CN106351214A - Construction method of long spiral variable diameter concrete pile - Google Patents

Construction method of long spiral variable diameter concrete pile Download PDF

Info

Publication number
CN106351214A
CN106351214A CN201610741635.6A CN201610741635A CN106351214A CN 106351214 A CN106351214 A CN 106351214A CN 201610741635 A CN201610741635 A CN 201610741635A CN 106351214 A CN106351214 A CN 106351214A
Authority
CN
China
Prior art keywords
reaming
concrete
pile
construction method
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610741635.6A
Other languages
Chinese (zh)
Inventor
刘伟
何经纬
董天文
董雪峰
王延昭
金佳旭
杨懿涵
王士祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHONGYE SHENKAN ENGINEERING TECHNOLOGY Co Ltd
Original Assignee
ZHONGYE SHENKAN ENGINEERING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGYE SHENKAN ENGINEERING TECHNOLOGY Co Ltd filed Critical ZHONGYE SHENKAN ENGINEERING TECHNOLOGY Co Ltd
Priority to CN201610741635.6A priority Critical patent/CN106351214A/en
Publication of CN106351214A publication Critical patent/CN106351214A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/36Concrete or concrete-like piles cast in position ; Apparatus for making same making without use of mouldpipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention provides a construction method of long spiral variable diameter concrete pile, comprising the construction using the non rock rooted long spiral super-fluid reaming bit, and hole boring, ream drilling and bottom enlarging construction on pile positions as required by the design; and then the concrete pump is opened, injecting the super-fluid concrete with pressure and lift the drill pipe with continuous guncreting to keep the concrete pumped into the borehole greater than the volume lifted up by the drill pipe; fix the reinforcement cage at the design elevation on the top of pile. The construction method can realize concrete grouting without lifting up the drill pipe, finish drilling, reaming and ream drilling at one time, and greatly reduce the engineering cost and environmental pollution with good pile quality and high working efficiency, having a good social and economic benefit.

Description

A kind of long spire variable diameters guncreting pile construction method
Technical field
The invention belongs to construction engineering technical field is and in particular to a kind of long spire variable diameters cast-with-pressure concrete pile construction party Method, can realize the cast-in-place superfluidity coagulations such as repeatedly expanding or base expanding and base expanding according to stratum bearing capacity condition in pile body, stake bottom any part Native shaped pile.The construction method of the present invention is applicable to compared with the Soft Ground of high-bearing capacity eigenvalue with compared with high-bearing capacity Pile foundation construction.
Background technology
Environmental protection, abnormal shape, high-bearing capacity are the development trends of pile foundation and construction method now, and to pile foundation on weak soil ground The application that base process, Composite foundation construction, slope retaining are administered produces material impact.Long spire superfluidity cast-in-situ bored pile is with it Speed of application is fast, quality is good, pollution-free the features such as more and more adopted by engineering circles.Reaming, ream drilling technology are to improve list The important means of pile bearing capacity, but traditional reaming, ream drilling technology are only applicable to the underwater cast-in-place pile of mechanical hole building, and Pore-forming, base expanding and base expanding need secondary just can complete, not only speed of application is slow, and is also easy to produce undergauge, collapse hole, underwater grouting broken pile, bottom hole Sediment is exceeded to wait quality accident, and mud emission amount is big simultaneously, seriously polluted.Therefore, need exploitation one kind badly can once complete to bore Hole pile work and pile quality is good, efficiency high concrete pile construction method.
Content of the invention
The problem existing for prior art, the present invention provides a kind of long spire variable diameters cast-with-pressure concrete pile construction party Method.The technical scheme is that
A kind of long spire variable diameters guncreting pile construction method, including the long spire superfluidity reaming bit using non-embedding rock Construction, holes at stake position according to design requirement, reaming is crept into and carried out base expanding and base expanding construction;It is then turned on concrete pump, pressure injection surpasses Chutable concrete, carries brill in pressure injection, remains that concrete pumps into amount of concrete in hole and above carries volume more than drilling rod;By steel Muscle cage is fixed on design of pile top absolute altitude.
In above-mentioned construction method, the long spire superfluidity reaming bit of described non-embedding rock is coaxial Double-pillar hollow-core construction, Internal layer column structure internal diameter is identical with drilling rod internal diameter, and outer layer column structure is double acting hollow piston hydraulic cylinder, and adopts double cropping With hollow piston hydraulic cylinder inner wall tube as bit central pipe, realize not proposing brill concrete perfusion operation;And described drill bit two Side is the reaming wing plate installing cutting tooth, and cutting tooth is used for down-cutting foundation soil, and reaming wing plate is arranged on reaming hinge and props up On support hinge, reaming wing plate is used for lateral compression ground and makes reducing section stable, and reaming hinge and supporting hinges composition cut with scissors Chain mechanism, controls the flexible of double acting hollow hydraulic cylinder piston top by control system of rig, by controlling linkage Realize the boring of reaming wing plate, reaming and the ream drilling process of cutting tooth.
In above-mentioned construction method, the counter bore diameter allowable error of described reaming drilling is -0.1 times of counter bore diameter, and -0.1 Times counter bore diameter≤5cm;Reducing reaming should enter good soil layer in vertical direction and be no less than 0.5m;Base expanding and base expanding position allows vertical Direction adjusts 0.5~1.0m up and down.
In above-mentioned construction method, described carry brill in pressure injection put forward brill speed controlling in 2.0 ~ 2.5m/min, and drilling rod Lifting is not more than 30cm.
The invention has the benefit that the present invention can realize not proposing brill concrete perfusion operation, can once complete to bore Hole, reaming and ream drilling work, and pile quality is good, efficiency high, significantly reduces construction costs and environmental pollution, has Good Social and economic benef@.
Brief description
Fig. 1 is a kind of flow chart of long spire variable diameters guncreting pile construction method of the present invention.
Fig. 2 is a kind of non-embedding rock long spire superfluidity of long spire variable diameters guncreting pile construction method of the present invention Reaming bit bore state figure;
Fig. 3 is a kind of non-embedding rock long spire superfluidity reaming of long spire variable diameters guncreting pile construction method of the present invention Drill bit reaming state diagram;
In Fig. 2 and Fig. 3,1- adpting flange, 2- abrasion-proof helical blade, 3- double acting hollow piston hydraulic cylinder, 4- double acting is hollow Hydraulic cylinder piston comes directly towards, 5- bit central pipe, 6- reaming hinge, 7- reaming wing plate, 8- supporting hinges, 9- cutting tooth, and 10- is easy Change bottom side overhead door, 11- bottom cone palm piece.
Fig. 4 is the long spire variable diameters cast-with-pressure concrete pile detail drawing of the present invention.
Fig. 5 is the long spire variable diameters cast-with-pressure concrete pile profile of the present invention, and wherein (a) presses for long spire variable diameters and fill The longitudinal sectional drawing of concrete-pile;B () is the sectional view in (a) in figure 1-1 face.
Specific embodiment
With specific embodiment, the present invention is described in further details below in conjunction with the accompanying drawings, described is the solution to the present invention Release rather than limit.
By a kind of long spire variable diameters guncreting pile construction method of the present invention be applied to prototype pile foundation test drilling, Pile and detection, its partial data is shown in Table 1.
As shown in Figure 4 and Figure 5, the mattress layer of the thick 0.3m of stake top laying of described long spire variable diameters cast-with-pressure concrete pile (blinding layer), pile body concrete adopts c30 Superfluid state concrete to irrigate, pile body diameter and length be respectively as follows: diameter d=0.4m, L=8.0m, configures 5 hrb335 18 cage bars, using tie hoop hpb235 6@200, stirrup encryption at stake top, variable diameters, Away from for 100mm;The pile body reaming of argillic horizon, diameter is respectively d=0.4m, 0.6m, 0.7m, 0.8m, 0.9m.Test site is taken off The stratum showing is respectively the argillic horizon of thickness 2m and the coarse sands layer of thickness 8m from top to bottom.The severe of argillic horizon is 19.5kn m-3, modulus of compressibility is 15mpa, and Poisson's ratio is 0.35, and cohesion is 20kpa, and Nei Mocha angle is 10 °;The severe of coarse sands layer is 20kn·m-3, modulus of compressibility is 40mpa, and Poisson's ratio is 0.3, and cohesion is 1kpa, and Nei Mocha angle is 40 °.
Described long spire variable diameters guncreting pile construction method, process chart is as shown in figure 1, Specific construction step It is:
(1) preparation of construction
Purchase material by design requirement, checking and accepting is carried out to the model of material, specification, quantity, quality, checks product certificate Book, samples by specification and rechecks;
After levelling of the land, carry out pipes investigation, remove the barrier within 2 meters of construction site below ground, then leveling, rammer Real;Reasonable Arrangement construction machinery, transfer pipeline and power circuit position are it is ensured that " three supplies and one leveling " of construction site;
Using power be 110kw, drill pipe diameter be 400mm izd800 rig, hbt80 type concrete pump, and debug to Normal operation;Described rig adopts the long spire superfluidity reaming bit of non-embedding rock, and described drill bit is the hollow knot of coaxial Double-pillar Structure, internal layer column structure internal diameter is identical with drilling rod internal diameter, and outer layer column structure is double acting hollow piston hydraulic cylinder 3, and adopts Double acting hollow piston hydraulic cylinder inner wall tube, as bit central pipe 5, is realized not proposing brill concrete perfusion operation;And described brill Head both sides are the reaming wing plate 7 installing cutting tooth 9, and cutting tooth is used for down-cutting foundation soil, and reaming wing plate 7 is arranged on reaming hinge On chain 6 and supporting hinges 8, reaming wing plate is used for lateral compression ground and makes reducing section stable, reaming hinge and bloster hinge Chain forms linkage, controls the flexible of double acting hollow hydraulic cylinder piston top 4 by control system of rig, by controlling Linkage realizes the boring of reaming wing plate, reaming and the ream drilling process of cutting tooth;Fig. 2 and Fig. 3 each provides described The bore state figure of non-embedding rock long spire superfluidity reaming bit and reaming state diagram;
Laying coarse sand, layered rolling, mattress layer thickness is 0.3m, mattress layer upper surface absolute altitude+0.3m;
(2) the construction line-putting and rig are in place
Before construction, introduce measurement control point from original measurement basic point to construction site, measure long spire variable diameters with total powerstation The measurement control point of cast-with-pressure concrete pile, discharges stake point bit line;Through repetition measurement test line qualified after, laid on the spot with steel ruler and survey line Stake position is it is ensured that stake holes center shift variance is less than 50mm;
Rig is in place, makes rig supporting & stablizing, behind align piles site must leveling it is ensured that the perpendicularity of pore-forming;
Set stake top absolute altitude as relative elevation (± 0.000), using nts-355s total powerstation (5 " level), certainty of measurement ± (3mm + 2ppm d), measures stake mouth absolute altitude, according to Design of Foundation drawing and geologic prospect report, determines stake boring counterbore depth For -2.5m, stake drilling total depth 8m;
(3) make steel reinforcement cage, prepare Superfluid state concrete
The entering of reinforcing steel bar should be by " metal stretching experimental technique " (gb/t228 2002), " steel and the sampling of product made from steel mechanical property test Position and sample preparation " (gb/t2975 1998), the regulation of " bend test of metal materials method " (gb/t232 2010) enter Row yield point, tensile strength, elongation and cold bending test;Reinforcing bar must be divided by different steel grades, grade, the trade mark, specification and factory Criticize and check and accept, store up respectively, and board should be found and be easy to identify;Fabrication of reinforcing cage adopts long line method unified making, steel on pedestal mold Muscle cage saves long 8m, 5 hrb335 18 of steel reinforcement cage cage bar substantially, and hpb235 6 stirrup adopts spiral wound, and cage bar sets every 2m Put stirrup of putting more energy into (hpb235 12) and fix cage bar, cage bar is connected suitable spot welding with stirrup;Fabrication of reinforcing cage is to bar gauge, welding rod Specification, kind, fusion length, weld appearance quality, cage bar and stirrup manufacturing deviation etc. are checked;Steel reinforcement cage cage bar with put more energy into Stirrup must weld, the preferably inside lateral bend 15~30 of cage bar at the 500mm of steel reinforcement cage lower end, and steel reinforcement cage tolerance is as follows: diameter ± 10mm, length ± 100mm, cage bar spacing ± 10mm, stirrup spacing ± 20mm;
C30 Superfluid state concrete selects portland cement, and strength grade is 32.5 mpa, and the ratio of mud is 0.58, slump 23 Cm, when mixing feeds intake, it is dosed order and preferably lags behind water and cement, stone, sand coarse aggregate ratio 44%, and it is every that pile concrete must leave test block Individual cast machine-team cannot be less than 1 group, every group 3;
(4) draw a little in place, reducing reaming and boring
After rig is in place, stake position is carried out with repetition measurement, firm rig, by the long spire of horizon rule and the non-embedding rock of plumb bob double-direction control Superfluidity reaming bit center and drilling rod perpendicularity, carry out leveling, centering, the perpendicularity of adjustment stake machine, deviation should to stake machine Within 10mm, borehole perpendicularity error < 0.3%, control linkage and reaming wing plate to open (as shown in Figure 3);Verification is bored Pole length it is ensured that drilling depth accurate;Far from ground 10~20cm, align piles position, in press-in soil, in work progress for drilling rod lower end Require the cleaning hole side dregs in rotary drill rod, fallen into soil block when preventing from lifting drilling rod, boring procedure total powerstation corrects Perpendicularity (≤1%), holes at stake position according to design requirement and reaming is to projected depth -2.5m;Then control linkage and Reaming wing plate is retracted, and continues construction pile body downwards and locates to -8m, stops rig;
In pile body reaming work progress, should conscientiously observe the change of hydralic pressure gauge, the gauge pressure of itemized record each reducing reaming position Value and reducing reaming, base expanding and base expanding time, -0.1 times of counter bore diameter of counter bore diameter allowable error, and -0.1 times of counter bore diameter≤5cm.Become Footpath reaming should enter good soil layer in vertical direction and be no less than 0.5m;Base expanding and base expanding position allow in the vertical direction under adjustment 0.5~ 1.0m;
(5) pore-forming perfusion
Start hbt80 type concrete pump and start pressure injection Superfluid state concrete, carry brill in pressure injection, drilling rod lifting is not more than 30cm, controls drilling rod lifting speed (2.0 ~ 2.5m/min), remains that pumping into amount of concrete in hole above puies forward volume more than drilling rod Amount, calculate every dish pumping enter concrete square amount (often 0.44 cubic metre of disk), during construction, by concrete pumping drilling rod is produced upper Top power, adjustment carries drilling speed degree it is ensured that drilling rod and blade have certain squeezing action to concrete;
(6) lay steel reinforcement cage
For preventing steel reinforcement cage deformation during lifting, attached steel pipe (along the elongated arrangement of cage bar, spacing is 1.5 meters) should be tied up in steel reinforcement cage bottom, Provide suspension hook for oneself using rig steel reinforcement cage is vertically sling, above aperture, under then helping steady rotation dependence to conduct oneself with dignity and be artificial Enter in hole, decentralization steel reinforcement cage should be put down gently, slow play, if be hampered hindering, should ascertain the reason, being processed;Can be in termination with counterweight Vibrator vibration press-in, and monitor stake top absolute altitude;After steel reinforcement cage enters hole, it is positioned to accurately, fixing firm, its median-plane location Deviation is not more than 20mm, skeleton top elevation ± 20mm.
The embodiment of the present invention is to a kind of pile foundation of long spire variable diameters guncreting pile construction method (as Fig. 4 and Fig. 5 Shown) carry out vertical bearing capacity test, with pile body diameter in argillic horizon from 400mm equal-diameter pile, reaming to pile body diameter The non-uniform pile of 600mm, 700mm, 800mm, 900mm, the vertical limit load respectively 447.58kn of pile foundation, 508.17kn, 557.99kn, 561.31kn, 585.30kn, the corresponding displacement at pile top of vertical limit load respectively 6.95mm, 7.05mm、7.00mm、6.06mm、5.88mm.
Analyze (see Table 1) from ULTIMATE LOAD OF SINGLE PILE, after viscous soil horizon pile foundation plinth reaming, pile foundation ultimate load is in integrally Now improve trend, when counter bore diameter is in 700 ~ 800mm, pile foundation is close to large-diameter pile foundation boundary diameter, the limit of stake Bearing capacity increasing degree is less, shows end resistance and the collateral resistance relaxation phenomenon that similar stake end embeds closely knit foundation soil, 800mm The ultimate load increasing degree of later stake increases, but less than medium-small diameter pile foundation expanding after ultimate load increment.? Displacement at pile top aspect, the reaming with stake footpath in viscous soil horizon increases, and displacement at pile top integrally presents the trend of being gradually reduced.Viscous In property soil layer, after pile foundation reaming, reaming pile body increases the compression depth to bottom dense sand stratum so that 700mm reaming is straight Pile foundation settling amount within footpath is increased slightly, but increasing degree is less by 0.72% ~ 1.44%;Thereafter, with the increasing of counter bore diameter Plus, displacement at pile top during ultimate load has more apparent reduction.Concrete data is shown in Table 1.
The ultimate bearing capacity of table 1 long spire variable diameters cast-with-pressure concrete pile and displacement at pile top

Claims (4)

1. a kind of long spire variable diameters guncreting pile construction method is it is characterised in that include surpassing using the long spire of non-embedding rock Fluidised form reaming bit is constructed, and is holed at stake position according to design requirement, reaming is crept into and carried out base expanding and base expanding construction;It is then turned on coagulation Native pump, pressure injection Superfluid state concrete, carry brill in pressure injection, remain that concrete pumps into amount of concrete in hole and above carries more than drilling rod Volume;Steel reinforcement cage is fixed on designed elevation.
2. a kind of long spire variable diameters guncreting pile construction method according to claim 1 is it is characterised in that described The long spire superfluidity reaming bit of non-embedding rock is coaxial Double-pillar hollow-core construction, internal layer column structure internal diameter and drilling rod internal diameter phase With, outer layer column structure is double acting hollow piston hydraulic cylinder, and using double acting hollow piston hydraulic cylinder inner wall tube as brill Head central canal, realizes not proposing brill concrete perfusion operation;And described drill bit both sides are the reaming wing plate installing cutting tooth, cutting Tooth is used for down-cutting foundation soil, and reaming wing plate is arranged on reaming hinge and supporting hinges, and reaming wing plate is used for laterally squeezing Pressure ground simultaneously makes reducing section stable, and reaming hinge and supporting hinges form linkage, are controlled double by control system of rig Act on the flexible of hollow hydraulic cylinder piston top, realize the boring of the reaming wing plate of cutting tooth, expansion by controlling linkage Hole and ream drilling process.
3. a kind of long spire variable diameters guncreting pile construction method according to claim 1 is it is characterised in that described The counter bore diameter allowable error of reaming drilling is -0.1 times of counter bore diameter, and -0.1 times of counter bore diameter≤5cm;Reducing reaming is perpendicular Nogata is no less than 0.5m to entering good soil layer;Base expanding and base expanding position allows to adjust 0.5~1.0m under in the vertical direction.
4. a kind of long spire variable diameters guncreting pile construction method according to claim 1 is it is characterised in that described In pressure injection, carrying of drilling process bores speed controlling in 2.0 ~ 2.5m/min, and drilling rod lifting is not more than 30cm.
CN201610741635.6A 2016-08-29 2016-08-29 Construction method of long spiral variable diameter concrete pile Pending CN106351214A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610741635.6A CN106351214A (en) 2016-08-29 2016-08-29 Construction method of long spiral variable diameter concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610741635.6A CN106351214A (en) 2016-08-29 2016-08-29 Construction method of long spiral variable diameter concrete pile

Publications (1)

Publication Number Publication Date
CN106351214A true CN106351214A (en) 2017-01-25

Family

ID=57855359

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610741635.6A Pending CN106351214A (en) 2016-08-29 2016-08-29 Construction method of long spiral variable diameter concrete pile

Country Status (1)

Country Link
CN (1) CN106351214A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107313730A (en) * 2017-08-11 2017-11-03 朱龙 One kind fetches earth Screw Pile drilling tool and Screw Pile
CN114541372A (en) * 2022-03-25 2022-05-27 刘帅 Soil-squeezing pore-forming and pile-forming method for screw pile

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1814915A (en) * 2006-02-24 2006-08-09 翟向滨 Apparatus and method for long spiral-drilling enlarging-base agitation and reaming-in-hole concrete filling to form pile
CN103089146A (en) * 2013-01-23 2013-05-08 阎慧奎 Engineering driller capable of conducting superfluid concrete grouting pile driving construction on hard rock strata
CN103510510A (en) * 2013-10-22 2014-01-15 山东鸿顺集团有限公司 Reinforced long spiral drilling concrete grouting pile and construction method thereof
CN104250970A (en) * 2013-06-27 2014-12-31 上海城地建设股份有限公司 Novel visual intelligent super-fluid cast-in-place concrete pile device and construction method
CN204225771U (en) * 2014-10-24 2015-03-25 中冶沈勘工程技术有限公司 The embedding rock reaming bit of long auger guncreting pile

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1814915A (en) * 2006-02-24 2006-08-09 翟向滨 Apparatus and method for long spiral-drilling enlarging-base agitation and reaming-in-hole concrete filling to form pile
CN103089146A (en) * 2013-01-23 2013-05-08 阎慧奎 Engineering driller capable of conducting superfluid concrete grouting pile driving construction on hard rock strata
CN104250970A (en) * 2013-06-27 2014-12-31 上海城地建设股份有限公司 Novel visual intelligent super-fluid cast-in-place concrete pile device and construction method
CN103510510A (en) * 2013-10-22 2014-01-15 山东鸿顺集团有限公司 Reinforced long spiral drilling concrete grouting pile and construction method thereof
CN204225771U (en) * 2014-10-24 2015-03-25 中冶沈勘工程技术有限公司 The embedding rock reaming bit of long auger guncreting pile

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107313730A (en) * 2017-08-11 2017-11-03 朱龙 One kind fetches earth Screw Pile drilling tool and Screw Pile
CN107313730B (en) * 2017-08-11 2023-10-03 朱龙 Soil-taking screw pile drilling tool
CN114541372A (en) * 2022-03-25 2022-05-27 刘帅 Soil-squeezing pore-forming and pile-forming method for screw pile

Similar Documents

Publication Publication Date Title
CN102011397B (en) Construction process of concrete form water-stopping occlusion pile
CN102943466B (en) Construction method for miniature steel pipe concrete pile to penetrate through roadbed layer for reinforcing soft foundation construction
CN203846485U (en) Long pile percussion drill hole forming construction device
CN103243747B (en) Deviation rectifying method of prestressed concrete pipe pile foundation
CN109024651B (en) Steel pipe concrete mixed pile foundation and construction method
CN103422510B (en) Steel pipe frame type cofferdam structure and construction method
CN105275381A (en) Drilling construction method for water-rich cobble stratum by utilizing impact drill
CN105821835A (en) Water injection type rotary drilling construction method for cast-in-situ bored pile
CN103290840A (en) Prestressed pipe pile construction method under boulder group geological conditions
CN106677168A (en) Construction method of cast-in-place superfluid concrete pile
CN103266602A (en) Diameter-expanding pile for manual hole digging and construction method thereof
CN110469332A (en) A kind of advance support consolidation method passing through Debris Flow Deposition body tunnel
CN106758759B (en) A kind of trestle pile foundation and its anchoring process for deep water drift net riverbed
CN206721870U (en) A kind of long auger guncreting pile steel reinforcement cage
CN111608210A (en) Construction method of pressure bearing type anti-floating anchor rod in water-saturated silt stratum
CN106351214A (en) Construction method of long spiral variable diameter concrete pile
CN107100164A (en) A kind of long auger guncreting pile construction method
CN109944244A (en) A kind of anti-float anchor rod and its construction method
CN103147435A (en) Method for treating construction engineering foundation in gob
CN211713954U (en) Cast-in-situ bored pile in deep fine sand stratum
CN206477240U (en) A kind of trestle pile foundation for deep water drift net riverbed
CN110924401A (en) Construction foundation pit supporting mode for combined arching and bearing of mixing piles and cast-in-place piles
CN204780943U (en) H type precast concrete pile and excavation supporting device
CN107675700A (en) The construction method of diaphram wall
CN208330410U (en) A kind of Tunnel Passing crushed zone canopy protection structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170125

RJ01 Rejection of invention patent application after publication