CN104192552B - For bagged cement load piling main frame unload bag apparatus - Google Patents

For bagged cement load piling main frame unload bag apparatus Download PDF

Info

Publication number
CN104192552B
CN104192552B CN201410424795.9A CN201410424795A CN104192552B CN 104192552 B CN104192552 B CN 104192552B CN 201410424795 A CN201410424795 A CN 201410424795A CN 104192552 B CN104192552 B CN 104192552B
Authority
CN
China
Prior art keywords
bag
unload
belt feeder
gate
bagged cement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410424795.9A
Other languages
Chinese (zh)
Other versions
CN104192552A (en
Inventor
周燕权
邓援超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN LANHAIYAN SMART LOADING EQUIPMENT Co Ltd
Original Assignee
WUHAN LANHAIYAN SMART LOADING EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN LANHAIYAN SMART LOADING EQUIPMENT Co Ltd filed Critical WUHAN LANHAIYAN SMART LOADING EQUIPMENT Co Ltd
Priority to CN201410424795.9A priority Critical patent/CN104192552B/en
Publication of CN104192552A publication Critical patent/CN104192552A/en
Application granted granted Critical
Publication of CN104192552B publication Critical patent/CN104192552B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of for bagged cement load piling main frame unload bag apparatus, including support, longitudinal sliding motion is on support and can unload bag belt feeder with two of the outfan level of corresponding upper step station longitudinally docking, drives two to unload two of bag belt feeder longitudinal sliding motion respectively and unloads bag belt feeder vertical shift motor and be arranged on support corresponding two forwards unloading bag belt feeder vertical shift final position and unload bag gate.Bagged cement on upper step station is delivered to forward unloads above bag gate by unloading bag belt feeder by the present invention, being moved by bagged cement to forward by the cooperation of the rotation and reversely two actions of return of unloading bag belt feeder unloads on bag gate again, the upset of bag gate is unloaded by bagged cement vertical transport to lower step station finally by forward, complete to unload packet procedures, whole process participates in without artificial, thus greatly reduce the labor intensity of workman, ensure that workman's is healthy;And, structure is very simple, low cost.It is applicable to the entrucking of bagged cement.

Description

For bagged cement load piling main frame unload bag apparatus
Technical field
The present invention relates to a kind of parts loading piling main frame for bagged cement, particularly relate to one For bagged cement load piling main frame unload bag apparatus.
Background technology
At present, when the bagged cement entrucking of most of cement plants is dispatched from the factory, still use manual type entrucking, this Plant entrucking mode and there is labor strength greatly, the inefficient defect of entrucking.Part of cement factory uses Auto-manual system carloader, this carloader generally comprise be fixed on Factory Building 1 guide rail 2, roll be arranged on Horizontal transferring device 3 on guide rail 2, roll and be arranged on guide rail 2 and defeated with horizontal transferring device 3 Going out running gear 4 and inclined conveyor 5 that end is connected, this inclined conveyor 5 one end is defeated with level The outfan sending device 3 docks, and inclined conveyor 5 other end is lifted on walking dress by steel wire rope Put on 4.
The work process of this auto-manual system carloader is: first, inclination is carried by running gear 4 The outfan of device 5 moves to need the position of entrucking;Then, start horizontal transferring device 3 and tilt Bagged cement is delivered to the outfan of inclined conveyor 5 by conveyer device 5;Then, workman is by bag Dress cement is transported on vehicle from inclined conveyor 5, the piling of complete multilamellar in a row;Complete one After row's piling, again by running gear 4, the outfan of inclined conveyor 5 is moved to next row Piling is continued in the position needing pile, so circulates.In palletization, when promoting inclination conveying dress During the height of the outfan putting 5, adjust the height of inclined conveyor 5 outfan by pullling steel wire rope Degree.
This auto-manual system carloader is when actually used, and the labor intensity of workman is the biggest, entrucking Efficiency is the most relatively low, and the working environment very severe of workman, is unfavorable for that workman's is healthy.For solving Certainly these problems, inventor tentatively contemplate a kind of by distributor, unload bag apparatus and palletizing apparatus The loading piling main frame constituted, this loading piling main frame can mate with this auto-manual system carloader The automatic stacking of bagged cement.Specifically, distributor want can be by packed water on inclined conveyor 5 Mud is delivered to multiple unloading in bag apparatus, and each outfan unloading bag apparatus fills with corresponding piling again The input vertical butt joint put, to be delivered to by bagged cement on the palletizing apparatus of correspondence, finally owns Palletizing apparatus is wanted can be by horizontal for bagged cement linear array to specifying position.Therefore, how one is developed Plant the input vertical butt joint of outfan and lower step station and bagged cement can be delivered to lower step station Unload bag apparatus, be one of the key issue of whole loading piling main frame research and development.
Summary of the invention
The invention aims to overcome the deficiency of above-mentioned background technology, it is provided that a kind of outfan with under The input vertical butt joint of step station and bagged cement can be delivered to lower step station be used for packed water Mud load piling main frame unload bag apparatus.
In order to realize object above, a kind of of present invention offer loads piling main frame for bagged cement Unloading bag apparatus, including support, longitudinal sliding motion is installed on the bracket and can be with corresponding upper step station Two of outfan level longitudinally docking unload bag belt feeder, drive said two to unload bag belt feeder respectively Two of longitudinal sliding motion unload bag belt feeder vertical shift motor and arrange and unload foreskin described in correspondence on the bracket Two forwards with machine vertical shift final position unload bag gate.By unloading bag belt feeder by upper step station (i.e. Distributor) on bagged cement be delivered to forward and unload above bag gate, more dexterously by unloading foreskin Bagged cement is moved to forward and unloads bag gate by the cooperation of the rotation with machine and reversely two actions of return On, unload the upset of bag gate by bagged cement vertical transport to lower step station (i.e. code finally by forward Buttress device) on, completing to unload packet procedures, the whole packet procedures that unloads participates in without artificial, thus greatly drops The low labor intensity of workman, has ensured that workman's is healthy;And, structure is very simple, one-tenth This is low.
In such scheme, described in unload the level height of bag belt feeder end face greater than or equal to described forward Unload the level height of bag gate end face.By being designed to be higher than by the level height unloading bag belt feeder end face Or unload the level height of bag gate end face equal to described forward, so it is easy to unload bag belt feeder by packed water Mud moves to forward and unloads on bag gate.
In such scheme, described support unloads the vertical shift start position of bag belt feeder respectively described in correspondence It is provided with two and reversely unloads bag gate.Divided by the vertical shift start position unloading bag belt feeder corresponding on support Do not arrange two and reversely unload bag gate, so, when code dress loads the head of container (such as lorry etc.), Use forward to unload bag gate to carry out unloading bag, when piling loads the afterbody of container, use and reversely unload bag lock Door carries out unloading bag, it is to avoid this device interferes with head and the afterbody of loading container, makes full use of Load the space of container.
In such scheme, described in unload the level height of bag belt feeder end face greater than or equal to described reversely Unload the level height of bag gate end face.By being designed to be higher than by the level height unloading bag belt feeder end face Or equal to the described level height reversely unloading bag gate end face, be so easy to unload bag belt feeder by packed water Mud moves to reversely unloading on bag gate.
In such scheme, it is identical with the structure reversely unloading bag gate and all wrap that described forward unloads bag gate Include two sides to be respectively articulated with unloading bag door leaf, one end and described unloading bag door leaf on the bracket is installed Fixing connect unload bag bull stick and two install unload bag door leaf position on described supports described in correspondence unload bag Gate cylinder, described in unload the telescopic end of bag gate cylinder with corresponding described in unload the bag bull stick other end hinged.
The present invention is compared with the prior art, and fully shows that it is advantageous in that:
1, the bagged cement on upper step station (i.e. distributor) is just delivered to by unloading bag belt feeder To unloading above bag gate, more dexterously by unloading the rotation of bag belt feeder and reversely moving back two actions Coordinating to move bagged cement unloads on bag gate to forward, and the upset unloading bag gate finally by forward will Bagged cement vertical transport on lower step station (i.e. palletizing apparatus), completes to unload packet procedures, whole unloads Packet procedures participates in without artificial, thus greatly reduces the labor intensity of workman, has ensured workman's Healthy;And, structure is very simple, low cost;
2, by being designed to unload bag greater than or equal to described forward by the level height unloading bag belt feeder end face The level height of gate end face, is so easy to unload bag belt feeder and is moved by bagged cement to forward and unload bag lock Men Shang;
3, it is respectively provided with two by the vertical shift start position unloading bag belt feeder corresponding on support reversely to unload Bag gate, so, when code dress loads the head of container (such as lorry etc.), uses forward to unload bag lock Door carries out unloading bag, when piling loads the afterbody of container, uses and reversely unloads bag gate and carry out unloading bag, keep away The head and afterbody of having exempted from this device and load container interfere, and take full advantage of the sky loading container Between;
4, by being designed to reversely unload bag greater than or equal to described by the level height unloading bag belt feeder end face The level height of gate end face, is so easy to unload bag belt feeder and is moved by bagged cement to reversely unloading bag lock Men Shang.
The present invention has without advantages such as artificial participation, simple in construction, low cost and floor space are little.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the plan structure schematic diagram of Fig. 1;
Fig. 3 is the structural representation loading piling main frame;
Fig. 4 is the plan structure schematic diagram of Fig. 3;
Fig. 5 is the use status architecture schematic diagram of the present invention;
Fig. 6 is the plan structure schematic diagram after Fig. 5 removes running gear and lifting device;
Fig. 7 is the structural representation of distributor;
Fig. 8 is the plan structure schematic diagram of Fig. 7;
Fig. 9 is the partial enlargement structural representation in A portion in Fig. 2;
Figure 10 is the structural representation of palletizing apparatus;
Figure 11 is the cross-sectional view of Figure 10;
Figure 12 is the side-looking structural representation of Figure 10;
Figure 13 is the original state structural representation of forward piling gate;
Figure 14 is the operating state structural representation of forward piling gate;
Figure 15 is the plan structure schematic diagram of Figure 13.
In figure: Factory Building 1, guide rail 2, horizontal transferring device 3, running gear 4, inclined conveyor 5, Alignment system 6, controller 7, loading piling main frame 8, distributor 8a, check strap machine 8a1, Ground floor distribution belt feeder 8a2, the first distribution belt feeder transverse cylinder 8a3, second layer distribution belt feeder 8a4, second layer distribution belt feeder traversing motor 8a5, unload bag apparatus 8b, unload bag belt feeder 8b1, unload Bag belt feeder vertical shift motor 8b2, forward unloads bag gate 8b3, unloads bag door leaf 8b3a, unloads bag bull stick 8b3b, Unload bag gate cylinder 8b3c, reversely unload bag gate 8b4, palletizing apparatus 8c, upright slide rail 8c1, vertically Slide rail traversing motor 8c2, installing rack 8c3, forward piling gate 8c4, piling gate cylinder 8c4a, Connecting rod 8c4b, intermediate connecting rod 8c4c, piling bull stick 8c4d, piling door leaf 8c4e, guide pin bushing 8c4f, lead Post 8c4g, lift cylinder 8c5, reverse piling gate 8c6, support 8d, lifting device 9, ground jack 9a, steel wire rope 9b, guide pillar guide pin bushing 9c.
Detailed description of the invention
Below in conjunction with the accompanying drawings and embodiment the present invention is described in further detail, but this embodiment is not It is interpreted as limitation of the present invention.
Originally unload bag apparatus actually used time need to be with distributor 8a, palletizing apparatus 8c, horizontal transferring device 3, running gear 4, inclined conveyor 5, alignment system 6, controller 7 and lifting device 9 etc. are joined Unify the full-automatic bag-pack cement loading machine of composition, to realize the Full automatic loading of bagged cement, specifically Ground, this full-automatic bag-pack cement loading machine includes the guide rail 2 being fixed on Factory Building 1, rolls and is arranged on institute State the horizontal transferring device 3 on guide rail 2, roll be arranged on described guide rail 2 and with described horizontal feed The running gear 4 that the outfan of device 3 is connected, inclined conveyor 5, alignment system 6 and controller 7, the input of described inclined conveyor 5 docks with the outfan of described horizontal transferring device 3, institute Stating the outfan of inclined conveyor 5 to being connected to load piling main frame 8, described loading piling main frame 8 leads to Cross lifting device 9 to be lifted on described running gear 4;Described loading piling main frame 8 includes distribution dress Put 8a, unload bag apparatus 8b, palletizing apparatus 8c and support 8d, described distributor 8a, unload bag apparatus 8b and palletizing apparatus 8c is sequentially arranged on described support 8d, the input of described distributor 8a with The outfan docking of described inclined conveyor 5, the quantity of the outfan of described distributor 8a is at least Being 2, each outfan of described distributor 8a unloads the defeated of bag apparatus 8b with described in one respectively Enter the docking of end level, each described in unload the outfan of bag apparatus 8b respectively with a described palletizing apparatus 8c Input vertical butt joint, the outfan of each described palletizing apparatus 8c is by bagged cement vertical transport extremely Specifying position, all described palletizing apparatus 8c are delivered to specify the bagged cement of position to be horizontal straight line Arrangement.By distributor 8a, the bagged cement on inclined conveyor 5 at least divided 2 supply lines It is delivered to unloading in bag apparatus 8b of respective amount, then to unload bag apparatus 8b defeated by bagged cement by each Deliver on the palletizing apparatus 8c of respective amount, finally by all palletizing apparatus 8c, bagged cement is horizontal Linear array, completes piling, and whole process participates in without artificial, thus greatly reduces workman's Labor intensity, has ensured that workman's is healthy;It is additionally, since described loading piling main frame 8 at least There are 2 supply lines, so piling efficiency is high.
In such scheme, described distributor 8a includes check strap machine 8a1, slides laterally installation Two ground floor distribution belt feeder 8a2 on described support 8d, drive described ground floor to distribute belt The first distribution belt feeder transverse cylinder 8a3 and be arranged on described support 8d that machine 8a2 slides laterally simultaneously On two second layers distribution belt feeder 8a4;The input of described check strap machine 8a1 and described inclination The longitudinally docking of the outfan of conveyer device 5, the outfan of described check strap machine 8a1 can respectively with institute State the input longitudinally docking of two ground floor distribution belt feeder 8a2, said two ground floor distribution skin Outfan with machine 8a2 can be longitudinal with the input of corresponding described second layer distribution belt feeder 8a4 respectively Docking, the outfan of described second layer distribution belt feeder 8a4 and the described input water unloading bag apparatus 8b Flat longitudinally docking.By check strap machine 8a1, the bagged cement on inclined conveyor 5 is delivered to On ground floor distribution belt feeder 8a2, then will by sliding laterally of two ground floor distribution belt feeder 8a2 Bagged cement divides on the second layer distribution belt feeder 8a4 that two supply lines are delivered to correspondence respectively, finally By two second layer distribution belt feeder 8a4, bagged cement is delivered to two respectively and unloads bag apparatus 8b On, completing assigning process, whole assigning process participates in without artificial, thus greatly reduces workman Labor intensity, ensured that workman's is healthy;Meanwhile, by check strap machine 8a1 and first Bagged cement on inclined conveyor 5 is divided two supply lines defeated by the cooperation of Layer assignment belt feeder 8a2 Send, greatly increase efficiency, and simple in construction, low cost;And, described check strap machine 8a1 Rotation is stopped, when ground floor distributes belt feeder 8a2 after receiving bagged cement from inclined conveyor 5 Input when docking with the outfan of check strap machine 8a1, check strap machine 8a1 just may proceed to rotation And bagged cement is delivered on ground floor distribution belt feeder 8a2, thus play cushioning effect, so, Can guarantee that bagged cement is delivered on ground floor distribution belt feeder 8a2 exactly.
In such scheme, described second layer distribution belt feeder 8a4 slides laterally and is arranged on described support On 8d, described support 8d is provided with and drives said two second layer distribution belt feeder 8a4 laterally to slide respectively Two dynamic second layer distribution belt feeder traversing motor 8a5, described second layer distribution belt feeder 8a4's is defeated Go out end and be positioned at the distribution of the described second layer with the described longitudinal position docked of input level unloading bag apparatus 8b The middle position of the transverse shifting stroke of belt feeder 8a4, described second layer distribution belt feeder traversing motor 8a5 For servomotor, described second layer distribution belt feeder traversing motor 8a5 can by chain or Timing Belt or Steel wire rope drives second layer distribution belt feeder 8a4 to slide laterally, to realize second layer distribution belt feeder 8a4 Be accurately positioned.By the second layer being distributed the structure that belt feeder 8a4 is also designed to slide laterally, And the outfan that the second layer distributes belt feeder 8a4 longitudinally docks with the input level unloading bag apparatus 8b Position Design in the middle position of transverse shifting stroke of second layer distribution belt feeder 8a4, so can be significantly Reduce the lateral dimension unloading bag apparatus 8b, thus reduce cost, reduce floor space.
Certainly, it is possible to directly by two or more pieces by horizontal transferring device 3 and inclined conveyor 5 groups Bagged cement is fed directly to unload in bag apparatus 8b by the bagged cement supply line become.
In such scheme, described in unload bag apparatus 8b and include that longitudinal sliding motion is arranged on described support 8d And can unload with two of the outfan level longitudinally docking of corresponding described second layer distribution belt feeder 8a4 Bag belt feeder 8b1, drives said two to unload two of bag belt feeder 8b1 longitudinal sliding motion respectively and unloads foreskin band Machine vertical shift motor 8b2 unloads bag belt feeder 8b1 vertical shift terminal with being arranged on described support 8d described in correspondence Two forwards of position unload bag gate 8b3.By unloading bag belt feeder 8b1 by the bag on distributor 8a Dress cement is longitudinally fed to be unloaded above bag gate 8b3 to forward, more dexterously by unloading bag belt feeder 8b1 Rotation and the cooperation of reversely two actions of return bagged cement is moved to forward and unloads on bag gate 8b3, Specifically, rotational velocity and the reverse return speed of unloading bag belt feeder 8b1 are equal, finally by Forward unloads the upset of bag gate 8b3 by bagged cement vertical transport to palletizing apparatus 8c, completes to unload bag Process, the whole packet procedures that unloads participates in without artificial, thus greatly reduces the labor intensity of workman, Ensure that workman's is healthy;And, structure is very simple, low cost.
The above-mentioned bag belt feeder vertical shift motor 8b2 that unloads is servomotor, its can by chain or Timing Belt or Steel wire rope drives and unloads bag belt feeder 8b1 longitudinal sliding motion, thus realizes unloading the most fixed of bag belt feeder 8b1 Position.
Certainly, it is possible to use the bag belt feeder 8b1 that unloads of lifting structure directly to be moved to just by bagged cement To unloading on bag gate 8b3, thus without controlling ordinatedly unload the rotation of bag belt feeder 8b1 and reversely return Move two actions.Specifically, unload bag belt feeder 8b1 and can be arranged on institute by elevating mechanism longitudinal sliding motion State on support 8d, unload bag gate 8b3 by longitudinally fed for bagged cement to forward when unloading bag belt feeder 8b1 During top, described elevating mechanism drives and unloads bag belt feeder 8b1 decline, so that bagged cement falls completely Unload on bag gate 8b3 at forward, unload after bag belt feeder 8b1 separates with bagged cement, unload bag belt feeder 8b1 just starts reversely back to move, and meanwhile, elevating mechanism drive is unloaded bag belt feeder 8b1 and risen to initially Position, so circulates.
Certainly, it is possible to use the bag apparatus of unloading of other structures bagged cement is delivered to forward to unload bag gate On 8b3, or bagged cement is manually carried to forward and unloads on bag gate 8b3 by direct employing.
In such scheme, described palletizing apparatus 8c include sliding laterally be arranged on below support 8d right Answer said two forward unload bag gate 8b3 position two couples of upright slide rail 8c1, respectively drive described two right Two upright slide rail traversing motor 8c2 that upright slide rail 8c1 slides laterally, be slidably mounted on described vertically Installing rack 8c3 on slide rail 8c1, it is arranged on corresponding described forward on described installing rack 8c3 and unloads bag gate The forward piling gate 8c4 of 8b3 position and the lift cylinder of the described installing rack 8c3 vertical sliding motion of driving 8c5, the upper end of every couple of described upright slide rail 8c1 is connected by connecting plate, and described lift cylinder 8c5 fixes Being arranged on described connecting plate, described forward piling gate 8c4 is positioned at described forward and is just unloading bag gate 8b3 Lower section.The bag under dropping at bag gate 8b3 is unloaded from forward by forward piling gate 8c4 vertical reception Dress cement, then laterally move to bagged cement specify position by sliding laterally of upright slide rail 8c1 Surface, and bagged cement is vertically declined near specific bit by the vertical sliding motion of installing rack 8c3 Putting, bagged cement is fallen to specify position by the upset finally by forward piling gate 8c4, completes Palletization, whole palletization participates in without artificial, thus the work greatly reducing workman is strong Degree, has ensured that workman's is healthy;And, upright slide rail 8c1 slides laterally two codes of cooperation Buttress device 8c, it is achieved that the horizontal linear array of bagged cement, simple in construction and low cost.
Above-mentioned upright slide rail traversing motor 8c2 is servomotor, and it can be by chain or Timing Belt or steel Cord drives upright slide rail 8c1 to slide laterally, thus realizes being accurately positioned of upright slide rail 8c1.
Certainly, it is possible to use the palletizing apparatus 8c of other structures to realize the palletization of bagged cement, or Directly employing manually realizes the piling of bagged cement.
In such scheme, described support 8d unloads described in correspondence the vertical shift starting point position of bag belt feeder 8b1 Put and be respectively equipped with two and reversely unload bag gate 8b4, corresponding on described installing rack 8c3 described reversely unloads bag lock The position of door 8b4 is provided with reverse piling gate 8c6, described forward piling gate 8c4 and described reverse code Buttress gate 8c6 is arranged symmetrically with relative to described upright slide rail 8c1, and described forward piling gate 8c4 is positioned at The front of described upright slide rail 8c1, described reverse piling gate 8c6 is positioned at described upright slide rail 8c1 Rear, described reverse piling gate 8c6 is positioned at described reversely unloading immediately below bag gate 8b4.Pass through Front and back at upright slide rail 8c1 is respectively provided with piling gate, so, when code dress loads container During the head of (such as lorry etc.), use forward piling gate 8c4 to carry out piling, hold when piling loads During the afterbody of device, reverse piling gate 8c6 is used to carry out piling, it is to avoid upright slide rail 8c1 and loading Head and the afterbody of container interfere, and take full advantage of the space loading container.
In such scheme, described in unload the level height of bag belt feeder 8b1 end face greater than or equal to described Forward unloads the level height of bag gate 8b3 end face, described in unload the level height of bag belt feeder 8b1 end face Greater than or equal to the described level height reversely unloading bag gate 8b4 end face.By bag belt feeder 8b1 will be unloaded The level height of end face is designed to unload the level height of bag gate 8b3 end face greater than or equal to described forward, And be designed to reversely unload bag gate greater than or equal to described by the level height unloading bag belt feeder 8b1 end face The level height of 8b4 end face, is so easy to unload bag belt feeder 8b1 and is moved by bagged cement to forward and unload bag Gate 8b3 or reversely unload on bag gate 8b4.
In such scheme, described forward unloads bag gate 8b3 and reversely unloads the structure phase of bag gate 8b4 With and all include two sides be respectively articulated be arranged on described support 8d unload bag door leaf 8b3a, one end Fix unload bag bull stick 8b3b and two being connected install on described support 8d with the described bag door leaf 8b3a that unloads That unloads bag door leaf 8b3a position described in correspondence unloads bag gate cylinder 8b3c, described in unload bag gate cylinder 8b3c Telescopic end with corresponding described in unload the bag bull stick 8b3b other end hinged.Said two unloads bag door leaf 8b3a Between spacing match with the width unloading bag belt feeder 8b1.
In such scheme, described forward piling gate 8c4 is identical with the structure of reverse piling gate 8c6 And all include piling gate cylinder 8c4a, middle part and the described piling being arranged on described installing rack 8c3 Connecting rod 8c4b, two intermediate connecting rod 8c4c, two pilings that the telescopic end of gate cylinder 8c4a is connected turn Bar 8c4d and two sides are respectively articulated with the piling door leaf 8c4e being arranged on described installing rack 8c3, institute State that piling bull stick 8c4d one end and described piling door leaf 8c4e are fixing to be connected, described piling bull stick 8c4d The other end is hinged with described intermediate connecting rod 8c4c one end, the described intermediate connecting rod 8c4c other end and described company The termination of bar 8c4b is hinged;The both sides of corresponding described piling gate cylinder 8c4a on described installing rack 8c3 Being respectively equipped with a guide pin bushing 8c4f, in described guide pin bushing 8c4f, activity is fitted with guide pillar 8c4g respectively, described The upper end of guide pillar 8c4g is connected with described connecting rod 8c4b respectively.By connecting rod 8c4b and intermediate connecting rod 8c4c Cooperation, it is achieved that two piling door leaf 8c4e share the purpose of a cylinder, thus reduce cost; Meanwhile, the guide pin bushing 8c4f cooperated added and guide pillar 8c4g makes the translation of connecting rod 8c4b more flat Surely, thus improve forward piling gate 8c4 and reverse piling gate 8c6 and open and the stability of Guan Bi.
In such scheme, described lifting device 9 includes ground jack 9a, steel wire rope 9b and four set guide pillars Guide pin bushing 9c, the lower end of described four set guide pillar guide pin bushing 9c is separately mounted at the corner of described support 8d, The upper end of described four set guide pillar guide pin bushing 9c is separately mounted on described running gear 4, described ground jack 9a It is fixedly mounted on described running gear 4, one end of described steel wire rope 9b and described ground jack 9a phase Even, the other end of described steel wire rope 9b is connected with described support 8d, and described ground jack 9a is arranged on institute State on support 8d, and described ground jack 9a electrically connects with described controller 7.By support 8d's Add a set of guide pillar guide pin bushing 9c at corner respectively, on the one hand can improve and load the flat of piling main frame 8 lifting Stability, on the other hand, can guarantee that loading piling main frame 8 remains level in lifting process, from And improve the accuracy of piling.
Above-mentioned horizontal transferring device 3, running gear 4, inclined conveyor 5, alignment system 6, dress The each several part carried in piling main frame 8 is all connected with controller 7 with lifting device 9, by controller 7 Control.
Above-mentioned horizontal transferring device 3, inclined conveyor 5 and each belt feeder loaded in piling main frame 8 All can use the belt feeder of motorized pulleys belt feeder or common drive, it is possible to use cartridge type conveyer or plate Formula conveyer.
The work process of above-mentioned full-automatic bag-pack cement loading machine is as follows:
First, after haulage vehicle enters entrucking station, vision positioning system 6 haulage vehicle is determined Physical location, and relevant data are passed to controller 7 prepare entrucking;Then, horizontal transferring device 3 Bagged cement from cement plant packing shop or warehouse is delivered to inclined conveyor 5, and by tilting Bagged cement is delivered on the check strap machine 8a1 of distributor 8a by conveyer device 5;Then, slow Rush belt feeder 8a1 to be delivered to by bagged cement on ground floor distribution belt feeder 8a2, and by two first Bagged cement is divided two supply lines to be delivered to correspondence respectively by sliding laterally of Layer assignment belt feeder 8a2 On second layer distribution belt feeder 8a4, then the transverse shifting by two second layer distribution belt feeder 8a4 is accurate Bagged cement really is delivered to two respectively unload on bag belt feeder 8b1, completes assigning process;Connect again , unload bag belt feeder 8b1 and unload longitudinally fed for bagged cement above bag gate 8b3 to forward, and ingeniously Bagged cement is moved by the cooperation of the rotation and reversely two actions of return by unloading bag belt feeder 8b1 wonderfully Move to forward and unload on bag gate 8b3, then unload the upset of bag gate 8b3 by forward bagged cement is hung down Directly it is delivered on forward piling gate 8c4, completes to unload packet procedures;Subsequently, the horizontal stroke of upright slide rail 8c1 To sliding, forward piling gate 8c4 and bagged cement laterally move to specify on haulage vehicle position Surface, and by the vertical sliding motion of installing rack 8c3 by vertical to forward piling gate 8c4 and bagged cement Decline until near described appointment position, then by the upset of forward piling gate 8c4 by bagged cement Fall to described appointment position, complete the completeest horizontal piling in a row of palletization;Complete in a row laterally After piling, first driven loading piling main frame 8 to move to next row by running gear 4 and need the position of piling Continue piling, when loading piling main frame 8 and moving to haulage vehicle afterbody, by reversely unloading bag gate 8b4 Piling action is completed with reverse piling gate 8c6, until complete one layer of code, the most again by lifting device 9 Driving loading piling main frame 8 to rise one layer and complete second layer piling, so circulation is until completing whole fortune The piling of defeated vehicle.Certainly, after complete horizontal piling in a row, it is possible to first driven dress by lifting device 9 Load piling main frame 8 rises one layer and completes the same piling that ranked second layer, until the complete same row's of code is all Layer, is driven loading piling main frame 8 to move to next row by running gear 4 the most again and needs the position of piling Continue piling, when loading piling main frame 8 and moving to haulage vehicle afterbody, by reversely unloading bag gate 8b4 Completing piling action with reverse piling gate 8c6, so circulation is until completing the code of whole haulage vehicle Buttress.
Above-mentioned full-automatic bag-pack cement loading machine passes through distributor 8a by the bag on inclined conveyor 5 Dress cement at least divides 2 supply lines to be delivered to the unloading in bag apparatus 8b of respective amount, then is unloaded by each Bagged cement is delivered on the palletizing apparatus 8c of respective amount by bag apparatus 8b, finally by all codes Buttress device 8c, by horizontal for bagged cement linear array, completes piling, and whole process participates in without artificial, Thus greatly reduce the labor intensity of workman, ensure that workman's is healthy;Due to described dress Carry piling main frame 8 at least 2 supply lines, so piling efficiency is high;By check strap machine 8a1 Bagged cement on inclined conveyor 5 is delivered on ground floor distribution belt feeder 8a2, then passes through Bagged cement is divided two supply lines to carry respectively by two ground floor sliding laterally of belt feeder 8a2 of distribution To corresponding second layer distribution belt feeder 8a4, finally by two second layer distribution belt feeder 8a4 Bagged cement is delivered to respectively two and unloads in bag apparatus 8b, complete assigning process, whole assigning process Participate in without artificial, thus greatly reduce the labor intensity of workman, ensured that the health of workman is good for Health;And, inclination is carried by the cooperation being distributed belt feeder 8a2 by check strap machine 8a1 and ground floor Bagged cement on device 5 divides the conveying of two supply lines, greatly increases efficiency, and simple in construction, Low cost;By the second layer being distributed the structure that belt feeder 8a4 is also designed to slide laterally, and will The position that the outfan of second layer distribution belt feeder 8a4 longitudinally docks with the input level unloading bag apparatus 8b Install the middle position counting the transverse shifting stroke at second layer distribution belt feeder 8a4, so can be greatly reduced Unload the lateral dimension of bag apparatus 8b, thus reduce cost, reduce floor space;By unloading bag belt feeder Bagged cement on distributor 8a is delivered to forward and unloads above bag gate 8b3 by 8b1, more dexterously By the cooperation of the rotation and reversely two actions of return of unloading bag belt feeder 8b1 bagged cement moved to Forward unloads on bag gate 8b3, and the upset unloading bag gate 8b3 finally by forward is vertical by bagged cement Being delivered on palletizing apparatus 8c, complete to unload packet procedures, the whole packet procedures that unloads participates in without artificial, thus Greatly reduce the labor intensity of workman, ensured that workman's is healthy;And, structure is very Simply, low cost;Unload to fall at bag gate 8b3 from forward by forward piling gate 8c4 vertical reception The bagged cement fallen, then by sliding laterally of upright slide rail 8c1, bagged cement is laterally moved to Specify the surface of position, and by the vertical sliding motion of installing rack 8c3, bagged cement is vertically declined and lean on Closely specifying position, bagged cement is fallen to specific bit by the upset finally by forward piling gate 8c4 Putting, complete palletization, whole palletization participates in without artificial, thus greatly reduces workman Labor intensity, ensured that workman's is healthy;Upright slide rail 8c1 slides laterally cooperation two Palletizing apparatus 8c, it is achieved that the horizontal linear array of bagged cement, simple in construction and low cost;Pass through Front and back at upright slide rail 8c1 is respectively provided with piling gate, so, when code dress loads container During the head of (such as lorry etc.), use forward piling gate 8c4 to carry out piling, hold when piling loads During the afterbody of device, reverse piling gate 8c6 is used to carry out piling, it is to avoid upright slide rail 8c1 and loading Head and the afterbody of container interfere, and take full advantage of the space loading container;By foreskin will be unloaded Level height with machine 8b1 end face is designed to unload bag gate 8b3 end face greater than or equal to described forward Level height, and the level height unloading bag belt feeder 8b1 end face is designed to greater than or equal to described instead To unloading the level height of bag gate 8b4 end face, so it is easy to unload bag belt feeder 8b1 and bagged cement is moved Move to forward and unload bag gate 8b3 or reversely unload on bag gate 8b4;By connecting rod 8c4b and intermediate connecting rod The cooperation of 8c4c, it is achieved that two piling door leaf 8c4e share the purpose of a cylinder, thus reduce Cost;The guide pin bushing 8c4f cooperated added and guide pillar 8c4g makes the translation of connecting rod 8c4b more flat Surely, thus improve forward piling gate 8c4 and reverse piling gate 8c6 and open and the stability of Guan Bi; By adding a set of guide pillar guide pin bushing 9c at the corner of support 8d respectively, loading piling on the one hand can be improved The stationarity of main frame 8 lifting, on the other hand, can guarantee that loading piling main frame 8 begins in lifting process Keep level eventually, thus improve the accuracy of piling.
Above-mentioned full-automatic bag-pack cement loading machine is applicable not only to cement industry, is further adapted to other as changed The sacked material of the industry such as work, grain needs the situation of entrucking.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all at this Within bright spirit and principle, any modification, equivalent substitution and improvement etc. made, should be included in Within protection scope of the present invention.

Claims (3)

1. one kind is unloaded bag apparatus for what bagged cement loaded piling main frame, it is characterised in that: include Frame (8d), longitudinal sliding motion is arranged on described support (8d) and can be with the output of corresponding upper step station Two of end level longitudinally docking unload bag belt feeder (8b1), drive said two to unload bag belt feeder respectively (8b1) two of longitudinal sliding motion unload bag belt feeder vertical shift motor (8b2) and are arranged on described support (8d) Two forwards unloading bag belt feeder (8b1) vertical shift final position described in upper correspondence unload bag gate (8b3); The described level height unloading bag belt feeder (8b1) end face unloads bag gate (8b3) greater than or equal to described forward The level height of end face;The vertical shift unloading bag belt feeder (8b1) described in the upper correspondence of described support (8d) rises Point position is respectively equipped with two and reversely unloads bag gate (8b4).
2. be used for bagged cement loading piling main frame as claimed in claim 1 unloads bag apparatus, and it is special Levy and be: described in unload the level height of bag belt feeder (8b1) end face and reversely unload bag greater than or equal to described The level height of gate (8b4) end face.
3. be used for bagged cement loading piling main frame as claimed in claim 1 unloads bag apparatus, and it is special Levy and be: described forward to unload bag gate (8b3) identical with the structure reversely unloading bag gate (8b4) and All include two sides be respectively articulated be arranged on described support (8d) unload bag door leaf (8b3a), one End with described unload bag door leaf (8b3a) fixing is connected unload described in bag bull stick (8b3b) and two installations That unloads bag door leaf (8b3a) position described in the upper correspondence of support (8d) unloads bag gate cylinder (8b3c), institute State the telescopic end unloading bag gate cylinder (8b3c) and unload bag bull stick (8b3b) other end described in corresponding Hinged.
CN201410424795.9A 2014-08-26 2014-08-26 For bagged cement load piling main frame unload bag apparatus Active CN104192552B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410424795.9A CN104192552B (en) 2014-08-26 2014-08-26 For bagged cement load piling main frame unload bag apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410424795.9A CN104192552B (en) 2014-08-26 2014-08-26 For bagged cement load piling main frame unload bag apparatus

Publications (2)

Publication Number Publication Date
CN104192552A CN104192552A (en) 2014-12-10
CN104192552B true CN104192552B (en) 2016-09-28

Family

ID=52077980

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410424795.9A Active CN104192552B (en) 2014-08-26 2014-08-26 For bagged cement load piling main frame unload bag apparatus

Country Status (1)

Country Link
CN (1) CN104192552B (en)

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3762230D1 (en) * 1986-08-16 1990-05-17 Meypack Verpackungs Und Palett SACK PALLETISER.
IT1201564B (en) * 1986-11-03 1989-02-02 Car Ventomatic Spa CONTINUOUS INTERVENTION SYSTEM FOR AUTOMATIC MUTUAL POSITIONING ACCORDING TO ANY DIAGRAM OF BAGS, BOXES OR OTHER OBJECTS, PARTICULARLY FOR THE USE OF MACHINES FOR LOADING HANDLING PLATFORMS
CN2589424Y (en) * 2002-12-09 2003-12-03 孙川峰 Bagged goods catching and placing machine
FR2899203B1 (en) * 2006-04-04 2010-08-27 Sidel Participations REMOVAL TABLE FOR PALLETIZER.
CN201183684Y (en) * 2008-03-21 2009-01-21 常熟市三禾计量设备厂 Shaping mechanism for wrapper
CN202704582U (en) * 2012-08-08 2013-01-30 江苏中科友特机器人科技有限公司 Automatic stacking machine
CN204162057U (en) * 2014-08-26 2015-02-18 武汉蓝海燕智能装车设备有限公司 The packaging of unloading of loading piling main frame for bagged cement is put

Also Published As

Publication number Publication date
CN104192552A (en) 2014-12-10

Similar Documents

Publication Publication Date Title
CN104192584B (en) Full-automatic bag-pack cement loading machine
CN204162110U (en) Full automaticity bag-pack cement loading machine
CN104192586B (en) Loading piling main frame for bag-pack cement loading machine
CN104670925B (en) Automatic stacking and loading machine for bagged cement
CN104724516B (en) A kind of automatic loading device being applicable to van
CN104192588B (en) For bagged cement load piling main frame unload bag piling assembly
CN105035688B (en) Automatic conveying device for material disc
CN204384498U (en) A kind of automatic loading device being applicable to box-body truck
CN204162111U (en) That loads piling main frame for bagged cement unloads bag piling assembly
CN101863387A (en) Mobile corrugated sidewall belt conveyor
CN104192587B (en) The distributor of piling main frame is loaded for bagged cement
CN113264318A (en) Bag folding machine
CN106743785A (en) A kind of band classify automatically pipeline auxiliary material storage logistics system
CN107867524A (en) A kind of plug-in and take-out type automates national treasury storehouse mechanism
CN204162112U (en) For the loading piling main frame of bag-pack cement loading machine
CN104192552B (en) For bagged cement load piling main frame unload bag apparatus
CN204162057U (en) The packaging of unloading of loading piling main frame for bagged cement is put
CN205708378U (en) Facilitate implementation the Wall or floor tile warehousing system of automatization's access
CN201703877U (en) Moving type corrugated raised edge belt conveyer
CN204162113U (en) The distribution device of piling main frame is loaded for bagged cement
CN106429393A (en) Tile loading machine
CN103341996B (en) Automatic charging device of tread trolley of tire forming machine
CN207511475U (en) Transfiguration mobile assembling horizontal bin
CN206814033U (en) Full-automatic bagged articles carloader
CN105883330A (en) Automatic car loader for flexible packaging bagged cargos and car loading method of automatic car loader

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant