CN104047630B - A kind of fully-mechanized mining working mechanization mounting process method - Google Patents

A kind of fully-mechanized mining working mechanization mounting process method Download PDF

Info

Publication number
CN104047630B
CN104047630B CN201310582373.XA CN201310582373A CN104047630B CN 104047630 B CN104047630 B CN 104047630B CN 201310582373 A CN201310582373 A CN 201310582373A CN 104047630 B CN104047630 B CN 104047630B
Authority
CN
China
Prior art keywords
support
hydraulic
mining
installs
hydraulic crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310582373.XA
Other languages
Chinese (zh)
Other versions
CN104047630A (en
Inventor
张希望
马士军
马长春
于代文
薛庆生
史长林
蔡济娟
刘博�
李云峰
史云龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Xinfeng mining (Group) Co., Ltd.
Original Assignee
LIAONING XINFENG MINE ELECTRICAL EQUIPMENT MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIAONING XINFENG MINE ELECTRICAL EQUIPMENT MANUFACTURING Co Ltd filed Critical LIAONING XINFENG MINE ELECTRICAL EQUIPMENT MANUFACTURING Co Ltd
Priority to CN201310582373.XA priority Critical patent/CN104047630B/en
Publication of CN104047630A publication Critical patent/CN104047630A/en
Application granted granted Critical
Publication of CN104047630B publication Critical patent/CN104047630B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The present invention discloses a kind of fully-mechanized mining working mechanization mounting process method, fork truck, hydraulic support upending frame are installed using mining hydraulic crane, hydraulic crane for middle trough, corner road assembly, support carries out mechanization installation, and the power set of device therefor adopt the hydraulic system of work surface;Concrete installation steps are as follows:Step 1. installs the parts such as elevating conveyor, disintegrating machine, belt feeder self-movable foot end;Then remove and elevating conveyor part rail is installed;Step 2. is installed scrapper conveyor with hydraulic crane for middle trough;Step 3. is installed hydraulic support step 4. and installs coal-winning machine, installs rocker arm of coal mining machine.Advantages of the present invention:It is an advantage of the invention that:Using mechanized operation, time saving and energy saving, work efficiency, and safe ready is not only substantially increased, the demand of modern mining mechanization development is met.

Description

A kind of fully-mechanized mining working mechanization mounting process method
Technical field
The present invention relates to mining mechanization mounting technique field, especially fully-mechanized mining working mechanization mounting process method.
Background technology
Equipment is transported to scene using using flat car by the installation of existing fully-mechanized mining working, then using manually or electrically Calabash is installed, not only time-consuming, high labor intensive, inefficiency, and it occur frequently that casualty accident, serious restriction The development of power coal-mining technique, therefore, in the urgent need to a kind of fully-mechanized mining working mechanization mounting process method.
Content of the invention
For solving above-mentioned technical problem, the purpose of the present invention is to disclose a kind of fully-mechanized mining working mechanization mounting process side Method, content are as follows:Fork truck, hydraulic pressure are installed using mining hydraulic crane, hydraulic crane for middle trough, corner road assembly, support Support upending frame carries out mechanization installation, and the power set of device therefor adopt the hydraulic system of work surface;Concrete installation steps As follows:
The transport of mining hydraulic crane is installed elevating conveyor position to Yun Shun lanes by step 1.;Using mining hydraulic crane according to The parts such as secondary installation elevating conveyor intermediate channel, disintegrating machine, belt feeder self-movable foot end;Then remove and elevating conveyor part rail is installed;
Step 2. is transferred to scraper conveyor middle groove in front carriage with hydraulic crane for middle trough, and specified location is arrived in transport After installed, remove traction rail away from track, and by the track installation support assembling fork track road that removes, support assembling fork track Track installs scraper conveyor middle groove away from for 1500mm or 2000mm with hydraulic crane for middle trough, removes intermediate channel hydraulic pressure afterwards Hoisting machine, installs corner road assembly with mining hydraulic crane and assembles support and install fork truck;Forklift transport is installed with support to scrape Trigger head, is installed with mining hydraulic crane;
The tail boom of hydraulic support, main body, front fine strain of millet are assembled by step 3. with hydraulic support upending frame, the hydraulic pressure after assembling Hydraulic support is pulled on support installation fork truck and is transported to specified location by winch or traction forklift and installed by support;Tear open Except length is 1.5 meters of rails for installation length after 3 meters of rails, then transition bracket and ordinary stent are installed successively;Hydraulic support After installation, the facilities such as fork truck, corner road assembly and hydraulic support upending frame installed by striking;
Step 4. mining hydraulic crane is installed coal-winning machine, installs rocker arm of coal mining machine, installs body, then, pacifies successively Dress miscellaneous part;Scrapper conveyor tail is installed with mining hydraulic crane again, mining hydraulic crane is placed on suitable position finally Put and can dismount other facilities of down-hole or gug at any time.
In the step 3, such as lanewidth degree degree not enough, can be installed in support, on fork truck, hydraulic support is carried out tuning, then Transporting specified location carries out tuning installation.
In the step 4, when rocker arm of coal mining machine is installed, need to be fixed with support, prevent which from toppling over.
The mining hydraulic crane adopts Liaoning Xinfeng Coal Mine Electrical Equipment Manufacturing Co., Ltd.'s product.
The hydraulic crane for middle trough adopts Liaoning Xinfeng Coal Mine Electrical Equipment Manufacturing Co., Ltd.'s product.
Corner road assembly adopts Liaoning Xinfeng Coal Mine Electrical Equipment Manufacturing Co., Ltd.'s product.
The support is installed fork truck and adopts Liaoning Xinfeng Coal Mine Electrical Equipment Manufacturing Co., Ltd.'s product.
The hydraulic support upending frame adopts Liaoning Xinfeng Coal Mine Electrical Equipment Manufacturing Co., Ltd.'s product.
It is an advantage of the invention that:Using mechanized operation, time saving and energy saving, not only substantially increase work efficiency, and secure side Just, the demand of modern mining mechanization development is met.
Description of the drawings
Schematic diagrams of the Fig. 1 for step 1;
Schematic diagrams of the Fig. 2 for step 2;
Schematic diagrams of the Fig. 3 for step 3;
Schematic diagrams of the Fig. 4 for step 4;
In figure, 1 is lane of rolling back and rationalizing, and 2 for cutting eye, and 3 is Yun Shun lanes, and 4 is flat car, and 5 is mining hydraulic crane, and 6 is winch, 7 is belt feeder self-movable foot end, and 8 is elevating conveyor intermediate channel, and 9 is disintegrating machine, and 10 is hydraulic crane for middle trough, and 11 is parking lot, 12 For scrapper conveyor, 13 is hydraulic support, and 14 is high-strength spacing pillow, and 15 is corner road assembly, and 16 is that fork truck installed by support, and 17 is triangle Point, 18 is coal-winning machine, and 19 is scrapper conveyor tail, and 20 are
Specific embodiment
The present invention is illustrated below in conjunction with the accompanying drawings, and as Figure 1-Figure 4, roll back and rationalize lane 1 width 4.6-5m, high 3-4.2m, Cut 2 width 5.5-7.5m of eye, Yun Shun lanes 3 width 4.6-5m, high 3-4.2m lay 38 kilograms of rails, gauge be 600mm or 900mm;Fork truck 16, hydraulic pressure is installed using mining hydraulic crane 5, hydraulic crane for middle trough 10, corner road assembly 15, support Support upending frame carries out mechanization installation, and the power set of device therefor adopt the hydraulic system of work surface;Concrete installation steps As follows:
Mining hydraulic crane 5 is transported Yun Shun lanes 3 with flat car 4 and installs elevating conveyor position by step 1.;Using mining The parts such as elevating conveyor intermediate channel 8, disintegrating machine 9, belt feeder self-movable foot end 7 installed successively by hydraulic crane 5;Then remove to install and turn Carrier aircraft part rail;
Step 2. is transferred to scraper conveyor middle groove in front carriage with hydraulic crane for middle trough 10, and specific bit is arrived in transport Postpone and installed, traction rail is removed away from track, and by the track installation support assembling fork track road that removes, fork truck installed by support Track gauge is 1500mm or 2000mm, installs scraper conveyor middle groove with hydraulic crane for middle trough 10, removes intermediate channel afterwards Hydraulic hoisting car 10, installs corner road assembly 15 with mining hydraulic crane 5 and assembles support and install fork truck 16;Installed with support Fork truck 16 transports scrapper conveyor head, is installed with mining hydraulic crane 5;
The tail boom of hydraulic support 13, main body, front fine strain of millet are assembled by step 3. with hydraulic support upending frame, the liquid after assembling Hydraulic support 13 is pulled to support by winch 6 or traction forklift and installs on fork truck 16 and be transported to specified location by pressure support 13 Row is installed;It is 1.5 meters of rails that length is removed for installation length after 3 meters of rails, then installs transition bracket and ordinary stent successively; After 13 installation of hydraulic support, the facilities such as fork truck 16, corner road assembly 15 and hydraulic support upending frame installed by striking;
Step 4. mining hydraulic crane 5 is installed coal-winning machine 18, installs rocker arm of coal mining machine, installs body, then, successively Miscellaneous part is installed;Scrapper conveyor tail 19 is installed with mining hydraulic crane 5 again, mining hydraulic crane 5 is placed on conjunction finally Suitable position can dismount other facilities of down-hole or gug at any time.
In the step 3, such as lanewidth degree degree not enough, can be installed in support, on fork truck 16, hydraulic support 13 is carried out tuning, Then transporting specified location carries out tuning installation.
In the step 4, when rocker arm of coal mining machine is installed, need to be fixed with support, prevent which from toppling over.
The mining hydraulic crane adopts Liaoning Xinfeng Coal Mine Electrical Equipment Manufacturing Co., Ltd.'s product.
The hydraulic crane for middle trough adopts Liaoning Xinfeng Coal Mine Electrical Equipment Manufacturing Co., Ltd.'s product.
Corner road assembly adopts Liaoning Xinfeng Coal Mine Electrical Equipment Manufacturing Co., Ltd.'s product.
The support is installed fork truck and adopts Liaoning Xinfeng Coal Mine Electrical Equipment Manufacturing Co., Ltd.'s product.
The hydraulic support upending frame adopts Liaoning Xinfeng Coal Mine Electrical Equipment Manufacturing Co., Ltd.'s product.

Claims (1)

1. a kind of fully-mechanized mining working mechanization mounting process method, it is characterised in that:Using mining hydraulic crane, middle part tank liquor Pressure hoisting machine, corner road assembly, support installation fork truck, hydraulic support upending frame carry out mechanization installation, the power of device therefor Hydraulic system of the device using work surface;Concrete installation steps are as follows:
The transport of mining hydraulic crane is installed elevating conveyor position to Yun Shun lanes by step 1.;Pacified using mining hydraulic crane successively Dress elevating conveyor intermediate channel, disintegrating machine, belt feeder self-movable foot end;Then remove and elevating conveyor part rail is installed;
Step 2. is transferred to scraper conveyor middle groove in front carriage with hydraulic crane for middle trough, and transport is laggard to specified location Row is installed, and removes traction rail away from track, and by the track installation support assembling fork track road that removes, support assembling fork track track Away from for 1500mm or 2000mm, scraper conveyor middle groove is installed with hydraulic crane for middle trough, removes intermediate channel hydraulic hoisting afterwards Car, installs corner road assembly with mining hydraulic crane and assembles support and install fork truck;Forklift transport scrapper conveyor is installed with support Head, is installed with mining hydraulic crane;
The tail boom of hydraulic support, main body, front fine strain of millet are assembled by step 3. with hydraulic support upending frame, the hydraulic support after assembling Hydraulic support is pulled on support installation fork truck and is transported to specified location by winch or traction forklift and installed;Remove length It is 1.5 meters of rails to spend for installation length after 3 meters of rails, then installs transition bracket and ordinary stent successively;Hydraulic support is installed After the completion of, striking installs fork truck, corner road assembly and hydraulic support upending frame;
Step 4. mining hydraulic crane is installed coal-winning machine, installs rocker arm of coal mining machine, installs body, then, installs which successively His part;Scrapper conveyor tail is installed with mining hydraulic crane again, finally mining hydraulic crane is put and in place may be used Down-hole other facilities or gug are dismounted at any time;In the step 3, such as lanewidth degree degree not enough, can be installed liquid on fork truck in support Pressure support carries out tuning, and then transporting specified location carries out tuning installation;In the step 4, when rocker arm of coal mining machine is installed, need Fixed with support, prevent which from toppling over.
CN201310582373.XA 2013-11-19 2013-11-19 A kind of fully-mechanized mining working mechanization mounting process method Active CN104047630B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310582373.XA CN104047630B (en) 2013-11-19 2013-11-19 A kind of fully-mechanized mining working mechanization mounting process method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310582373.XA CN104047630B (en) 2013-11-19 2013-11-19 A kind of fully-mechanized mining working mechanization mounting process method

Publications (2)

Publication Number Publication Date
CN104047630A CN104047630A (en) 2014-09-17
CN104047630B true CN104047630B (en) 2017-03-15

Family

ID=51500981

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310582373.XA Active CN104047630B (en) 2013-11-19 2013-11-19 A kind of fully-mechanized mining working mechanization mounting process method

Country Status (1)

Country Link
CN (1) CN104047630B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105089692A (en) * 2014-05-14 2015-11-25 四川省华蓥山煤业股份有限公司绿水洞煤矿 Safe and quick installation method of steeply inclined fully mechanized mining equipment
CN104612738B (en) * 2015-03-04 2016-11-02 山东良庄矿业有限公司 A kind of fully-mechanized mining working surface hydraulic support quickly remove transportation method
CN107035392B (en) * 2017-06-15 2019-06-21 淮南矿业(集团)有限责任公司 A kind of hydraulic support fortune is suitable into frame installing mechanism and installation method
CN107355248B (en) * 2017-09-05 2019-04-09 淮南矿业(集团)有限责任公司 A kind of fully mechanized coal face fully-mechanized mining equipment method for rapidly mounting
CN109230336A (en) * 2018-08-07 2019-01-18 兖矿集团有限公司 A kind of coal transfer device
CN112096439B (en) * 2020-09-18 2022-10-25 淮南矿业(集团)有限责任公司 Synchronous mounting method for forepoling support and reversed loader

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3301530A1 (en) * 1983-01-19 1984-07-19 Gewerkschaft Eisenhütte Westfalia, 4670 Lünen Bracing device for a shiftable conveying and/or winning installation, in particular a plough installation
DE4426406C1 (en) * 1994-07-26 1995-11-02 Beukenberg Maschf Transfer device for coal
CN2398424Y (en) * 1999-10-14 2000-09-27 王宝民 Special equipment for underground hydraulic support assembling and resolving
CN100567703C (en) * 2005-05-19 2009-12-09 兖矿集团有限公司 Comprehensive coal-mining process by using long wall mining method

Also Published As

Publication number Publication date
CN104047630A (en) 2014-09-17

Similar Documents

Publication Publication Date Title
CN104047630B (en) A kind of fully-mechanized mining working mechanization mounting process method
CN100494635C (en) Method for filling goaf by gangue
CN102094675B (en) Safe moving and withdrawing method of complex-structured thick coal seam fully mechanized heavy equipment
CN104675422B (en) The hydraulic means of coal mine roadway temporary support for drivage face
CN104500069A (en) Continuous coal mining machine top-coal mining process for extremely-thick coal seam bound coal
CN103742192A (en) Fully-mechanized-coal-mining-face mechanization withdrawing method
CN102094673A (en) Method for quickly moving fully mechanized mining face under special geological condition
CN101554897A (en) Multifunctional transport cart with self-assembly and disassembly rubber wheels for mining
CN201407069Y (en) Mine-used multifunctional rubber wheel self-loading and unloading transport vehicle
CN104329117B (en) Installation method of comprehensive mechanized filling, coal mining and open-off cutting equipment
CN103612983B (en) Underground coal mine automatic moving type telpher
CN104670838A (en) Open-pit mine belt conveyor head segment transverse moving device
CN102748027A (en) Reverse-procedure installation technology for fully mechanized mining face
CN104264549A (en) Rapid rail replacement operation vehicle and operation method thereof
CN203624851U (en) Self-moving electric monorail hoist in coal mine
CN102616520A (en) Auxiliary device for shield single-well integral starting belt conveyor
CN202508557U (en) Shield single-well overall originating belt machine auxiliary device
CN106939536B (en) A kind of coal mine inclined shaft assembled is laid a railway track construction method
CN206156620U (en) Movable track hoisting trolley of usefulness is demolishd with temporary track to shield tunnel construction
CN102963371B (en) Belt conveyor rigid frame assembly
CN102410016A (en) Rectangular full-section continuous miner
CN203020329U (en) Self-moving system of equipment trains for fully mechanized coal face
CN201963354U (en) Float coal recycle machine at exit on thin seam coal face
CN216269274U (en) Track-climbing device for underground mine car
CN202879496U (en) Rigid frame assembly of belt conveyor

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 112700 Diaobingshan Development Zone, Tieling, Liaoning

Patentee after: Liaoning Xinfeng mining (Group) Co., Ltd.

Address before: 112700 Diaobingshan Development Zone, Tieling, Liaoning

Patentee before: Liaoning Xinfeng Mine Electrical Equipment Manufacturing Co., Ltd.

CP01 Change in the name or title of a patent holder