CN104195908A - A combined-structure overpass - Google Patents

A combined-structure overpass Download PDF

Info

Publication number
CN104195908A
CN104195908A CN201310721924.6A CN201310721924A CN104195908A CN 104195908 A CN104195908 A CN 104195908A CN 201310721924 A CN201310721924 A CN 201310721924A CN 104195908 A CN104195908 A CN 104195908A
Authority
CN
China
Prior art keywords
layer
straight
track
east
west
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310721924.6A
Other languages
Chinese (zh)
Other versions
CN104195908B (en
Inventor
杨光平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310721924.6A priority Critical patent/CN104195908B/en
Publication of CN104195908A publication Critical patent/CN104195908A/en
Application granted granted Critical
Publication of CN104195908B publication Critical patent/CN104195908B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A combined-structure overpass is disclosed. The overpass comprises straight lanes from north to south in the first layer, sidewalks from north to south in the first layer, turning lanes in the second layer, straight lanes from east to west in the third layer and sidewalks from east to west in the third layer. Slope lanes are disposed to lead to the layer of the turning lanes and the layer of the straight lanes from east to west and the sidewalks from east to west respectively and are communicated with each other. The turning lanes in the second layer are provided with an annular turning round passing zone in the intersection segment of the straight lanes from north to south in the first layer as well as the sidewalks from north to south in the first layer and the straight lanes from east to west in the third layer as well as the sidewalks from east to west in the third layer. Compared with the prior art, the overpass is characterized by low manufacturing cost, short on-site construction time, small occupied space, concise traffic routes and capability of making the traffic convenient because of no long-winded approach bridges, and dismounting convenience.

Description

Combined structure type overpass bridge
Technical field
The present invention relates to a kind of combined structure type overpass bridge.
Background technology
In road traffic automobile use amount in service, day by day increase, and existing road means of transportation do not catch up with development and make that some is main, the smooth vehicle congestion of Zhi Gandao intersection passing is very serious.Road traffic now adopts single overpass bridge, bridge or tunnel to solve traffic jam issue, and vehicle-pedestrian conflict, traffic lights is set and waits for restricted driving, greatly reduces road traffic traffic efficiency, even brings many potential safety hazards; Or adopt pedestrian overcrossing or People's Bank of China's tube, and to pedestrian, going across the road and bring very big inconvenience, in urban highway traffic, motor vehicles safety hazard and the main status of people in road traffic of causing to pedestrian that block up is more and more subject to social concerns and attention.
Summary of the invention
Technical problem solved by the invention is to provide a kind of combined structure type overpass bridge, to solve the problem proposing in above-mentioned background technology.
Technical problem solved by the invention realizes by the following technical solutions:
Combined structure type overpass bridge, comprises straight-through track and the sidewalk of the south-north direction of first floor, the turning roadway of the second layer, east-west straight-through track and the sidewalk of the 3rd layer; Describedly lead to turning roadway layer and lead to east-west straight-through track and sidewalk layer is equipped with the track, slope communicating with each other; The turning roadway central authorities of the described second layer are provided with the annular district of detouring that turns.
The straight-through track of the south-north direction of described first floor, the second layer and the 3rd layer and sidewalk, turning roadway and east-west straight-through track and sidewalk are by steel structure framework, road surfacing material (sheet metal and other auxiliary material), the auxiliary compositions such as material (channel-section steel, angle steel, sheet metal and other auxiliary material), outer ornament materials that fix.
Described steel structure framework is comprised of load-bearing double-screw bolt, skeleton component and other auxiliary material.
Described load-bearing double-screw bolt is made by round steel, and the epimere of described load-bearing double-screw bolt is provided with screw thread, for being connected and fixed, hypomere is provided with corrosion-resistant coating, the quantity of described load-bearing double-screw bolt is a plurality of, between load-bearing double-screw bolt, is led admittedly each other by channel-section steel and slab, makes bed rearrangement overpass bridge form an integral body.
Described skeleton component by various section bars such as channel-section steel, bar steel, angle steel by its residing position and function and the Steel material framework that the different workpieces of processing is formed by fixedly connecting via standard components such as screw, nuts.
Described auxiliary material comprises finger screw, nut and securing member.
Current principle: it is directly current that the straight-through vehicle of south-north direction is incorporated to straight-through track in advance, the vehicle that needs to turn (no matter left and right) is incorporated to turning roadway in advance, walks to the second layer detour by ramp, and pedestrian is directly current by sidewalk; East-west straight-through vehicle is incorporated in advance straight-through track and walks to the 3rd layer of direct passing through by slope, and the vehicle that need turn walks to the second layer by ramp and detours, and pedestrian walks to the 3rd layer by ramp and directly passes through.
Beneficial effect
Compared with prior art, cost of the present invention is low, on-site construction time is short, floor space is little and because there is no tediously long access bridge, transit route is short and sweet, and it is current more convenient to make, and to remove convenient simultaneously.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is lateral view of the present invention;
Fig. 3 is top view of the present invention;
Fig. 4 is the partial schematic diagram one of described steel structure framework;
Fig. 5 is the partial schematic diagram two of described steel structure framework;
Fig. 6 is the pre-buried schematic diagram of load-bearing double-screw bolt;
Fig. 7 is described skeleton component mounting structure schematic diagram.
The specific embodiment
Below in conjunction with the embodiment of the present invention, the technical scheme in the embodiment of the present invention is clearly and completely described, obviously, described embodiment is only the present invention's part embodiment, rather than whole embodiment.Embodiment based in the present invention, those of ordinary skills, not making the every other embodiment obtaining under creative work prerequisite, belong to the scope of protection of the invention.
Embodiment
As Figure 1-3, combined structure type overpass bridge, comprises straight-through track 1 and the sidewalk 2 of the south-north direction of first floor, east-west straight-through track 4 and sidewalk 5 that the turning roadway of the second layer is 3, the three layers; Describedly lead to turning roadway 3 and lead to east-west straight-through track 4 and sidewalk 5 is equipped with the track, slope 6 communicating with each other; The turning roadway central authorities of the described second layer are provided with the annular district 12 of detouring that turns, and its installation steps are as follows:
1, as Figure 4-Figure 6, according to the scale of institute's bridge and geographical conditions, determine quantity and the position of load-bearing double-screw bolt 7, around each place-centric, dig the hole (concrete size, the degree of depth are depending on geographical conditions) of a certain limit and certain depth, with pile driver, its hypomere (processing through corrosion protection) is thrown into undergroundly, then in dug hole, watered concrete.If residing geographical conditions are bad, also can take other reinforcement measure.(distributing position of double-screw bolt should stagger track and sidewalk, be typically chosen in the isolated area on track and sidewalk; Piling and pouring construction generally should be constructed for the previous period formal, solid to guarantee concrete; Construction should be carried out at night, not affect traffic.If planning is in order, general all pre-buried should completing in one night of double-screw bolt).
2, as shown in Figure 7, skeleton component is installed: after the concrete of pre-buried load-bearing double-screw bolt 7 is solid, with channel-section steel 8 and slab (for the road surface of driving a vehicle), each load-bearing double-screw bolt 7 is led mutually solid, then above skeleton component 9 being arranged on, 7 of skeleton component 9 and load-bearing double-screw bolts are affixed with screw, nut 10 and other clamping washer 11, (it is solid that every one deck basal plane of three layers all should have channel-section steel 8 or slab to lead).
3, bridge floor and side dividing plate are installed: the steel plate that preprocessing is good is arranged on corresponding position by corresponding size and requirement, uses equally screw, nut and other securing member affixed.
4, outer finishing and illumination, communications service are installed the same with interior decoration, accomplish as far as possible convenience and harmonious pleasing.
To those skilled in the art, obviously the invention is not restricted to the details of above-mentioned one exemplary embodiment, and in the situation that not deviating from spirit of the present invention or essential characteristic, can realize the present invention with other concrete form.Therefore, no matter from which point, all should regard embodiment as exemplary, and be nonrestrictive, scope of the present invention is limited by claims rather than above-mentioned explanation, is therefore intended to include in the present invention dropping on the implication that is equal to important document of claim and all changes in scope.
In addition, be to be understood that, although this manual is described according to embodiment, but not each embodiment only comprises an independently technical scheme, this narrating mode of manual is only for clarity sake, those skilled in the art should make manual as a whole, and the technical scheme in each embodiment also can, through appropriately combined, form other embodiments that it will be appreciated by those skilled in the art that.

Claims (7)

1. combined structure type overpass bridge, is characterized in that: comprise straight-through track and the sidewalk of the south-north direction of first floor, the turning roadway of the second layer, east-west straight-through track and the sidewalk of the 3rd layer; Describedly lead to turning roadway layer and lead to east-west straight-through track and sidewalk layer is equipped with the track, slope communicating with each other; The turning roadway central authorities of the described second layer are provided with the annular district of detouring that turns.
2. combined structure type overpass bridge according to claim 1, is characterized in that: the straight-through track of the south-north direction of described first floor, the second layer and the 3rd layer and sidewalk, turning roadway and east-west straight-through track and sidewalk form by steel structure framework, sheet metal, channel-section steel, angle steel and auxiliary material.
3. combined structure type overpass bridge according to claim 2, is characterized in that: described steel structure framework is comprised of load-bearing double-screw bolt, skeleton component and auxiliary material.
4. combined structure type overpass bridge according to claim 3, it is characterized in that: described load-bearing double-screw bolt is made by round steel, and the epimere of described load-bearing double-screw bolt is provided with screw thread, and hypomere is provided with corrosion-resistant coating, the quantity of described load-bearing double-screw bolt is a plurality of, is led each other solid between load-bearing double-screw bolt by channel-section steel and slab.
5. combined structure type overpass bridge according to claim 3, is characterized in that: described skeleton component by the Steel material of differential profiles by its residing position and function and the Steel material framework that the different workpieces of processing is formed by fixedly connecting via screw, nut.
6. according to the combined structure type overpass bridge described in claim 2 or 3, it is characterized in that: described auxiliary material comprises screw, nut and securing member.
7. combined structure type overpass bridge according to claim 1, it is characterized in that: it is directly current that the straight-through vehicle of south-north direction is incorporated to straight-through track in advance, the vehicle of need turning (no matter left and right) is incorporated to turning roadway in advance, by ramp, walk to the second layer and detour, pedestrian is directly current by sidewalk; East-west straight-through vehicle is incorporated in advance straight-through track and walks to the 3rd layer of direct passing through by slope, and the vehicle that need turn walks to the second layer by ramp and detours, and pedestrian walks to the 3rd layer by ramp and directly passes through.
CN201310721924.6A 2013-12-24 2013-12-24 Combined structure type viaduct Expired - Fee Related CN104195908B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310721924.6A CN104195908B (en) 2013-12-24 2013-12-24 Combined structure type viaduct

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310721924.6A CN104195908B (en) 2013-12-24 2013-12-24 Combined structure type viaduct

Publications (2)

Publication Number Publication Date
CN104195908A true CN104195908A (en) 2014-12-10
CN104195908B CN104195908B (en) 2016-08-17

Family

ID=52081261

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310721924.6A Expired - Fee Related CN104195908B (en) 2013-12-24 2013-12-24 Combined structure type viaduct

Country Status (1)

Country Link
CN (1) CN104195908B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104831596A (en) * 2015-05-25 2015-08-12 徐庆惠 Overpass-underpass interchange

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2093196U (en) * 1991-03-18 1992-01-15 路福昌 Grade separation bridge capable of dismantling and moving function
US5921701A (en) * 1997-06-25 1999-07-13 Clayton; Robert F. Traffic interchange
CN201010853Y (en) * 2007-02-08 2008-01-23 陈映华 Double-layer combined type overpass
CN201050027Y (en) * 2007-06-15 2008-04-23 李金才 Crossroad unblocked cloverleaf junction
CN101705652A (en) * 2009-11-03 2010-05-12 杨文臣 Universal compact road overpass
CN102220735A (en) * 2011-03-21 2011-10-19 刘金国 Steel structure movable overpass for crossroad traffic
CN102286904A (en) * 2011-06-10 2011-12-21 邱世军 Four-layer overpass at intersection
CN102337712A (en) * 2011-07-26 2012-02-01 莫济华 Crossed directional barrier-free overpass
CN102747658A (en) * 2012-06-26 2012-10-24 赵树峰 Trunk road L-shaped crankle and branch road connection combined barrier-free all-round transportation hub
CN203238508U (en) * 2013-02-07 2013-10-16 黄中良 Annular left-type city overpass

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2093196U (en) * 1991-03-18 1992-01-15 路福昌 Grade separation bridge capable of dismantling and moving function
US5921701A (en) * 1997-06-25 1999-07-13 Clayton; Robert F. Traffic interchange
CN201010853Y (en) * 2007-02-08 2008-01-23 陈映华 Double-layer combined type overpass
CN201050027Y (en) * 2007-06-15 2008-04-23 李金才 Crossroad unblocked cloverleaf junction
CN101705652A (en) * 2009-11-03 2010-05-12 杨文臣 Universal compact road overpass
CN102220735A (en) * 2011-03-21 2011-10-19 刘金国 Steel structure movable overpass for crossroad traffic
CN102286904A (en) * 2011-06-10 2011-12-21 邱世军 Four-layer overpass at intersection
CN102337712A (en) * 2011-07-26 2012-02-01 莫济华 Crossed directional barrier-free overpass
CN102747658A (en) * 2012-06-26 2012-10-24 赵树峰 Trunk road L-shaped crankle and branch road connection combined barrier-free all-round transportation hub
CN203238508U (en) * 2013-02-07 2013-10-16 黄中良 Annular left-type city overpass

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104831596A (en) * 2015-05-25 2015-08-12 徐庆惠 Overpass-underpass interchange

Also Published As

Publication number Publication date
CN104195908B (en) 2016-08-17

Similar Documents

Publication Publication Date Title
CN103161105A (en) Crossroad unblocked bridge
CN201648898U (en) Traffic system with traffic light-free intersection
CN102268852A (en) Two-phase implementation method of urban road transport system
CN104963252A (en) Urban multilayer roundabout viaduct
CN105239479A (en) City multilayer-rotary-island-type overpass
CN105350416A (en) Method for solving urban road traffic jam
CN101654900A (en) Smooth-moving bridge for intersection
CN104195908A (en) A combined-structure overpass
CN101298749B (en) Winding across method of communicated crossroads
CN202509392U (en) Fast installing-dismounting city small car over-bridge
CN103452022A (en) Construction and transformation methods and structure of flyover junction
CN202688814U (en) Traffic light-free fast transportation system arranged on city crossroad
CN202671991U (en) Small universal unblocked overpass
CN202416105U (en) Unblocked bridge for crossroad
CN202072999U (en) Integral type steel structure flyover
CN204982578U (en) Crossroad does not have red light individual layer overpass
CN105002796A (en) Single-layer overpass without traffic lights on crossroads
CN205368917U (en) City multilayer rotary island formula overpass
CN206385409U (en) Interchange overpass
CN201132919Y (en) Single-layer all-communicated crossroads
CN204803699U (en) Economical cross overpass
CN205557214U (en) High -efficient convenient assembled transportation junction
CN202559200U (en) Urban road traffic optimization function system
CN103452021A (en) Universal unblocked small overpass
CN102493302A (en) Viaduct technology under innovated traffic organization method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817

Termination date: 20191224

CF01 Termination of patent right due to non-payment of annual fee