CN106939536B - A kind of coal mine inclined shaft assembled is laid a railway track construction method - Google Patents

A kind of coal mine inclined shaft assembled is laid a railway track construction method Download PDF

Info

Publication number
CN106939536B
CN106939536B CN201710111205.0A CN201710111205A CN106939536B CN 106939536 B CN106939536 B CN 106939536B CN 201710111205 A CN201710111205 A CN 201710111205A CN 106939536 B CN106939536 B CN 106939536B
Authority
CN
China
Prior art keywords
segmented tracks
railway track
tracks
segmented
hole transportation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710111205.0A
Other languages
Chinese (zh)
Other versions
CN106939536A (en
Inventor
许光元
张钢
王刚
卢大政
樊伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING QIANNIU CONSTRUCTION ENGINEERING Co Ltd
CHONGQING JUNENG CONSTRUCTION GROUP Co Ltd
Original Assignee
CHONGQING QIANNIU CONSTRUCTION ENGINEERING Co Ltd
CHONGQING JUNENG CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING QIANNIU CONSTRUCTION ENGINEERING Co Ltd, CHONGQING JUNENG CONSTRUCTION GROUP Co Ltd filed Critical CHONGQING QIANNIU CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201710111205.0A priority Critical patent/CN106939536B/en
Publication of CN106939536A publication Critical patent/CN106939536A/en
Application granted granted Critical
Publication of CN106939536B publication Critical patent/CN106939536B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/02Transporting, laying, removing, or renewing lengths of assembled track, assembled switches, or assembled crossings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B23/00Easily dismountable or movable tracks, e.g. temporary railways; Details specially adapted therefor
    • E01B23/02Tracks for light railways, e.g. for field, colliery, or mine use

Abstract

It lays a railway track construction method the invention discloses a kind of coal mine inclined shaft assembled, step is:1) segmented tracks are assembled in ground-mounted field;2) segmented tracks are transported to the well head of coal mine inclined shaft;3) it uses down-hole transportation that first segmented tracks is transported to underground to lay a railway track a little and install;4) down-hole transportation is returned into well head;5) segmented tracks to be installed are transported to underground to lay a railway track a little, and dock, locks with segmented tracks has been filled;6) placement of segmented tracks to be installed is realized;7) step step 4) is repeated to step 6), until the last one segmented tracks is completed to place;8) positioning adjustment is carried out to track, floor is hardened.The present invention has used mechanical work to the maximum extent, reduces labour's input, alleviates labor intensity, effectively increase construction efficiency, and significantly improve quality of laying a railway track, the safety in work progress is good.

Description

A kind of coal mine inclined shaft assembled is laid a railway track construction method
Technical field
The invention belongs to roadway construction technical fields, specifically, being a kind of construction party laid a railway track applied to coal mine inclined shaft Method.
Background technology
Underground coal mine transport is divided into rail travel and flexible transport, flexible transport using rubber tire and crawler type as driving mechanism, Rail travel then mainly uses stringing electric power, anti-explosion diesel engine, accumulator and steel wire rope for traction power.It is domestic except the north at present For a small number of large-scale mines using outside flexible transport, remaining mine mostly uses rail travel.
The traditional method of laying a railway track of well lane engineering is first to transport the materials such as rail, sleeper by haulage inclined shaft hoisting system with wooden handcart To infield, using the construction method manually laid a railway track by root installation.
Tradition is laid a railway track and is disadvantageous in that present in construction method:
1) gradient carries out heavy rail installation in 15 ° or more of inclined shaft engineering, and material handling is difficult, work efficiency is low, speed is slow, input It is of high cost.
2) slope construction security threat is big, and mechanical casualty accident easily occurs and slope machine transports accident.
3) labour's input is especially more, and per tour at least needs to put into 14 people, on the one hand increases labour cost and on the other hand increases Security risk.
4) construction time is long, is often laid with the track of 12.5m standards length, the time that need to be spent about 17-18h.
Invention content
In view of the above-mentioned deficiency of the prior art, technical problem to be solved by the present invention lies in provide a kind of coal mine inclined shaft Assembled is laid a railway track construction method.
Technical scheme is as follows:A kind of coal mine inclined shaft assembled is laid a railway track construction method, it is characterised in that including with Lower step:
1) segmented tracks are assembled in ground-mounted field, which has two or so parallel rail, in rail The more sleepers being mutually parallel are arranged in lower section from front to back, and sleeper is mutually fixed by railway spike or fastener with two one steel rails, and sleeper Damping rubber pad is equipped between rail;
2) use ground handling trolley that segmented tracks are transported to the well head of coal mine inclined shaft;
3) it uses down-hole transportation that first segmented tracks is transported to underground to lay a railway track a little, by preceding hoisting gantry frame with after Hoisting gantry frame slings first segmented tracks, the then extraction below first segmented tracks by down-hole transportation, then will First segmented tracks is placed on the ground of underground;
4) down-hole transportation is returned into well head, while moves backward preceding hoisting gantry frame and rear hoisting gantry frame to next Station is installed;
5) next segmented tracks underground is transported to by down-hole transportation to lay a railway track a little, it will using preceding hoisting gantry frame The tail portion of dress segmented tracks is sling, and is realized the front end of the segmented tracks to be installed on down-hole transportation and has been filled the tail end of segmented tracks The consistent roads Hou Yong clamping plate is docked in docking, fish (-)bolt locks two segmented tracks connections;
6) segmented tracks on down-hole transportation are lifted by crane vacantly using rear hoisting gantry frame, makes the segmented tracks to connecting It detaches with down-hole transportation, then extracts down-hole transportation below segmented tracks out, then pass through preceding hoisting gantry frame and rear It hangs portal frame corresponding segmented tracks are placed on the ground of underground;
7) step step 4) is repeated to step 6), until the last one segmented tracks is completed to place;
8) positioning adjustment is carried out to the track placed according to stringcourse in tunnel, floor is hardened, all work of laying a railway track of completion.
Rail, sleeper, damping rubber pad, railway spike or fastener are first assembled by the present invention in ground-mounted field by design requirement Segmented tracks then use ground handling trolley and down-hole transportation to transport segmented tracks to underground and lay a railway track position, recycle The docking that portal frame carries out two sections of tracks is hung, has used mechanical work to the maximum extent in this way, reduces labour's input, mitigates Labor intensity, effectively increases efficiency of laying a railway track.
The ground handling trolley is made of truck chassis and bracket, and the bracket includes column, joist and crossbeam, two supports Beam or so is parallel and is arranged symmetrically, which is higher than the headstock of truck chassis, and the front end of joist exceeds the front end of truck chassis Face, the rear end of joist exceed the rear end face of truck chassis, the more cross being mutually parallel are provided with from front to back between two joists Beam forms frame structure, which fixes support by four columns by the rectangular distribution, and the bottom end of the column is welded on On truck chassis.Since segmented tracks are up to more than ten meters, ground handling trolley using the above structure can realize segmented tracks It transports;Carrier structure is simple, and intensity is reliable, can ensure during transport firm to segmented tracks support.
Preferably, the column, joist and crossbeam are made of I-beam for mine, it is provided between column and truck chassis Raker beam.
The down-hole transportation is made of preceding unwheeling, rear unwheeling and steel cable, and the preceding unwheeling and rear unwheeling all have band rolling The flatcar of the flatcar of wheel, preceding unwheeling is connect by steel cable with the flatcar of rear unwheeling, the fixing support rack on flatcar, the supporting rack Top is equipped with trustship, and the trustship can be rotated along its axial line.It is flexibly connected using steel cable between preceding unwheeling and rear unwheeling, and It supports the trustship of segmented tracks rotatable, has the function of during underground transportation in this way " adaptive ", can adapt to ground Slope change, so that it is guaranteed that by segmented tracks it is safely unobstructed transport to underground and lay a railway track place.Preceding unwheeling is less than rear unwheeling, waits for Fill track in rear unwheeling with filled with regard to -5 ° of top rakes of self-assembling formation between track, and track front end to be installed and ground are just Form 440cm height.When having filled track follower head and lifting to 440cm height, just docked unanimously with track front end to be installed (data above is according to experiment gained).Front and back unwheeling height, the foundation of front and back frame vehicle headway are controlled using this data as design.
Advantageous effect:Rail, sleeper, damping rubber pad, railway spike or fastener are first pressed design by the present invention in ground-mounted field It is required that be assembled into segmented tracks, then use ground handling trolley and down-hole transportation to transport segmented tracks to underground and lay a railway track position It sets, recycles hoisting gantry frame to carry out the docking of two sections of tracks, used mechanical work to the maximum extent in this way, reduced labour Power is put into, and alleviates labor intensity.Per tour only needs 4 people to carry out operation, reduces than conventional construction method a greater part of.Ground group Dress is that batch production standard is assembled, and quality is easily controllable, and quality of laying a railway track significantly is promoted.The present invention carries out construction work of laying a railway track Industry environment makes moderate progress with respect to conventional construction method, and the insecurity of environment and people reduce many, the danger of major hazard source Degree is reduced.
Description of the drawings
Fig. 1 is the structural schematic diagram of ground handling trolley.
Fig. 2 is the docking schematic diagram of two segmented tracks.
Specific implementation mode
The invention will be further described with reference to the accompanying drawings and examples:
As shown in Figure 1, ground handling trolley is made of truck chassis 5 and bracket 6.Wherein, bracket 6 has column 6a, joist 6b, crossbeam and raker beam 6c.Two joist 6b or so are parallel and are arranged symmetrically, and joist 6b is higher than the headstock of truck chassis 5, and The front end of joist 6b exceeds the front end face of truck chassis 5, and the rear end of joist 6b exceeds the rear end face of truck chassis 5, two joists The more crossbeams being mutually parallel are provided between 6b from front to back, beam vertical passes through welding in joist 6b, crossbeam with joist 6b It is fixed, frame structure is formed, which fixes support, the bottom end welding of column 6a by four column 6a by the rectangular distribution On truck chassis 5, raker beam 6c is welded between column 6a and truck chassis 5.Preferably, column 6a, joist 6b, cross Beam and raker beam 6c are made of I-beam for mine,
As shown in Fig. 2, down-hole transportation is made of preceding unwheeling 7, rear unwheeling 8 and steel cable 9.The structure type of preceding unwheeling 7 with The structure type of unwheeling 8 is identical afterwards, i.e.,:Preceding unwheeling 7 and rear unwheeling 8 all have the flatcar with idler wheel, and the flatcar of preceding unwheeling 7 passes through Steel cable 9 is connect with the flatcar of rear unwheeling 8, the fixing support rack on flatcar, and trustship 10,10 energy of trustship are installed in the top of the supporting rack It is enough to be rotated along its axial line.
If Fig. 1 is simultaneously combined shown in Fig. 2, coal mine inclined shaft assembled is laid a railway track construction method, is had steps of:
1) segmented tracks are assembled by design requirement in ground-mounted field, which has two or so parallel rail 1, the more sleepers being mutually parallel 2 are set from front to back in the lower section of rail 1, sleeper 2 passes through railway spike or fastener and two one steel rails 1 It is mutually fixed, and damping rubber pad is equipped between sleeper 2 and rail 1;
2) use ground handling trolley that segmented tracks are transported to the well head of coal mine inclined shaft;
3) first segmented tracks is transported to underground using down-hole transportation to lay a railway track a little, passes through 3 He of preceding hoisting gantry frame Hoisting gantry frame 4 slings first segmented tracks afterwards, the then extraction below first segmented tracks by down-hole transportation, then First segmented tracks is placed on the ground of underground;
4) down-hole transportation is returned into well head, while moves backward preceding hoisting gantry frame 3 and rear hoisting gantry frame 4 to next A installation station;
5) next segmented tracks underground is transported to by down-hole transportation to lay a railway track a little, it will using preceding hoisting gantry frame 3 The tail portion for having filled segmented tracks P is sling, and is realized the front end of the segmented tracks Q to be installed on down-hole transportation and has been filled segmented tracks P Tail end docking, dock the consistent roads Hou Yong clamping plate, fish (-)bolt by the connection locking of two segmented tracks;
6) segmented tracks on down-hole transportation are lifted by crane vacantly using rear hoisting gantry frame 4, makes the stepped rail to connecting Road is detached with down-hole transportation, is then extracted down-hole transportation below segmented tracks out, then by preceding hoisting gantry frame 3 with after Corresponding segmented tracks are placed on the ground of underground by hoisting gantry frame 4;
7) step step 4) is repeated to step 6), until the last one segmented tracks is completed to place;
8) positioning adjustment is carried out to the track placed according to stringcourse in tunnel, floor is hardened, all work of laying a railway track of completion.
In the above construction method, the movement of down-hole transportation is realized by winch by traction rope, the movement of hoisting gantry frame By manually moving.

Claims (4)

  1. The construction method 1. a kind of coal mine inclined shaft assembled is laid a railway track, it is characterised in that include the following steps:
    1) segmented tracks are assembled in ground-mounted field, which has two or so parallel rail (1), in rail (1) Lower section the more sleepers being mutually parallel (2) are set from front to back, sleeper (2) passes through railway spike or fastener and two one steel rails (1) phase It is fixed, and damping rubber pad is equipped between sleeper (2) and rail (1);
    2) use ground handling trolley that segmented tracks are transported to the well head of coal mine inclined shaft;
    3) use down-hole transportation by first segmented tracks be transported to underground lay a railway track a little, by preceding hoisting gantry frame (3) and after Hoisting gantry frame (4) slings first segmented tracks, the then extraction below first segmented tracks by down-hole transportation, then First segmented tracks is placed on the ground of underground;
    4) down-hole transportation is returned into well head, while moves backward preceding hoisting gantry frame (3) and rear hoisting gantry frame (4) to next A installation station;
    5) next segmented tracks underground is transported to by down-hole transportation to lay a railway track a little, it will using preceding hoisting gantry frame (3) The tail portion of dress segmented tracks is sling, and is realized the front end of the segmented tracks to be installed on down-hole transportation and has been filled the tail end of segmented tracks The consistent roads Hou Yong clamping plate is docked in docking, fish (-)bolt locks two segmented tracks connections;
    6) segmented tracks on down-hole transportation are lifted by crane vacantly using rear hoisting gantry frame (4), makes the segmented tracks to connecting Detach with down-hole transportation, then extract down-hole transportation below the segmented tracks out, then by preceding hoisting gantry frame (3) and after Corresponding segmented tracks are placed on the ground of underground by hoisting gantry frame (4);
    7) step step 4) is repeated to step 6), until the last one segmented tracks is completed to place;
    8) positioning adjustment is carried out to the track placed according to stringcourse in tunnel, floor is hardened, all work of laying a railway track of completion.
  2. The construction method 2. coal mine inclined shaft assembled according to claim 1 is laid a railway track, it is characterised in that:The ground handling trolley It is made of truck chassis (5) and bracket (6), the bracket (6) includes column (6a), joist (6b) and crossbeam, two joists The left and right (6b) is parallel and is arranged symmetrically, which is higher than the headstock of truck chassis (5), and the front end of joist (6b) is beyond card The front end face of chassis (5), the rear end of joist (6b) exceed the rear end face of truck chassis (5), between two joists (6b) in the past It is provided with the more crossbeams being mutually parallel backward, forms frame structure, the frame structure is by four columns by the rectangular distribution (6a) fixed support, the bottom end of the column (6a) is welded on truck chassis (5).
  3. The construction method 3. coal mine inclined shaft assembled according to claim 2 is laid a railway track, it is characterised in that:The column (6a), Joist (6b) and crossbeam are made of I-beam for mine, and raker beam (6c) is provided between column (6a) and truck chassis (5).
  4. The construction method 4. coal mine inclined shaft assembled according to claim 1 or 2 or 3 is laid a railway track, it is characterised in that:The underground Transport vehicle is made of preceding unwheeling (7), rear unwheeling (8) and steel cable (9), and the preceding unwheeling (7) and rear unwheeling (8) all have band idler wheel Flatcar, the flatcar of preceding unwheeling (7) connect by steel cable (9) with the flatcar of rear unwheeling (8), the fixing support rack on flatcar, should The top of supporting rack is equipped with trustship (10), and the trustship (10) can rotate along its axial line.
CN201710111205.0A 2017-02-27 2017-02-27 A kind of coal mine inclined shaft assembled is laid a railway track construction method Active CN106939536B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710111205.0A CN106939536B (en) 2017-02-27 2017-02-27 A kind of coal mine inclined shaft assembled is laid a railway track construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710111205.0A CN106939536B (en) 2017-02-27 2017-02-27 A kind of coal mine inclined shaft assembled is laid a railway track construction method

Publications (2)

Publication Number Publication Date
CN106939536A CN106939536A (en) 2017-07-11
CN106939536B true CN106939536B (en) 2018-09-11

Family

ID=59469270

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710111205.0A Active CN106939536B (en) 2017-02-27 2017-02-27 A kind of coal mine inclined shaft assembled is laid a railway track construction method

Country Status (1)

Country Link
CN (1) CN106939536B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110409233A (en) * 2019-08-21 2019-11-05 兖州煤业股份有限公司 A kind of track-laying machine of coal mine roadway and its method of laying a railway track
CN111979855B (en) * 2020-07-21 2021-12-07 中国水利水电第十二工程局有限公司 Special transport construction vehicle for installing inclined shaft track and construction method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2902330B2 (en) * 1995-09-07 1999-06-07 恒二 川原 Construction method of Incline equipment
CN101413234B (en) * 2008-09-27 2011-06-01 中铁一局集团有限公司 Arranging construction method of subway narrow shield well inclined hoisting rail
CN101813214B (en) * 2010-04-29 2011-09-07 中国石油化工集团公司 Mounting and construction method of U-shaped tunnel pipelines
CN201865015U (en) * 2010-12-09 2011-06-15 山西焦煤集团有限责任公司 Vertical curve track car
CN102756763B (en) * 2012-08-02 2013-03-13 王同建 Large-scale transport vehicle parallel operation transporting system and method
CN205855853U (en) * 2016-08-02 2017-01-04 西安科技大学 A kind of underground mine use track hoisting machine

Also Published As

Publication number Publication date
CN106939536A (en) 2017-07-11

Similar Documents

Publication Publication Date Title
CN104195952A (en) Steel box girder erection method applied to steel and concrete hybrid girder cable-stayed bridge
CN203284165U (en) Side slope material transporting system
CN202966320U (en) Hydraulic traction self-advancing flat car
CN104481547B (en) A kind of shed ding support tunnel speedy drivage method
CN204402530U (en) The transport of hydraulic support traction tuning withdraws device
CN108560927A (en) A kind of Lift-on/Lift-off System and its application method of reinforced concrete column
CN104453972A (en) Hydraulic support drawing, turning, transporting and retracting device
CN212054795U (en) Colliery is quick conveyer of monomer hydraulic prop in pit
CN106939536B (en) A kind of coal mine inclined shaft assembled is laid a railway track construction method
CN108590745A (en) The transportation resources of shield method tunnel construction and its transport structure
CN202703579U (en) Large slope inclined shaft rail transport construction apparatus
CN208415013U (en) track fast dismounting device
CN205422810U (en) A conveyor system for in tunnel construction inclined shaft
CN218090318U (en) Device for removing temporary track and sleeper of shield tunnel
CN109607384B (en) Turning-over method for cutter head of super-large-diameter shield tunneling machine
CN111636914A (en) Construction method for integrating transportation and erection of straddle type monorail PC track beam in circular-section tunnel
CN111133172A (en) Transport and transport system for tunnel buildings
CN210370694U (en) Tunnel secondary lining template trolley
CN209890978U (en) Device for removing TBM/shield tunnel track
CN203640753U (en) Traction, turning and transportation device for hydraulic support
CN205936693U (en) Underground ore dressing plant system of overhauing
CN111270577A (en) Assembly machine suitable for narrow space of subway underground line and overhead line cross-track section and construction method thereof
CN212128685U (en) Be suitable for narrow and small space of subway underground line and overhead line track section kludge of striding line
CN108952736A (en) For shield disintegration underground conveying device and construction method
CN210084211U (en) Adjustable buffer device for tail of rubber belt conveyor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant