CN204162057U - The packaging of unloading of loading piling main frame for bagged cement is put - Google Patents

The packaging of unloading of loading piling main frame for bagged cement is put Download PDF

Info

Publication number
CN204162057U
CN204162057U CN201420484204.2U CN201420484204U CN204162057U CN 204162057 U CN204162057 U CN 204162057U CN 201420484204 U CN201420484204 U CN 201420484204U CN 204162057 U CN204162057 U CN 204162057U
Authority
CN
China
Prior art keywords
bag
unload
belt feeder
unloading
gate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420484204.2U
Other languages
Chinese (zh)
Inventor
周燕权
邓援超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN LANHAIYAN SMART LOADING EQUIPMENT Co Ltd
Original Assignee
WUHAN LANHAIYAN SMART LOADING EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN LANHAIYAN SMART LOADING EQUIPMENT Co Ltd filed Critical WUHAN LANHAIYAN SMART LOADING EQUIPMENT Co Ltd
Priority to CN201420484204.2U priority Critical patent/CN204162057U/en
Application granted granted Critical
Publication of CN204162057U publication Critical patent/CN204162057U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Stacking Of Articles And Auxiliary Devices (AREA)

Abstract

The utility model discloses a kind of packaging of unloading for bagged cement loading piling main frame to put, comprise support, longitudinal sliding motion on support and two that longitudinally can docks with the mouth level of corresponding upper step station unload bag belt feeder, drive two to unload two of bag belt feeder longitudinal sliding motion respectively and unload bag belt feeder vertical shift motor and be arranged on two forwards that correspondence on support unloads bag belt feeder vertical shift final position and unload bag gate.Bagged cement on upper step station is delivered to forward unloads above bag gate by unloading bag belt feeder by the utility model, by the cooperation of the rotation and reverse travelling backwards two actions of unloading bag belt feeder, bagged cement being moved to forward again unloads on bag gate, the upset of bag gate is unloaded by bagged cement vertical transport to lower step station finally by forward, complete and unload packet procedures, whole process is without the need to artificial participation, thus greatly reduce the labour intensity of workman, ensure that workman's is healthy; And structure is very simple, cost is low.Be applicable to the entrucking of bagged cement.

Description

The packaging of unloading of loading piling main frame for bagged cement is put
Technical field
The utility model relates to a kind of parts loading piling main frame for bagged cement, particularly relates to a kind of packaging of unloading for bagged cement loading piling main frame and puts.
Background technology
At present, when the bagged cement entrucking of most of cement mill is dispatched from the factory, still adopt manual type entrucking, it is large that this entrucking mode also exists labor strength, the inefficient defect of entrucking.Part of cement factory adopts automanual system carloader, this carloader generally comprises the guide rail 2 be fixed on factory building 1, roll be arranged on horizontal transferring device 3 on guide rail 2, rolling is arranged on the running gear 4 and inclined conveyor 5 that are connected on guide rail 2 and with the mouth of horizontal transferring device 3, this inclined conveyor 5 one end is docked with the mouth of horizontal transferring device 3, and inclined conveyor 5 other end is lifted on running gear 4 by steel rope.
The working process of this automanual system carloader is: first, by running gear 4, the mouth of inclined conveyor 5 is moved to the position needing entrucking; Then, bagged cement is delivered to the mouth of inclined conveyor 5 by startup horizontal transferring device 3 and inclined conveyor 5; Then, bagged cement is transported on vehicle from inclined conveyor 5 by workman, the piling of complete multilayer in a row; After complete piling in a row, again by running gear 4, the mouth of inclined conveyor 5 being moved to next row needs the position of pile to continue piling, so circulates.In palletization, when the height of mouth of inclined conveyor 5 need be promoted, by pullling the height of steel rope adjustment inclined conveyor 5 mouth.
This automanual system carloader is when reality uses, and the labour intensity of workman is still comparatively large, and entrucking efficiency is still lower, and the working environment very severe of workman, be unfavorable for that workman's is healthy.For addressing these problems, utility model people tentatively contemplate a kind of by distribution device, unload packaging put the loading piling main frame formed with palletizing apparatus, this loading piling main frame can mate the automatic stacking of bagged cement with this automanual system carloader.Particularly, distribution device is wanted bagged cement on inclined conveyor 5 to be delivered to multiple packaging of unloading and is set up, and each unload pack the mouth put again with the input end vertical butt joint of corresponding palletizing apparatus bagged cement is delivered on corresponding palletizing apparatus, finally can by bagged cement transverse direction straight-though arrangement to assigned address for all palletizing apparatus.Therefore, how developing the input end vertical butt joint of a kind of mouth and lower step station and the packaging of unloading that bagged cement can be delivered to lower step station is put, is one of key issue of whole loading piling main frame research and development.
Summary of the invention
The purpose of this utility model is the deficiency in order to overcome above-mentioned background technology, provides the input end vertical butt joint of a kind of mouth and lower step station and the packaging of unloading that bagged cement loads piling main frame that is used for that bagged cement can be delivered to lower step station is put.
In order to realize above object, a kind of packaging of unloading for bagged cement loading piling main frame that the utility model provides is put, comprise support, longitudinal sliding motion install on the bracket and two that longitudinally can docks with the mouth level of corresponding upper step station unload bag belt feeder, drive described two to unload two of bag belt feeder longitudinal sliding motion and unload bag belt feeder vertical shift motor and two forwards unloading bag belt feeder vertical shift final position on the bracket described in correspondence are set unload bag gate respectively.Bagged cement on upper step station (i.e. distribution device) is delivered to forward unloads above bag gate by unloading bag belt feeder, by the cooperation of the rotation and reverse travelling backwards two actions of unloading bag belt feeder, bagged cement being moved to forward dexterously again unloads on bag gate, the upset of bag gate is unloaded by bagged cement vertical transport to lower step station (i.e. palletizing apparatus) finally by forward, complete and unload packet procedures, the whole packet procedures that unloads is without the need to artificial participation, thus greatly reduce the labour intensity of workman, ensure that workman's is healthy; And structure is very simple, cost is low.
In such scheme, described in unload bag belt feeder end face level height unload the level height of bag gate end face greater than or equal to described forward.By the level height of unloading bag belt feeder end face is designed to the level height of unloading bag gate end face greater than or equal to described forward, is convenient to unload bag belt feeder like this and bagged cement is moved to forward and unload on bag gate.
In such scheme, the vertical shift start position described support unloading bag belt feeder described in correspondence is respectively equipped with two and oppositely unloads bag gate.Arrange two respectively by the vertical shift start position unloading bag belt feeder corresponding on support and oppositely unload bag gate, like this, when the head of code dress container (as lorry etc.), use forward to unload bag gate to carry out unloading bag, when the afterbody of piling container, use and oppositely unload bag gate and carry out unloading bag, the head and the afterbody that avoid this device and container interfere, and take full advantage of the space of container.
In such scheme, described in unload the level height of bag belt feeder end face greater than or equal to described level height of oppositely unloading bag gate end face.By the level height of unloading bag belt feeder end face is designed to greater than or equal to described level height of oppositely unloading bag gate end face, is convenient to unload bag belt feeder like this and bagged cement is moved to oppositely unloads on bag gate.
In such scheme, described forward unload bag gate identical with the structure of oppositely unloading bag gate and include two sides be hingedly mounted on respectively on described support unload bag door leaf, one end with described unload that bag door leaf is fixedly connected with unload bag bull stick and two install corresponding on described support described in unload bag door leaf position unload bag gate cylinder, described in unload bag gate cylinder telescopic end with corresponding described in unload the bag bull stick other end hinged.
The utility model is compared with the prior art, and fully its preceence of display is:
1, the bagged cement on upper step station (i.e. distribution device) is delivered to forward unloads above bag gate by unloading bag belt feeder, by the cooperation of the rotation and reverse travelling backwards two actions of unloading bag belt feeder, bagged cement being moved to forward dexterously again unloads on bag gate, the upset of bag gate is unloaded by bagged cement vertical transport to lower step station (i.e. palletizing apparatus) finally by forward, complete and unload packet procedures, the whole packet procedures that unloads is without the need to artificial participation, thus greatly reduce the labour intensity of workman, ensure that workman's is healthy; And structure is very simple, cost is low;
2, by the level height of unloading bag belt feeder end face is designed to the level height of unloading bag gate end face greater than or equal to described forward, is convenient to unload bag belt feeder like this and bagged cement is moved to forward and unload on bag gate;
3, arrange two respectively by the vertical shift start position unloading bag belt feeder corresponding on support and oppositely unload bag gate, like this, when the head of code dress container (as lorry etc.), use forward to unload bag gate to carry out unloading bag, when the afterbody of piling container, use and oppositely unload bag gate and carry out unloading bag, the head and the afterbody that avoid this device and container interfere, and take full advantage of the space of container;
4, by the level height of unloading bag belt feeder end face is designed to greater than or equal to described level height of oppositely unloading bag gate end face, is convenient to unload bag belt feeder like this and bagged cement is moved to oppositely unloads on bag gate.
Advantage that the utility model has without the need to manually participating in, structure is simple, cost is low and floor area is little etc.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the plan structure schematic diagram of Fig. 1;
Fig. 3 is the structural representation loading piling main frame;
Fig. 4 is the plan structure schematic diagram of Fig. 3;
Fig. 5 is using state structural representation of the present utility model;
Fig. 6 is the plan structure schematic diagram after Fig. 5 removes running gear and bont;
Fig. 7 is the structural representation of distribution device;
Fig. 8 is the plan structure schematic diagram of Fig. 7;
Fig. 9 is the partial enlargement structural representation in A portion in Fig. 2;
Figure 10 is the structural representation of palletizing apparatus;
Figure 11 is the cross-sectional view of Figure 10;
Figure 12 is the side-looking structural representation of Figure 10;
Figure 13 is the initial condition structural representation of forward piling gate;
Figure 14 is the operating state structural representation of forward piling gate;
Figure 15 is the plan structure schematic diagram of Figure 13.
In figure: factory building 1, guide rail 2, horizontal transferring device 3, running gear 4, inclined conveyor 5, position fixing system 6, controller 7, load piling main frame 8, distribution device 8a, check strap machine 8a1, ground floor distributes belt feeder 8a2, first distributes belt feeder transverse cylinder 8a3, the second layer distributes belt feeder 8a4, the second layer distributes belt feeder traversing motor 8a5, unload packaging and put 8b, unload bag belt feeder 8b1, unload bag belt feeder vertical shift motor 8b2, forward unloads bag gate 8b3, unload bag door leaf 8b3a, unload bag bull stick 8b3b, unload bag gate cylinder 8b3c, oppositely unload bag gate 8b4, palletizing apparatus 8c, upright slide rail 8c1, the traversing motor 8c2 of upright slide rail, erecting frame 8c3, forward piling gate 8c4, piling gate cylinder 8c4a, connecting rod 8c4b, intermediate connecting rod 8c4c, piling bull stick 8c4d, piling door leaf 8c4e, guide pin bushing 8c4f, guide pillar 8c4g, lift cylinder 8c5, reverse piling gate 8c6, support 8d, bont 9, Jack 9a, steel rope 9b, guide pillar guide pin bushing 9c.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is described in further detail, but this embodiment should not be construed as restriction of the present utility model.
Originally to unload when packaging puts actual use need with distribution device 8a, palletizing apparatus 8c, horizontal transferring device 3, running gear 4, inclined conveyor 5, position fixing system 6, composition full automaticity bag-pack cement loading machine together with controller 7 coordinates with bont 9 grade, to realize the Full automatic loading of bagged cement, particularly, this full automaticity bag-pack cement loading machine comprises the guide rail 2 be fixed on factory building 1, roll the horizontal transferring device 3 be arranged on described guide rail 2, roll and be arranged on the running gear 4 be connected on described guide rail 2 and with the mouth of described horizontal transferring device 3, inclined conveyor 5, position fixing system 6 and controller 7, the input end of described inclined conveyor 5 docks with the mouth of described horizontal transferring device 3, the mouth of described inclined conveyor 5 loads piling main frame 8 to being connected to, described loading piling main frame 8 is lifted on described running gear 4 by bont 9, described loading piling main frame 8 comprises distribution device 8a, unload packaging and put 8b, palletizing apparatus 8c and support 8d, described distribution device 8a, unload packaging to put 8b and palletizing apparatus 8c and be arranged on described support 8d successively, the input end of described distribution device 8a docks with the mouth of described inclined conveyor 5, the quantity of the mouth of described distribution device 8a is at least 2, each mouth of described distribution device 8a is packed the input end level of putting 8b and is docked with unloading described in one respectively, mouth that packaging the puts 8b input end vertical butt joint of described palletizing apparatus 8c with is respectively unloaded described in each, the mouth of each described palletizing apparatus 8c by bagged cement vertical transport to assigned address, all described palletizing apparatus 8c be delivered to assigned address bagged cement be horizontal straight-though arrangement.The packaging of unloading of at least dividing 2 lane of traffic to be delivered to respective amount the bagged cement on inclined conveyor 5 by distribution device 8a is put on 8b, put 8b by each packaging of unloading bagged cement is delivered on the palletizing apparatus 8c of respective amount again, finally by all palletizing apparatus 8c by horizontal for bagged cement straight-though arrangement, complete piling, whole process is without the need to artificial participation, thus greatly reduce the labour intensity of workman, ensure that workman's is healthy; And, because described loading piling main frame 8 has 2 lane of traffic at least, so piling efficiency is high.
In such scheme, described distribution device 8a comprises check strap machine 8a1, two ground floors be laterally slidably mounted on described support 8d distribute belt feeder 8a2, and laterally slide the while of driving described ground floor to distribute belt feeder 8a2 first distributes belt feeder transverse cylinder 8a3 and be arranged on two second layers distribution belt feeder 8a4 on described support 8d; The input end of described check strap machine 8a1 longitudinally docks with the mouth of described inclined conveyor 5, the mouth of described check strap machine 8a1 can distribute belt feeder 8a2 respectively input end with described two ground floors longitudinally docks, the mouth that described two ground floors distribute belt feeder 8a2 can distribute belt feeder 8a4 respectively input end with the corresponding described second layer longitudinally dock, and the mouth of described second layer distribution belt feeder 8a4 is packed the input end level longitudinal direction of putting 8b dock with described being unloaded.By check strap machine 8a1, the bagged cement on inclined conveyor 5 being delivered to ground floor distributes on belt feeder 8a2, the second layer that bagged cement divides two lane of traffic to be delivered to correspondence respectively by the transverse direction slip distributing belt feeder 8a2 by two ground floors again distributes on belt feeder 8a4, distribute belt feeder 8a4 finally by two second layers bagged cement to be delivered to respectively two and to unload packaging and put on 8b, complete assigning process, whole assigning process is without the need to artificial participation, thus greatly reduce the labour intensity of workman, ensure that workman's is healthy; Meanwhile, the bagged cement on inclined conveyor 5 is divided two lane of traffic conveyings by the cooperation being distributed belt feeder 8a2 by check strap machine 8a1 and ground floor, greatly increase efficiency, and structure is simple, cost is low; And, described check strap machine 8a1 receives after bagged cement from inclined conveyor 5 and stops rotation, when the input end that ground floor distributes belt feeder 8a2 docks with the mouth of check strap machine 8a1, check strap machine 8a1 just can continue rotation and bagged cement is delivered to ground floor to distribute on belt feeder 8a2, thus play buffer action, like this, can ensure that bagged cement is delivered to ground floor exactly and distributes on belt feeder 8a2.
In such scheme, the described second layer distributes belt feeder 8a4 and is laterally slidably mounted on described support 8d, described support 8d is provided with and drives described two second layers to distribute horizontal two the traversing motor 8a5 of second layers distribution belt feeder slided of belt feeder 8a4 respectively, the mouth that the described second layer distributes belt feeder 8a4 is packed position that the input end level longitudinal direction of putting 8b docks and is positioned at described unloading the meta that the described second layer distributes the transverse shifting stroke of belt feeder 8a4, it is servomotor that the described second layer distributes the traversing motor 8a5 of belt feeder, the described second layer distributes the traversing motor 8a5 of belt feeder and drives the second layer to distribute belt feeder 8a4 by chain or Timing Belt or steel rope laterally to slide, to realize the accurate location that the second layer distributes belt feeder 8a4.By the second layer being distributed the structure that belt feeder 8a4 is also designed to laterally to slide, and the mouth second layer being distributed belt feeder 8a4 with unload the meta packed Position Design that the input end level of putting 8b longitudinally docks and to distribute the transverse shifting stroke of belt feeder 8a4 at the second layer, greatly can reduce to unload the lateral dimension that packaging puts 8b like this, thus reduce costs, reduce floor area.
Certainly, bagged cement is directly delivered to unload to pack by the bagged cement lane of traffic that also can directly be made up of horizontal transferring device 3 and inclined conveyor 5 by two or more pieces to be put on 8b.
In such scheme, described packaging of unloading is put 8b and is comprised longitudinal sliding motion and to be arranged on described support 8d on and can to distribute two that the mouth level longitudinal direction of belt feeder 8a4 docks with the corresponding described second layer and unload bag belt feeder 8b1, drives described two to unload two of bag belt feeder 8b1 longitudinal sliding motion and unload bag belt feeder vertical shift motor 8b2 and be arranged on two forwards described support 8d unloading bag belt feeder 8b1 vertical shift final position described in correspondence and unload bag gate 8b3 respectively.Bagged cement on distribution device 8a is longitudinally delivered to forward unloads above bag gate 8b3 by unloading bag belt feeder 8b1, by the cooperation of the rotation and reverse travelling backwards two actions of unloading bag belt feeder 8b1, bagged cement being moved to forward dexterously again unloads on bag gate 8b3, particularly, the rotational velocity unloading bag belt feeder 8b1 is equal with reverse travelling backwards speed, the upset of unloading bag gate 8b3 finally by forward by bagged cement vertical transport on palletizing apparatus 8c, complete and unload packet procedures, the whole packet procedures that unloads is without the need to artificial participation, thus greatly reduce the labour intensity of workman, ensure that workman's is healthy, and structure is very simple, cost is low.
Above-mentioned to unload bag belt feeder vertical shift motor 8b2 be servomotor, and it drives by chain or Timing Belt or steel rope and unloads bag belt feeder 8b1 longitudinal sliding motion, thus realizes the accurate location of unloading bag belt feeder 8b1.
Certainly, the bag belt feeder 8b1 that unloads of lifting structure also can be adopted bagged cement directly to be moved to forward and unload on bag gate 8b3, thus without the need to controlling rotation and reverse travelling backwards two actions of unloading bag belt feeder 8b1 ordinatedly.Particularly, unloading bag belt feeder 8b1 is arranged on described support 8d by lifting mechanism longitudinal sliding motion, when unload bag belt feeder 8b1 bagged cement is longitudinally delivered to forward unload above bag gate 8b3 time, described lifting mechanism drive is unloaded bag belt feeder 8b1 and is declined, thus make bagged cement drop on forward completely to unload on bag gate 8b3, unload after bag belt feeder 8b1 is separated with bagged cement, unload bag belt feeder 8b1 just to start oppositely back to move, simultaneously, lifting mechanism drive is unloaded bag belt feeder 8b1 and is risen to initial position, so circulates.
Certainly, the packaging of unloading of other structures also can be adopted to put and bagged cement is delivered to forward unloads on bag gate 8b3, or directly adopt and manually bagged cement is carried to forward and unloads on bag gate 8b3.
In such scheme, described palletizing apparatus 8c comprises and is laterally slidably mounted on corresponding described two forwards below support 8d and unloads two couples of upright slide rail 8c1 of bag gate 8b3 position, drive the traversing motor 8c2 of two upright slide rails that described two couples of upright slide rail 8c1 laterally slide respectively, be slidably mounted on the erecting frame 8c3 on described upright slide rail 8c1, be arranged on corresponding described forward on described erecting frame 8c3 unload the forward piling gate 8c4 of bag gate 8b3 position and drive the lift cylinder 8c5 of described erecting frame 8c3 vertical sliding motion, the upper end of often couple of described upright slide rail 8c1 is connected by connecting plate, described lift cylinder 8c5 is fixedly mounted on described connecting plate, described forward piling gate 8c4 is positioned at described forward and unloads immediately below bag gate 8b3.By forward piling gate 8c4 vertical reception from forward unload bag gate 8b3 drop under bagged cement, being slided by the transverse direction of upright slide rail 8c1 laterally moves to directly over assigned address by bagged cement again, and by the vertical sliding motion of erecting frame 8c3, bagged cement is vertically declined near assigned address, bagged cement is fallen to assigned address by the upset finally by forward piling gate 8c4, complete palletization, whole palletization is without the need to artificial participation, thus greatly reduce the labour intensity of workman, ensure that workman's is healthy; And horizontal bearing fit two palletizing apparatus 8c of upright slide rail 8c1, achieve the horizontal straight-though arrangement of bagged cement, structure is simple and cost is low.
The traversing motor 8c2 of above-mentioned upright slide rail is servomotor, and it drives upright slide rail 8c1 laterally to slide by chain or Timing Belt or steel rope, thus realizes the accurate location of upright slide rail 8c1.
Certainly, the palletizing apparatus 8c of other structures also can be adopted to realize the palletization of bagged cement, or directly employing manually realize the piling of bagged cement.
In such scheme, the vertical shift start position described support 8d unloading bag belt feeder 8b1 described in correspondence is respectively equipped with two and oppositely unloads bag gate 8b4, on described erecting frame 8c3, corresponding described position of oppositely unloading bag gate 8b4 is provided with reverse piling gate 8c6, described forward piling gate 8c4 and described reverse piling gate 8c6 is arranged symmetrically with relative to described upright slide rail 8c1, described forward piling gate 8c4 is positioned at the front of described upright slide rail 8c1, described reverse piling gate 8c6 is positioned at the rear of described upright slide rail 8c1, described reverse piling gate 8c6 is positioned at described oppositely unloading immediately below bag gate 8b4.By arranging piling gate respectively in the front of upright slide rail 8c1 and rear, like this, when the head of code dress container (as lorry etc.), forward piling gate 8c4 is used to carry out piling, when the afterbody of piling container, use reverse piling gate 8c6 to carry out piling, the head and the afterbody that avoid upright slide rail 8c1 and container interfere, and take full advantage of the space of container.
In such scheme, described level height of unloading bag belt feeder 8b1 end face unloads the level height of bag gate 8b3 end face greater than or equal to described forward, described in unload the level height of bag belt feeder 8b1 end face greater than or equal to described level height of oppositely unloading bag gate 8b4 end face.By the level height of unloading bag belt feeder 8b1 end face is designed to the level height of unloading bag gate 8b3 end face greater than or equal to described forward, and the level height of unloading bag belt feeder 8b1 end face is designed to greater than or equal to described level height of oppositely unloading bag gate 8b4 end face, be convenient to unload bag belt feeder 8b1 like this and bagged cement moved to forward and unload bag gate 8b3 or oppositely unload on bag gate 8b4.
In such scheme, described forward unload bag gate 8b3 identical with the structure of oppositely unloading bag gate 8b4 and include two sides be hingedly mounted on respectively on described support 8d unload bag door leaf 8b3a, one end with described unload that bag door leaf 8b3a is fixedly connected with unload bag bull stick 8b3b and two install corresponding on described support 8d described in unload bag door leaf 8b3a position unload bag gate cylinder 8b3c, described in unload bag gate cylinder 8b3c telescopic end with corresponding described in unload the bag bull stick 8b3b other end hinged.Described two spacing of unloading between bag door leaf 8b3a match with the width unloading bag belt feeder 8b1.
In such scheme, described forward piling gate 8c4 is identical with the structure of reverse piling gate 8c6 and include the piling gate cylinder 8c4a be arranged on described erecting frame 8c3, the connecting rod 8c4b that middle part is connected with the telescopic end of described piling gate cylinder 8c4a, two intermediate connecting rod 8c4c, two piling bull stick 8c4d and two sides are hingedly mounted on the piling door leaf 8c4e on described erecting frame 8c3 respectively, described piling bull stick 8c4d one end is fixedly connected with described piling door leaf 8c4e, the described piling bull stick 8c4d other end and described intermediate connecting rod 8c4c one end hinged, the termination of the described intermediate connecting rod 8c4c other end and described connecting rod 8c4b is hinged, on described erecting frame 8c3, the both sides of corresponding described piling gate cylinder 8c4a are respectively equipped with a guide pin bushing 8c4f, and in described guide pin bushing 8c4f, activity is fitted with guide pillar 8c4g respectively, and the upper end of described guide pillar 8c4g is connected with described connecting rod 8c4b respectively.By the cooperation of connecting rod 8c4b and intermediate connecting rod 8c4c, achieve the object that two piling door leaf 8c4e share a cylinder, thus reduce cost; Meanwhile, the guide pin bushing 8c4f cooperatively interacted added and guide pillar 8c4g makes the translation of connecting rod 8c4b more steady, thus improves the stability of forward piling gate 8c4 and reverse piling gate 8c6 opening and closing.
In such scheme, described bont 9 comprises Jack 9a, steel rope 9b and four cover guide pillar guide pin bushing 9c, the lower end of described four cover guide pillar guide pin bushing 9c is arranged on the corner place of described support 8d respectively, the upper end of described four cover guide pillar guide pin bushing 9c is arranged on described running gear 4 respectively, described Jack 9a is fixedly mounted on described running gear 4, one end of described steel rope 9b is connected with described Jack 9a, the other end of described steel rope 9b is connected with described support 8d, described Jack 9a is arranged on described support 8d, and described Jack 9a is electrically connected with described controller 7.By adding a set of guide pillar guide pin bushing 9c respectively at the corner place of support 8d, the stationarity of loading piling main frame 8 and being elevated can be improved on the one hand, on the other hand, can ensure that load piling main frame 8 remains level in lifting process, thus improve the accuracy of piling.
Above-mentioned horizontal transferring device 3, running gear 4, inclined conveyor 5, position fixing system 6, each several part loaded in piling main frame 8 are all connected with controller 7 with bont 9, control by controller 7.
Above-mentioned horizontal transferring device 3, inclined conveyor 5 and each belt feeder loaded in piling main frame 8 all can adopt the belt feeder of motorized pulleys belt feeder or common drive, also can adopt cartridge type conveyer or apron conveyor.
The working process of above-mentioned full automaticity bag-pack cement loading machine is as follows:
First, after transport vehicle enters entrucking station, determined the actual position of transport vehicle by vision positioning system 6, and relevant data is passed to controller 7 and prepare entrucking; Then, the bagged cement from cement mill packing shop or warehouse is delivered to inclined conveyor 5 by horizontal transferring device 3, and is delivered on the check strap machine 8a1 of distribution device 8a by inclined conveyor 5 by bagged cement; Then, bagged cement is delivered to ground floor and distributes on belt feeder 8a2 by check strap machine 8a1, and distribute on belt feeder 8a4 by the second layer that bagged cement divides two lane of traffic to be delivered to correspondence respectively by the transverse direction slip that two ground floors distribute belt feeder 8a2, exactly bagged cement is delivered to respectively two by the transverse shifting of two second layers distribution belt feeder 8a4 again to unload on bag belt feeder 8b1, completes assigning process; Again then, unload bag belt feeder 8b1 bagged cement is longitudinally delivered to forward unloads above bag gate 8b3, and by the cooperation of the rotation and reverse travelling backwards two actions of unloading bag belt feeder 8b1, bagged cement is moved to forward dexterously and unload on bag gate 8b3, bagged cement vertical transport on forward piling gate 8c4, is completed and unloads packet procedures by the upset of being unloaded bag gate 8b3 again by forward; Subsequently, the transverse direction of upright slide rail 8c1 is slided and forward piling gate 8c4 and bagged cement to be laterally moved on transport vehicle directly over assigned address, and by the vertical sliding motion of erecting frame 8c3, forward piling gate 8c4 and bagged cement are vertically declined until near described assigned address, by the upset of forward piling gate 8c4, bagged cement is fallen to described assigned address again, complete palletization and complete horizontal piling in a row; After complete horizontal piling in a row, first driving loading piling main frame 8 to move to next row by running gear 4 needs the position of piling to continue piling, when loading piling main frame 8 and moving to transport vehicle afterbody, by oppositely unloading bag gate 8b4 and reverse piling gate 8c6 completes piling action, until the complete one deck of code, and then to be driven by bont 9 and load piling main frame 8 one deck that rises and complete second layer piling, so circulation is until complete the piling of whole transport vehicle.Certainly, after complete horizontal piling in a row, also first can be driven by bont 9 and load piling main frame 8 one deck that rises and complete the same piling that ranked second layer, until all layers of the complete same row of code, and then to be driven by running gear 4 and load piling main frame 8 and move to next row and need the position of piling to continue piling, when loading piling main frame 8 and moving to transport vehicle afterbody, by oppositely unloading bag gate 8b4 and reverse piling gate 8c6 completes piling action, so circulation is until complete the piling of whole transport vehicle.
The packaging of unloading that bagged cement on inclined conveyor 5 at least divides 2 lane of traffic to be delivered to respective amount by distribution device 8a by above-mentioned full automaticity bag-pack cement loading machine is put on 8b, put 8b by each packaging of unloading bagged cement is delivered on the palletizing apparatus 8c of respective amount again, finally by all palletizing apparatus 8c by horizontal for bagged cement straight-though arrangement, complete piling, whole process is without the need to artificial participation, thus greatly reduce the labour intensity of workman, ensure that workman's is healthy; Because described loading piling main frame 8 has 2 lane of traffic at least, so piling efficiency is high; By check strap machine 8a1, the bagged cement on inclined conveyor 5 being delivered to ground floor distributes on belt feeder 8a2, the second layer that bagged cement divides two lane of traffic to be delivered to correspondence respectively by the transverse direction slip distributing belt feeder 8a2 by two ground floors again distributes on belt feeder 8a4, distribute belt feeder 8a4 finally by two second layers bagged cement to be delivered to respectively two and to unload packaging and put on 8b, complete assigning process, whole assigning process is without the need to artificial participation, thus greatly reduce the labour intensity of workman, ensure that workman's is healthy; And the bagged cement on inclined conveyor 5 is divided two lane of traffic conveyings by the cooperation being distributed belt feeder 8a2 by check strap machine 8a1 and ground floor, greatly increase efficiency, and structure is simple, cost is low; By the second layer being distributed the structure that belt feeder 8a4 is also designed to laterally to slide, and the mouth second layer being distributed belt feeder 8a4 with unload the meta packed Position Design that the input end level of putting 8b longitudinally docks and to distribute the transverse shifting stroke of belt feeder 8a4 at the second layer, greatly can reduce to unload the lateral dimension that packaging puts 8b like this, thus reduce costs, reduce floor area; Bagged cement on distribution device 8a is delivered to forward unloads above bag gate 8b3 by unloading bag belt feeder 8b1, by the cooperation of the rotation and reverse travelling backwards two actions of unloading bag belt feeder 8b1, bagged cement being moved to forward dexterously again unloads on bag gate 8b3, the upset of unloading bag gate 8b3 finally by forward by bagged cement vertical transport on palletizing apparatus 8c, complete and unload packet procedures, the whole packet procedures that unloads is without the need to artificial participation, thus greatly reduce the labour intensity of workman, ensure that workman's is healthy; And structure is very simple, cost is low; By forward piling gate 8c4 vertical reception from forward unload bag gate 8b3 drop under bagged cement, being slided by the transverse direction of upright slide rail 8c1 laterally moves to directly over assigned address by bagged cement again, and by the vertical sliding motion of erecting frame 8c3, bagged cement is vertically declined near assigned address, bagged cement is fallen to assigned address by the upset finally by forward piling gate 8c4, complete palletization, whole palletization is without the need to artificial participation, thus greatly reduce the labour intensity of workman, ensure that workman's is healthy; Horizontal bearing fit two palletizing apparatus 8c of upright slide rail 8c1, achieve the horizontal straight-though arrangement of bagged cement, and structure is simple and cost is low; By arranging piling gate respectively in the front of upright slide rail 8c1 and rear, like this, when the head of code dress container (as lorry etc.), forward piling gate 8c4 is used to carry out piling, when the afterbody of piling container, use reverse piling gate 8c6 to carry out piling, the head and the afterbody that avoid upright slide rail 8c1 and container interfere, and take full advantage of the space of container; By the level height of unloading bag belt feeder 8b1 end face is designed to the level height of unloading bag gate 8b3 end face greater than or equal to described forward, and the level height of unloading bag belt feeder 8b1 end face is designed to greater than or equal to described level height of oppositely unloading bag gate 8b4 end face, be convenient to unload bag belt feeder 8b1 like this and bagged cement moved to forward and unload bag gate 8b3 or oppositely unload on bag gate 8b4; By the cooperation of connecting rod 8c4b and intermediate connecting rod 8c4c, achieve the object that two piling door leaf 8c4e share a cylinder, thus reduce cost; The guide pin bushing 8c4f cooperatively interacted added and guide pillar 8c4g makes the translation of connecting rod 8c4b more steady, thus improves the stability of forward piling gate 8c4 and reverse piling gate 8c6 opening and closing; By adding a set of guide pillar guide pin bushing 9c respectively at the corner place of support 8d, the stationarity of loading piling main frame 8 and being elevated can be improved on the one hand, on the other hand, can ensure that load piling main frame 8 remains level in lifting process, thus improve the accuracy of piling.
Above-mentioned full automaticity bag-pack cement loading machine is not only applicable to cement industry, is also adapted to the situation that other sacked material as the industry such as chemical industry, grain needs entrucking.
The foregoing is only preferred embodiment of the present utility model, not in order to limit the utility model, all within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.

Claims (5)

1. put for the packaging of unloading of bagged cement loading piling main frame for one kind, it is characterized in that: comprise support (8d), longitudinal sliding motion be arranged on described support (8d) upper and two that longitudinally can docks with the mouth level of corresponding upper step station unload bag belt feeder (8b1), drive described two to unload two of bag belt feeder (8b1) longitudinal sliding motion and unload bag belt feeder vertical shift motor (8b2) and be arranged on described support (8d) and go up two forwards unloading bag belt feeder (8b1) vertical shift final position described in correspondence and unload bag gate (8b3) respectively.
2. the packaging of unloading of as claimed in claim 1 loading piling main frame for bagged cement is put, and it is characterized in that: described in unload bag belt feeder (8b1) end face level height unload the level height of bag gate (8b3) end face greater than or equal to described forward.
3. put for the packaging of unloading of bagged cement loading piling main frame as claimed in claim 1, it is characterized in that: the vertical shift start position unloading bag belt feeder (8b1) described in the upper correspondence of described support (8d) is respectively equipped with two and oppositely unloads bag gate (8b4).
4. the packaging of unloading of as claimed in claim 3 loading piling main frame for bagged cement is put, and it is characterized in that: described in unload the level height of bag belt feeder (8b1) end face greater than or equal to described level height of oppositely unloading bag gate (8b4) end face.
5. put for the packaging of unloading of bagged cement loading piling main frame as claimed in claim 3, it is characterized in that: it is identical with the structure of oppositely unloading bag gate (8b4) and include two sides and be hingedly mounted on respectively described support (8d) unloads bag door leaf (8b3a) that described forward unloads bag gate (8b3), one end with described unload that bag door leaf (8b3a) is fixedly connected with unload bag bull stick (8b3b) and two install described support (8d) upper corresponding described in unload bag door leaf (8b3a) position unload bag gate cylinder (8b3c), the described telescopic end unloading bag gate cylinder (8b3c) with corresponding described in unload bag bull stick (8b3b) other end hinged.
CN201420484204.2U 2014-08-26 2014-08-26 The packaging of unloading of loading piling main frame for bagged cement is put Expired - Fee Related CN204162057U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420484204.2U CN204162057U (en) 2014-08-26 2014-08-26 The packaging of unloading of loading piling main frame for bagged cement is put

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420484204.2U CN204162057U (en) 2014-08-26 2014-08-26 The packaging of unloading of loading piling main frame for bagged cement is put

Publications (1)

Publication Number Publication Date
CN204162057U true CN204162057U (en) 2015-02-18

Family

ID=52535767

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420484204.2U Expired - Fee Related CN204162057U (en) 2014-08-26 2014-08-26 The packaging of unloading of loading piling main frame for bagged cement is put

Country Status (1)

Country Link
CN (1) CN204162057U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104192552A (en) * 2014-08-26 2014-12-10 武汉蓝海燕智能装车设备有限公司 Unloading device for bagged cement loading stacking main machine
CN113661416A (en) * 2019-04-11 2021-11-16 特鲁普机械奥地利有限公司及两合公司 Manufacturing apparatus and conveying apparatus

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104192552A (en) * 2014-08-26 2014-12-10 武汉蓝海燕智能装车设备有限公司 Unloading device for bagged cement loading stacking main machine
CN113661416A (en) * 2019-04-11 2021-11-16 特鲁普机械奥地利有限公司及两合公司 Manufacturing apparatus and conveying apparatus
US11945666B2 (en) 2019-04-11 2024-04-02 Trumpf Maschinen Austria Gmbh & Co. Kg. Manufacturing device and conveyor means
CN113661416B (en) * 2019-04-11 2024-06-18 特鲁普机械奥地利有限公司及两合公司 Manufacturing apparatus and conveying apparatus

Similar Documents

Publication Publication Date Title
CN204162110U (en) Full automaticity bag-pack cement loading machine
CN104192584A (en) Fully-automatic bagged cement loader
CN104724516B (en) A kind of automatic loading device being applicable to van
CN104192586A (en) Loading stacking main machine for bagged cement car loader
CN106927277B (en) Intelligent loading equipment
CN204162111U (en) That loads piling main frame for bagged cement unloads bag piling assembly
CN204384498U (en) A kind of automatic loading device being applicable to box-body truck
CN104925531A (en) Full-automatic truck loading and brick stacking machine
CN108545490B (en) The Unitized logistics operating system and method for box car revolving platform, highway railway combined transport
CN107499803A (en) One kind can avoidance rope driving automatic stereowarehouse access device and method
CN104192588A (en) Unloading stacking assembly for bagged cement loading stacking main machine
CN204162057U (en) The packaging of unloading of loading piling main frame for bagged cement is put
CN113264318A (en) Bag folding machine
CN204162112U (en) For the loading piling main frame of bag-pack cement loading machine
CN109264440A (en) A kind of cabinet sorting conveying device and cabinet palletizing system
CN204162113U (en) The distribution device of piling main frame is loaded for bagged cement
CN108820668A (en) A kind of storage automatic material fetching machine
CN104192587A (en) Distribution device for bagged cement loading stacking main machine
CN106081668B (en) A kind of steel drum loading-unloading vehicle system and method
CN104891208A (en) Truck loading robot of full-automatic container
CN206814033U (en) Full-automatic bagged articles carloader
CN204917040U (en) Take perpendicular sorting machine of medical formula of towing of horizontal transport function
CN105883330A (en) Automatic car loader for flexible packaging bagged cargos and car loading method of automatic car loader
CN214002991U (en) Material bag material feeding unit
CN205973630U (en) Multi -functional stacker

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150218