CN104250970A - Novel visual intelligent super-fluid cast-in-place concrete pile device and construction method - Google Patents

Novel visual intelligent super-fluid cast-in-place concrete pile device and construction method Download PDF

Info

Publication number
CN104250970A
CN104250970A CN201310261488.9A CN201310261488A CN104250970A CN 104250970 A CN104250970 A CN 104250970A CN 201310261488 A CN201310261488 A CN 201310261488A CN 104250970 A CN104250970 A CN 104250970A
Authority
CN
China
Prior art keywords
concrete
novel visual
construction method
pump truck
drill bit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310261488.9A
Other languages
Chinese (zh)
Inventor
谢晓东
周玉石
谢益飞
赵伟明
黄立伟
鲍国强
汤武
张群
邢克伦
施问知
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai City Ground Ground Design Co Ltd
SHANGHAI CHENGDI CONSTRUCTION CO Ltd
Original Assignee
Shanghai City Ground Ground Design Co Ltd
SHANGHAI CHENGDI CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai City Ground Ground Design Co Ltd, SHANGHAI CHENGDI CONSTRUCTION CO Ltd filed Critical Shanghai City Ground Ground Design Co Ltd
Priority to CN201310261488.9A priority Critical patent/CN104250970A/en
Publication of CN104250970A publication Critical patent/CN104250970A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to a novel visual intelligent super-fluid cast-in-place concrete pile device and a construction method. The novel visual intelligent super-fluid cast-in-place concrete pile device comprises a walking and crawler type main machine, a winding machine, a guide rod, a steel wire rope, a feed inlet, a power head, a gearbox, a speed reducer, a spiral drill rod, a drill bit, a feed outlet, a pump truck guide pipe, a concrete pump truck, a flow meter and a depth sensor, wherein the winding machine and the guide rod are fixedly arranged on the main machine, the power head is connected with a pulley arranged at the top end of the guide rod through the steel wire rope, the steel wire rope drives the power head to ascend and descend, the power head is sequentially connected with the spiral drill rod through the gearbox and the speed reducer, the lower end of the spiral drill rod is connected with the drill bit, the feed outlet is formed in the drill bit and is provided with an iron sheet, the iron sheet is fixed by a bolt, the concrete pump truck is connected with the feed inlet through the pump truck guide pipe, and the pump truck guide pipe is provided with the flow meter. The invention also provides the construction method of a novel visual intelligent super-fluid cast-in-place concrete pile. The construction method comprises the steps of firstly, drilling to a design depth by a long spiral drilling machine; then, forwards rotating or directly lifting the drill rod; continuously infusing super-fluid concrete in a hole through a drill bit valve while pulling out the drill rod; finally, inserting a steel reinforcement cage after pulling out the drill rod. Compared with the prior art, the novel visual intelligent super-fluid cast-in-place concrete pile device and the construction method, provided by the invention, have the advantages that no noise or vibration is generated, a soil compaction performance is not generated, intelligentization is realized, the quality is ensured, the cost is reduced, the construction period is shortened, and the like.

Description

A kind of Novel visual intelligence super flowing concrete drill hole grouting pile device and construction method
Technical field
The present invention relates to a kind of Novel visual intelligence super flowing concrete drill hole grouting pile device and construction method, be mainly used in the bracing of foundation pit gear soil in civilian and industrial infrastructure construction and agent structure vertical applied force.
Background technology
The concrete filling pile construction method of current routine has the castinplace pile etc. of the castinplace pile of dry operation pore-forming, the castinplace pile of mud off pore-forming, the castinplace pile of casing pipe hole forming and explosive expansion pore-forming
The construction process of bored concrete pile flow process of dry operation pore-forming: sediment → hole quality at the bottom of land clearing → surveying setting-out fixed pile → pile-forming machine perching → boring extracting soil pore-forming → cleaning hole is inspected for acceptance → install reinforcing cage → pouring hole inner concrete.
The castinplace pile of mud armlet pore-forming utilizes mud off, during boring by circulating mud by the native slag tap under bit cutting outer and pore-forming, then install reinforcing cage, underwater concreting and pile.
Casing pipe hole forming castinplace pile utilizes impact pile driving method or vibrosinking, and by with valve type pile shoe or sink in soil with the steel sleeve of precast concrete shoe, then limit is pulled out cover tube edge concrete perfusion and formed.If when being furnished with reinforcing bar, then before fluid concrete, first hang cage of reinforcement.Utilize hammer piling equipment immersed tube, tube drawing, be called hammer hidden pipe caisson pile; Utilize the vibration sinking tube of vibrator, tube drawing, be called vibrator pipe sinking cast-in-place pile.
Conventional construction process of bored concrete pile is all first put reinforcing cage usually, then concreting.There is waste concrete in current Concrete Grouting Pale, the shortcoming that cost is higher, construction period aspect is also to be improved simultaneously, and construction machinery intelligence degree is not high, many times reinforcedly be all experience according to field personnel and determine, well can not carry out monitoring management.
The original way of guncreting pile is not equipped with visual intelligent system, and pile quality is poor, and pile quality is uncontrollable.
Summary of the invention
The object of the present invention is to provide a kind of have noiselessness, friction, without soil compaction, intellectuality, guarantee the quality, cost declining, the Novel visual of contracting duration intelligence super flowing concrete drill hole grouting pile device and construction method.
A kind of Novel visual intelligence super flowing concrete drill hole grouting pile device, this device comprises walking and crawler type main frame, hoist engine, guide rod, wire rope, charging aperture, unit head, gearbox, reductor, auger stem, drill bit, discharging opening, pump truck conduit, concrete mixer, flow instrument, depth sensing instrument, described hoist engine and guide rod are fixed on main frame, described unit head connects guide rod top pulley by wire rope, wire rope drives unit head oscilaltion, described unit head is connected auger stem by gearbox with reductor successively, auger stem lower end connects drill bit, drill bit is provided with discharging opening, described discharging opening is provided with iron plate, iron plate is bolted, described concrete mixer is by pump truck tubes connection charging aperture, pump truck conduit is provided with flow instrument.
Described pump truck conduit is provided with flow instrument, and embedded depth sensing instrument is equipped with at described guide rod and unit head upper and lower slide rail place, and flow instrument and depth sensing instrument are all connected on the integrated computer of main frame driver's cabin.
A construction method for Novel visual intelligence super flowing concrete drill hole grouting pile, its method comprises the following steps: smooth location → stake position setting-out → Installation and Debugging rig (installation steel pile casting) → debugging concrete pump, pump line → driller insertion → lifting reinforcing cage is installed, vibrating hammer → hole to projected depth stops creeping into → infusion Superfluid state concrete limit, limit promotes drilling rod → proposition drilling rod, removes drilling tool → Vibration on Start-up hammer into shape under slotting reinforcing cage to design elevation → pile → Stake head handling → stake top safeguard measure.
Described Superfluid state concrete is the concrete of the slump at 16cm ~ 26cm.
Described injection Superfluid state concrete can carry out automatic gauge.
Inserting reinforcing cage under described vibrating hammer adopts high-frequency hydraulic vibration to insert.
The invention has the advantages that:
1, the construction technology of more traditional castinplace pile, the present invention bores under adopting auger stem and carries soil, and promote auger stem and pour into Superfluid state concrete by the hollow part pressure of drilling rod simultaneously, shorten the engineering time, efficiency of construction is higher;
2, traditional handicraft coagulation soil pressure filling amount and drilling down and up, does not install flow instrument and depth sensing instrument, and construction is complete has now installed corresponding computer sensing instrument by rule of thumb, reach directly perceived, effectively, the requirement of automation, ensure that quality.
3, the present invention inserts reinforcing cage and adopts high-frequency hydraulic vibration hammer, has velocity of vibration fast, the features such as seismic wave is little;
4, the present invention can one-step pore-creating, Superfluid state concrete technology easy understand.
Accompanying drawing explanation
Fig. 1 is apparatus of the present invention Novel visual intelligence super flowing concrete drill hole grouting pile mechanical device schematic diagram;
Fig. 2-Fig. 5 is the working drawing of Novel visual of the present invention intelligence super flowing concrete drill hole grouting pile 6 different phases.
Fig. 6 is Novel visual of the present invention intelligence super flowing concrete drill hole grouting pile backstage display instrument display interface.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described in detail.
Embodiment:
As shown in Figure 1, a kind of Novel visual intelligence super flowing concrete drill hole grouting pile device, this device comprises walking and crawler type main frame 1, hoist engine 2, guide rod 3, wire rope 4, charging aperture 5, unit head 6, gearbox 7, reductor 8, auger stem 9, drill bit 10, discharging opening 11, pump truck conduit 12, concrete mixer 13, flow instrument 14, depth sensing instrument 15, described hoist engine 2 and guide rod 3 are fixed on main frame 1, described unit head 6 connects guide rod top pulley by wire rope 4, wire rope 4 drives unit head 6 oscilaltion, described unit head 6 is connected auger stem 9 by gearbox 7 with reductor 8 successively, auger stem 9 lower end connects drill bit 10, drill bit 10 is provided with discharging opening 11, described discharging opening 11 is provided with iron plate, iron plate is bolted, described concrete mixer 13 connects charging aperture 5 by pump truck conduit 12, pump truck conduit 12 is provided with flow instrument 14.
Described pump truck conduit is provided with flow instrument, at guide rod and unit head upper and lower slide rail place, embedded depth sensing instrument is housed, and flow instrument and depth sensing instrument are all connected on the integrated computer of main frame driver's cabin, the stake footpath of display different depth, every meter of descending depth, every meter of filling concrete amount, total filling concrete amount and total mixing time.
The construction method of Novel visual intelligence super flowing concrete drill hole grouting pile: smooth location → stake position setting-out → Installation and Debugging rig (installation steel pile casting) → debugging concrete pump, pump line → driller insertion → lifting reinforcing cage is installed, vibrating hammer → hole to projected depth stops creeping into → infusion Superfluid state concrete limit, limit promotes drilling rod → proposition drilling rod, removes drilling tool → Vibration on Start-up hammer into shape under slotting reinforcing cage to design elevation → pile → Stake head handling → stake top safeguard measure.
Described Superfluid state concrete is the concrete of the slump at 16cm ~ 26cm.
Described injection Superfluid state concrete can carry out automatic gauge, and data can store printable.
Inserting reinforcing cage under described vibrating hammer adopts high-frequency hydraulic vibration to insert.

Claims (6)

1. a Novel visual intelligence super flowing concrete drill hole grouting pile device, this device comprises walking and crawler type main frame, hoist engine, guide rod, wire rope, charging aperture, unit head, gearbox, reductor, auger stem, drill bit, discharging opening, pump truck conduit, concrete mixer, flow instrument, depth sensing instrument, described hoist engine and guide rod are fixed on main frame, described unit head connects guide rod top pulley by wire rope, wire rope drives unit head oscilaltion, described unit head is connected auger stem by gearbox with reductor successively, auger stem lower end connects drill bit, drill bit is provided with discharging opening, described discharging opening is provided with iron plate, iron plate is bolted, described concrete mixer is by pump truck tubes connection charging aperture, pump truck conduit is provided with flow instrument.
2. a kind of Novel visual intelligence super flowing concrete drill hole grouting pile device according to claim 1, it is characterized in that, described pump truck conduit is provided with flow instrument, embedded depth sensing instrument is equipped with at described guide rod and unit head upper and lower slide rail place, and flow instrument and depth sensing instrument are all connected on the integrated computer of main frame driver's cabin.
3. the construction method of a Novel visual intelligence super flowing concrete drill hole grouting pile; it is characterized in that, described method comprises the following steps: smooth location → stake position setting-out → Installation and Debugging rig (installation steel pile casting) → debugging concrete pump, pump line → driller insertion → lifting reinforcing cage is installed, vibrating hammer → hole to projected depth stops creeping into → infusion Superfluid state concrete limit, limit promotes drilling rod → propositions drilling rod, removes drilling tool → Vibration on Start-up hammer into shape under slotting reinforcing cage to design elevation → pile → Stake head handling → stake top safeguard measure.
4. the construction method of Novel visual intelligence super flowing concrete drill hole grouting pile according to claim 3, it is characterized in that, described Superfluid state concrete is the concrete of the slump at 16cm ~ 26cm.
5. the construction method of Novel visual intelligence super flowing concrete drill hole grouting pile according to claim 3, it is characterized in that, described injection Superfluid state concrete can carry out automatic gauge.
6. the construction method of Novel visual intelligence super flowing concrete drill hole grouting pile according to claim 3, is characterized in that, inserts reinforcing cage and adopt high-frequency hydraulic vibration to insert under described vibrating hammer.
CN201310261488.9A 2013-06-27 2013-06-27 Novel visual intelligent super-fluid cast-in-place concrete pile device and construction method Pending CN104250970A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310261488.9A CN104250970A (en) 2013-06-27 2013-06-27 Novel visual intelligent super-fluid cast-in-place concrete pile device and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310261488.9A CN104250970A (en) 2013-06-27 2013-06-27 Novel visual intelligent super-fluid cast-in-place concrete pile device and construction method

Publications (1)

Publication Number Publication Date
CN104250970A true CN104250970A (en) 2014-12-31

Family

ID=52186203

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310261488.9A Pending CN104250970A (en) 2013-06-27 2013-06-27 Novel visual intelligent super-fluid cast-in-place concrete pile device and construction method

Country Status (1)

Country Link
CN (1) CN104250970A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104674792A (en) * 2015-02-13 2015-06-03 河南三建建设集团有限公司 Pumping-type concrete press-grouting pile lift drill display device
CN104833389A (en) * 2015-05-19 2015-08-12 长沙理工大学 Grouting sealing hole stop grout visual experimental device and experimental method thereof
CN106351214A (en) * 2016-08-29 2017-01-25 中冶沈勘工程技术有限公司 Construction method of long spiral variable diameter concrete pile
CN108018856A (en) * 2017-11-30 2018-05-11 中国冶集团有限公司 A kind of Novel spiral pile-driving machine and its construction method
CN111395346A (en) * 2020-03-19 2020-07-10 广州市建筑科学研究院有限公司 Construction method for pouring concrete into karst cave
CN113174935A (en) * 2021-05-27 2021-07-27 城地建设集团有限公司 Dry-method rotary extrusion-expansion pile forming device and construction method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1089587A (en) * 1993-02-23 1994-07-20 何庆林 Superfluid state concrete and placing pile making method thereof and the used rig of this method
EP1146173A1 (en) * 2000-04-11 2001-10-17 Compagnie Du Sol Apparatus for producing drilled piles
CN2753796Y (en) * 2004-12-29 2006-01-25 雷玉华 Construction machine for long-spiral pressure-poured concrete core-inserting combined pile
KR100553478B1 (en) * 2005-06-14 2006-02-22 (주)진산이엔지 The drilled shaft and its construction method with the application of perforated metal tubing as drilled shaft reinforcement
CN102002941A (en) * 2010-10-21 2011-04-06 李贵堂 Large-aperture long screw rig, reinforcement cage concreting device and fabricating method of large-aperture deep pile
CN102535445A (en) * 2012-02-07 2012-07-04 陕西桩鑫建设工程有限公司 Molding device and molding method for long spiral extruding rock-entering cast-in-place pile
CN102628266A (en) * 2011-12-30 2012-08-08 中铁二局股份有限公司 Construction method of long spiral cast-in-situ bored pile
CN202430710U (en) * 2012-01-17 2012-09-12 上海城地建设发展有限公司 Five-axis concrete mixing pile device
CN203487527U (en) * 2013-06-27 2014-03-19 上海城地建设股份有限公司 Novel visual intelligent extra-liquid concrete cast-in-place pile device

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1089587A (en) * 1993-02-23 1994-07-20 何庆林 Superfluid state concrete and placing pile making method thereof and the used rig of this method
EP1146173A1 (en) * 2000-04-11 2001-10-17 Compagnie Du Sol Apparatus for producing drilled piles
CN2753796Y (en) * 2004-12-29 2006-01-25 雷玉华 Construction machine for long-spiral pressure-poured concrete core-inserting combined pile
KR100553478B1 (en) * 2005-06-14 2006-02-22 (주)진산이엔지 The drilled shaft and its construction method with the application of perforated metal tubing as drilled shaft reinforcement
CN102002941A (en) * 2010-10-21 2011-04-06 李贵堂 Large-aperture long screw rig, reinforcement cage concreting device and fabricating method of large-aperture deep pile
CN102628266A (en) * 2011-12-30 2012-08-08 中铁二局股份有限公司 Construction method of long spiral cast-in-situ bored pile
CN202430710U (en) * 2012-01-17 2012-09-12 上海城地建设发展有限公司 Five-axis concrete mixing pile device
CN102535445A (en) * 2012-02-07 2012-07-04 陕西桩鑫建设工程有限公司 Molding device and molding method for long spiral extruding rock-entering cast-in-place pile
CN203487527U (en) * 2013-06-27 2014-03-19 上海城地建设股份有限公司 Novel visual intelligent extra-liquid concrete cast-in-place pile device

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104674792A (en) * 2015-02-13 2015-06-03 河南三建建设集团有限公司 Pumping-type concrete press-grouting pile lift drill display device
CN104674792B (en) * 2015-02-13 2016-08-17 河南三建建设集团有限公司 A kind of pumped type concrete guncreting pile puies forward brill display device
CN104833389A (en) * 2015-05-19 2015-08-12 长沙理工大学 Grouting sealing hole stop grout visual experimental device and experimental method thereof
CN106351214A (en) * 2016-08-29 2017-01-25 中冶沈勘工程技术有限公司 Construction method of long spiral variable diameter concrete pile
CN108018856A (en) * 2017-11-30 2018-05-11 中国冶集团有限公司 A kind of Novel spiral pile-driving machine and its construction method
CN111395346A (en) * 2020-03-19 2020-07-10 广州市建筑科学研究院有限公司 Construction method for pouring concrete into karst cave
CN113174935A (en) * 2021-05-27 2021-07-27 城地建设集团有限公司 Dry-method rotary extrusion-expansion pile forming device and construction method

Similar Documents

Publication Publication Date Title
CN104250970A (en) Novel visual intelligent super-fluid cast-in-place concrete pile device and construction method
CN101638891B (en) Construction method of all casing precessing isolation pile
CN106400782B (en) A kind of construction method for going along with sb. to guard him hole-drilling interlocking pile using rotary drilling rig construction foundation pit
CN106320333B (en) Combined drainage type water filling pile device and construction method
CN203846485U (en) Long pile percussion drill hole forming construction device
CN104563098B (en) A kind of super-large diameter all steel casing does operation pore-creating filling pile construction method
CN102720186B (en) Underwater once pouring method for variable cross-section bored cast-in-place pile
CN104047542B (en) Embedding rock taper pile impacts drilling pipe hammer system and embedding rock taper pile impacts construction method
CN102383431B (en) Middle pick prestressed centrifugally pile tube pile-sinking device and pile sinking method thereof
CN103924585B (en) The construction method of wind-powered electricity generation socketed pile
CN108166483A (en) Bored pile construction method
CN105780763A (en) Construction method of medium-hole vibrating casing wall protection type long spiral cast-in-situ bored pile
CN101538857A (en) Pile extraction construction method
CN105155519A (en) Rotary-excavating under-reamed bored pile constructing method
CN101982614A (en) Method for drilling rocks into pile by utilizing all casing drill
CN104711975B (en) Construction technology for long spiral cast-in-situ bored pile
CN102808407A (en) Construction method of soft-foundation reinforced concrete cast-in-place pile
CN104975734B (en) Casting machine casing installation method
CN203487527U (en) Novel visual intelligent extra-liquid concrete cast-in-place pile device
CN205444192U (en) Bridge stake is towards pile driving construction system
CN104278680A (en) Envelope structure combining five (six) shaft mixing piles with press grouting piles and construction method
CN202467652U (en) High speed rotary drilling machine
CN104264679A (en) Construction method of tower transmission iron tower foundation large-diameter underwater cast-in-place piles
CN102758434B (en) Middle pick prestressed centrifugally pile tube pile-sinking device and pile sinking method thereof
CN211646351U (en) Cast-in-situ bored pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20141231

WD01 Invention patent application deemed withdrawn after publication