CN104234258B - Building block and reinforced concrete sandwich body of wall and construction method - Google Patents

Building block and reinforced concrete sandwich body of wall and construction method Download PDF

Info

Publication number
CN104234258B
CN104234258B CN201410515053.7A CN201410515053A CN104234258B CN 104234258 B CN104234258 B CN 104234258B CN 201410515053 A CN201410515053 A CN 201410515053A CN 104234258 B CN104234258 B CN 104234258B
Authority
CN
China
Prior art keywords
building block
block
layer
wall
embedded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410515053.7A
Other languages
Chinese (zh)
Other versions
CN104234258A (en
Inventor
何建国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410515053.7A priority Critical patent/CN104234258B/en
Publication of CN104234258A publication Critical patent/CN104234258A/en
Application granted granted Critical
Publication of CN104234258B publication Critical patent/CN104234258B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Retaining Walls (AREA)

Abstract

The invention discloses a kind of building block and reinforced concrete sandwich body of wall and construction method, this body of wall includes that connector and armored concrete pouring layer are fixed in building block, building block.Described building block is divided into three types, by building block from the bottom to top.Building by laying bricks or stones by most descending row to be arranged in order for the first building block, second row is that the second building block is alternately arranged with the third building block builds by laying bricks or stones, and the 3rd row is arranged in order for the first building block and builds by laying bricks or stones, the like;The H-shaped building block locator card being sequentially connected with is inserted the groove by the building block surrounding of above-mentioned arrangement, constitutes the reinforcement by connection part between building block.By the building block back side of above-mentioned arrangement it is being the armored concrete pouring layer of one layer of cast-in-site, at the corresponding pre-embedded block of armored concrete pouring layer, is being embedded with Apertured cushion block.The present invention can realize the side of casting reinforced concrete body of wall and exempt from form removal, improves construction quality, simplifies working procedure, reduction of erection time, improves efficiency of construction and precision, reduces construction construction cost, saving of work and time.

Description

Building block and reinforced concrete sandwich body of wall and construction method
Technical field
The present invention relates to a kind of construction wall structure and construction method.
Technical background
In the site operation of current reinforced concrete wall, majority is utilized in after wall steel bar colligation completes The template taking both sides is propped up respectively, executing of the reinforced concrete wall completed by cast-in-place concrete in both sides Work method, and respectively the interior alien invasion of body of wall is decorated, it is finally completed whole wall construction engineerings.This The method of kind also exists long in time limit, the technical problems such as supply and demand (operation) is loaded down with trivial details, takes a lot of work, time-consuming.
Summary of the invention
It is to provide a kind of building block and reinforced concrete sandwich body of wall and construction method, to solve to make mesh of the present invention The building together with a kind of complex superposition combined at the construction field (site) with dedicated templates with dedicated building block and produce The technical problem of body of wall.
In order to realize foregoing invention purpose, technical scheme is as follows:
Building block and reinforced concrete sandwich body of wall, including building block, connector is fixed in building block and armored concrete waters Note layer;Described building block is divided into three types, and the first is that surrounding side has one or more annular groove and length Longer building block;The second is that surrounding side has one or individual annular groove and the shorter building block of length;The third Being that surrounding side has one or more annular groove and length is shorter, the back side is embedded with the block of inverted tubaeform pre-embedded block Block;Described pre-embedded block there is bolt fixing hole;By building block from the bottom to top by descend most row be the first building block successively Arrangement, second row is that the second building block is alternately arranged with the third building block, and the 3rd row arranges successively for the first building block Row, the like superposition constitute building block layer;Each building block position relationship of described building block layer is interlaced, i.e. The first building block of the first floor and the center alignment of the second building block of the second layer, in the third building block of the second layer Align in gap between the first building block of the heart and the first floor;The H-shaped building block locator card being sequentially connected with is inserted by upper State in the groove of building block surrounding of arrangement, constitute the reinforcement by connection part between building block;It is existing at the back side of building block layer One layer of armored concrete pouring layer of field cast, at the corresponding pre-embedded block of armored concrete pouring layer, is embedded with Apertured cushion block.
Groove is had at the back side of first and second kind of building block.
Have cross groove at the back side of the first building block, the back side of the second building block has and is positioned at center Longitudinal in-line groove, when being superimposed as building block layer, the back side in-line groove of the second building block is built with the first The longitudinal fluting alignment of the back side cross groove of block.
Building block and the construction method of reinforced concrete sandwich body of wall, its step is as follows:
1) groove of building block surrounding side and the connected mode of the locator card inserted in groove, phase, by building block are passed through Mutually superposition fill masonry mortar and consolidate, constitutes the alien invasion layer of body of wall;
2), at the described part-block back side, it is embedded with inverted tubaeform pre-embedded block, pre-embedded block has spiral shell Bolt fixing hole;Groove is had at the described part-block back side;
3), fixing bolt coat is utilized to have Apertured cushion block that template is fixed on the alien invasion layer back side that building block is formed, I.e. fixing the bolt screw through template, the bolt fixing hole that fixing bolt end and tubaeform pre-embedded block are opened is even Connecing, cushion block is enclosed within fixing bolt and between template and building block;
4) space, between building block and template, pours into a mould one layer of armored concrete pouring layer;
5), after and maintenance completely dry until concrete expire, screw out fixing nut, unload described template, i.e. shape Become the construction wall compound with reinforced concrete floor by building block layer.
Present invention have the advantage that and provide a kind of building block and reinforced concrete sandwich body of wall, simplify existing Water the template of reinforced concrete wall template to prop up and take and disassemble, it is achieved that the side of cast in situ ferroconcrete wall body Exempt from form removal, improve construction quality, simplify working procedure, reduction of erection time, improve efficiency of construction and precision, Reduce construction construction cost, saving of work and time.
Accompanying drawing explanation
Fig. 1 is building block and the front elevation view of reinforced concrete sandwich wall construction process of the present invention.
Fig. 2 is building block and the back elevation of reinforced concrete sandwich wall construction process of the present invention.
Fig. 3 is the A-A profile of Fig. 2.
Fig. 4 is the B-B profile of Fig. 3.
Fig. 5 is recessed (location) groove between the laying bricks of the present invention and locator card connects drawing.
Fig. 6-8 is positive facade, side elevation and the top view of locator card of the present invention.
Fig. 9-14 be the back elevation of building block a type of the present invention, front elevation view, right facade, left facade, Look up, overlook elevation.
Figure 15-20 is the back elevation of building block b type of the present invention, left facade, right facade, positive facade, faces upward Depending on face and the face of vertical view figure.
Figure 21-27 is the back elevation of building block c type of the present invention, left facade, right facade, positive facade, faces upward Depending on face, overlook face and the C-C profile of back elevation.
Figure 28-31 is the positive facade of the building block built-in fitting of the present invention, back elevation, side elevation and vertical view face figure.
Figure 32-33 is positive facade and the back elevation of Apertured cushion block of the present invention.
Figure 34-36 is positive facade, back elevation and the side elevational view of masterplate of the present invention.
Numbering explanation: 1, building block a type, 2, building block b type, 3, building block c type, 4, masterplate, 5, fixing spiral shell Bolt, 6, masterplate horizontal location bar, 7, pre-embedded block, 8, Apertured cushion block, 9, building block locator card, 10, the back side Groove.
Detailed description of the invention
See shown in Fig. 1,2,3,4.Building block and reinforced concrete sandwich body of wall, including building block 1,2,3, Connector (locator card 9 of laying bricks) and armored concrete pouring layer are fixed in building block;Described building block is divided into three types, The first is a type, and surrounding side has one or two annular groove, and the back side has cross groove and annular is recessed Groove and this cross groove are misaligned on section, and front is the structure of plane;The second is b type, surrounding side Having one or two annular groove, the back side has in-line groove and two annular grooves and this in-line groove On section misaligned, front is the structure of plane;The third is c type, and surrounding side has one or two ring Connected in star, front is plane, and the back side is embedded with the structure of inverted tubaeform pre-embedded block 7, has solid on pre-embedded block 7 Determine bolt 5 fixing hole;By building block from the bottom to top by most descending row to be arranged in order for the first building block 1, second row is The second building block 2 is alternately arranged with the third building block 3, and the 3rd row is arranged in order for the first building block 1, successively Analogize;The back side one word of the longitudinal fluting of the back side cross groove of first floor building block and the second building block of the second layer Connected in star aligns, and i.e. the second building block of the second layer and the building block center of the first floor are to center, the 3rd of the second layer Align with the gap of first floor building block in the center planting building block;The H-shaped building block locator card 9 being sequentially connected with is inserted by The groove of building block 1,2,3 surrounding of above-mentioned arrangement, constitutes the reinforcement by connection part between building block, and in building block and Fill masonry mortar between building block to consolidate;By one layer of armored concrete of building block back side cast-in-site of above-mentioned arrangement Pouring layer, at the corresponding pre-embedded block 7 of armored concrete pouring layer, is embedded with Apertured cushion block 8.
Building block and the construction method of reinforced concrete sandwich body of wall,
1) groove of building block surrounding side and the connected mode of the locator card inserted in groove, phase, by building block are passed through Mutually superposition fill masonry mortar and consolidate, constitutes the alien invasion layer of body of wall;
2), at the described part-block back side, it is embedded with inverted tubaeform pre-embedded block, pre-embedded block has spiral shell Bolt fixing hole;Groove is had at the described part-block back side;
3), fixing bolt coat is utilized to have Apertured cushion block that template is fixed on the alien invasion layer back side that building block is formed, I.e. fixing the bolt screw through template, the bolt fixing hole that fixing bolt end and tubaeform pre-embedded block are opened is even Connecing, cushion block is enclosed within fixing bolt and between template and building block;
4) space, between building block and template, pours into a mould one layer of armored concrete pouring layer;
5), after the completely dry maintenance of concrete expires, screw out fixing nut, unload described template, i.e. formed The construction wall compound with reinforcing bar water-setting soil layer by building block layer.
Embodiment: as shown in figure (1-3), it includes: dedicated building block 1 (a), 2 (b), 3 (c);Specially With template, building block locator card, connecting bolt.
Concrete method describes sees Fig. 1, Fig. 2, Fig. 3.Building foundation beam is built by laying bricks or stones with masonry mortar The first floor (ground floor building block) body of wall, and all use a type concrete block masonry, when second layer building wall it is Use b type building block and c type building block to be used alternatingly, use groove and the groove of second layer building block of first floor building block Align, and insert location building block locator card, ensure that upper and lower two-layer building block will not misplace. b to be made when building by laying bricks or stones Centering in the building block of type and first floor a type, aligns (as shown in Figure 1) with first floor a groove part in c type. in this approach Alternately masonry panel is to design height, and requires assembling reinforcement, and same base according to design inside blockwork Reserved steel bar on plinth beam connects firmly;Fixed form level is laid by design reinforced concrete wall thickness requirement Location bar is connected firmly with first floor dedicated templates, and splicing dedicated templates is to the design height of body of wall. building block with Place Apertured cushion block between template, with fixing bolt is solid, template and masonry panel are connected fixation, with sealing Masterplate is the closure of body of wall two ends firmly. just can pouring concrete in-situ, maintenance expires form removal, i.e. completes Building block and the construction of reinforced concrete sandwich body of wall.
Experiment proves: with building block and the construction of reinforced concrete sandwich body of wall method, decreases propping up of masterplate and takes and tear open Except workload, shorten construction period, save labor, improve efficiency, reduce cost.

Claims (4)

1. building block and reinforced concrete sandwich body of wall, it is characterised in that include that connector and reinforcing bar are fixed in building block, building block Concrete pouring layer;Described building block is divided into three types, and the first is that surrounding side has one or more annular groove and length Spend longer building block;The second is that surrounding side has one or more annular groove and the shorter building block of length;The third is Surrounding side has one or more annular groove and length is shorter, and the back side is embedded with the building block of inverted tubaeform pre-embedded block;Institute State and on pre-embedded block, have bolt fixing hole;By building block from the bottom to top by most descending row to be arranged in order for the first building block, second row is The second building block is alternately arranged with the third building block, and the 3rd row is arranged in order for the first building block, the like superposition constitute Building block layer;Each building block position relationship of described building block layer is interlaced, i.e. the first building block of the first floor and the second layer The center alignment of the second building block, aligns in the gap between the first building block of the center of the third building block of the second layer and the first floor; The H-shaped building block locator card being sequentially connected with is inserted by the groove of the building block surrounding of above-mentioned arrangement, constitutes between building block Reinforcement by connection part;It is one layer of armored concrete pouring layer of cast-in-site at the back side of building block layer, pours into a mould at armored concrete At the corresponding pre-embedded block of layer, it is embedded with Apertured cushion block.
Building block the most according to claim 1 and reinforced concrete sandwich body of wall, it is characterised in that first and second The back side planting building block has groove.
Building block the most according to claim 2 and reinforced concrete sandwich body of wall, it is characterised in that build at the first The back side of block has cross groove, and the back side of the second building block has the longitudinal in-line groove being positioned at center, in superposition When becoming building block layer, the back side in-line groove of the second building block and the longitudinal fluting of the back side cross groove of the first building block Alignment.
4. building block and the construction method of reinforced concrete sandwich body of wall, its step is as follows:
1), by building block by the connected mode of the groove of building block surrounding side with the locator card inserted in groove, it is overlapped mutually also Filling masonry mortar consolidates, and constitutes the alien invasion layer of body of wall;
2), at the described part-block back side, it is embedded with inverted tubaeform pre-embedded block, pre-embedded block has bolt fixing hole; Groove is had at the described part-block back side;
3), fixing bolt coat is utilized to have Apertured cushion block that template is fixed on the alien invasion layer back side that building block is formed, the most fixing Bolt is through the screw of template, and fixing bolt end is connected with the bolt fixing hole opened on tubaeform pre-embedded block, and cushion block is enclosed within On fixing bolt and between template and building block;
4) space, between building block and template, pours into a mould one layer of armored concrete pouring layer;
5), after and maintenance completely dry until concrete expire, screw out fixing nut, unload described template, i.e. formed by building block The construction wall that layer is compound with reinforced concrete floor.
CN201410515053.7A 2014-09-29 2014-09-29 Building block and reinforced concrete sandwich body of wall and construction method Expired - Fee Related CN104234258B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410515053.7A CN104234258B (en) 2014-09-29 2014-09-29 Building block and reinforced concrete sandwich body of wall and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410515053.7A CN104234258B (en) 2014-09-29 2014-09-29 Building block and reinforced concrete sandwich body of wall and construction method

Publications (2)

Publication Number Publication Date
CN104234258A CN104234258A (en) 2014-12-24
CN104234258B true CN104234258B (en) 2016-08-24

Family

ID=52223085

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410515053.7A Expired - Fee Related CN104234258B (en) 2014-09-29 2014-09-29 Building block and reinforced concrete sandwich body of wall and construction method

Country Status (1)

Country Link
CN (1) CN104234258B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6388739B1 (en) * 2017-05-03 2018-09-12 广州大学 Ion conductive concrete masonry block wall

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735547B (en) * 2016-04-19 2018-01-16 张小强 A kind of walling unit and the wall assembly construction method based on the walling unit
CN112482607A (en) * 2020-12-08 2021-03-12 韩里平 Composite wall prepared from hollow steel pipe and building blocks

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5560167A (en) * 1994-05-25 1996-10-01 Miceli; Robert Laminated masonry block system
CN101571005A (en) * 2009-06-02 2009-11-04 哈尔滨鸿盛房屋节能体系研发中心 Module connected combined type energy conservation and heat preservation moulding board for wall body construction
CN201485989U (en) * 2009-06-06 2010-05-26 西北民族大学 Exterior wall body structure built of decorative heat-insulating compound building blocks
CN204185966U (en) * 2014-09-29 2015-03-04 何建国 Building block and reinforced concrete sandwich body of wall

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5560167A (en) * 1994-05-25 1996-10-01 Miceli; Robert Laminated masonry block system
CN101571005A (en) * 2009-06-02 2009-11-04 哈尔滨鸿盛房屋节能体系研发中心 Module connected combined type energy conservation and heat preservation moulding board for wall body construction
CN201485989U (en) * 2009-06-06 2010-05-26 西北民族大学 Exterior wall body structure built of decorative heat-insulating compound building blocks
CN204185966U (en) * 2014-09-29 2015-03-04 何建国 Building block and reinforced concrete sandwich body of wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6388739B1 (en) * 2017-05-03 2018-09-12 广州大学 Ion conductive concrete masonry block wall
JP2018188950A (en) * 2017-05-03 2018-11-29 广州大学 Ion conductive concrete piled block wall body

Also Published As

Publication number Publication date
CN104234258A (en) 2014-12-24

Similar Documents

Publication Publication Date Title
CN104453014B (en) The method of attachment of 3D printing filled wall and constructional column and attachment structure
KR101301081B1 (en) Wall structure and the construction method therefor
CN104532953B (en) 3D printing based assembly type special-shaped column framework structure and construction method thereof
CN107387117A (en) A kind of prefabricated assembled tunnel structure in tunnel bottom and its construction method
CN103410317A (en) Construction method for site assembly and casting integral wall body by adopting wall body prefabricated part
CN110359631A (en) Secondary structure Constructional Col-umn Construction method
CN104234258B (en) Building block and reinforced concrete sandwich body of wall and construction method
JP2013159929A (en) Building foundation construction method and raised block for use in the same
CN107761759B (en) L-shaped concrete retaining wall
CN104088473A (en) Construction structure and method used for underpinning load-bearing wall
CN210369032U (en) Socket type precast concrete assembled retaining wall unit and assembled retaining wall thereof
CN105019645B (en) Fetch earth in contrary sequence method and the template system and construction method of xoncrete structure are built at mouth
CN112976297B (en) Remanufacturing method of T-beam prefabricated pedestal
CN104141358A (en) Mortar-free self-embedded masonry structure system and building comprising system
CN108385869B (en) Construction method using wall unit for superposed shear wall
CN102251582B (en) Barrier-free decoration structure of high and low incorporated buildings and construction method thereof
KR101088477B1 (en) Multi retaining wall block applicable various stiffener and retaining wall constructing method using this
CN204185966U (en) Building block and reinforced concrete sandwich body of wall
CN102748070B (en) Method for supporting gob-side entry retaining building block coak structure wall
JP6414679B2 (en) Column beam frame structure, method of building column beam frame structure
ITVR20100206A1 (en) FOUNDATION STRUCTURE PARTICULARLY FOR PREFABRICATED BUILDINGS
CN105970995A (en) Bearing platform mold
CN206693266U (en) concrete pipe gallery module
CN106401613B (en) Tunnel steelframe construction method for supporting
CN214034246U (en) Assembled concrete prefabricated component

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160824

Termination date: 20210929