CN104153397A - Concrete wall construction joint waterproof treatment method - Google Patents

Concrete wall construction joint waterproof treatment method Download PDF

Info

Publication number
CN104153397A
CN104153397A CN201410386829.XA CN201410386829A CN104153397A CN 104153397 A CN104153397 A CN 104153397A CN 201410386829 A CN201410386829 A CN 201410386829A CN 104153397 A CN104153397 A CN 104153397A
Authority
CN
China
Prior art keywords
waterproof roll
layer
paste
width
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410386829.XA
Other languages
Chinese (zh)
Other versions
CN104153397B (en
Inventor
王卫东
张睿
王恺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Third Metallurgical Group Co Ltd
Original Assignee
China Third Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Third Metallurgical Group Co Ltd filed Critical China Third Metallurgical Group Co Ltd
Priority to CN201410386829.XA priority Critical patent/CN104153397B/en
Publication of CN104153397A publication Critical patent/CN104153397A/en
Application granted granted Critical
Publication of CN104153397B publication Critical patent/CN104153397B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention relates to a concrete wall construction joint waterproof treatment method which comprises the steps of (1) cleaning a wall, (2) laying a first layer of waterproof coiled material, (3) laying a second layer of waterproof coiled material, (4) laying a third layer of waterproof coiled material and (5) attaching an outer protective layer. Compared with the prior art, the method has the advantages that a mode of stacking multiple layers of coiled materials is adopted, so that wall construction joints with a waterproof requirement are effectively protected, and an underwater leakage phenomenon caused by failure of waterproof measures is avoided; the waterproof coiled materials are not attached to a basic layer within a range and properly reserve expansion amount, so that the ability of a waterproof layer adapting to basic layer deformation is improved, and the waterproof coiled materials are prevented from being bumpy and cracking; the protective layer is additionally disposed outside the coiled materials, so that construction portions are protected from underground water or erosion of corrosive matter; the method is easy and convenient to operate, and people only need to operate according to conventional construction methods.

Description

A kind of concrete wall Case Study on Construction Joint Water-proofing
Technical field
The present invention relates to the waterproofing work technical field in building operations, relate in particular to a kind of concrete wall Case Study on Construction Joint Water-proofing.
Background technology
In the time of box foundation or basement construction, the concrete of base plate and side fascia separately waters and smashes, and waters a constuction joint of section existence of smashing R.C. wall board for twice, in the time that the position of this seam is in below phreatic line, just easily produce infiltration, therefore must carry out waterproofing work to constuction joint place.The method of processing is a lot, and commonplace method is that steel plate for sealing water or waterstop are set in waterproof concrete body of wall at present, simultaneously one deck waterproof roll of side wall paving outside or brushing one deck penetrant crystalline waterproofing materials.This construction method only arranges waterproof measure one at body of wall upstream face, under the long period of soaking corrosiveness of underground water, or under differential settlement and soil body freeze thawing acting in conjunction due to building, once waterproof roll plays drum cracking or water-repellent paint lost efficacy, will cause seepage phenomenon under anti-water destruct spot, ground water seepage is to engineering inside, can make engineering interior decoration and equipment accelerate corrosion, affect the normal use of building products, and use machinery to get rid of engineering internal leak water, need to expend mass energy and funds.
Summary of the invention
The invention provides a kind of concrete wall Case Study on Construction Joint Water-proofing, adopt the method for waterproof roll multilayer lay-up reserved stroke, strengthen the waterproofing work at wall construction seam place, avoid causing ground water seepage phenomenon because of waterproof failure.
In order to achieve the above object, the present invention realizes by the following technical solutions:
A kind of concrete wall Case Study on Construction Joint Water-proofing, comprises the steps:
1) concrete wall in each upstream face constuction joint both sides 400~500mm wide region is cleaned out; By " waterproof coiled material construction technological standards " paving waterproof roll, adopt the paving of hot-melt adhesive method;
2) paving first floor waterproof roll, in the each 30~60mm wide region in upstream face constuction joint both sides, do not paste, after middle reserved (the not pasting body of wall width+10~30mm) width of first floor waterproof roll, both sides and body of wall cement, and paste width 80~120mm;
3) paving second layer waterproof roll, within the scope of first floor waterproof roll, do not paste, after reserved in the middle of second layer waterproof roll (first floor waterproof roll is pasted width+20~40mm) width, both sides start to paste from the body of wall at first floor waterproof roll edge, paste width 80~120mm with body of wall;
4) the 3rd layer of waterproof roll of paving, within the scope of second layer waterproof roll, do not paste, after reserved in the middle of the 3rd layer of waterproof roll (second layer waterproof roll is pasted width+30~50mm) width, both sides start to paste from the body of wall at second layer waterproof roll edge, paste width 80~120mm with body of wall;
5) the 3rd layer of waterproof roll paving complete after; paste topping in its outside; protective layer thickness 40~80mm, topping outer ledge exceeds the 3rd layer of each 80~120mm in waterproof roll edge, and topping can carry out backfill construction or the construction of integral waterproofing layer after having constructed.
Described waterproof roll is the one in SBS rubber modified asphalt coiled material, APP (APAO) modified bituminous pitch coiled material, PVC modification tar asphalt coiled material, rubber powder modified asphalt coiled material or modification drop polyethylene tire (OEE) coiled material.
Described topping is the one in extruded sheet, benzene plate or phenolic board.
The minimum density of described extruded sheet is 22kg/m 3, the minimum density of benzene plate is 18kg/m 3, the minimum density of phenolic board is 22kg/m 3.
Compared with prior art, the invention has the beneficial effects as follows:
1) the present invention adopts the mode of waterproof roll multilayer lay-up, and the wall construction seam position that has waterproof requirement is effectively protected, and avoids because of the waterproof measure ground water seepage phenomenon causing that lost efficacy;
2) waterproof roll and basic unit do not paste within the scope of one, and suitably reserved stroke of waterproof roll, increase the ability that waterproofing course adapts to basic unit's distortion, are conducive to prevent that waterproof roll from playing drum, cracking;
3) waterproof roll adds topping outward, can further protect construction part not to be subject to underground water or have the erosion of corrosiveness material;
4) simple to operation, construction method operation routinely.
Brief description of the drawings
Fig. 1 is the wall body structure schematic diagram one after the present invention constructs.
Fig. 2 is the wall body structure schematic diagram two after the present invention constructs
In figure: 1. the 3rd layer of waterproof roll of concrete wall 2. constuction joint 3. first floor waterproof roll 4. second layer waterproof rolls 5. 6. topping 7. steel plate for sealing water 8. waterstops
Detailed description of the invention
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is described further:
Seeing Fig. 1-Fig. 2, is the wall body structure schematic diagram after the present invention constructs, and a kind of concrete wall Case Study on Construction Joint Water-proofing, comprises the steps:
1) concrete wall 1 in the upstream face constuction joint 2 each 400~500mm wide regions in both sides is cleaned out; By " waterproof coiled material construction technological standards " paving waterproof roll, adopt the paving of hot-melt adhesive method;
2) paving first floor waterproof roll 3, in the upstream face constuction joint 2 each 30~60mm wide regions in both sides, do not paste, after middle reserved (the not pasting body of wall width+10~30mm) width of first floor waterproof roll 3, both sides and body of wall 1 cement, and paste width 80~120mm;
3) paving second layer waterproof roll 4, in first floor waterproof roll 3 scopes, do not paste, in the middle of second layer waterproof roll 4, after reserved (first floor waterproof roll 3 is pasted width+20~40mm) width, both sides start to paste from the body of wall 1 at first floor waterproof roll 3 edges, paste width 80~120mm with body of wall 1;
4) the 3rd layer of waterproof roll 5 of paving, in second layer waterproof roll 4 scopes, do not paste, in the middle of the 3rd layer of waterproof roll 5, after reserved (second layer waterproof roll 4 is pasted width+30~50mm) width, both sides start to paste from the body of wall 1 at second layer waterproof roll 4 edges, paste width 80~120mm with body of wall 1;
5) the 3rd layer of waterproof roll 5 paving complete after; paste topping 6 in its outside; topping 6 thickness 40~80mm, topping 6 outer ledges exceed the 3rd layer of waterproof roll 5 each 80~120mm in edge, and topping 6 can carry out backfill construction or the construction of integral waterproofing layer after having constructed.
Described waterproof roll is the one in SBS rubber modified asphalt coiled material, APP (APAO) modified bituminous pitch coiled material, PVC modification tar asphalt coiled material, rubber powder modified asphalt coiled material or modification drop polyethylene tire (OEE) coiled material.
Described topping is the one in extruded sheet, benzene plate or phenolic board.
The minimum density of described extruded sheet is 22kg/m 3, the minimum density of benzene plate is 18kg/m 3, the minimum density of phenolic board is 22kg/m 3.
Following examples are implemented under taking technical solution of the present invention as prerequisite, provided detailed embodiment and concrete operating process, but protection scope of the present invention are not limited to following embodiment.In following embodiment, method therefor is conventional method if no special instructions.
[embodiment 1] concrete wall 1 constuction joint 2 waterproofing work (seeing Fig. 1) with steel plate for sealing water 7
Concrete wall 1 in the upstream face constuction joint 2 each 500mm wide regions in both sides is cleaned out; By " waterproof coiled material construction technological standards " paving waterproof roll, waterproof roll is APP (APAO) modified bituminous pitch coiled material, adopts the paving of hot-melt adhesive method;
Paving first floor waterproof roll 3, does not paste in the upstream face constuction joint 2 each 50mm wide regions in both sides, and after the middle reserved 120mm width of first floor waterproof roll 3, both sides and body of wall 1 cement, and paste width 100mm;
Paving second layer waterproof roll 4, does not paste in first floor waterproof roll 3 scopes, and in the middle of second layer waterproof roll 4, after reserved 330mm width, both sides start to paste from the body of wall 1 at first floor waterproof roll 3 edges, paste width 80mm with body of wall 1;
The 3rd layer of waterproof roll 5 of paving, does not paste in second layer waterproof roll 4 scopes, and in the middle of the 3rd layer of waterproof roll 5, after reserved 500mm width, both sides start to paste from the body of wall 1 at second layer waterproof roll 4 edges, paste width 80mm with body of wall 1;
After the 3rd layer of waterproof roll 5 paving are complete, paste topping 6 in its outside, topping 6 is thickness 60mm, and density is 22kg/m 3extruded sheet, extruded sheet topping 6 outer ledges exceed the 3rd layer of waterproof roll 5 each 100mm in edge, topping 6 can carry out the construction of backfill construction or integral waterproofing layer after having constructed.
[embodiment 2] concrete wall 1 constuction joint 2 waterproofing work (seeing Fig. 2) with waterstop 8
Concrete wall 1 in the upstream face constuction joint 2 each 500mm wide regions in both sides is cleaned out; By " waterproof coiled material construction technological standards " paving waterproof roll, waterproof roll is SBS rubber modified asphalt coiled material, adopts the paving of hot-melt adhesive method;
Paving first floor waterproof roll 3, does not paste in the upstream face constuction joint 2 each 50mm wide regions in both sides, and after the middle reserved 130mm width of first floor waterproof roll 3, both sides and body of wall 1 cement, and paste width 100mm;
3) paving second layer waterproof roll 4, does not paste in first floor waterproof roll 3 scopes, and in the middle of second layer waterproof roll 4, after reserved 340mm width, both sides start to paste from the body of wall 1 at first floor waterproof roll 3 edges, paste width 100mm with body of wall 1;
4) the 3rd layer of waterproof roll 5 of paving, does not paste in second layer waterproof roll 4 scopes, and in the middle of the 3rd layer of waterproof roll 5, after reserved 550mm width, both sides start to paste from the body of wall 1 at second layer waterproof roll 4 edges, paste width 100mm with body of wall 1;
5) the 3rd layer of waterproof roll 5 paving complete after, its outside paste topping 6, topping 6 is thickness 80mm, density is 22kg/m 3phenolic board, phenolic board topping 6 outer ledges exceed the 3rd layer of waterproof roll 5 each 100mm in edge, topping 6 can carry out the construction of backfill construction or integral waterproofing layer after having constructed.

Claims (4)

1. a concrete wall Case Study on Construction Joint Water-proofing, is characterized in that, comprises the steps:
1) concrete wall in each upstream face constuction joint both sides 400~600mm wide region is cleaned out; By " waterproof coiled material construction technological standards " paving waterproof roll, adopt the paving of hot-melt adhesive method;
2) paving first floor waterproof roll, in the each 30~60mm wide region in upstream face constuction joint both sides, do not paste, after middle reserved (the not pasting body of wall width+10~30mm) width of first floor waterproof roll, both sides and body of wall cement, and paste width 80~120mm;
3) paving second layer waterproof roll, within the scope of first floor waterproof roll, do not paste, after reserved in the middle of second layer waterproof roll (first floor waterproof roll is pasted width+20~40mm) width, both sides start to paste from the body of wall at first floor waterproof roll edge, paste width 80~120mm with body of wall;
4) the 3rd layer of waterproof roll of paving, within the scope of second layer waterproof roll, do not paste, after reserved in the middle of the 3rd layer of waterproof roll (second layer waterproof roll is pasted width+30~50mm) width, both sides start to paste from the body of wall at second layer waterproof roll edge, paste width 80~120mm with body of wall;
5) the 3rd layer of waterproof roll paving complete after; paste topping in its outside; protective layer thickness 40~80mm, topping outer ledge exceeds the 3rd layer of each 80~120mm in waterproof roll edge, and topping can carry out backfill construction or the construction of integral waterproofing layer after having constructed.
2. a kind of concrete wall Case Study on Construction Joint Water-proofing according to claim 1, it is characterized in that, described waterproof roll is the one in SBS rubber modified asphalt coiled material, APP (APAO) modified bituminous pitch coiled material, PVC modification tar asphalt coiled material, rubber powder modified asphalt coiled material or modification drop polyethylene tire (OEE) coiled material.
3. a kind of concrete wall Case Study on Construction Joint Water-proofing according to claim 1, is characterized in that, described topping is the one in extruded sheet, benzene plate or phenolic board.
4. a kind of concrete wall Case Study on Construction Joint Water-proofing according to claim 3, is characterized in that, the minimum density of described extruded sheet is 22kg/m 3, the minimum density of benzene plate is 18kg/m 3, the minimum density of phenolic board is 22kg/m 3.
CN201410386829.XA 2014-08-06 2014-08-06 A kind of concrete wall Case Study on Construction Joint Water-proofing Active CN104153397B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410386829.XA CN104153397B (en) 2014-08-06 2014-08-06 A kind of concrete wall Case Study on Construction Joint Water-proofing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410386829.XA CN104153397B (en) 2014-08-06 2014-08-06 A kind of concrete wall Case Study on Construction Joint Water-proofing

Publications (2)

Publication Number Publication Date
CN104153397A true CN104153397A (en) 2014-11-19
CN104153397B CN104153397B (en) 2016-05-18

Family

ID=51879011

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410386829.XA Active CN104153397B (en) 2014-08-06 2014-08-06 A kind of concrete wall Case Study on Construction Joint Water-proofing

Country Status (1)

Country Link
CN (1) CN104153397B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105780816A (en) * 2016-03-17 2016-07-20 上海东方雨虹防水技术有限责任公司 Waterproofing treatment manner for underground portion settlement joint in existing building expansion construction
CN109057057A (en) * 2018-08-17 2018-12-21 庐江荣睿建设工程有限公司 A kind of concrete wall Case Study on Construction Joint Water-proofing
CN109440777A (en) * 2018-11-23 2019-03-08 中国人民解放军63926部队 Underground structure concrete construction joint leaks advanced monitoring warning device and construction method
CN117127654A (en) * 2023-08-01 2023-11-28 广东欣涛新材料科技股份有限公司 Waterproof coiled material capable of realizing two waterproof functions and construction process thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4608787A (en) * 1984-06-25 1986-09-02 Carlson Franklin J Manhole seal construction
JPH0489915A (en) * 1990-08-02 1992-03-24 Giken Seisakusho Co Ltd Water cutoff member and sheet pile using this cutoff structure and executing method for sheet pile
CN1458354A (en) * 2003-04-25 2003-11-26 王丛巍 Laminated composite water-proof structure with double side self adhesive water-proof coil as base layer and its construction method
CN201485883U (en) * 2009-05-21 2010-05-26 朱奎 Basement deformation joint
CN202416379U (en) * 2012-02-23 2012-09-05 山东同圆设计集团有限公司 Precipitation post-pouring belt capable of stopping dewatering in advance
CN202937276U (en) * 2012-12-14 2013-05-15 中铁二十三局集团有限公司 Waterproof structure for tunnel
CN103590424A (en) * 2013-11-29 2014-02-19 李涛 Road passage underground project construction method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4608787A (en) * 1984-06-25 1986-09-02 Carlson Franklin J Manhole seal construction
JPH0489915A (en) * 1990-08-02 1992-03-24 Giken Seisakusho Co Ltd Water cutoff member and sheet pile using this cutoff structure and executing method for sheet pile
CN1458354A (en) * 2003-04-25 2003-11-26 王丛巍 Laminated composite water-proof structure with double side self adhesive water-proof coil as base layer and its construction method
CN201485883U (en) * 2009-05-21 2010-05-26 朱奎 Basement deformation joint
CN202416379U (en) * 2012-02-23 2012-09-05 山东同圆设计集团有限公司 Precipitation post-pouring belt capable of stopping dewatering in advance
CN202937276U (en) * 2012-12-14 2013-05-15 中铁二十三局集团有限公司 Waterproof structure for tunnel
CN103590424A (en) * 2013-11-29 2014-02-19 李涛 Road passage underground project construction method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105780816A (en) * 2016-03-17 2016-07-20 上海东方雨虹防水技术有限责任公司 Waterproofing treatment manner for underground portion settlement joint in existing building expansion construction
CN105780816B (en) * 2016-03-17 2018-02-09 上海东方雨虹防水技术有限责任公司 A kind of water-proofing treatment mode for solving underground position subsiding crack in existed building enlarging construction
CN109057057A (en) * 2018-08-17 2018-12-21 庐江荣睿建设工程有限公司 A kind of concrete wall Case Study on Construction Joint Water-proofing
CN109440777A (en) * 2018-11-23 2019-03-08 中国人民解放军63926部队 Underground structure concrete construction joint leaks advanced monitoring warning device and construction method
CN117127654A (en) * 2023-08-01 2023-11-28 广东欣涛新材料科技股份有限公司 Waterproof coiled material capable of realizing two waterproof functions and construction process thereof
CN117127654B (en) * 2023-08-01 2024-04-30 广东欣涛新材料科技股份有限公司 Waterproof coiled material capable of realizing two waterproof functions and construction process thereof

Also Published As

Publication number Publication date
CN104153397B (en) 2016-05-18

Similar Documents

Publication Publication Date Title
CN201588229U (en) Basement waterproof construction system
CN207131424U (en) A kind of lining construction stitches waterproof construction
CN104153397B (en) A kind of concrete wall Case Study on Construction Joint Water-proofing
CN103276858B (en) Drainage structure for inverted roof and construction method of drainage structure
CN205804633U (en) A kind of basement bottom board waterproof construction
CN204646270U (en) Shield method waterproof construction system
CN105019919A (en) Tunnel for transmitting fluid and construction method thereof
CN108643230A (en) A kind of outer waterproof construction of underground pipe gallery and construction method
CN102661449B (en) Water-proof structure of upstream face of flexible wall penetration pipe
CN109252549A (en) A kind of bentonite waterproof blanket and its construction method for man-made lake wetland
CN101979781B (en) Method for constructing oil drilling waste mud solidification pool
CN102852530A (en) Tunnel buffering multilayered water-discharging-preventing structure and construction method
CN202139571U (en) Plant protective river foundation structure
CN110541431A (en) waterproof structure of pipe gallery and construction method thereof
CN205444256U (en) Salt lake mineral salt crystallizing pond protective screen system
CN204252414U (en) Roof covering water-proof structure
CN203412598U (en) Cable-tunnel composite lining waterproof structure
CN212001695U (en) Outer wall waterproof construction
CN204827469U (en) A tunnel for transmission fluid
CN210637591U (en) Steel trenchless jacking pipe
CN103031887B (en) Construction method and water guide system of house bathroom water guide system
CN113737809B (en) Waterproof construction method for lattice column crossing pipe gallery
CN103912123A (en) Caisson type washroom water leakage preventing-draining construction method
CN104343137B (en) Underground waterproof engineering construction method
CN203144968U (en) Concrete slab expansion joint

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant