CN1115819A - Serial pile of screw drilling pouring pile of and their construction process and apparatus - Google Patents

Serial pile of screw drilling pouring pile of and their construction process and apparatus Download PDF

Info

Publication number
CN1115819A
CN1115819A CN 95104637 CN95104637A CN1115819A CN 1115819 A CN1115819 A CN 1115819A CN 95104637 CN95104637 CN 95104637 CN 95104637 A CN95104637 A CN 95104637A CN 1115819 A CN1115819 A CN 1115819A
Authority
CN
China
Prior art keywords
pile
auger
auger boring
construction
mixture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 95104637
Other languages
Chinese (zh)
Inventor
孙新河
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 95104637 priority Critical patent/CN1115819A/en
Publication of CN1115819A publication Critical patent/CN1115819A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The replacement construction process of bored and cast-in-place piles features the replacement of bore slurry with mortar or concrete. The said cast-in-place piles include bored composite pile, bored expanded-base pile and bored composite expanded-base pile. The present invention can reduce the cost of cast-in-place piles while raising the bearing capacity of pile foundation.

Description

The pile series of auger boring pouring pile and job practices thereof and construction equipment
The present invention relates to pile foundation and the job practices and the construction equipment of building.
Bore slurry pressuring pile-forming can solve and easily collapse the hole and phreatic pore-forming pile problem is arranged, but owing to lack fines in the pile body, cause the folk prescription concrete cost of perfusion pile body more much higher than common filling pile, for addressing this problem, the present invention will solve with the replacement construction method of auger boring pouring pile and lack the fines problem in the concrete, thereby further reduce the cost of pile foundation, existing auger boring equipment can't carry out the construction of large-diameter deep stake.Therefore, its bearing capacity also is subjected to certain restriction, for further improving its bearing capacity, the present invention will be provided with vertically in the bottom of auger boring pouring pile body by stir with churning among at least a job practices gained mixture or enlarged body is set in the bottom of auger boring pouring pile body or enlarged body is set in the bottom of mixture, thereby constitute the pile series of auger boring pouring pile.
The objective of the invention is to propose pile series and the job practices and the construction equipment of auger boring pouring pile, so that reduce the concrete cost of pile body and improve the supporting capacity of stake.
The job practices of auger boring pouring pile of the present invention comprises replacement construction method and non-replacement construction method.
The replacement construction method of auger boring pouring pile: be bored into the precalculated position with auger stem, auger stem limit grout injection or stabilizing solution in auger boring are put forward in the limit then.When the cement paste of perfusion or stabilizing solution when reaching the precalculated position, auger stem can be proposed, in auger boring, place reinforcing cage, it is characterized in that when throwing in the auger boring has coarse aggregate, available cement mortar puts the cement paste drawn in the auger boring or when in the auger boring during non-coarse aggregate, available concrete is put and drawn auger boring interior cement paste or stabilizing solution.
But put among the cement mortar or concrete that the cement paste tripping of drawing out is used to replace, the stabilizing solution that is displaced can be stored among the special container, uses so that continue.
The cement mortar or the concrete that are used in the auger boring pouring pile replace are respectively progressively to distinguish replacing water mud or stabilizing solution from the boring end to top by cement mortar conduit or tremie.
The non-replacement construction method of auger boring pouring pile comprises the job practices of bore slurry pressuring pile-forming and the common auger boring pouring pile under nothing is collapsed the hole situation.
The pile series of auger boring pouring pile comprises auger boring composite pile, auger boring expanded bore pile and the compound expanded bore pile of auger boring.
The auger boring composite pile is in the bottom of auger boring pouring pile body mixture to be arranged vertically, and perfusion pile body and mixture fuse and constitute the auger boring composite pile jointly.
Mixture is by churning and the mixture that at least a job practices obtains among stirring.
The auger boring expanded bore pile is in the bottom of auger boring pouring pile body enlarged body to be arranged, and constitutes the auger boring expanded bore pile jointly by enlarged body and auger boring pouring pile body.
The compound expanded bore pile of auger boring is in the bottom of the mixture of auger boring composite pile enlarged body to be arranged, and constitutes the compound expanded bore pile of auger boring jointly by enlarged body, mixture and perfusion pile body.The pile series of auger boring pouring pile be by auger boring pouring pile body and the enlarged body that is provided with in the bottom of this perfusion pile body or with the mixture that is provided with along between centers, or with enlarged body that is provided with in this mixture bottom and the common formation of mixture.
Enlarged body comprises that mixing enlarged body, perfusion enlarged body and perfusion mixes enlarged body.
Mixing enlarged body is the enlarged body that obtains with the rotary-spraying construction method.
The perfusion enlarged body is to cut soil to inhale the expansion space that the slurry soil basketing method digs out with jet, pours into cementing material in this expansion space.
It is because the expansion space bottom of perfusion enlarged body has surface dust or sediment that perfusion mixes enlarged body, handles these surface dust or sediment with the churning method and it is formed mix enlarged body, and pour into cementing material in expansion space.
The job practices of auger boring composite pile is in the auger boring process or after boring is finished, can carry out the construction of mixture, among the mixture construction is carried out or after finishing, can carry out the construction of auger boring pouring pile body by the job practices of auger boring pouring pile.
The job practices of auger boring expanded bore pile is after auger boring is finished, can mix the construction of enlarged body or carry out the construction of expansion space or pour into and mix the expansion space among the enlarged body and mix the construction of enlarged body, when mix enlarged body or expansion space or perfusion mix among the enlarged body expansion space with mix after enlarged body finishes, can carry out the construction of auger boring pouring pile body by the job practices of auger boring pouring pile.
The job practices of the compound expanded bore pile of auger boring is in the auger boring process or after finishing, can carry out the drilling construction of mixture, after waiting to get into the mixture bottom, can carry out the construction of the enlarged body of mixture bottom, carry out the mixture construction then, can carry out the construction of auger boring pouring pile body by the job practices of auger boring bottling body in the mixture work progress or after finishing.
The job practices of auger boring pouring pile body is identical with the job practices of auger boring pouring pile.
The construction equipment of auger boring expanded bore pile is on the auger stem of existing auger boring equipment two medium channels to be set at least, if two medium channels, then one is fluidic channel, and another is for inhaling the slurry passage.
Churning comprises single tube, double pipe, triple pipe and multiple pipe.
Stirring comprises mixing-filling and stirring powder spraying.
With accompanying drawing some embodiment among the present invention are described.
Fig. 1: with the cement paste in the cement mortar displacement auger boring;
Fig. 2: with the stabilizing solution in the concrete displacement auger boring;
Fig. 3: the auger boring composite pile of auger boring pouring pile body and the compound formation of churning mixture;
Fig. 4: auger boring pouring pile body and churning mixture and mix the auger boring composite pile of the common compound formation of body;
Fig. 5: the auger boring pouring pile body mixes the auger boring expanded bore pile that enlarged body constitutes with churning;
Fig. 6: auger boring pouring pile body and the auger boring expanded bore pile that pours into the enlarged body formation;
Fig. 7: the auger boring pouring pile body is with the perfusion enlarged body and mix the common auger boring expanded bore pile that constitutes of enlarged body;
Fig. 8: have jet and suction pipe on the auger stem of auger boring equipment, auger boring pouring pile or auger boring expanded bore pile can be used for constructing;
Fig. 9: the helical blade band medium channel on the auger stem, hollow tube is a medium channel, auger boring pouring pile or auger boring expanded bore pile can be used for constructing;
Figure 10: have hollow tube and, can be used for auger boring pouring pile or auger boring expanded bore pile at the fixing medium channel of helical blade root;
Figure 11: the fixing mixture drilling rod at the drill bit position of auger stem, the auger boring composite pile can be used for constructing;
Figure 12: the fixing mixture drilling rod at the drill bit position of auger stem is provided with churning mouth and stirring vane, the auger boring composite pile of can constructing on the mixture drilling rod;
Figure 13: the fixing mixture drilling rod at the drill bit position of auger stem is provided with churning mouth and stirring vane, the compound expanded bore pile of auger boring composite pile and auger boring of can constructing on the mixture drilling rod;
Figure 14: the mixture drilling rod that can move along between centers is housed at the hollow tube of auger stem, jet orifice and pulp absorbing hole are housed, can construct compound expanded bore pile of auger boring composite pile and auger boring and auger boring pouring pile and auger boring expanded bore pile on the mixture drilling rod;
Figure 15: the hollow tube at auger stem is equipped with axially displaceable mixture drilling rod, stirring vane, churning mouth and pulp absorbing hole are housed on the mixture drilling rod, the auger boring pouring pile of can constructing, auger boring composite pile, the compound expanded bore pile of auger boring expanded bore pile and auger boring;
Figure 16: the mixture drilling rod is set in the auger stem hollow tube, on the mixture drilling rod, jet is set, can construct auger boring composite pile and auger boring pouring pile and auger boring expanded bore pile.
In Fig. 1 to Figure 16, (a) be the auger boring pouring pile body, (b) be the mixture of churning method construction, (c) be the mixture of stirring means construction, (d) be to mix enlarged body, (e) be the perfusion enlarged body, (f) be auger stem, (1) is the reinforcing cage of auger boring pouring pile (a), (2) be the cement mortar conduit, (3) be cement paste, (4) be concrete, (5) be coarse aggregate, (6) be stabilizing solution, (7) be tremie, (8) be the helical blade of auger stem (f), (9) be the hollow tube of auger stem (f), (10) be the drill bit of auger stem (f), (11) be auger stem (f) jet, (12) be the pulp absorbing hole of auger stem (f), (13) be the medium channel of auger stem (f), (14) be helical blade, (15) be the medium channel that is fixed on helical blade (14) root, (16) be to be fixed on auger stem (f) drill bit (10) and along the axial mixture drilling rod of auger stem (f), (17) are the medium channels of mixture drilling rod (16), (18) are the stirring vanes of mixture drilling rod (16), (19) be the grouting port of stirring vane (18), (20) be the jet of mixture drilling rod (16), (21) are among the hollow tube of auger stem (f) (9) and the mixture drilling rod that moves vertically, and (22) are the pulp absorbing holes of mixture drilling rod (21), (23) be the jet of mixture drilling rod (21), (24) are the medium channels of mixture drilling rod (21).(25) be the expansion space size probe of mixture drilling rod (21) end.
In the construction equipment of auger boring expanded bore pile or the compound expanded bore pile of auger boring, if pour into the construction of enlarged body (e) or perfusion mixing enlarged body, then in its construction equipment, need set up the slurry system of taking out, also can on perfusion enlarged body (e) construction equipment, adorn expansion space size probe (25).
Auger boring pouring pile, it all is existing mature technique that the mixture of churning or stirring and churning mix enlarged body, the job practices of the expansion space of perfusion enlarged body is similar to the job practices of the multiple pipe of churning.
The present invention draws the cost that job practices can reduce auger boring pouring pile by putting, and can make the application of concrete material more reasonable.
The present invention sets up enlarged body or mixture or sets up the bearing capacity that enlarged body can improve pile foundation in the bottom of composite pile in the bottom of auger boring pouring pile body.
Auger boring pouring pile of the present invention and pile series thereof are a kind of noiselessness, friction, no mud off blowdown, again can be, the easily following pore-forming pile of hole and groundwater table that collapses, and its bearing capacity height at quicksand, and the pile foundation cost is low.Therefore, the present invention is a kind of rising pile foundation.
Among the construction equipment of the pile series of auger boring pouring pile of the present invention, but some a tractor serves several purposes, and therefore, construction equipment is simpler relatively.

Claims (8)

1, the pile series of auger boring pouring pile and job practices thereof and construction equipment, the pile series that it is characterized in that auger boring pouring pile be by the auger boring pouring pile body with cut soil in the bottom of this perfusion pile body with churning or churning and inhale the slurry soil basketing method, the enlarged body of setting or with along the mixture of the setting of between centers or with cut soil in this mixture bottom with churning or churning and inhale enlarged body that the slurry soil basketing method is provided with and the common formation of mixture.
2, according to pile series and the job practices and the construction equipment of the auger boring pouring pile of claim 1, the replacement construction method that it is characterized in that the auger boring pouring pile body of auger boring pouring pile and pile series is when throwing in the auger boring has coarse aggregate, cement paste in the available cement mortar displacement auger boring or when auger boring in during non-coarse aggregate, available concrete is replaced auger boring interior cement paste or stabilizing solution.
3, according to pile series and the job practices and the construction equipment of the auger boring pouring pile of claim 1, the job practices that it is characterized in that the auger boring composite pile is in the auger boring process or after boring is finished, can carry out the construction of mixture, among the mixture construction or after finishing, can carry out the construction of auger boring pouring pile body by the job practices of auger boring pouring pile.
4, according to pile series and the job practices and the construction equipment of the auger boring pouring pile of claim 1, the job practices that it is characterized in that the auger boring expanded bore pile is after auger boring is finished, can mix the construction of enlarged body or carry out the construction of expansion space or pour into and mix the expansion space among the enlarged body and mix the construction of enlarged body, after this part construction is finished, can carry out the construction of auger boring pouring pile body by the job practices of auger boring pouring pile.
5, according to the job practices and the construction equipment of the pile series of the auger boring pouring pile of claim 1, the job practices that it is characterized in that the compound expanded bore pile of auger boring is in the auger boring process or after finishing, can carry out the drilling construction of mixture, after waiting to get into the mixture bottom, can carry out the construction of the enlarged body of mixture bottom, carry out the mixture construction then, in the mixture work progress or after finishing, can carry out the construction of auger boring pouring pile body by the job practices of auger boring pouring pile.
6, according to pile series and the job practices and the construction equipment of the auger boring pouring pile of claim 1, the construction equipment that it is characterized in that the auger boring expanded bore pile is on the auger stem of existing auger boring equipment two medium channels to be set at least, if medium channel two, then one is fluidic channel, and another is for inhaling the slurry passage.
7, pile series and job practices and construction equipment according to the auger boring pouring pile of claim 1, the construction equipment that it is characterized in that the auger boring composite pile is on the auger stem of existing auger boring equipment a medium channel to be set at least, drill bit at auger stem is provided with the mixture drilling rod vertically and can loads onto stirring on the mixing body rod, execute at least a construction equipment among the spray, and, on the mixture drilling rod, can load onto stirring a medium channel being set on the mixture drilling rod at least or among the auger stem hollow tube, loading onto and moving axially or to move axially the mixture drilling rod that also can sway along auger stem, execute among the spray at least a construction equipment and a medium channel is set on the mixture drilling rod at least.
8, the pile series of the auger boring pouring pile of root a tree name claim 1 and job practices thereof and construction equipment, the construction equipment that it is characterized in that the compound expanded bore pile of auger boring is to be provided with the mixture drilling rod on the auger stem of existing auger boring equipment, and two medium channels are set at least on the mixture drilling rod, if medium channel two, then one is the jet media passage, and another is to inhale the slurry medium channel.
CN 95104637 1995-04-25 1995-04-25 Serial pile of screw drilling pouring pile of and their construction process and apparatus Pending CN1115819A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 95104637 CN1115819A (en) 1995-04-25 1995-04-25 Serial pile of screw drilling pouring pile of and their construction process and apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 95104637 CN1115819A (en) 1995-04-25 1995-04-25 Serial pile of screw drilling pouring pile of and their construction process and apparatus

Publications (1)

Publication Number Publication Date
CN1115819A true CN1115819A (en) 1996-01-31

Family

ID=5075204

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 95104637 Pending CN1115819A (en) 1995-04-25 1995-04-25 Serial pile of screw drilling pouring pile of and their construction process and apparatus

Country Status (1)

Country Link
CN (1) CN1115819A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102011399A (en) * 2010-11-05 2011-04-13 河南理工大学 PHC pile-based multiple high jet pedestal pile construction method
CN102605771A (en) * 2012-04-01 2012-07-25 贺德新 Construction method for drilling cast-in-place concrete pipe pile and drilling tool for concrete pipe pile
CN102619219A (en) * 2012-04-11 2012-08-01 贺德新 Drilling construction method for cast-in-place concrete variable threaded tubular pile and drilling tool for implementing drilling construction method
CN102817347A (en) * 2012-09-05 2012-12-12 北京东方新星石化工程股份有限公司 Reaming device for reinforcing soft soil foundation
CN104452747A (en) * 2014-11-18 2015-03-25 中淳高科桩业股份有限公司 Technology for constructing pile-top cemented soil enlarged head
CN114606933A (en) * 2022-01-28 2022-06-10 赵关保 Concrete filling pile for reinforcing pile bottom by adopting cement-soil mixing pile and construction method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102011399A (en) * 2010-11-05 2011-04-13 河南理工大学 PHC pile-based multiple high jet pedestal pile construction method
CN102011399B (en) * 2010-11-05 2012-11-28 河南理工大学 PHC pile-based multiple high jet pedestal pile construction method
CN102605771A (en) * 2012-04-01 2012-07-25 贺德新 Construction method for drilling cast-in-place concrete pipe pile and drilling tool for concrete pipe pile
CN102619219A (en) * 2012-04-11 2012-08-01 贺德新 Drilling construction method for cast-in-place concrete variable threaded tubular pile and drilling tool for implementing drilling construction method
CN102817347A (en) * 2012-09-05 2012-12-12 北京东方新星石化工程股份有限公司 Reaming device for reinforcing soft soil foundation
CN102817347B (en) * 2012-09-05 2015-07-22 北京东方新星石化工程股份有限公司 Reaming device for reinforcing soft soil foundation
CN104452747A (en) * 2014-11-18 2015-03-25 中淳高科桩业股份有限公司 Technology for constructing pile-top cemented soil enlarged head
CN114606933A (en) * 2022-01-28 2022-06-10 赵关保 Concrete filling pile for reinforcing pile bottom by adopting cement-soil mixing pile and construction method

Similar Documents

Publication Publication Date Title
CN1193141C (en) Combined grouting construction process of reinforcing foundation
CN105604001B (en) Drilling tool is stirred in the stake of stiff-core cement soil cylinder and the rotation of construction method and tubular
CN1177109C (en) Pile end mortar pre-pressing construction method and apparatus for long screw auger drilling deposited pile and CFG pile
CN106996105A (en) Down-the-hole impacts jet mixing pile constructing process and equipment
CN1219945C (en) High-pressure rotary spraying and core inserting process to form pedestal pile
EP2278075A1 (en) Soil stabilization column, rotary device and manufacturing method of such column
JP4520913B2 (en) Ground improvement method and existing structure foundation reinforcement method
JP4852732B2 (en) Column replacement construction method
CN109183790A (en) A kind of Screw Pile and its construction tool and construction method
CN104153357A (en) Construction method of composite pile
CN1115819A (en) Serial pile of screw drilling pouring pile of and their construction process and apparatus
JP6576230B2 (en) Rotating cap, ready-made pile burying device, pile foundation construction method
CN1206417C (en) Forming method for water-proof pile fender and screw drill therefor
CN1029518C (en) Super fluidized concrete, the method and drilling machine for pile forming using such concret
KR20060027443A (en) The foundation grouting construction method of having used foundation digging and the equipment for grout material and this
CN2177046Y (en) Static-pressure grouter
CN1117906C (en) Construction method of concrete pile and its construction equipment
CN1143032C (en) Dry construction composite filling pile
CN1127819A (en) Internal thread bored and cast-in-place pile series and construction method and equipment thereof
CN1908321A (en) Inner hole stirring concrete pile making process and equipment of grouting extrusion head
CN1995553A (en) Pile forming method for filling pile of compact-making hole and its drill rod
CN1111229C (en) High-pressure spray process for swing-vibrated hole
JP2006312866A (en) Method for replacing and constructing column, and replaced column
JP3017181U (en) Mixing and stirring equipment used for ground improvement method
JP2006307628A (en) Column replacing construction method and replacing column

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C01 Deemed withdrawal of patent application (patent law 1993)
WD01 Invention patent application deemed withdrawn after publication