Superfluid state concrete and placing pile making method thereof and the used rig of this method
The present invention puts it briefly and relates to concrete, and engineering construction is used builds piling method and drilling machine for building, specifically relates to a kind of Superfluid state concrete, concrete perfusion pile-making method and cast-in-place concrete pile rig.
The concrete kind that building operation is used is a lot, as normal concrete, pump concrete, chutable concrete or the like.The normal concrete slump is lower.Be about 5-9 centimetre, needing reinforcement to vibrate could be closely knit, combines eakiness with surrounding soil with its dabbling concrete pile, moulds under the mud geologic condition soft, grout spreads loss easily, concrete can automatically shrink, and deep hole can't jolt ramming in addition, phenomenons such as pile body constriction, fracture may occur, particularly in the concrete perfusion pile driving construction, because heavy stone easily sinks, accumulates in the bottom in hole in normal concrete, forms more closely knit structure, can't insert reinforcement cage skeleton.
Though the chutable concrete slump is higher, can reach about 20 centimetres, be convenient to pumping transportation and cast, the quality of the plastic concrete that is similar to slump 5-10 centimetre is arranged again, stone is many, viscosity is little, workability is poor but it contains.In the construction of pouring concrete pile, it is the same with normal concrete, and heavy stone easily sinks, and can not suspend, and more closely knit structure is formed on the bottom that accumulates in the hole, can't insert Steel Reinforcement Cage.In some construction technology, earlier concrete is pressed into the Kong Zhongzhi height in hole that do not collapse, and then puts into Steel Reinforcement Cage, under the situation of top penetration concrete, can form the darker plain concrete pile in bottom again, the reinforced concrete pile that top is short, thereby, the stake of poor quality, intensity is low.
In engineerings such as pile foundation, foundation stabilization, foundation ditch retaining wall, reservoir leak stopping, often adopt reinforced concrete pile or by annotating method such as stake formation underground diaphragm wall.U.S. Pat-No. 2920455 discloses a kind of pile-making method, its technological process is after getting into predetermined depth with spiral drill pipe, drilling rod is allotted on the limit, the limit pressurized air force feed concrete of 6-7 kg/cm, the height in hole does not collapse near the aperture, in the emptying aperture of the top in the hole that do not collapse, put into the reinforcement cage skeleton (because of Steel Reinforcement Cage can't insert dabbling concrete for the first time) that adapts to the emptying aperture degree of depth then, again from top penetration concrete, thereby form the darker plain concrete pile in bottom, the reinforced concrete pile that top is short.The shortcoming of this method is that stake is when soil layer combines on every side, because the scattering and permeating of slurries runs off, contraction with concrete self, can't vibrate in addition, the constriction so that the fracture of pile body may appear, pile peripheral friction force is weakened, and this stake only can do plain concrete pile, Steel Concrete can only be done partial one section.
In " kind and the speciality of stake row formula ground lower wall local method " literary composition of Japan's " basic worker " academic periodical the 8th phase of nineteen eighty-two, introduced the method for the PIP(in-site pouring reinforced concrete mortar pile of perfusion Steel Concrete) and the method for CIP(in-site pouring reinforced concrete pile) worker's method.PIP worker's method be become also carry brill in from the grout outlet that is located at drill bit the pressure with 7 kg/cm extrude slurries, fill with whole hole, put into Steel Reinforcement Cage then, solidify afterwards reinforced concrete mortar post; CIP worker's method is only not have the underground water quicksand to collapse under the good geologic condition in hole fully, after boring proposes drilling rod, in the hole, put into Steel Reinforcement Cage, and put into Grouting Pipe, in pore, fill up pellet, pressure injection grout of pressure with the 6-7 kg/cm reaches the aperture until slurries then, forms reinforced concrete pile.PIP and CIP worker's method, owing to all be the once grouting pile of low pressure, because of the scattering and permeating of slurries runs off, and the gap that can cause the pile body and the soil body of the factors such as contraction in fixed, weaken frictional force and constriction, the problem of broken pile.
The processing step of Chinese patent CN8610070.5 number " bore slurry pressuring pile-forming " is: hole to predetermined depth, carry brill simultaneously by be located at nozzle on the drill bit to hole inner high voltage spray slurries till the height that does not have the hole danger of collapsing, in the hole, put into Steel Reinforcement Cage and Grouting Pipe behind the proposition drilling rod at the bottom of the hole, fill up pellet, mend slurry by Grouting Pipe secondary high-pressure in the hole at last, reach the aperture to slurries.
Though this method has overcome above-mentioned shortcoming of building piling method, pile quality and intensity have been improved, but because of its in the slip casting first time, after the proposition drilling rod is put into Steel Reinforcement Cage, because drill bit is little to the nozzle diameter of hole inner high voltage spray slurries, can only inject grout, can not be used for concrete perfusion, need separately with artificial pellet, the second pulp feeding then thrown in.Thereby its complex technical process, inefficiency, and pellet mix with slurries inhomogeneous, the stake second-rate, intensity is lower, the cost height.
At present, when annotating stake, construction industry generally uses a kind of full screw earth auger, behaviour is simple in vain, easy to use though it has, reliable operation, variable-ratio, drilling efficiency advantages of higher, but this rig can only be finished boring work separately in construction, after needing when annotating stake drilling tool all proposed, grout injection or concrete again, thereby, whole technological process efficient is low, and can't handle the hole that collapses; In construction industry, also use a kind of drilled pressure filling rig, drilled pressure filling rig as above-mentioned Chinese patent CN8610070.5 number " bore slurry pressuring pile-forming " use, the characteristics of this rig are to be provided with nozzle on drill bit, this nozzle is starched sebific duct with thinner soft confession and is linked to each other, though this rig is more superior than long-spiral drilling machine, can handle stake end loosened soil and retaining wall, prevent the hole that collapses, can drift sand arranged, grouting pile-forming under the unfavorable geological conditions such as underground water, but, can only be used to inject thin cement slurry because the nozzle diameter on the drill bit is little, can not be used for concrete perfusion, need after slip casting proposition first time drilling tool is put into Steel Reinforcement Cage, separately with the artificial pellet of throwing in, and then the benefit slurry, thereby, the pile-formation process process is still complicated, inefficiency, and pellet mixes uneven with slurries, the stake second-rate, intensity is lower, the cost height.
It is low to the purpose of this invention is to provide a kind of frictional coefficient, good fluidity, and closely knit automatically, viscosity is big, and workability is good, intensity height, good endurance, the Superfluid state concrete that stone can suspend therein.
Another object of the present invention is to overcome the shortcoming of above-mentioned pile making method, provide a kind of technology simple, cost is low, can underground water arranged, contain quicksand, the collapse method of the high-intensity reinforced concrete pile of high-quality of the efficient down perfusion Superfluid state concretes of unfavorable geological condition such as hole of sandy gravel, silt seam.
A further object of the present invention is to overcome the shortcoming of above-mentioned rig, and what a kind of above-mentioned pile-making method use was provided can be applicable to the twist bit of the concrete perfusion of matter condition variously.
Each purpose of the present invention is to realize by following manner respectively:
A kind of Superfluid state concrete mainly is made up of stone, sand, UWB-1 type flocculation agent or naphthalene water reducer, polyacrylamide and the water of ordinary Portland cement, flyash, particle diameter 0.5-2 centimetre, and each ingredients weight parts proportioning is:
Cement 500-700
Flyash 25-210
Water 210-637
Sand 500-700
Stone 333-1050
UWB-1 type flocculation agent 5.25-27.3 or
Naphthalene water reducer 2.625-45.5
Polyacrylamide 0.053-0.91.
A kind of drill-pouring Superfluid state concrete pile-making method, its processing step is as follows:
1, from the 325-625 ordinary Portland cement, select wherein a kind of according to construction requirement, from UWB-1 type flocculation agent and naphthalene water reducer, select wherein a kind of, according to required concrete total consumption, the ratio of matching each component by following proportioning makes it to reach design requirements, calculates and weigh respectively the weight of each component:
Cement 500-700
Flyash 25-210
Water 210-637
Sand 500-700
The stone 333-1050 of particle diameter 0.5-2.0cm
UWB-1 type flocculation agent 5.25-27.3 or
Naphthalene water reducer 2.625-45.5
Polyacrylamide 0.053-0.91.
Each component is mixed, and mixing and stirring is stand-by under field conditions (factors), makes Superfluid state concrete,
2, hole to predetermined depth with described concrete perfusion rig,
3, when mentioning borer drill rod, injecting water cement ratio by rig core pipe discharge port with the pressure of 1-75 kg/cm is the grout of 0.4-0.8; Its injection rate is the 3-10% of stake pore volume,
4, the limit promotes borer drill rod, and the limit is pressed into described Superfluid state concrete to the position a little more than the hole danger of not collapsing with the pressure of 1-75 kg/cm,
5, propose drilling rod, put into Steel Reinforcement Cage,
6, the described Superfluid state concrete of perfusion is to design height.
A kind of twist bit of concrete perfusion, comprise jacking system, hydraulic power and maneuvering system, chassis and travel mechanism and by unit head, spiral drill, the revolution guidance system that the unearthed device of guiding is formed, described unit head is by electric motor, wheel box is formed, described spiral drill comprises drill bit and drilling rod, drilling rod is by outer tube, composition such as screw-blade and web member, the top of outer tube is meshed with the wheel box driving gear, interior pipe is equipped with in the inside of outer tube, the upper end of interior pipe links to each other with feeder sleeve by diverter, upper part of dental clutch is housed in the outer tube lower end, interior Guan Weike is by concrete rigid pipe, the lower end of interior pipe is shaped on lower part of dental clutch, and described drill bit and dental clutch lower part are fixed together, and has the concrete discharge port on the position of bottom near dental clutch lower part of interior pipe, but being fitted together of described outer tube and interior pipe clutch, described feeder sleeve are the concrete feeding pipe.
The present invention has following advantage:
The Superfluid state concrete frictional coefficient is low, good fluidity, and levelling is closely knit automatically voluntarily, and anti-good dispersity can be from the construction that falls in water, the intensity height, stone can suspend therein, when being used to pour into reinforced concrete pile, can enhance productivity greatly, reduces cost.
Drill-pouring Superfluid state concrete pile-making method technology is simple, and cost is low; Be applicable to various geologic condition, rate of flooding is fast, improves about 50% than the CN8610070.5 bore slurry pressuring pile-forming, the production efficiency height, and the quality of stake is good.
Helical driller for concrete perfusion both can be holed, but again setting-out, mud jacking, pressure concrete, can be under matter condition variously perfusion reinforced concrete pile fast.
" Superfluid state concrete ", " helical driller for concrete perfusion " and " drill-pouring Superfluid state concrete pile-making method " three are one, complement each other, and can form the mechanized construction flow process, reduce concrete transportation, can handle stake end loosened soil and retaining wall, prevent the hole that collapses, improve the quality of pile.
Other advantages of the present invention and details can the embodiment of description can understand by reading hereinafter in conjunction with the accompanying drawings, wherein:
Fig. 1 is a drill-pouring Superfluid state concrete pile-making method operation synoptic diagram of the present invention;
Fig. 1 (1) is operation 2 synoptic diagram that drill-pouring Superfluid state concrete of the present invention is sloughed off a method;
Fig. 1 (2) is operation 3,4 synoptic diagram of drill-pouring Superfluid state concrete pile-making method of the present invention;
Fig. 1 (3,4) is operation 5 synoptic diagram of drill-pouring Superfluid state concrete pile-making method of the present invention;
Fig. 1 (5) is operation 6 synoptic diagram of drill-pouring Superfluid state concrete pile-making method of the present invention;
Fig. 2 is the wheel box of helical driller for concrete perfusion of the present invention and the structural arrangement synoptic diagram of spiral drill;
Fig. 3 is the wheel box of helical driller for concrete perfusion of the present invention and structural arrangement another program synoptic diagram of spiral drill;
Fig. 4 is the partial enlarged drawing of Fig. 2;
Exemplify the formulation Example of 4 Superfluid state concretes of the present invention below in the tabulation mode.
UWB-1 type flocculation agent is a kind of acrylic acid series special additive of concrete under water in the table, is the product of Engineering Technology Inst., China Petroleum ﹠ Natural Gas General Co's (No. 40, the pool, Tanggu District Tianjin, Tianjin City, China highway) development.The SNF-6(naphthalenesulfonate formaldehyde condensation compound) is a kind of naphthalene water reducer, the salient features diminishing, be magnificent enlightening synthetic materials Allied Corp. (US) Law Department P.O. Box 2245R. Morristown, NJ 07960-2245, U.S. (Beijing, Structural Engineering institute of Tsing-Hua University) product of Sheng Chaning, NNO also is a naphthalene water reducer (main component: methylene dinaphthalene sulfonate, salient features and purposes: diminishing, strong, enhancing early, Hong Wei chemical plant, Dalian, Dalian Ganjingzi District).Also can select unshowned naphthalene water reducer in other table for use, compound as UNF-4(main component: UNF-a with Na
2SO
4, salient features: the chemical plant of improving oneself, early strong, Tianjin, iron East Road, storehouse, north, the north suburb, Tianjin district) etc.Water cement ratio=water (kilogram)/(concrete and coal ash) (kilogram), sand coarse aggregate ratio=sand (kilogram)/(sand+stone) (kilogram).
Component (weight) embodiment 1 embodiment 2 embodiment 3 embodiment 4
Cement mark 425 825 425 325
Cement (kilogram) 550 550 527 700
Flyash (kilogram) 100 75 52.7 35
Water cement ratio 0.5 0.53 0.55 0.48
Water (kilogram) 325 305 318 370
Sand coarse aggregate ratio 0.47 0.5 0.5 0.45
Medium sand (kilogram) 553 700
Coarse sand (kilogram) 738 500
Particle diameter 0.5-1.5 centimetre stone (kilogram) 624 610
Particle diameter 0.5-2.0 centimetre stone (kilogram) 738 700
UWB-1 type flocculation agent (kilogram) 13 15.4
Naphthalene water reducer (kilogram) is 7.4 (NNO) 5.8 (SNF-6)
Polyacrylamide (kilogram) 0.325 0.29 0.29 0.385
Wooden calcium sulfonate's (kilogram) 1.3
The span of the UWB-1 type flocculation agent (kilogram) among the embodiment 1 is 6.5-19.5, and the span of polyacrylamide (kilogram) is 0.065-0.65, and the span of wooden calcium sulfonate's (kilogram) is 0.65-1.95.
Wherein, the particle diameter of stone can be defined between 0.5-2 centimetre, and this is for stone can be suspended in the concrete for preparing, and can be by the concrete perfusion rig discharge port of inventor's invention.The purpose that adds UWB-1 type flocculation agent or naphthalene water reducer is to make the concrete for preparing obtain anti-dispersiveness, can be from the construction that fall in water, and levelling is closely knit automatically voluntarily.
The purpose that adds polyacrylamide is the concrete cohesive force for preparing in order to improve, and reduces the fluid friction coefficient, and its incorporation in concrete can make the concrete frictional coefficient reduce 50%-80% between 1/1000-1/10000.
Wooden calcium sulfonate also is a kind of water reducer, adds to its objective is in order further to increase the slump, improves workability, looks practical situation and also can not add.
Its process for preparation is as follows:
1, weighs the weight of each component respectively by said ratio according to the concrete weight that needs in the construction to use;
2, the component except that wooden calcium sulfonate is mixed, under field conditions (factors) mixing and stirring;
3, under the situation that adds wooden calcium sulfonate, in pumping adding in preceding about 10 minutes
Only enumerated 4 embodiment above, in the process of actual concrete batching, its proportioning can be chosen in following scope:
Cement (kilogram) 500-700
Flyash (kilogram) 25-210
Water (kilogram) 210-637
Sand (kilogram) 500-700
Particle diameter 0.5-2.0 centimetre stone (kilogram) 333-1050
UWB-1 type flocculation agent (kilogram) 5.25-27.3 or
Naphthalene water reducer (kilogram) 2.625-45.5
Polyacrylamide (kilogram) 0.053-0.91
The 0.53-2.73 of wooden calcium sulfonate's (kilogram)
Wherein, wooden calcium sulfonate can replace with similar water reducer, and cement can use a kind of in No. 325-No. 625 the Portland cement.
Superfluid state concrete of the present invention is water insoluble, intensity is up to the 200-350 kg/cm, good endurance, workability is good, presetting period is 8-18 hour, frictional coefficient reduces 60-90% than normal concrete, can be used for pouring into reinforced concrete pile, also can be used for productions such as beam, post, plate, be suitable for pipe-line transportation, be convenient to mechanized construction.Especially its stone can suspend in concrete, thus can be behind concrete perfusion descending reinforcing cage, thereby improved mass of foundation.Because of its viscosity is bigger, workability is good, and the slump is greater than 21 centimetres, and is bigger than the chutable concrete slump (18-21 centimetre), and stone can suspend therein, so be called " Superfluid state concrete ".
The performance of Superfluid state concrete of the present invention and chutable concrete is compared as follows:
|
Frictional coefficient |
It is neutral anti-to loose at minute water |
Ultimate compression strength |
The slump |
Workability |
Presetting period |
Float property with fixed attention outstanding mixing among the Shi Tuzi |
Viscosity |
Automatically closely knit |
Impervious |
Weather resistance |
Superfluid state concrete |
Little |
Good |
High |
21-25 centimetre |
Good |
8-18 hour |
Suspend |
Greatly |
Good |
Good |
Good |
Chutable concrete |
Greatly |
Difference |
High |
18-21 centimetre |
Good |
2-4 hour |
Do not suspend |
Little |
Good |
Good |
Good |
Embodiment 5: building a geologic condition is: 0-4 rice is that miscellaneous fill, 4-8 rice are that powder fine sand soil, 8-15 rice are medium sand, are sand pebble layer below 15 meters, and below ground is seen underground water for 5 meters; The basis must enter 1 meter of sand pebble layer, and requiring the perfusion diameter is 600 millimeters, long 16 meters foundation pile, and its processing step is as follows:
1, according to construction requirement, from the 325-625 ordinary Portland cement, select wherein a kind of, the quantity of pouring into foundation pile as required calculates required concrete total consumption, makes it to reach design requirements by following proportioning apolegamy, calculates and weigh the weight of above-mentioned each component of Superfluid state concrete respectively:
Cement (kilogram) 500-700
Flyash (kilogram) 25-210
Water (kilogram) 210-637
Sand (kilogram) 500-700
Particle diameter 0.5-2.0 centimetre stone (kilogram) 333-1050
UWB-1 type flocculation agent (kilogram) 5.25-27.3
Polyacrylamide (kilogram) 0.053-0.91
The 0.53-2.73 of wooden calcium sulfonate's (kilogram)
Described each component except that wooden calcium sulfonate is mixed, and mixing and stirring is stand-by under field conditions (factors), adds wooden calcium sulfonate in preceding about 10 minutes in pumping and mixes stirring, makes Superfluid state concrete,
2, be 600 millimeters with the concrete perfusion rig drill diameter of the present invention that hereinafter will be described in detail, long 16 meters deep hole, shown in Fig. 1 (1),
The external spiral drill bushing of 3, mentioning borer drill rod is opened core pipe discharge port 3(with reference to Fig. 2),
4, borer drill rod is promoted 8-10 centimetre after, injecting water cement ratio with concrete pump with the pressure of 30-50 kg/cm is 0.5 grout, cross lifting drilling tool marginal not then and go into grout to hole depth 6-8%, promptly 16 meters * (6-8%)=0.96-1.28 rice [Fig. 1 (2)].A purpose of this operation is in order to enlarge pile crown, to make the no loosened soil of stake end, to increase an anchorage force of end and the frictional force of hole periphery; Promptly when in next procedure, being pressed into Superfluid state concrete, make concrete sink to the grout bottom, grout is risen along hole wall, hole wall has increased the stake footpath through the osmosis of grout, cause the concrete and the soil body to be consolidated into one closely, thereby improved the quality of stake, compare with common screw pouring piles, its bearing capacity can improve 30-90%
5, shown in Fig. 1 (2), the limit promotes the drilling tool limit and is pressed into Superfluid state concrete extremely a little more than the hole height that collapses with concrete pump with the pressure of 30-50 kg/cm, promptly a little more than 8 meters of subsurfaces,
6, shown in Fig. 1 (3,4), drilling rod is proposed, put into Steel Reinforcement Cage.Owing to what inject at processing step 5 is the Superfluid state concrete that the inventor invents, and stone suspends in concrete, and concrete is softer, thereby Steel Reinforcement Cage can be inserted at the bottom of the hole,
7, shown in Fig. 1 (5), pour into Superfluid state concrete to 16 meter and natural Health preservation pile by the flexible pipe in the concrete that has poured in the inserting step 5 (depth of penetration is more than 2 meters) with pump.
Be understood that: the grout that injects in operation 4 can be a neat slurry, also can be to add the flyash of an amount of for example 5-50% of cement weight and the grout of an amount of water reducer.The water cement ratio of grout all can between 0.4-0.8.Identical with the cast-in-place pile concrete water cement ratio as far as possible, in process 4 and 5, can between the 1-75 kg/cm, choose according to geologic condition with the pressure that is pumped into Superfluid state concrete.Need dabbling stake footpath all can as 400,600,800 millimeters.Step 1,2 interchangeablely also can be carried out simultaneously.
Drill-pouring Superfluid state concrete pile-making method of the present invention is used with concrete pump, kneading mill, can form the semi-mechanization construction process, reduces concrete perfusion and transportation operation, and technological process is simple, and the efficient height is applicable to various complex geological conditions.
With reference to Fig. 2, Fig. 2 is that the present invention pours into the wheel box of the helical driller for concrete perfusion of the present invention that the Superfluid state concrete pile-making method uses and the structural representation of spiral drill.Drilling rod comprises the outer tube 9 that is linked together by several flanges 11, is contained in the screw-blade 10 of outer tube 9 outsides, is positioned at the cutting element 20 of screw-blade 10 bottoms, outer tube 9, and screw-blade 10 and cutting element 20 etc. is called the spiral drill bushing together.Outer tube top is meshed by the driving gear of counter flange 12 with wheel box 14, lower end at outer tube 9 is processed with screw thread, upper part 5 of dental clutch is fixed on the outer tube 9 by screw thread, and locks with set nut 6, also it can be welded in the lower end of outer tube.The interior pipe of for example being done by steel 8 that is linked together by flange is housed in the inside of outer tube 9, its lower end is processed with lower part 2 of dental clutch, drill bit 1 is fixed together by flange and dental clutch lower part 2, having on the position of bottom near clutch coupling lower part 2 of interior pipe 8 can be by for example containing the bigger discharge port 3 of concrete bore that particle diameter is a 0.5-2 centimetre of stone, in tightness system 4 is housed between pipe 8 and the bottom of outer tube 9, enter outer tube 9 to prevent concrete etc.Feather key 13 or other liner that is suitable for are housed between interior pipe 8 and the outer tube 9, and the upper end of interior pipe 8 communicates with concrete sebific duct 19 by diverter 17, can be hinged with cement-grout hose 18 on sebific duct 19, shows vacuum breaker 7 among the figure on concrete sebific duct 19.Be provided with rotating disk 21 between wheel box 14 and the diverter 17.With reference to Fig. 4.The cylinder body of two hydro-cylinders 15 of expression and the housing of wheel box 14 are fixed together among the figure, the housing of wheel box is fixed on the frame, the end of the piston rod of hydro-cylinder 15 is with welding or the "T"-shaped bar that is threaded, two rolling bearings 16 are equipped with at the two ends of "T"-shaped bar, 16 on bearing is installed in the rotating disk 21 that is fixed together with interior pipe 8, when rotating disk 21 when longitudinal center line rotates with interior pipe, the outer shroud of bearing 16 can be rotated around self axis by the frictional force effect, to reduce the resistance of motion.
When using this helical driller for concrete perfusion to annotate stake, when holing to predetermined depth, whole drilling tool is slightly upwards mentioned about 8-10 centimetre, make the piston rod retraction of hydro-cylinder 15 by hydraulic control system then and drive rotating disk 21 and move down with the interior pipe 8 and the drill bit 1 that are attached thereto, the outer tube 9 and the dental clutch of interior pipe 8 bottoms are thrown off, open discharge port 3, and inject grout by discharge port through sebific duct 18, limit lifting drilling tool marginal not is gone into grout then, so that handle stake end loosened soil, after injecting enough cement, can close the valve (not shown) of cement-grout hose 18, open the valve (not shown) of concrete sebific duct 19, the limit promotes the drilling tool marginal not and goes into concrete extremely a little more than the position that is provided with the hole danger of collapsing, propose drilling tool then and put into Steel Reinforcement Cage, and concrete perfusion is to predetermined height.
Fig. 3 is the wheel box of helical driller for concrete perfusion of the present invention and structural arrangement another program synoptic diagram of spiral drill.Fig. 3 and Fig. 2 difference only are that structure shown in Figure 3 cancelled the hydro-cylinder between the wheel box and rotating disk among Fig. 2, and on the interior pipe 8 between wheel box and the diverter, making a shoulder 22, manage on 8 in for example shoulder 22 can being welded in, this texture ratio is shown in Figure 1 simple in structure many, when the bores are being drilled owing to the ground drag effect is upwards passed drill bit together with interior pipe 8, lower part 2 of dental clutch in making on the pipe 8 and upper part 5 of the dental clutch on the outer tube 9 mesh together, rotation therewith is crept into, when boring finishes need injection grout or concrete, as long as wheel box 14 and the outer tube 9 that is attached thereto are upwards mentioned a bit of distance, interior pipe just moves down by deadweight and outer tube breaks away from engagement, open concrete discharge port 3, shoulder 22 restrictions in the distance that interior pipe moves down is subjected on the pipe, this moment, shoulder 22 rested on the gear box casing, and pipe continues to move down in stoping.
Helical driller for concrete perfusion of the present invention has multiple function, can hole, and the limit promotes drilling tool limit setting-out, mud jacking or presses concrete, can contain drift sand, sand-pebble, silt seam as required again, and pile under the different geologic conditions such as underground water is arranged.Be used with the Superfluid state concrete of neat slurry and inventor invention and can handle a stake end loosened soil and a retaining wall, prevent the hole that collapses, make pile body and hole surrounding soil be consolidated into one closely, a bearing capacity that can improve.Owing to can pass through the rig concrete perfusion, thereby reduce the transportation operation of concrete perfusion, technological process is oversimplified, improved working efficiency.