- CN105780816A CN105780816A CN201610153156.2A CN201610153156A CN105780816A CN 105780816 A CN105780816 A CN 105780816A CN 201610153156 A CN201610153156 A CN 201610153156A CN 105780816 A CN105780816 A CN 105780816A
- Authority
- CN
- China
- Prior art keywords
- underground
- layer
- construction
- water
- sheet material
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/16—Arrangement or construction of joints in foundation structures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0203—Arrangements for filling cracks or cavities in building constructions
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Mechanical Engineering (AREA)
- Electrochemistry (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Chemical & Material Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Road Paving Structures (AREA)
- Building Environments (AREA)
Abstract
The invention provides a waterproofing treatment manner for an underground position settlement joint in existing building expansion construction. After an expansion polystyrene board (5) and a nine-layer board (6) are coated with a second coiled material layer (1), a first coiled material layer (10) and a lap joint layer (9), the expansion polystyrene board (5) and the nine-layer board (6) are removed, an embedding and filling layer (8) is injected in a cavity, and therefore a novel waterproof structure is formed. The problems of waterproof guard difficulty and leakage of a deformation joint portion in expansion construction are effectively solved.
Description
Technical field
The present invention relates to waterproofing work technical field, particularly a kind of existed building that solves extends the water-proofing treatment mode of position, underground subsiding crack in construction.
Background technology
At present, basement UNICOM road deformation joint waterproof guard is usually taken the form of waterproofing of movement joints structure and processes, its more method is the embedding middle buried water stop in portion in the structure, system carrys out the sedimentation and deformation of commensurate structure by the elasticity of middle buried water stop, thus arriving corresponding waterproof guard requirement.Inventor is by the leakage scenarios analysis of the different waterstop condition of construction of new construction, this positions many, in discovery, buried water stop can not put in place by one-off construction in reality construction process, need to process between segmentation timesharing, cause the waterstop that there is exsertion part to easily cause breakage, and relatively repair more difficult after breakage;Simultaneously because of the differential settlement of structure, the defect of early stage construction, it is easy to cause the breakage at this position, therefore leakage scenarios is more.
For the problems referred to above, need a kind of existed building that solves badly and extend the water-proofing treatment mode of position, underground subsiding crack in construction, basement communication channel deformation joint waterproof guard is improved and set up, the good uncured asphalt paint of creep properties is adopted to carry out waterproof enhancement process, to adapt to the deformation at this position, make up the deficiency that waterstop construction brings, thus solving the leakage problems at this position simultaneously.
Summary of the invention
The technical problem to be solved is to provide a kind of existed building that solves and extends the water-proofing treatment mode of position, underground subsiding crack in construction.
A kind of existed building that solves extends the water-proofing treatment mode of position, underground subsiding crack in construction, comprises the steps:
1) is digged pit in existing structure bottom;
2) reject the corresponding cushion layer structure in old structure bottom, and clear up;Note the protection to place where troops were originally stationed water layer simultaneously;
3) carrying out overlap joint process with asphalt paint and old structure bottom waterproof layer, form bonding layer, bonding layer is extended to old structure base slab end face;
4) carry out cladding process with coiled material on described bonding layer surface, form first volume sheet material layers;
5) bottom split joint place, bury asphalt water-proof coiled material underground, form volume Two sheet material layers, after having constructed, be first temporarily fixed at old base arrangement place;
6) by step 1) after the soil layer etc. of old structure bottom that excavates filled, carry out the construction again of new bed course, rear launch interim fixing described volume Two sheet material layers, and bury a foam spacer rod underground in described volume Two sheet material layers bottom;
7) laying expansion polyphenyl plate at described volume Two sheet material layers upper face, expansion polyphenyl plate thickness answers bonding crack wide and the THICKNESS CALCULATION of nine laminates, and expansion polyphenyl plate point is bonded on the waterproof layer of old structure;
8) laying nine laminates on described expansion polyphenyl plate surface, described 9 laminate points are bonded on described expansion polyphenyl plate;
9), after described volume Two sheet material layers is launched, carry out overlap joint process with the new waterproof layer at new bed course position, the new waterproof layer at new bed course position turns to expansion polyphenyl plate and the top of nine laminates;
10) casting concrete, forms concrete floor, reaches after requirement of strength until concrete floor, and precompressed is layered on the new waterproof layer paving at expansion polyphenyl plate and nine laminate tops to new construction sidewall, rear rejects expansion polyphenyl plate and nine laminates;
11) the corresponding encapsulant of pointing, forms pointing layer.
Further, step 1) described hole side is inclined-plane
Further, step 1) width in described hole be 450-550mm, the degree of depth is 450-550mm.
Further, step 3) lap width of described bonding layer and old structure bottom waterproof layer is not less than 500mm, is extended to old structure base slab end face at least 300mm.
Further, step 5) described volume Two sheet material layers length is for being not less than 2m.
Further, step 5) described volume Two sheet material layers employing RWB-801 polymer modified bituminous waterproof sheet material.
Further, step 8) described in use pea gravel concreten to be supported bottom nine laminates, described nine laminate tops can adopt the waterproof layer at newly-built bed course position to turn over bag and process.
Further, step 10) described in pointing layer included uncured rubber asphalt, building asphalt glue, water expandable waterstop successively by inward at both ends.
Further, in step 10) after set up side wall additional waterproof course and waterproof layer, build top concrete, more separately set up film and waterproof coiled material extra play.
The beneficial effects of the present invention is, effectively solve to extend waterproof guard difficult point and the leakage problems at the movement joint position brought in construction.
Accompanying drawing explanation
With reference to the following drawings, it is better understood with many aspects of the present invention.Ingredient in accompanying drawing is not necessarily to scale, it is preferred that emphasis is clearly exemplify principles of the invention.
Fig. 1 is step 9) construct and terminate rear structural representation.
Fig. 2 is structural representation after completion.
Detailed description of the invention
Below in conjunction with drawings and Examples, the specific embodiment of the present invention being further described, following example are only for clearly illustrating technical scheme, and can not limit the scope of the invention with this.
As shown in Figure 1-2, the concrete technical scheme of the present invention is as follows:
A kind of existed building that solves extends the water-proofing treatment mode of position, underground subsiding crack in construction, comprises the steps:
1) hole of portion's excavation oblique angle shape under an existing structure;The width in described hole is 450-550mm, the degree of depth is 450-550mm;
2) reject the corresponding cushion layer structure in old structure bottom, and clear up;Note the protection to place where troops were originally stationed water layer simultaneously;
3) carrying out overlap joint process with asphalt paint and old structure bottom waterproof layer, form bonding layer 9, bonding layer 9 is extended to old structure base slab end face;The lap width of described bonding layer 9 and old structure bottom waterproof layer is not less than 500mm, is extended to old structure base slab end face at least 300mm;
4) carry out cladding process with coiled material on described bonding layer 9 surface, form first volume sheet material layers 10;
5) bottom split joint place, bury asphalt water-proof coiled material underground, form volume Two sheet material layers 1, after having constructed, be first temporarily fixed at old base arrangement place, stand-by;Described volume Two sheet material layers 1 length is for being not less than 2m, and described volume Two sheet material layers 1 adopts RWB-801 polymer modified bituminous waterproof sheet material;
6) by step 1) after the soil layer etc. of old structure bottom that excavates filled, carry out the construction again of new bed course 31, rear launch interim fixing described volume Two sheet material layers 1, and bury a foam spacer rod 4 underground in described volume Two sheet material layers 1 bottom;
7) laying expansion polyphenyl plate 5 at described volume Two sheet material layers 1 upper face, expansion polyphenyl plate 5 thickness answers bonding crack wide and the THICKNESS CALCULATION of nine laminates 6, on 5 waterproof layers being bonded at old structure of expansion polyphenyl plate;
8) laying nine laminates 6 on described expansion polyphenyl 5 plate surface, described nine laminate 6 is bonded on described expansion polyphenyl plate 5;Using pea gravel concreten to be supported bottom described nine laminates 6, described nine laminate 6 tops can adopt the waterproof layer at newly-built bed course position to turn over bag and process;
9), after described volume Two sheet material layers 1 is launched, carry out overlap joint process with the first volume sheet material layers 2 at new bed course 31 position, the first volume sheet material layers 2 at new bed course 31 position turns to the top of expansion polyphenyl plate 5 and nine laminates 6;
10) casting concrete, forms concrete floor 32, after concrete floor 32 reaches requirement of strength, precompressed is layered on first volume sheet material layers 2 paving at expansion polyphenyl plate 5 and nine laminate 6 tops to new construction sidewall, rear rejects expansion polyphenyl plate 5 and nine laminates 6;After set up side wall additional waterproof course and waterproof layer, build top concrete seven, more separately set up film and waterproof coiled material extra play;
11) the corresponding encapsulant of pointing, forms pointing layer 8;Described pointing layer 8 is included uncured rubber asphalt 81, building asphalt glue 82, water expandable waterstop 83 successively by inward at both ends.
The above is only the preferred embodiments of the present invention; it should be pointed out that, for those skilled in the art, under the premise without departing from the technology of the present invention principle; can also making some improvements and modifications, these improvements and modifications also should be regarded as protection scope of the present invention.
Claims (9)
1. one kind solves the water-proofing treatment mode of position, underground subsiding crack in existed building enlarging construction, it is characterised in that comprise the steps:
1) is digged pit in existing structure bottom;
2) reject the corresponding cushion layer structure in old structure bottom, and clear up;Note the protection to place where troops were originally stationed water layer simultaneously;
3) carrying out overlap joint process with asphalt paint and old structure bottom waterproof layer, form bonding layer (9), bonding layer (9) is extended to old structure base slab end face;
4) carry out cladding process with coiled material on described bonding layer (9) surface, form first volume sheet material layers (10);
5) bottom split joint place, bury asphalt water-proof coiled material underground, form volume Two sheet material layers (1), after having constructed, be first temporarily fixed at old base arrangement place;
6) by step 1) after the soil layer etc. of old structure bottom that excavates filled, carry out the construction again of new bed course (31), the described volume Two sheet material layers (1) that rear expansion is temporarily fixing, and bury a foam spacer rod (4) underground in described volume Two sheet material layers (1) bottom;
7) expansion polyphenyl plate (5) is laid at described volume Two sheet material layers (1) upper face, expansion polyphenyl plate (5) thickness answers bonding crack wide and the THICKNESS CALCULATION of nine laminates (6), and expansion polyphenyl plate (5) point is bonded on the waterproof layer of old structure;
8) laying nine laminates (6) on described expansion polyphenyl (5) plate surface, described nine laminates (6) point is bonded on described expansion polyphenyl plate (5);
9) after described volume Two sheet material layers (1) is launched, carry out overlap joint process with the new waterproof layer (2) at new bed course (31) position, the new waterproof layer (2) at new bed course (31) position turns to the top of expansion polyphenyl plate (5) and nine laminates (6);
10) casting concrete, form concrete floor (32), after concrete floor (32) reaches requirement of strength, precompressed is layered on new waterproof layer (2) paving at expansion polyphenyl plate (5) and nine laminates (6) top to new construction sidewall, rejects expansion polyphenyl plate (5) and nine laminates (6) afterwards;
11) the corresponding encapsulant of pointing, forms pointing layer (8).
2. as claimed in claim 1 a kind of solving the water-proofing treatment mode of position, underground subsiding crack in existed building enlarging construction, it is characterised in that step 1) described hole side is inclined-plane.
3. as claimed in claim 1 a kind of solving the water-proofing treatment mode of position, underground subsiding crack in existed building enlarging construction, it is characterised in that step 1) width in described hole be 450-550mm, the degree of depth is 450-550mm.
4. as claim 1 or state a kind of solve the water-proofing treatment mode of position, underground subsiding crack in existed building enlarging construction, it is characterized in that, step 3) lap width of described bonding layer (9) and old structure bottom waterproof layer is not less than 500mm, is extended to old structure base slab end face at least 300mm.
5. as claimed in claim 1 a kind of solving the water-proofing treatment mode of position, underground subsiding crack in existed building enlarging construction, it is characterised in that step 5) described volume Two sheet material layers (1) length is for being not less than 2m.
6. a kind of existed building that solves as claimed in claim 1 extends the water-proofing treatment mode of position, underground subsiding crack in construction, it is characterised in that step 5) described volume Two sheet material layers (1) employing RWB-801 polymer modified bituminous waterproof sheet material.
7. a kind of existed building that solves as claimed in claim 1 extends the water-proofing treatment mode of position, underground subsiding crack in construction, it is characterized in that, step 8) described in nine laminates (6) bottom use pea gravel concreten be supported, described nine laminates (6) top can adopt the waterproof layer at newly-built bed course position turn over bag process.
8. a kind of existed building that solves as claimed in claim 1 extends the water-proofing treatment mode of position, underground subsiding crack in construction, it is characterized in that, step 10) described in pointing layer (8) included uncured rubber asphalt (81), building asphalt glue (82), water expandable waterstop (83) successively by inward at both ends.
9. a kind of existed building that solves as claimed in claim 1 extends the water-proofing treatment mode of position, underground subsiding crack in construction, it is characterized in that, in step 10) after set up side wall additional waterproof course and waterproof layer, build top concrete (7), more separately set up film and waterproof coiled material extra play.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610153156.2A CN105780816B (en) | 2016-03-17 | 2016-03-17 | A kind of water-proofing treatment mode for solving underground position subsiding crack in existed building enlarging construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610153156.2A CN105780816B (en) | 2016-03-17 | 2016-03-17 | A kind of water-proofing treatment mode for solving underground position subsiding crack in existed building enlarging construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105780816A true CN105780816A (en) | 2016-07-20 |
CN105780816B CN105780816B (en) | 2018-02-09 |
Family
ID=56392837
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610153156.2A Active CN105780816B (en) | 2016-03-17 | 2016-03-17 | A kind of water-proofing treatment mode for solving underground position subsiding crack in existed building enlarging construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105780816B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109469102A (en) * | 2018-12-27 | 2019-03-15 | 中国二冶集团有限公司 | Piping lane expansion joint method for waterproofing |
CN112726680A (en) * | 2020-12-25 | 2021-04-30 | 中国建筑第八工程局有限公司 | Deformation joint structure of basement wall column corner area and construction method |
CN114775697A (en) * | 2022-05-16 | 2022-07-22 | 中铁十一局集团有限公司 | Method for processing deformation joint at joint of new structure and old structure |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101570973A (en) * | 2009-05-31 | 2009-11-04 | 武汉一冶建筑安装工程有限责任公司 | Internal-bonded water-proof technique for externally-bonded waterstop |
KR100934283B1 (en) * | 2007-08-09 | 2009-12-28 | 김기철 | Expansion joint waterproofing and waterproofing method of concrete structure using expansion joint member |
CN201943093U (en) * | 2011-01-07 | 2011-08-24 | 深圳市方佳建筑设计有限公司 | Settlement joint water-proof structure for basement with drainage channel |
CN103603376A (en) * | 2013-12-03 | 2014-02-26 | 深圳市城市优筑科技有限公司 | Concrete box culvert deformation joint waterproof structure and manufacturing technology thereof |
CN104153397A (en) * | 2014-08-06 | 2014-11-19 | 中国三冶集团有限公司 | Concrete wall construction joint waterproof treatment method |
-
2016
- 2016-03-17 CN CN201610153156.2A patent/CN105780816B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100934283B1 (en) * | 2007-08-09 | 2009-12-28 | 김기철 | Expansion joint waterproofing and waterproofing method of concrete structure using expansion joint member |
CN101570973A (en) * | 2009-05-31 | 2009-11-04 | 武汉一冶建筑安装工程有限责任公司 | Internal-bonded water-proof technique for externally-bonded waterstop |
CN201943093U (en) * | 2011-01-07 | 2011-08-24 | 深圳市方佳建筑设计有限公司 | Settlement joint water-proof structure for basement with drainage channel |
CN103603376A (en) * | 2013-12-03 | 2014-02-26 | 深圳市城市优筑科技有限公司 | Concrete box culvert deformation joint waterproof structure and manufacturing technology thereof |
CN104153397A (en) * | 2014-08-06 | 2014-11-19 | 中国三冶集团有限公司 | Concrete wall construction joint waterproof treatment method |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109469102A (en) * | 2018-12-27 | 2019-03-15 | 中国二冶集团有限公司 | Piping lane expansion joint method for waterproofing |
CN112726680A (en) * | 2020-12-25 | 2021-04-30 | 中国建筑第八工程局有限公司 | Deformation joint structure of basement wall column corner area and construction method |
CN114775697A (en) * | 2022-05-16 | 2022-07-22 | 中铁十一局集团有限公司 | Method for processing deformation joint at joint of new structure and old structure |
CN114775697B (en) * | 2022-05-16 | 2024-02-13 | 中铁十一局集团有限公司 | Method for processing deformation joint at joint of new and old structures |
Also Published As
Publication number | Publication date |
---|---|
CN105780816B (en) | 2018-02-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106120873B (en) | A kind of construction method of pile-raft foundation pre-installed and inverted adhered composite high-molecular waterproof roll | |
CN206545228U (en) | A kind of piping lane with waterproof construction | |
CN108411939A (en) | The spliced prefabricated pipe gallery of one kind and its construction method | |
CN109930631B (en) | Vibration isolation structure of building foundation and construction method thereof | |
CN102306225A (en) | Method for simulating construction course and tunnel deformation influence value of multiline overlapping tunnel | |
CN106400811B (en) | Frame is inverse to make foldable assembled foundation pit structure construction method | |
CN104695343B (en) | Long-distance jacking construction method based on back wall pushing technology | |
CN105780816A (en) | Waterproofing treatment manner for underground portion settlement joint in existing building expansion construction | |
CN112252462A (en) | Construction method of concrete roof layer waterproof structure | |
CN106593470A (en) | High-permeability water-rich sand shield terminal reinforcing system and construction method thereof | |
CN106869169A (en) | A kind of three-dimensional interval construction method of underground pipe gallery warehouse | |
CN105714942A (en) | Waterstop waterproof pretreatment method of newly built cellar connecting passage deformation joint | |
CN109372024A (en) | A kind of sole plate waterproof structure for deformation seams and construction method | |
CN110424556A (en) | A kind of basement bottom board water draining plate waterproof construction method | |
CN103603373B (en) | Prefabricated inspection well and road construction method involving inspection well | |
CN104652495A (en) | Waterproof construction process for joint of inner support upright post of foundation pit and bottom plate | |
CN209923991U (en) | Vibration isolation structure for building foundation | |
CN206299392U (en) | A kind of high osmosis water-rich sand layer shield end reinforcement system | |
CN202099706U (en) | Late construction structure for car ramp close to buildings | |
CN1431375A (en) | Wall module of well walls and method for building wall bodies of well walls by using module | |
CN207672616U (en) | A kind of outdoor cable penetration pipe is passed by one's way laying structure | |
CN213173843U (en) | Waterproof overlap joint structure of new and old underground works roof | |
CN109372030A (en) | A kind of post-cast strip waterproof construction and its construction method | |
CN209703545U (en) | A kind of tower-crane foundation structure under underground garage bottom plate | |
CN214574744U (en) | Deformation joint structure of roof track playground |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |