CN105780816A - Waterproofing treatment manner for underground portion settlement joint in existing building expansion construction - Google Patents

Waterproofing treatment manner for underground portion settlement joint in existing building expansion construction Download PDF

Info

Publication number
CN105780816A
CN105780816A CN201610153156.2A CN201610153156A CN105780816A CN 105780816 A CN105780816 A CN 105780816A CN 201610153156 A CN201610153156 A CN 201610153156A CN 105780816 A CN105780816 A CN 105780816A
Authority
CN
China
Prior art keywords
underground
layer
construction
water
sheet material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610153156.2A
Other languages
Chinese (zh)
Other versions
CN105780816B (en
Inventor
陈春荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI ORIENTAL YUHONG WATERPROOF TECHNOLOGY Co Ltd
Original Assignee
SHANGHAI ORIENTAL YUHONG WATERPROOF TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI ORIENTAL YUHONG WATERPROOF TECHNOLOGY Co Ltd filed Critical SHANGHAI ORIENTAL YUHONG WATERPROOF TECHNOLOGY Co Ltd
Priority to CN201610153156.2A priority Critical patent/CN105780816B/en
Publication of CN105780816A publication Critical patent/CN105780816A/en
Application granted granted Critical
Publication of CN105780816B publication Critical patent/CN105780816B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0203Arrangements for filling cracks or cavities in building constructions

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Electrochemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Chemical & Material Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Road Paving Structures (AREA)
  • Building Environments (AREA)

Abstract

The invention provides a waterproofing treatment manner for an underground position settlement joint in existing building expansion construction. After an expansion polystyrene board (5) and a nine-layer board (6) are coated with a second coiled material layer (1), a first coiled material layer (10) and a lap joint layer (9), the expansion polystyrene board (5) and the nine-layer board (6) are removed, an embedding and filling layer (8) is injected in a cavity, and therefore a novel waterproof structure is formed. The problems of waterproof guard difficulty and leakage of a deformation joint portion in expansion construction are effectively solved.

Description

A kind of existed building that solves extends the water-proofing treatment mode of position, underground subsiding crack in construction
Technical field
The present invention relates to waterproofing work technical field, particularly a kind of existed building that solves extends the water-proofing treatment mode of position, underground subsiding crack in construction.
Background technology
At present, basement UNICOM road deformation joint waterproof guard is usually taken the form of waterproofing of movement joints structure and processes, its more method is the embedding middle buried water stop in portion in the structure, system carrys out the sedimentation and deformation of commensurate structure by the elasticity of middle buried water stop, thus arriving corresponding waterproof guard requirement.Inventor is by the leakage scenarios analysis of the different waterstop condition of construction of new construction, this positions many, in discovery, buried water stop can not put in place by one-off construction in reality construction process, need to process between segmentation timesharing, cause the waterstop that there is exsertion part to easily cause breakage, and relatively repair more difficult after breakage;Simultaneously because of the differential settlement of structure, the defect of early stage construction, it is easy to cause the breakage at this position, therefore leakage scenarios is more.
For the problems referred to above, need a kind of existed building that solves badly and extend the water-proofing treatment mode of position, underground subsiding crack in construction, basement communication channel deformation joint waterproof guard is improved and set up, the good uncured asphalt paint of creep properties is adopted to carry out waterproof enhancement process, to adapt to the deformation at this position, make up the deficiency that waterstop construction brings, thus solving the leakage problems at this position simultaneously.
Summary of the invention
The technical problem to be solved is to provide a kind of existed building that solves and extends the water-proofing treatment mode of position, underground subsiding crack in construction.
A kind of existed building that solves extends the water-proofing treatment mode of position, underground subsiding crack in construction, comprises the steps:
1) is digged pit in existing structure bottom;
2) reject the corresponding cushion layer structure in old structure bottom, and clear up;Note the protection to place where troops were originally stationed water layer simultaneously;
3) carrying out overlap joint process with asphalt paint and old structure bottom waterproof layer, form bonding layer, bonding layer is extended to old structure base slab end face;
4) carry out cladding process with coiled material on described bonding layer surface, form first volume sheet material layers;
5) bottom split joint place, bury asphalt water-proof coiled material underground, form volume Two sheet material layers, after having constructed, be first temporarily fixed at old base arrangement place;
6) by step 1) after the soil layer etc. of old structure bottom that excavates filled, carry out the construction again of new bed course, rear launch interim fixing described volume Two sheet material layers, and bury a foam spacer rod underground in described volume Two sheet material layers bottom;
7) laying expansion polyphenyl plate at described volume Two sheet material layers upper face, expansion polyphenyl plate thickness answers bonding crack wide and the THICKNESS CALCULATION of nine laminates, and expansion polyphenyl plate point is bonded on the waterproof layer of old structure;
8) laying nine laminates on described expansion polyphenyl plate surface, described 9 laminate points are bonded on described expansion polyphenyl plate;
9), after described volume Two sheet material layers is launched, carry out overlap joint process with the new waterproof layer at new bed course position, the new waterproof layer at new bed course position turns to expansion polyphenyl plate and the top of nine laminates;
10) casting concrete, forms concrete floor, reaches after requirement of strength until concrete floor, and precompressed is layered on the new waterproof layer paving at expansion polyphenyl plate and nine laminate tops to new construction sidewall, rear rejects expansion polyphenyl plate and nine laminates;
11) the corresponding encapsulant of pointing, forms pointing layer.
Further, step 1) described hole side is inclined-plane
Further, step 1) width in described hole be 450-550mm, the degree of depth is 450-550mm.
Further, step 3) lap width of described bonding layer and old structure bottom waterproof layer is not less than 500mm, is extended to old structure base slab end face at least 300mm.
Further, step 5) described volume Two sheet material layers length is for being not less than 2m.
Further, step 5) described volume Two sheet material layers employing RWB-801 polymer modified bituminous waterproof sheet material.
Further, step 8) described in use pea gravel concreten to be supported bottom nine laminates, described nine laminate tops can adopt the waterproof layer at newly-built bed course position to turn over bag and process.
Further, step 10) described in pointing layer included uncured rubber asphalt, building asphalt glue, water expandable waterstop successively by inward at both ends.
Further, in step 10) after set up side wall additional waterproof course and waterproof layer, build top concrete, more separately set up film and waterproof coiled material extra play.
The beneficial effects of the present invention is, effectively solve to extend waterproof guard difficult point and the leakage problems at the movement joint position brought in construction.
Accompanying drawing explanation
With reference to the following drawings, it is better understood with many aspects of the present invention.Ingredient in accompanying drawing is not necessarily to scale, it is preferred that emphasis is clearly exemplify principles of the invention.
Fig. 1 is step 9) construct and terminate rear structural representation.
Fig. 2 is structural representation after completion.
Detailed description of the invention
Below in conjunction with drawings and Examples, the specific embodiment of the present invention being further described, following example are only for clearly illustrating technical scheme, and can not limit the scope of the invention with this.
As shown in Figure 1-2, the concrete technical scheme of the present invention is as follows:
A kind of existed building that solves extends the water-proofing treatment mode of position, underground subsiding crack in construction, comprises the steps:
1) hole of portion's excavation oblique angle shape under an existing structure;The width in described hole is 450-550mm, the degree of depth is 450-550mm;
2) reject the corresponding cushion layer structure in old structure bottom, and clear up;Note the protection to place where troops were originally stationed water layer simultaneously;
3) carrying out overlap joint process with asphalt paint and old structure bottom waterproof layer, form bonding layer 9, bonding layer 9 is extended to old structure base slab end face;The lap width of described bonding layer 9 and old structure bottom waterproof layer is not less than 500mm, is extended to old structure base slab end face at least 300mm;
4) carry out cladding process with coiled material on described bonding layer 9 surface, form first volume sheet material layers 10;
5) bottom split joint place, bury asphalt water-proof coiled material underground, form volume Two sheet material layers 1, after having constructed, be first temporarily fixed at old base arrangement place, stand-by;Described volume Two sheet material layers 1 length is for being not less than 2m, and described volume Two sheet material layers 1 adopts RWB-801 polymer modified bituminous waterproof sheet material;
6) by step 1) after the soil layer etc. of old structure bottom that excavates filled, carry out the construction again of new bed course 31, rear launch interim fixing described volume Two sheet material layers 1, and bury a foam spacer rod 4 underground in described volume Two sheet material layers 1 bottom;
7) laying expansion polyphenyl plate 5 at described volume Two sheet material layers 1 upper face, expansion polyphenyl plate 5 thickness answers bonding crack wide and the THICKNESS CALCULATION of nine laminates 6, on 5 waterproof layers being bonded at old structure of expansion polyphenyl plate;
8) laying nine laminates 6 on described expansion polyphenyl 5 plate surface, described nine laminate 6 is bonded on described expansion polyphenyl plate 5;Using pea gravel concreten to be supported bottom described nine laminates 6, described nine laminate 6 tops can adopt the waterproof layer at newly-built bed course position to turn over bag and process;
9), after described volume Two sheet material layers 1 is launched, carry out overlap joint process with the first volume sheet material layers 2 at new bed course 31 position, the first volume sheet material layers 2 at new bed course 31 position turns to the top of expansion polyphenyl plate 5 and nine laminates 6;
10) casting concrete, forms concrete floor 32, after concrete floor 32 reaches requirement of strength, precompressed is layered on first volume sheet material layers 2 paving at expansion polyphenyl plate 5 and nine laminate 6 tops to new construction sidewall, rear rejects expansion polyphenyl plate 5 and nine laminates 6;After set up side wall additional waterproof course and waterproof layer, build top concrete seven, more separately set up film and waterproof coiled material extra play;
11) the corresponding encapsulant of pointing, forms pointing layer 8;Described pointing layer 8 is included uncured rubber asphalt 81, building asphalt glue 82, water expandable waterstop 83 successively by inward at both ends.
The above is only the preferred embodiments of the present invention; it should be pointed out that, for those skilled in the art, under the premise without departing from the technology of the present invention principle; can also making some improvements and modifications, these improvements and modifications also should be regarded as protection scope of the present invention.

Claims (9)

1. one kind solves the water-proofing treatment mode of position, underground subsiding crack in existed building enlarging construction, it is characterised in that comprise the steps:
1) is digged pit in existing structure bottom;
2) reject the corresponding cushion layer structure in old structure bottom, and clear up;Note the protection to place where troops were originally stationed water layer simultaneously;
3) carrying out overlap joint process with asphalt paint and old structure bottom waterproof layer, form bonding layer (9), bonding layer (9) is extended to old structure base slab end face;
4) carry out cladding process with coiled material on described bonding layer (9) surface, form first volume sheet material layers (10);
5) bottom split joint place, bury asphalt water-proof coiled material underground, form volume Two sheet material layers (1), after having constructed, be first temporarily fixed at old base arrangement place;
6) by step 1) after the soil layer etc. of old structure bottom that excavates filled, carry out the construction again of new bed course (31), the described volume Two sheet material layers (1) that rear expansion is temporarily fixing, and bury a foam spacer rod (4) underground in described volume Two sheet material layers (1) bottom;
7) expansion polyphenyl plate (5) is laid at described volume Two sheet material layers (1) upper face, expansion polyphenyl plate (5) thickness answers bonding crack wide and the THICKNESS CALCULATION of nine laminates (6), and expansion polyphenyl plate (5) point is bonded on the waterproof layer of old structure;
8) laying nine laminates (6) on described expansion polyphenyl (5) plate surface, described nine laminates (6) point is bonded on described expansion polyphenyl plate (5);
9) after described volume Two sheet material layers (1) is launched, carry out overlap joint process with the new waterproof layer (2) at new bed course (31) position, the new waterproof layer (2) at new bed course (31) position turns to the top of expansion polyphenyl plate (5) and nine laminates (6);
10) casting concrete, form concrete floor (32), after concrete floor (32) reaches requirement of strength, precompressed is layered on new waterproof layer (2) paving at expansion polyphenyl plate (5) and nine laminates (6) top to new construction sidewall, rejects expansion polyphenyl plate (5) and nine laminates (6) afterwards;
11) the corresponding encapsulant of pointing, forms pointing layer (8).
2. as claimed in claim 1 a kind of solving the water-proofing treatment mode of position, underground subsiding crack in existed building enlarging construction, it is characterised in that step 1) described hole side is inclined-plane.
3. as claimed in claim 1 a kind of solving the water-proofing treatment mode of position, underground subsiding crack in existed building enlarging construction, it is characterised in that step 1) width in described hole be 450-550mm, the degree of depth is 450-550mm.
4. as claim 1 or state a kind of solve the water-proofing treatment mode of position, underground subsiding crack in existed building enlarging construction, it is characterized in that, step 3) lap width of described bonding layer (9) and old structure bottom waterproof layer is not less than 500mm, is extended to old structure base slab end face at least 300mm.
5. as claimed in claim 1 a kind of solving the water-proofing treatment mode of position, underground subsiding crack in existed building enlarging construction, it is characterised in that step 5) described volume Two sheet material layers (1) length is for being not less than 2m.
6. a kind of existed building that solves as claimed in claim 1 extends the water-proofing treatment mode of position, underground subsiding crack in construction, it is characterised in that step 5) described volume Two sheet material layers (1) employing RWB-801 polymer modified bituminous waterproof sheet material.
7. a kind of existed building that solves as claimed in claim 1 extends the water-proofing treatment mode of position, underground subsiding crack in construction, it is characterized in that, step 8) described in nine laminates (6) bottom use pea gravel concreten be supported, described nine laminates (6) top can adopt the waterproof layer at newly-built bed course position turn over bag process.
8. a kind of existed building that solves as claimed in claim 1 extends the water-proofing treatment mode of position, underground subsiding crack in construction, it is characterized in that, step 10) described in pointing layer (8) included uncured rubber asphalt (81), building asphalt glue (82), water expandable waterstop (83) successively by inward at both ends.
9. a kind of existed building that solves as claimed in claim 1 extends the water-proofing treatment mode of position, underground subsiding crack in construction, it is characterized in that, in step 10) after set up side wall additional waterproof course and waterproof layer, build top concrete (7), more separately set up film and waterproof coiled material extra play.
CN201610153156.2A 2016-03-17 2016-03-17 A kind of water-proofing treatment mode for solving underground position subsiding crack in existed building enlarging construction Active CN105780816B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610153156.2A CN105780816B (en) 2016-03-17 2016-03-17 A kind of water-proofing treatment mode for solving underground position subsiding crack in existed building enlarging construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610153156.2A CN105780816B (en) 2016-03-17 2016-03-17 A kind of water-proofing treatment mode for solving underground position subsiding crack in existed building enlarging construction

Publications (2)

Publication Number Publication Date
CN105780816A true CN105780816A (en) 2016-07-20
CN105780816B CN105780816B (en) 2018-02-09

Family

ID=56392837

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610153156.2A Active CN105780816B (en) 2016-03-17 2016-03-17 A kind of water-proofing treatment mode for solving underground position subsiding crack in existed building enlarging construction

Country Status (1)

Country Link
CN (1) CN105780816B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109469102A (en) * 2018-12-27 2019-03-15 中国二冶集团有限公司 Piping lane expansion joint method for waterproofing
CN112726680A (en) * 2020-12-25 2021-04-30 中国建筑第八工程局有限公司 Deformation joint structure of basement wall column corner area and construction method
CN114775697A (en) * 2022-05-16 2022-07-22 中铁十一局集团有限公司 Method for processing deformation joint at joint of new structure and old structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101570973A (en) * 2009-05-31 2009-11-04 武汉一冶建筑安装工程有限责任公司 Internal-bonded water-proof technique for externally-bonded waterstop
KR100934283B1 (en) * 2007-08-09 2009-12-28 김기철 Expansion joint waterproofing and waterproofing method of concrete structure using expansion joint member
CN201943093U (en) * 2011-01-07 2011-08-24 深圳市方佳建筑设计有限公司 Settlement joint water-proof structure for basement with drainage channel
CN103603376A (en) * 2013-12-03 2014-02-26 深圳市城市优筑科技有限公司 Concrete box culvert deformation joint waterproof structure and manufacturing technology thereof
CN104153397A (en) * 2014-08-06 2014-11-19 中国三冶集团有限公司 Concrete wall construction joint waterproof treatment method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100934283B1 (en) * 2007-08-09 2009-12-28 김기철 Expansion joint waterproofing and waterproofing method of concrete structure using expansion joint member
CN101570973A (en) * 2009-05-31 2009-11-04 武汉一冶建筑安装工程有限责任公司 Internal-bonded water-proof technique for externally-bonded waterstop
CN201943093U (en) * 2011-01-07 2011-08-24 深圳市方佳建筑设计有限公司 Settlement joint water-proof structure for basement with drainage channel
CN103603376A (en) * 2013-12-03 2014-02-26 深圳市城市优筑科技有限公司 Concrete box culvert deformation joint waterproof structure and manufacturing technology thereof
CN104153397A (en) * 2014-08-06 2014-11-19 中国三冶集团有限公司 Concrete wall construction joint waterproof treatment method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109469102A (en) * 2018-12-27 2019-03-15 中国二冶集团有限公司 Piping lane expansion joint method for waterproofing
CN112726680A (en) * 2020-12-25 2021-04-30 中国建筑第八工程局有限公司 Deformation joint structure of basement wall column corner area and construction method
CN114775697A (en) * 2022-05-16 2022-07-22 中铁十一局集团有限公司 Method for processing deformation joint at joint of new structure and old structure
CN114775697B (en) * 2022-05-16 2024-02-13 中铁十一局集团有限公司 Method for processing deformation joint at joint of new and old structures

Also Published As

Publication number Publication date
CN105780816B (en) 2018-02-09

Similar Documents

Publication Publication Date Title
CN106120873B (en) A kind of construction method of pile-raft foundation pre-installed and inverted adhered composite high-molecular waterproof roll
CN206545228U (en) A kind of piping lane with waterproof construction
CN108411939A (en) The spliced prefabricated pipe gallery of one kind and its construction method
CN109930631B (en) Vibration isolation structure of building foundation and construction method thereof
CN102306225A (en) Method for simulating construction course and tunnel deformation influence value of multiline overlapping tunnel
CN106400811B (en) Frame is inverse to make foldable assembled foundation pit structure construction method
CN104695343B (en) Long-distance jacking construction method based on back wall pushing technology
CN105780816A (en) Waterproofing treatment manner for underground portion settlement joint in existing building expansion construction
CN112252462A (en) Construction method of concrete roof layer waterproof structure
CN106593470A (en) High-permeability water-rich sand shield terminal reinforcing system and construction method thereof
CN106869169A (en) A kind of three-dimensional interval construction method of underground pipe gallery warehouse
CN105714942A (en) Waterstop waterproof pretreatment method of newly built cellar connecting passage deformation joint
CN109372024A (en) A kind of sole plate waterproof structure for deformation seams and construction method
CN110424556A (en) A kind of basement bottom board water draining plate waterproof construction method
CN103603373B (en) Prefabricated inspection well and road construction method involving inspection well
CN104652495A (en) Waterproof construction process for joint of inner support upright post of foundation pit and bottom plate
CN209923991U (en) Vibration isolation structure for building foundation
CN206299392U (en) A kind of high osmosis water-rich sand layer shield end reinforcement system
CN202099706U (en) Late construction structure for car ramp close to buildings
CN1431375A (en) Wall module of well walls and method for building wall bodies of well walls by using module
CN207672616U (en) A kind of outdoor cable penetration pipe is passed by one's way laying structure
CN213173843U (en) Waterproof overlap joint structure of new and old underground works roof
CN109372030A (en) A kind of post-cast strip waterproof construction and its construction method
CN209703545U (en) A kind of tower-crane foundation structure under underground garage bottom plate
CN214574744U (en) Deformation joint structure of roof track playground

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant