rail girder construction | |
CN204282185U (en) | A kind of armful rail magnetic levitation track traffic bridge | |
CN104480805A (en) | Framed sleeper unit | |
CN210174677U (en) | Hard crossing for changing electrified railway into moving | |
CN113931212A (en) | Road and bridge transition section structure for tramcar and construction method thereof | |
CN202081383U (en) | Temporary support used in construction striding over existing line bridge | |
CN204174481U (en) | Soft clay area modern tram abutment rebound structure | |
CN210439155U (en) | Multi-layer continuous combined overhead beam | |
CN202865708U (en) | Railway aerial fixing device | |
CN108342980B (en) | Railway suspension bridge upper bearing type steel truss bridge deck structure | |
CN216514886U (en) | Line reinforcing device for existing railway | |
CN202298390U (en) | Ballastless track rush repair device | |
CN114837225B (en) | Empty reinforcement method for multi-channel existing line frame with different height differences | |
CN110725160A (en) | Double-block type point-support floating slab track bed structure | |
CN216891770U (en) | Elastic support structure and ballastless track slab and ballastless track system having the same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171003 Termination date: 20220213 |