CN104259065B - Electron plate automatic spraying production line and production method - Google Patents
Electron plate automatic spraying production line and production method Download PDFInfo
- Publication number
- CN104259065B CN104259065B CN201410485687.2A CN201410485687A CN104259065B CN 104259065 B CN104259065 B CN 104259065B CN 201410485687 A CN201410485687 A CN 201410485687A CN 104259065 B CN104259065 B CN 104259065B
- Authority
- CN
- China
- Prior art keywords
- electron plate
- spraying
- plate
- sprayed
- electron
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Application Of Or Painting With Fluid Materials (AREA)
Abstract
The present invention discloses a kind of electron plate automatic spraying production line and production method, and the production line includes connecting gear, and upper panel assembly, panel turnover device, spray equipment, solidification furnace apparatus and the board descending device being sequentially connected by the connecting gear;The upper panel assembly is arranged on the connecting gear foremost, for automatic upper electron plate;The board descending device is arranged at the connecting gear least significant end, for automatic lower electron plate;The panel turnover device is arranged between panel assembly and spray equipment, for overturning electron plate;And the first spraying testing agency is installed on the panel turnover device, the spraying situation for detecting electron plate.The automatic upper plate lower plate of production line that the present invention is provided, lifts automaticity, reduces handwork amount;Production line automatic panel-turnover, automatic cycle, improve production efficiency.
Description
Technical field
The present invention relates to circuit board spraying technology field, more particularly to a kind of electron plate automatic spraying production line and producer
Method.
Background technology
Traditional circuit board spraying production operation flow process mode is as follows, artificial first electron plate loading tool and from putting plate work
Make platform feeding flush coater, spraying operation is carried out to electron plate one side using flush coater, the plate after spraying is then flowed into curing oven
Carry out the plate after surface drying solidification-solidification and flow out to receipts plate workbench, plate is unloaded from tool finally by manual type.This
Kind operating type is in the field of business is generally used, and its wire body is simple, and floor space is small.But there is also following shortcoming:Automation
Low degree, the dependence to operating personnel is big;Turn line frequently, complex procedures, low production efficiency;Production environment is poor, wire body sealing
Property inadequate waste gas can distribute to workshop, receive that plate personnel are excessively near apart from curing oven, environment temperature is high, smell weight, harmful.
The content of the invention
Based on this, poor to solve the problems, such as the low low production efficiency of above-mentioned automaticity and production environment, the present invention is carried
Go out a kind of electron plate automatic spraying production line and production method.
A kind of electron plate automatic spraying production line, its technical scheme is as follows:
A kind of electron plate automatic spraying production line, including connecting gear, and be sequentially connected by the connecting gear
Upper panel assembly, panel turnover device, spray equipment, solidification furnace apparatus and board descending device;The upper panel assembly is arranged on the conveyer
Structure foremost, electron plate is gone up for automatic;The board descending device is arranged at the connecting gear least significant end, for automatic lower electronics
Plate;The panel turnover device is arranged between panel assembly and spray equipment, for overturning electron plate;And installed on the panel turnover device
There is the first spraying testing agency, the spraying situation for detecting electron plate.
By upper panel assembly and the automatic upper plate of board descending device and lower plate, electricity is transported by connecting gear in whole production process
Daughter board, it is not necessary to a dead lift electron plate, saves artificial, improves operating efficiency.And, by setting panel turnover device, and
First is set on panel turnover device and sprays testing agency, the spraying situation of electron plate can be detected before spraying, and (i.e. whether electron plate
There is one side to spray, or two sides does not all spray), so as to decide whether that turnover panel is sprayed, prevent electron plate quilt
Repeat to spray, influence product quality, automatic detection and automatic panel-turnover are carried out additionally by machinery equipment, it is not necessary to it is artificial check and
Artificial turnover panel, improves operating efficiency, without depending on operating personnel unduly.
Its further technical scheme is illustrated below:
Preferably, the first translating device, the first translation dress are provided between the solidification furnace apparatus and board descending device
Put and be connected between upper panel assembly and panel turnover device by the connecting gear;And the second spray is installed on first translating device
Apply testing agency, the spraying situation for detecting electron plate.Testing agency is sprayed by setting second, to spray coated electron plate
Secondary detection is carried out, (i.e. whether two sides has sprayed electron plate the spraying situation of detection electron plate, or only simultaneously carries out
Spraying), it is so as to decide whether that supplement spraying is carried out to electron plate or directly that electron plate is offline.Also, by first
Production line is connected into loop structure by translating device and connecting gear, to the electronics that only one side spraying or two sides do not spray
Plate carries out spraying detection and sprays again, completes just offline until electron plate two sides sprays.Equally, this process is without manually entering
Row checks and artificial offline (or manually turning line) that detection process is carried out automatically by equipment, and electron plate is offline or turns line process
Carried out automatically by equipment, without manually carrying out, greatly improve production efficiency.
Preferably, the first spraying testing agency and the second spraying testing agency include fluorescence detector.Lead to
Cross fluorescence detector to detect the spraying situation of electron plate, that is, detect whether electron plate has one side to spray or two sides has been sprayed
The situation that painting or two sides do not spray.
Preferably, the electron plate automatic spraying production line takes the shape of the letter U arrangement, and the U-shaped crossover position is provided with second
Translating device, second translating device is used for transition connection spray equipment and solidification furnace apparatus;The upper panel assembly and lower plate
Device is separately positioned on two end positions of U-shaped, and upper panel assembly and board descending device are mutually aligned.The is set in intermediate location
Electron plate can be transported to different directions up by two translating devices, be such as transported to from straight line vertical with this straight line
Another straight line on, just can connect whole production line by setting multiple simple inline conveyor structures.Make production line pair
Claim arrangement and characteristics of compact layout, feeding and blanking are convenient and simple, moreover it is possible to reduce floor space, save hall space.
Preferably, the spray equipment and solidification furnace apparatus peripheral hardware are equipped with protective cover, and are connected with the protective cover
Blast pipe.During spraying and baking-curing, parcel setting is carried out to spray equipment and solidification furnace apparatus using protective cover,
The waste gas produced in production is not discharged in working environment, and waste gas is discharged to outside working environment by blast pipe is located
Reason, in order to avoid adverse effect is produced to human body and pollution is produced to environment.
Preferably, electron plate information reading mechanism is provided with the spray equipment.Read by setting electron plate information
Mechanism is taken, electron plate information can be automatically read, the species of electron plate is recognized, so as to call different sprays according to the species of electron plate
Painting program, carries out corresponding spraying operation, meets different spraying demands, without carrying out turning line operation, there is provided operating efficiency.
A kind of electron plate sprays production method automatically, comprises the following steps:
S110, it is automatic electron plate is served into line, and detect that electron plate sprays situation;
If S120, detecting electron plate two sides and being sprayed, directly electron plate is sent to and is sprayed;
If detecting electron plate one side to have sprayed and another side is not sprayed, automatically by electron plate turn-over, and by electronics
Plate is sent to and the one side that the electron plate is not sprayed is sprayed;
S130, the electron plate that will have been sprayed are sent to and are toasted, and baked electron plate are sent offline, are received automatically
Plate.
Preferably, before step S120 also includes spraying electron plate, first electron plate is identified, then basis
The type information of electron plate calls spray procedure to be sprayed automatically.
Preferably, step S130 such as detects electron plate two sides equal also including being detected to the electron plate after baking
Spraying is completed, is then directly sent electron plate offline;Such as detect electron plate and only complete one side spraying, then electron plate is transported to and turned over
At panel assembly, step S110 is returned to.
Preferably, when also including electron plate is sprayed and toasted in step S120 and step S130, automatically to producing
Raw waste gas is collected treatment.
The present invention has the advantages that:
1st, the automatic upper plate lower plate of production line, lifts automaticity, reduces handwork amount;
2nd, production line automatic panel-turnover, automatic cycle, improve production efficiency;
3rd, electron plate identifying system makes production line to greatly reduce thread-changing frequency, during saving with multiple product operation simultaneously
Between;
4th, spray equipment and solidification furnace apparatus use closed design, improve in-situ production environment.
Brief description of the drawings
Fig. 1 is the block diagram of electron plate automatic spraying production line described in the embodiment of the present invention;
Fig. 2 is the structural representation of electron plate automatic spraying production line described in the embodiment of the present invention;
Fig. 3 is the step of electron plate described in the embodiment of the present invention sprays production method automatically schematic diagram;
Fig. 4 is the schematic flow sheet that electron plate described in the embodiment of the present invention sprays production method automatically.
Description of reference numerals:
100- connecting gears, the upper panel assemblies of 200-, 300- panel turnover devices, the sprayings of 310- first testing agency, 400- sprayings
Device, 410- coating qualities testing agency, 420- electron plate information reading mechanisms, 500- declines door device, 600- second
Translating device, 700- solidification furnace apparatus, the translating devices of 800- first, the sprayings of 810- second testing agency, 900- board descending devices.
Specific embodiment
Embodiments of the invention are described in detail below in conjunction with the accompanying drawings.
As shown in Figure 1 to Figure 2, a kind of electron plate automatic spraying production line, including connecting gear 100, and by transmission
Upper panel assembly 200, panel turnover device 300, spray equipment 400, solidification furnace apparatus 700 and board descending device that mechanism 100 is sequentially connected
900.Upper panel assembly 200 is arranged on connecting gear 100 foremost, for automatic upper electron plate.Board descending device 900 is arranged at transmission
The least significant end of mechanism 100, for automatic lower electron plate.Panel turnover device 300 is arranged between panel assembly 200 and spray equipment 400, is used
In upset electron plate.And the first spraying testing agency 310 is installed on panel turnover device 300, the spraying feelings for detecting electron plate
Condition.
By upper panel assembly 200 and the automatic upper plate of board descending device 900 and lower plate, connecting gear is passed through in whole production process
100 transport electron plate, it is not necessary to a dead lift electron plate, save artificial, improve operating efficiency.And, by setting turnover panel
Device 300, and the first spraying testing agency 310 is set on panel turnover device 300, the spraying of electron plate can be detected before spraying
Situation (i.e. whether electron plate has one side to spray, or two sides does not all spray), so as to decide whether that turnover panel is carried out
Spraying, prevent electron plate repeatedly sprayed or drain spray apply, influence product quality, additionally by machinery equipment carry out automatic detection and
Automatic panel-turnover, it is not necessary to it is artificial check with artificial turnover panel, operating efficiency is improve, without depending on operating personnel unduly.
And, the first translating device 800, the first translation dress are provided between solidification furnace apparatus 700 and board descending device 900
Put 800 to be connected between panel assembly 200 and panel turnover device 300 by connecting gear 100, so as to form a production for circulation
Line, i.e., connect into loop structure by the first translating device 800 and connecting gear by production line, to only one side spraying or two
The electron plate that face does not spray carries out spraying detection and sprays again, completes just offline until electron plate two sides sprays.And, first
Second spraying testing agency 810 is installed, the spraying situation for detecting electron plate on translating device 800.By setting second
Spraying testing agency 810, secondary detection is carried out to spray coated electron plate, and (i.e. electron plate is the spraying situation of detection electron plate
No two sides has been sprayed, or is only simultaneously sprayed, or two sides is sprayed), so as to decide whether
Supplement spraying is carried out to electron plate, or it is directly that electron plate is offline.Also, this process is without manually carry out checking and manually
Offline (or manually turning line), detection process is carried out automatically by equipment, and electron plate is offline or to turn line process automatic also by equipment
Carry out, without manually carrying out, greatly improve production efficiency.
The electron plate automatic spraying production line is taken the shape of the letter U arrangement, and the second translating device 600 is provided with U-shaped crossover position,
Second translating device 600 is used for transition connection spray equipment 400 and solidification furnace apparatus 700.It is flat second to be set in intermediate location
Electron plate can be transported to different directions up by moving device 600, be such as transported to from straight line vertical with this straight line
Another straight line on, so just can connect whole production line by setting multiple simple inline conveyor structures, without
The complicated shaped form connecting gear of one whole piece is set.And upper panel assembly 200 and board descending device 900 are separately positioned on the two of U-shaped
Individual end position, and upper panel assembly 200 and board descending device 900 be mutually aligned.Production line is so set to be arranged symmetrically and compact conformation,
Feeding and blanking are convenient and simple, moreover it is possible to reduce floor space, save hall space.Additionally, the production line can also be arranged linearly
Type or other shapes, but relative to U-shaped, floor space is all relatively large, or structure is not compact simple enough.
In the present embodiment, upper panel assembly 200, panel turnover device 300 and spray equipment 400 are arranged on straight line formula
On first connecting gear, and solidify furnace apparatus 700, board descending device 900 and be arranged on another the second linear connecting gear,
Two connecting gear 100 is parallel to each other.For the ease of electron plate is transferred on two connecting gears 100, in U-shaped production
The second translating device 600 is provided with the link position of line, second translating device 600 respectively with the first connecting gear and second
Connecting gear is mutually perpendicular to, and is easy to be transferred to the electron plate on the first connecting gear on the second connecting gear.And, second
Between board descending device 900 and solidification furnace apparatus 700 on connecting gear, there is provided the first translating device 800, first translation
Device 800 is connected between the upper panel assembly 200 of the first connecting gear and panel turnover device 300, for by the second connecting gear
Electron plate be transferred on the first connecting gear.
More specifically, the first above-mentioned spraying testing agency 810 of spraying testing agency 310 and second includes fluoroscopic examination
Device.The spraying situation of electron plate is detected by fluorescence detector, that is, detects whether electron plate has one side to spray or two sides
Spray or situation that two sides does not spray, so as to decide whether to proceed spraying to electron plate, or directly general
Electron plate transports offline.
And, electron plate information reading mechanism 420 is additionally provided with spray equipment 400.Before being sprayed, first pass through
Electron plate information reading mechanism 420 is set, electron plate information can be automatically read, the species of electron plate is recognized, and according to electron plate
Species call different spray procedures, carry out corresponding spraying operation, meet different spraying demands, make without turn line
Industry, improves operating efficiency.In the present embodiment, electron plate information reading mechanism 420 can be bar code scan mechanism, by scanning electricity
Bar code information on daughter board confirms electron plate model, to call corresponding spray procedure to be sprayed.
In addition, coating quality testing agency 410 is additionally provided with behind spray equipment 400, the coating quality detection machine
Structure 410 is ultraviolet light check machine, and the spraying effect to electron plate is detected, to detect the coating quality quality of electron plate.
Protective cover (not shown) is provided with outside spray equipment 400 and solidification furnace apparatus 700, i.e., is carried out in electron plate
Panel turnover device 300, until electron plate is carried out in the range of solidification furnace apparatus 700, all uses protective cover into spray equipment 400
Carry out cover to set, and multiple blast pipe (not shown)s are connected with the protective cover.During spraying and baking-curing, profit
Parcel setting is carried out to spray equipment 400 and solidification furnace apparatus 700 with protective cover, the waste gas produced in production is not discharged to
In working environment, but waste gas is discharged to outside working environment by blast pipe is processed, in order to avoid adverse effect is produced to human body
Pollution is produced with to environment.
And, decline door device is provided between the translating device 600 of coating quality testing agency 410 and second
500, by the decline door device 500, the protective cover that can be closed opens a part, is easy to spray equipment 400 and solid
Change furnace apparatus 700 to be overhauled or added materials.
Correspondingly, as shown in Figure 3 to Figure 4, the present invention also proposes that a kind of electron plate sprays production method automatically, including as follows
Step:
S110, it is automatic electron plate is served into line, and detect that electron plate sprays situation.I.e. will by upper panel assembly 200 automatically
Electron plate is sent on the connecting gear 100 of straight line formula, and electron plate is sent into panel turnover device by the connecting gear 100
At 300, the spraying situation of electron plate is detected using the first spraying testing agency 310 set on panel turnover device 300;
If S120, detecting electron plate two sides and being sprayed, directly electron plate is sent to and is sprayed.I.e. first spray
Apply testing agency 310 to detect electron plate two sides, such as detect the not spray coated three-proofing coating in two sides of the electron plate, then will
The electron plate is sprayed in being directly sent to spray equipment 400 by connecting gear 100;
If detecting electron plate one side to have sprayed and another side is not sprayed, automatically by electron plate turn-over, and by electronics
Plate is sent to and the one side that the electron plate is not sprayed is sprayed.I.e. first spraying testing agency 310 examines to electron plate two sides
Survey, such as detecting the electron plate has one side spray coated three-proofing coating, and its another side does not have spray coated three-proofing coating, then by turning over
Panel assembly 300 overturns the electron plate, make the electron plate it is not spray coated one facing to spraying direction, and utilize connecting gear
100 are sent in spray equipment 400 electron plate, the one side spraying three-proofing coating sprayed to the electron plate;
S130, the electron plate that will have been sprayed are sent to and are toasted, and baked electron plate are sent offline, are received automatically
Plate.By the electron plate of the spray coated three-proofing coating of spray equipment 400, using connecting gear 100 along linear transmission, it is sent to U-shaped and turns
At angle, electron plate is turned to using the second translating device 600 is sent on another linear connecting gear 100, and transported
Baking-curing is carried out in solidification furnace apparatus 700, it is baked that electron plate is just carried out solidification furnace apparatus 700 along straight line afterwards.
Further, before step S120 also includes spraying electron plate, first electron plate is identified, then basis
The type information of electron plate calls spray procedure to be sprayed automatically.The electricity being identified by setting spray equipment 400 herein
Daughter board information reading mechanism 420 is realized, i.e., before being sprayed to electron plate by spray equipment 400, first to utilize bar code
Sweep mechanism is scanned to the bar code information on electron plate, to obtain the type information of electron plate, so that spray equipment 400
Calling corresponding spray procedure carries out spray treatment.
And, step S130 also includes detecting the electron plate after baking, such as detects electron plate two sides and completes
Spraying, then directly send electron plate offline;Such as detect electron plate and only complete one side spraying, then electron plate is transported to turnover panel dress
Put at 300, return to step S110.Detection herein sprays testing agency by be arranged on the first translating device 800 second
810 are carried out, the spraying situation of three-proofing coating on detection electron plate.And the first translating device 800 has been connected with panel turnover device 300
Come, constitute a circulatory system, detection spraying can be carried out to the not spray coated face of electron plate always, until the two sides of the electron plate
Spraying is completed, and just exits the circulatory system, offline by automatic board descending device.The electronics i.e. after solidification furnace apparatus 700 are toasted
Plate is transported on the first translating device 800, and the second spraying testing agency 810 will carry out spraying situation inspection to the electron plate
Survey, if the two sides of the electron plate has sprayed completion, under directly the electron plate is sent to automatically by connecting gear 100
At panel assembly 900, automatic board descending;There is at least one side not spray three-proofing coating if detecting the electron plate, by first
Translating device 800, the electron plate on a connecting gear 100 where being located at solidification furnace apparatus 700, is sent to panel turnover device
On a connecting gear 100 where 300, and detection spraying, repetitive cycling are carried out to the electron plate.
In addition, when also including electron plate is sprayed and toasted in step S120 and step S130, automatically to generation
Waste gas is collected treatment.This is collected waste gas and is realized by protective cover and blast pipe, will gas sampling in protective cover, and
The waste gas in protective cover is discharged to outside working environment by blast pipe is processed, it is to avoid working environment is polluted, shadow
Ring the health of operating personnel.
Embodiment described above only expresses specific embodiment of the invention, and its description is more specific and detailed, but simultaneously
Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art
For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to guarantor of the invention
Shield scope.
Claims (8)
1. a kind of electron plate automatic spraying production line, it is characterised in that including connecting gear, and by the connecting gear according to
The upper panel assembly of secondary connection, panel turnover device, spray equipment, solidification furnace apparatus and board descending device;The upper panel assembly is arranged on institute
State connecting gear foremost;The board descending device is arranged at the connecting gear least significant end;
The panel turnover device is arranged between panel assembly and spray equipment, for overturning electron plate;And pacify on the panel turnover device
Equipped with the first spraying testing agency, the spraying situation for detecting electron plate;
The first translating device is provided between the solidification furnace apparatus and board descending device, first translating device is by the transmission
Mechanism is connected between panel assembly and panel turnover device;And the second spraying testing agency is installed on first translating device, use
In the spraying situation of detection electron plate.
2. electron plate automatic spraying production line according to claim 1, it is characterised in that the first spraying testing agency
Include fluorescence detector with the second spraying testing agency.
3. electron plate automatic spraying production line according to claim 1, it is characterised in that the electron plate sprays life automatically
Producing line is taken the shape of the letter U arrangement, and the U-shaped crossover position is provided with the second translating device, and second translating device is connected for transition
Spray equipment and solidification furnace apparatus;
The upper panel assembly and board descending device are separately positioned on two end positions of U-shaped, and upper panel assembly and board descending device phase
Mutually alignment.
4. the electron plate automatic spraying production line according to claim 1-3 any one, it is characterised in that the spraying dress
Put and solidify furnace apparatus peripheral hardware and be equipped with protective cover, and the blast pipe being connected with the protective cover.
5. the electron plate automatic spraying production line according to claim 1-3 any one, it is characterised in that the spraying dress
Put and be provided with electron plate information reading mechanism.
6. a kind of electron plate sprays production method automatically, it is characterised in that comprise the following steps:
S110, it is automatic electron plate is served into line, and detect that electron plate sprays situation;
If S120, detecting electron plate two sides and being sprayed, directly electron plate is sent to and is sprayed;
If detecting electron plate one side to have sprayed and another side is not sprayed, automatically by electron plate turn-over, and electron plate is sent
Go to spray the one side that the electron plate is not sprayed;
S130, the electron plate that will have been sprayed are sent to and are toasted, and baked electron plate are sent offline, and receipts plate is carried out automatically:Step
Rapid S130 also includes detecting the electron plate after baking, such as detects electron plate two sides and complete spraying, then directly by electricity
Daughter board send offline;
Such as detect electron plate and only complete one side spraying, then electron plate is transported at panel turnover device, return to step S110.
7. electron plate according to claim 6 sprays production method automatically, it is characterised in that step S120 also includes to electricity
Before daughter board is sprayed, first electron plate is identified, then the type information according to electron plate calls spray procedure to enter automatically
Row spraying.
8. the electron plate according to claim 6-7 any one sprays production method automatically, it is characterised in that step S120
During with also including electron plate is sprayed and toasted in step S130, treatment is collected to the waste gas for producing automatically.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410485687.2A CN104259065B (en) | 2014-09-22 | 2014-09-22 | Electron plate automatic spraying production line and production method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410485687.2A CN104259065B (en) | 2014-09-22 | 2014-09-22 | Electron plate automatic spraying production line and production method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104259065A CN104259065A (en) | 2015-01-07 |
CN104259065B true CN104259065B (en) | 2017-06-09 |
Family
ID=52150712
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410485687.2A Active CN104259065B (en) | 2014-09-22 | 2014-09-22 | Electron plate automatic spraying production line and production method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104259065B (en) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106824643B (en) * | 2016-12-23 | 2023-05-09 | 江西拓又达科技集团有限公司 | Spraying equipment and spraying method for six-degree-of-freedom robot |
CN107774510A (en) * | 2017-11-20 | 2018-03-09 | 上海斐讯数据通信技术有限公司 | A kind of circuit board and shell seamless glue injection equipment and method |
CN108580198A (en) * | 2018-05-22 | 2018-09-28 | 麦格纳电子(张家港)有限公司 | A kind of dual coating technique of circuit board |
CN109107847B (en) * | 2018-10-19 | 2024-04-12 | 宁波均普智能制造股份有限公司 | Oiling control method of oiling device of automobile window guide frame |
CN109876962A (en) * | 2019-03-26 | 2019-06-14 | 上海浩韵化妆品有限公司 | A kind of lipstick equipment for spraying |
CN112156918A (en) * | 2019-06-16 | 2021-01-01 | 苏州曼柯精密部件有限公司 | Auto-parts spraying line |
CN110342773A (en) * | 2019-07-09 | 2019-10-18 | 上海砼领建筑科技有限公司 | A kind of mud waste pulp drying production line |
CN110543714B (en) * | 2019-08-28 | 2023-07-28 | 珠海格力智能装备有限公司 | Circuit board glue spraying control method and device, storage medium and electronic equipment |
CN110860435B (en) * | 2019-12-05 | 2021-11-12 | 重庆市佳禾家具制造有限公司 | Furniture painting leveling production control system |
CN113856958B (en) * | 2021-11-11 | 2022-11-15 | 中国航发沈阳黎明航空发动机有限责任公司 | Automatic spraying production line and spraying process for titanium alloy thermal forming protective coating |
CN115025949A (en) * | 2022-05-23 | 2022-09-09 | 中国电子科技集团公司第十研究所 | Local spraying method of printed circuit assembly silicone conformal coating |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102139260B (en) * | 2011-01-13 | 2014-02-05 | 株洲时代新材料科技股份有限公司 | Method and device for automatically detecting coating of glue sprayer |
US8727233B2 (en) * | 2011-10-17 | 2014-05-20 | Champion Power Equipment, Inc. | Pressure spray washer and control |
CN103108493B (en) * | 2013-02-25 | 2016-01-20 | 上海夏普电器有限公司 | A kind of Moistureproof treatment method of electronic circuit board |
-
2014
- 2014-09-22 CN CN201410485687.2A patent/CN104259065B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104259065A (en) | 2015-01-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104259065B (en) | Electron plate automatic spraying production line and production method | |
CN205096417U (en) | Automatic unloader that goes up of steel pipe punching press | |
CN106216990B (en) | A kind of pcb board fully automated assembly line and its production technology | |
CN203688705U (en) | Automatic one-with-two test line with screening function | |
CN203699249U (en) | Double-track NG/OK automatic plate collecting machine | |
CN109794446A (en) | A kind of overlay film detection device | |
CN105817365B (en) | Flash baking quantifies honeycomb substrate catalyst coating equipment entirely | |
CN107878797A (en) | The auto arrangement recrater and its implementation of a kind of press-molding | |
CN106891153A (en) | A kind of door cover plate pre-assembled machine | |
CN206030314U (en) | Novel automatic size reducing machine of bush | |
CN101494183B (en) | Panel detection device and panel detection method | |
CN201464135U (en) | Fully automatic leakage detection device of air cylinder heads of motorcycle | |
CN110394651A (en) | Elevator hook, which presses, assembles device, production line and technique | |
CN105911457A (en) | Method for realizing ICT and FCT multi-machine parallel test | |
CN209363049U (en) | A kind of wheel hub air-leakage test is with allocating device | |
CN205506428U (en) | Cylinder line transmission system of assembly pig body in hot laboratory cave | |
CN209127641U (en) | A kind of glass automatic sorting transportation system | |
CN206689054U (en) | Brake general assembly vision detection system | |
CN206824951U (en) | A kind of door cover plate pre-assembled machine | |
CN204432829U (en) | Vehicle module automatic production line | |
CN207642805U (en) | A kind of carrying mechanism adding slider cylinder by vacuum cup | |
CN115367409A (en) | Novel test device | |
CN205474311U (en) | Complete quantitative coating equipment of fast drying | |
CN205258320U (en) | Vacuum glass auxiliary production line | |
CN106379022A (en) | Novel double-decorative panel production equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: Nanxiang three road, Science City high tech Industrial Development Zone, Guangzhou city of Guangdong Province, No. 2 510660 Patentee after: Hitachi building technologies (Guangzhou) Co. Ltd. Address before: Nanxiang Road three Guangzhou Science City 510660 high tech Industrial Development Zone, Guangdong city of Guangzhou province No. 2 Patentee before: Guangzhou Ropente Science and Technology Development Co., Ltd. |
|
CP03 | Change of name, title or address |