CN209508725U - Horizontal transport track combined type sleeper in a kind of shield tunnel - Google Patents

Horizontal transport track combined type sleeper in a kind of shield tunnel Download PDF

Info

Publication number
CN209508725U
CN209508725U CN201821997914.XU CN201821997914U CN209508725U CN 209508725 U CN209508725 U CN 209508725U CN 201821997914 U CN201821997914 U CN 201821997914U CN 209508725 U CN209508725 U CN 209508725U
Authority
CN
China
Prior art keywords
sleeper
trolley
channel steel
battery truck
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821997914.XU
Other languages
Chinese (zh)
Inventor
霍显超
郭宏洲
周建明
吕宗华
刘明山
郑樑
张华光
栾朝翔
郜浩森
齐康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Original Assignee
First Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd filed Critical First Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Priority to CN201821997914.XU priority Critical patent/CN209508725U/en
Application granted granted Critical
Publication of CN209508725U publication Critical patent/CN209508725U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses horizontal transport track combined type sleepers in a kind of shield tunnel.It includes battery truck sleeper and trolley sleeper, battery truck sleeper includes channel steel, the both ends bottom of channel steel has been respectively fixedly connected with end stiffening plate, the both upper ends thereof of channel steel is symmetrically fixedly installed pressing plate and spring fastener, there is the gap that can accommodate rail between pressing plate and spring fastener, there is the hole of pluggable spring among spring fastener, trolley sleeper includes the bottom plate of arc, with trolley rail construction section and the joint section to link together with trolley rail construction section on bottom plate, the top of trolley rail construction section corresponds to trolley rail installation site and is provided with two pieces of locating pieces, it is plugged with a trolley sleeper respectively at the both ends of battery truck sleeper, the joint section of trolley sleeper is together with the end plug connection of the channel steel of battery truck sleeper.The utility model structure is simple, stability is high, peace tears that convenient, maintenance rate is low, turnover rate is high open.

Description

Horizontal transport track combined type sleeper in a kind of shield tunnel
Technical field
The utility model relates to horizontal transport track combined type sleepers in a kind of shield tunnel, are mainly used for shield tunnel The track laying used is run for battery truck, trolley in road construction.
Background technique
With the fast development of urban track traffic, shield method is used widely in track traffic construction.In shield In method constructing tunnel, horizontal transport carries out dregs using marshaling in hole and transport of materials, the sleeper of general conveying track are adopted With on channel steel weld bolt fix battery truck rails.Trolley track sleeper is welded using steel plate, is made into interior Plug mode is connect with battery truck railway sleeper, and weld bolt fixes trolley track on sleeper.Advancing the track is applied in tunnel In work, installation speed is slow, and track structure is unstable.Track is chronically in wet environment, and bolt is easy corrosion, and disassembly is difficult. Tunnel of having constructed generally requires to cut off and welds a large amount of bolts again, can just be used in turn, not only waste time, but also waste material And manpower.
Summary of the invention
In view of the above defects of the prior art, the utility model provide a kind of structure is simple, stability is high, peace Tear horizontal transport track combined type sleeper in the shield tunnel that convenient, maintenance rate is low, turnover rate is high open.
The utility model is achieved by the following technical solution: horizontal transport track group in a kind of shield tunnel Box-like sleeper, it is characterized in that: including battery truck sleeper and trolley sleeper, the battery truck sleeper includes channel steel, the channel steel Both ends bottom has been respectively fixedly connected with end stiffening plate, and the both upper ends thereof of the channel steel is symmetrically fixedly installed pressing plate and spring card Part has the gap that can accommodate rail, has among the spring fastener pluggable between the pressing plate and the spring fastener The hole of spring, the trolley sleeper include the bottom plate of arc, have on the bottom plate trolley rail construction section and with the trolley The joint section that rail construction section links together, the top of the trolley rail construction section correspond to trolley rail installation position and install Two pieces of locating pieces are equipped with, are plugged with the trolley sleeper, the trolley sleeper respectively at the both ends of the battery truck sleeper Joint section together with the end plug connection of the channel steel of the battery truck sleeper.
When the utility model is used, battery truck rail is mounted on battery truck sleeper, when installing battery truck rail, under rail Limb side is directly caught in pressing plate, and the other side is fixed using spring.Trolley rail is mounted on trolley sleeper, erecting bed When vehicle rail, when installing trolley rail, directly rail is put between two pieces of locating pieces, passes through the fixed steel of two pieces of locating pieces Rail, it is quick and easy for installation.When battery truck rail is removed, spring is extracted out, battery truck rail can directly be drawn off, trolley rail is torn open Except when, rail is drawn off between two locating pieces, it is convenient to remove, and the sleeper after removing can be directly used for without maintenance Lower constructing tunnel.
Further, for convenient for being applicable in tunnel structure and raising concrete sleeper stability, the both ends bottom of the channel steel is Inclined-plane.
Further, the trolley rail construction section is by one piece of superposed top plate, two block weldings in top plate two sides The construction section sealing plate of triangle web, a block welding in top plate one end forms, the bottom and the bottom of the trolley rail construction section Plate top is welded to connect the triangle body structure to form inner hollow, the joint section by one piece of superposed connector panel, Two block weldings are formed in the connector sealing plate of the connector webs of connector panel two sides, a block welding in connector panel one end, described to connect One end opposite with the connector sealing plate of head section and the trolley rail construction section are welded to connect, the bottom of the joint section with The top of the bottom plate is welded to connect the rectangular box structure to form inner hollow, the end of the joint section have can with it is described The inserting groove that channel steel matches.
The beneficial effects of the utility model are: the utility model structure is simple, each composite sleeper is by a storage battery track Pillow and two trolley sleepers are applied in combination, and the simple easy processing of the structure of every sleepers is light-weight, transport and convenient to assemble and disassemble;This reality It is secured with new structure, and rail fixed form is simple and practical, rail installation and convenient disassembly, when can greatly save peace and tearing open Between, working efficiency is improved, and be used in turn after sleeper and rail dismounting without repairing to put into, turnaround speed is fast, imitates Rate is high, and turnover rate is high, can greatly save construction cost.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the side schematic view of the trolley sleeper in the utility model;
Fig. 3 is the schematic top plan view of Fig. 2;
Fig. 4 is the side schematic view of the battery truck sleeper in the utility model;
Fig. 5 is the top view of Fig. 4;
In figure, 1 is trolley sleeper, and 2 be battery truck sleeper, and 3 be triangle web, and 4 be construction section sealing plate, and 5 be top plate, and 6 are Connector panel, 7 be connector sealing plate, and 8 be connector web, and 9 be bottom plate, and 10 be locating piece, and 11 be pressing plate, and 12 be spring fastener, 13 It is spring, 14 be channel steel, and 15 be end stiffening plate, and 16 be trolley rail, and 17 be battery truck rail, and 18 be inserting groove.
Specific embodiment
The utility model is further described below by non-limiting embodiment and in conjunction with attached drawing:
As shown in the picture, a kind of horizontal transport track combined type sleeper in shield tunnel comprising battery truck sleeper 2 With trolley sleeper 1, wherein the both ends of a battery truck sleeper are separately connected a trolley sleeper 1 and form combined type sleeper.It is described Battery truck sleeper 2 includes channel steel 14, and the both ends bottom of the channel steel 14 has been respectively fixedly connected with end stiffening plate 15, preferably end Stiffening plate 15 and channel steel 14 are welded to connect, and the both upper ends thereof of the channel steel 14 is symmetrically fixedly installed pressing plate 11 and spring fastener 12, there is the gap that can accommodate battery truck rail 17, the spring fastener 12 between the pressing plate 11 and the spring fastener 12 Centre has the hole of pluggable spring 13, has certain gap between the pressing plate 11 and the upper surface of channel steel 14.To guarantee Sleeper can be preferably designed for inclined-plane with tunnel duct piece reliable contacts, the both ends bottom of the channel steel 14.The trolley sleeper 1 wraps The bottom plate 9 of bracket links together with trolley rail construction section and with the trolley rail construction section on the bottom plate 9 Joint section, the top of the trolley rail construction section correspond to 16 installation site of trolley rail and are provided with two pieces of locating pieces 10, and two Trolley rail 16 can be accommodated between block locating piece 10.It is plugged with one described respectively at the both ends of the battery truck sleeper 2 The end plug connection of the channel steel 14 of track pillow 1, the joint section of the trolley sleeper 1 and the battery truck sleeper 2 is one It rises.
For the structural strength for improving sleeper, in the present embodiment, the trolley rail construction section is by one piece of superposed top Plate 5, two block weldings are formed in the construction section sealing plate 4 of the triangle webs 3 of 5 two sides of top plate, a block welding in 5 one end of top plate, described The bottom of trolley rail construction section and 9 top of bottom plate are welded to connect the triangle body structure to form inner hollow, described to connect Head section is by one piece of superposed connector panel 6, two block weldings in the connector webs 8 of 6 two sides of connector panel, a block welding in connecing The connector sealing plate 7 of 6 one end of head plate forms, one end opposite with the connector sealing plate 7 of the joint section and the trolley steel Rail construction section is welded to connect, and the top of the bottom of the joint section and the bottom plate 9 is welded to connect the rectangle to form inner hollow Body structure, the end of the joint section have the inserting groove 18 that can be matched with the channel steel 14, and the end of channel steel 14 can insert It connects in inserting groove 18, battery truck sleeper and trolley sleeper is made to link together.
When the utility model is used, every combined type sleeper is plugged on battery truck by a battery truck sleeper and two respectively The trolley sleeper 1 at sleeper both ends forms.In construction, with the propulsion of shield, battery truck sleeper 2 is laid with first on section of jurisdiction, Then battery truck rail 17 is installed on battery truck sleeper 2, when installing battery truck rail, rail lower limb side is directly caught in pressing plate In 11, it is inserted into spring 13 in the hole of spring fastener 12, is fixed the rail lower limb other side using spring 13, later in electricity Piece trolley sleeper 1 of grafting is distinguished at the both ends of bottle track pillow 2, and trolley rail 16 is then installed on trolley sleeper 1, installs trolley When rail 16, directly rail is put between two pieces of locating pieces 10, it is easy for installation fast by the fixed rail of two pieces of locating pieces 10 It is prompt.With the continuous advance of trolley, the trolley sleeper 1 at trolley rear is successively removed, and recycling, battery truck sleeper is in whole tunnel After road hole is logical, carries out dismounting and go to next tunnel use week.It, will when battery truck rail 17 is removed when needing to remove track Spring 13 is extracted out, can directly draw off battery truck rail 17, when trolley rail 16 is removed, by rail between two locating pieces 10 It draws off, it is convenient to remove, and the sleeper after dismounting can be directly used for lower constructing tunnel without maintenance.
The structure of every sleepers in the utility model is simple, and easy processing is light-weight, transports and convenient to assemble and disassemble.
Other parts in the present embodiment are the prior art, and details are not described herein.

Claims (3)

1. horizontal transport track combined type sleeper in a kind of shield tunnel, it is characterized in that: including battery truck sleeper (2) and platform Track rests the head on (1), and the battery truck sleeper (2) includes channel steel (14), and the both ends bottom of the channel steel (14) has been respectively fixedly connected with The both upper ends thereof of end stiffening plate (15), the channel steel (14) is symmetrically fixedly installed pressing plate (11) and spring fastener (12), institute Stating has the gap that can accommodate rail between pressing plate (11) and the spring fastener (12), have among the spring fastener (12) The hole of pluggable spring (13), the trolley sleeper (1) include the bottom plate (9) of arc, have trolley rail on the bottom plate (9) Construction section and the joint section to link together with the trolley rail construction section, the top of the trolley rail construction section correspond to Trolley rail installation site is provided with two pieces of locating pieces (10), is plugged with one respectively at the both ends of the battery truck sleeper (2) The end of the channel steel (14) of the trolley sleeper (1), the joint section of the trolley sleeper (1) and the battery truck sleeper (2) Portion's plug connection is together.
2. horizontal transport track combined type sleeper in shield tunnel according to claim 1, it is characterized in that: the slot The both ends bottom of steel (14) is inclined-plane.
3. horizontal transport track combined type sleeper in shield tunnel according to claim 1 or 2, it is characterized in that: institute State trolley rail construction section by one piece of superposed top plate (5), two block weldings in top plate (5) two sides triangle web (3), one Construction section sealing plate (4) of the block welding in top plate (5) one end forms, the bottom and the bottom plate (9) of the trolley rail construction section Top is welded to connect the triangle body structure to form inner hollow, the joint section by one piece of superposed connector panel (6), Two block weldings are in the connector web (8) of connector panel (6) two sides, a block welding in the connector sealing plate (7) of connector panel (6) one end Composition, one end opposite with the connector sealing plate (7) of the joint section and the trolley rail construction section are welded to connect, described The top of the bottom of joint section and the bottom plate (9) is welded to connect the rectangular box structure to form inner hollow, the joint section End there is the inserting groove (18) that can match with the channel steel (14).
CN201821997914.XU 2018-11-30 2018-11-30 Horizontal transport track combined type sleeper in a kind of shield tunnel Expired - Fee Related CN209508725U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821997914.XU CN209508725U (en) 2018-11-30 2018-11-30 Horizontal transport track combined type sleeper in a kind of shield tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821997914.XU CN209508725U (en) 2018-11-30 2018-11-30 Horizontal transport track combined type sleeper in a kind of shield tunnel

Publications (1)

Publication Number Publication Date
CN209508725U true CN209508725U (en) 2019-10-18

Family

ID=68190888

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821997914.XU Expired - Fee Related CN209508725U (en) 2018-11-30 2018-11-30 Horizontal transport track combined type sleeper in a kind of shield tunnel

Country Status (1)

Country Link
CN (1) CN209508725U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113512910A (en) * 2021-07-10 2021-10-19 中铁隧道局集团有限公司 Track device and method for rapidly stepping open TBM (tunnel boring machine)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113512910A (en) * 2021-07-10 2021-10-19 中铁隧道局集团有限公司 Track device and method for rapidly stepping open TBM (tunnel boring machine)

Similar Documents

Publication Publication Date Title
CN209508725U (en) Horizontal transport track combined type sleeper in a kind of shield tunnel
CN206752216U (en) A kind of shield machine trolley and electric locomotive pin-connected panel sleeper with lower arcuate surface
CN107653755A (en) Solid concrete roabed, which pours, in Subway Tunnel separate tunnel inverse makees formula construction method
CN105155370A (en) Continuous rail changing operation train and operation method thereof
CN204715774U (en) Multi-functional revolution transport vehicle
CN204959513U (en) Trade rail operation train in succession
CN205895274U (en) A section of jurisdiction travelling bogie that is used for shield constituent body to start
CN201952686U (en) Assembled sleeper for shield construction
CN217080453U (en) Simple support structure for air thrust of shield machine
CN108532633A (en) Urban Underground pipe gallery repair method
CN204867941U (en) Assembly welding equipment of curved surface apron
CN211547321U (en) Device for temporarily communicating bridge expansion joints
CN210087340U (en) High-speed railway tunnel detects and maintenance platform truck
CN207212401U (en) Temporary track fixed system in a kind of tunnel
CN207277104U (en) A kind of easy assembling type shield trolley composite sleeper
CN205775658U (en) Bracket sleeper is landed for shield-tunneling construction
CN214087695U (en) General Z shaped steel structure tanker aircraft kerve support
CN215856962U (en) Prefabricated part for tunnel sleeper construction
CN209654041U (en) A kind of disintegration shield machine suitable for the confined space
CN209741579U (en) No pillow formula ballastless track bed protects wheel rail support installation mould
CN204959578U (en) PC track roof beam
CN106245471A (en) A kind of light-duty sleeper of rapid-assembling/disassembling and using method thereof
CN105804449A (en) Stability component for train cleaning and manufacturing method thereof
CN213086483U (en) Simple train sleeper assembly for tunnel construction
CN209007025U (en) A kind of TBM tears machine workbench open

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191018

Termination date: 20211130