Method for simulating construction course and tunnel deformation influence value of multiline overlapping tunnel Download PDFInfo
- Publication number
- CN102306225A CN102306225A CN 201110289142 CN201110289142A CN102306225A CN 102306225 A CN102306225 A CN 102306225A CN 201110289142 CN201110289142 CN 201110289142 CN 201110289142 A CN201110289142 A CN 201110289142A CN 102306225 A CN102306225 A CN 102306225A
- Authority
- CN
- China
- Prior art keywords
- tunnel
- soil
- shield
- soil body
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110289142 CN102306225B (en) | 2011-09-27 | 2011-09-27 | Method for simulating construction course and tunnel deformation influence value of multiline overlapping tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110289142 CN102306225B (en) | 2011-09-27 | 2011-09-27 | Method for simulating construction course and tunnel deformation influence value of multiline overlapping tunnel |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102306225A true CN102306225A (en) | 2012-01-04 |
CN102306225B CN102306225B (en) | 2013-01-09 |
Family
ID=45380086
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110289142 Active CN102306225B (en) | 2011-09-27 | 2011-09-27 | Method for simulating construction course and tunnel deformation influence value of multiline overlapping tunnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102306225B (en) |
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103593553A (en) * | 2013-11-01 | 2014-02-19 | 中南大学 | Shield tunnel segment non-homogeneous equivalent beam element model structural calculation method |
CN103698217A (en) * | 2014-01-07 | 2014-04-02 | 煤炭科学研究总院 | Druker-Prager rock-soil softening intensity parameter determination method |
CN103742163A (en) * | 2013-05-21 | 2014-04-23 | 上海大学 | Method for determining ground access type shield construction shield tunneling machine soil cabin control pressure |
CN104878785A (en) * | 2015-05-18 | 2015-09-02 | 湖北工业大学 | Pile-soil interaction and pile-end soil constitutive model and parameter determining method thereof |
CN105064314A (en) * | 2015-07-30 | 2015-11-18 | 同济大学 | Method for determining stiffness matching of under-cross railway engineering |
CN106202766A (en) * | 2016-07-15 | 2016-12-07 | 浙江大学城市学院 | The soil body vertical deformation computational methods that ground suction/discharge type shield method tunnel construction causes |
CN106250618A (en) * | 2016-07-28 | 2016-12-21 | 浙江大学城市学院 | Ground suction/discharge type shield-tunneling construction causes the computational methods of underground utilities moment of flexure and strain |
CN107330194A (en) * | 2017-06-29 | 2017-11-07 | 暨南大学 | The Numerical Analysis methods that Shield Tunneling influences on neighbouring multi-column pier foundation |
CN108090283A (en) * | 2017-12-18 | 2018-05-29 | 华北水利水电大学 | The finite element method of tunnel-vehicle coupled vibrations under a kind of DYNAMIC LOADING OF DRIVING TRAIN ON BRIDGES |
CN108287945A (en) * | 2017-12-29 | 2018-07-17 | 东北大学 | The Method for Calculating Deformation and application technology of foundation soil under large foundation |
CN109056731A (en) * | 2018-07-06 | 2018-12-21 | 中铁二院工程集团有限责任公司 | A kind of Karst grouting reinforcement means close to existing ballastless track roadbed |
CN110245426A (en) * | 2019-06-17 | 2019-09-17 | 中铁七局集团有限公司 | A kind of finite element fining analogy method for Pipe rack jacking construction |
CN111222275A (en) * | 2020-01-07 | 2020-06-02 | 河海大学 | Method for establishing segment ring floating and dislocation fine model separated from shield tail |
CN112228078A (en) * | 2020-09-27 | 2021-01-15 | 宁波市政工程建设集团股份有限公司 | Underground space construction method in short-distance crossing construction of soft soil shield |
CN112948931A (en) * | 2021-03-03 | 2021-06-11 | 河南大学 | Method for determining reasonable included angle and clear distance of shield construction under double-line overlapping working condition of new construction and existing subway tunnel |
CN112989638A (en) * | 2021-05-18 | 2021-06-18 | 中南大学 | Method for calculating interaction stress of porous tunnel under far field and any surface stress |
CN117540480A (en) * | 2024-01-08 | 2024-02-09 | 中铁南方投资集团有限公司 | Method for calculating stress deformation of tunnel lining structure under shield attitude adjustment |
CN117951799A (en) * | 2024-03-26 | 2024-04-30 | 北京城建设计发展集团股份有限公司 | Long-term treatment method for transverse convergence deformation of subway shield tunnel |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106126775B (en) * | 2016-06-13 | 2019-05-14 | 暨南大学 | Land movement analysis method caused by double track tunnel shield-tunneling construction |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040139419A1 (en) * | 2003-01-10 | 2004-07-15 | Lei Jiang | Minimization of microelectronic interconnect thickness variations |
CN1609884A (en) * | 2003-10-17 | 2005-04-27 | 住友橡胶工业株式会社 | Method of simulating viscoelastic material |
CN101192243A (en) * | 2006-11-22 | 2008-06-04 | 上海电气集团股份有限公司 | Crankshaft fine finishing emulation analysis parameter determination method |
US20100145662A1 (en) * | 2008-12-09 | 2010-06-10 | Livermore Software Technology Corporation | Solid finite elements suitable for simulating large deformations and/or rotations of a structure |
CN101950318A (en) * | 2010-10-02 | 2011-01-19 | 上海交通大学 | Water-conveyance tunnel simulating method based on mixed model |
-
2011
- 2011-09-27 CN CN 201110289142 patent/CN102306225B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040139419A1 (en) * | 2003-01-10 | 2004-07-15 | Lei Jiang | Minimization of microelectronic interconnect thickness variations |
CN1609884A (en) * | 2003-10-17 | 2005-04-27 | 住友橡胶工业株式会社 | Method of simulating viscoelastic material |
CN101192243A (en) * | 2006-11-22 | 2008-06-04 | 上海电气集团股份有限公司 | Crankshaft fine finishing emulation analysis parameter determination method |
US20100145662A1 (en) * | 2008-12-09 | 2010-06-10 | Livermore Software Technology Corporation | Solid finite elements suitable for simulating large deformations and/or rotations of a structure |
CN101950318A (en) * | 2010-10-02 | 2011-01-19 | 上海交通大学 | Water-conveyance tunnel simulating method based on mixed model |
Cited By (32)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103742163A (en) * | 2013-05-21 | 2014-04-23 | 上海大学 | Method for determining ground access type shield construction shield tunneling machine soil cabin control pressure |
CN103742163B (en) * | 2013-05-21 | 2016-01-13 | 上海大学 | A kind of method determining suction/discharge type shield-tunneling construction shield machine soil storehouse, ground controlled pressure |
CN103593553A (en) * | 2013-11-01 | 2014-02-19 | 中南大学 | Shield tunnel segment non-homogeneous equivalent beam element model structural calculation method |
CN103593553B (en) * | 2013-11-01 | 2017-01-25 | 中南大学 | Shield tunnel segment non-homogeneous equivalent beam element model structural calculation method |
CN103698217A (en) * | 2014-01-07 | 2014-04-02 | 煤炭科学研究总院 | Druker-Prager rock-soil softening intensity parameter determination method |
CN103698217B (en) * | 2014-01-07 | 2016-01-13 | 煤炭科学技术研究院有限公司 | Drucker-Prager ground softening intensity parametric measurement method |
CN104878785A (en) * | 2015-05-18 | 2015-09-02 | 湖北工业大学 | Pile-soil interaction and pile-end soil constitutive model and parameter determining method thereof |
CN104878785B (en) * | 2015-05-18 | 2017-06-30 | 卢里尔 | Pile-soil interaction and pile-end soil constitutive model and model parameter determine method |
CN105064314A (en) * | 2015-07-30 | 2015-11-18 | 同济大学 | Method for determining stiffness matching of under-cross railway engineering |
CN105064314B (en) * | 2015-07-30 | 2017-04-05 | 同济大学 | A kind of method for determining undercrossing tunnel engineering Rigidity Matching |
CN106202766A (en) * | 2016-07-15 | 2016-12-07 | 浙江大学城市学院 | The soil body vertical deformation computational methods that ground suction/discharge type shield method tunnel construction causes |
CN106202766B (en) * | 2016-07-15 | 2019-05-24 | 浙江大学城市学院 | Soil body vertical deformation calculation method caused by the suction/discharge type shield method tunnel construction of ground |
CN106250618B (en) * | 2016-07-28 | 2019-03-19 | 浙江大学城市学院 | Ground suction/discharge type shield-tunneling construction causes the calculation method of underground utilities moment of flexure and strain |
CN106250618A (en) * | 2016-07-28 | 2016-12-21 | 浙江大学城市学院 | Ground suction/discharge type shield-tunneling construction causes the computational methods of underground utilities moment of flexure and strain |
CN107330194A (en) * | 2017-06-29 | 2017-11-07 | 暨南大学 | The Numerical Analysis methods that Shield Tunneling influences on neighbouring multi-column pier foundation |
CN107330194B (en) * | 2017-06-29 | 2020-05-08 | 暨南大学 | Numerical simulation analysis method for influence of shield tunnel excavation on adjacent pile group foundation |
CN108090283A (en) * | 2017-12-18 | 2018-05-29 | 华北水利水电大学 | The finite element method of tunnel-vehicle coupled vibrations under a kind of DYNAMIC LOADING OF DRIVING TRAIN ON BRIDGES |
CN108090283B (en) * | 2017-12-18 | 2021-03-12 | 华北水利水电大学 | Finite element analysis method for tunnel-vehicle coupled vibration under dynamic load of train |
CN108287945B (en) * | 2017-12-29 | 2021-09-24 | 东北大学 | Deformation calculation method and application technology of foundation soil under large foundation |
CN108287945A (en) * | 2017-12-29 | 2018-07-17 | 东北大学 | The Method for Calculating Deformation and application technology of foundation soil under large foundation |
CN109056731A (en) * | 2018-07-06 | 2018-12-21 | 中铁二院工程集团有限责任公司 | A kind of Karst grouting reinforcement means close to existing ballastless track roadbed |
CN110245426A (en) * | 2019-06-17 | 2019-09-17 | 中铁七局集团有限公司 | A kind of finite element fining analogy method for Pipe rack jacking construction |
CN110245426B (en) * | 2019-06-17 | 2023-09-22 | 中铁七局集团有限公司 | Finite element refined simulation method for pipe gallery structure pipe jacking construction |
CN111222275A (en) * | 2020-01-07 | 2020-06-02 | 河海大学 | Method for establishing segment ring floating and dislocation fine model separated from shield tail |
CN112228078A (en) * | 2020-09-27 | 2021-01-15 | 宁波市政工程建设集团股份有限公司 | Underground space construction method in short-distance crossing construction of soft soil shield |
CN112948931B (en) * | 2021-03-03 | 2023-04-07 | 河南大学 | Method for determining reasonable included angle and clear distance of shield construction under double-line overlapping working condition of new construction and existing subway tunnel |
CN112948931A (en) * | 2021-03-03 | 2021-06-11 | 河南大学 | Method for determining reasonable included angle and clear distance of shield construction under double-line overlapping working condition of new construction and existing subway tunnel |
CN112989638B (en) * | 2021-05-18 | 2021-08-10 | 中南大学 | Method for calculating interaction stress of porous tunnel under far field and any surface stress |
CN112989638A (en) * | 2021-05-18 | 2021-06-18 | 中南大学 | Method for calculating interaction stress of porous tunnel under far field and any surface stress |
CN117540480A (en) * | 2024-01-08 | 2024-02-09 | 中铁南方投资集团有限公司 | Method for calculating stress deformation of tunnel lining structure under shield attitude adjustment |
CN117540480B (en) * | 2024-01-08 | 2024-04-19 | 中铁南方投资集团有限公司 | Method for calculating stress deformation of tunnel lining structure under shield attitude adjustment |
CN117951799A (en) * | 2024-03-26 | 2024-04-30 | 北京城建设计发展集团股份有限公司 | Long-term treatment method for transverse convergence deformation of subway shield tunnel |
Also Published As
Publication number | Publication date |
---|---|
CN102306225B (en) | 2013-01-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102306225B (en) | Method for simulating construction course and tunnel deformation influence value of multiline overlapping tunnel | |
CN102080548B (en) | Construction method of tunnel to cross airport runway by shield method | |
Li et al. | Numerical simulation and analysis of the pile underpinning technology used in shield tunnel crossings on bridge pile foundations | |
Yang et al. | Performance of overlapped shield tunneling through an integrated physical model tests, numerical simulations and real-time field monitoring | |
Tu et al. | Excavation and kinematic analysis of a shallow large-span tunnel in an up-soft/low-hard rock stratum | |
CN104102767A (en) | Numerical simulation analysis method for influence of adjacent underpinning pile foundation by shield construction | |
CN105421461A (en) | Excavation method of building foundation pit adjacent to existing tunnel under soil-rock geological condition | |
Ma et al. | The influence of shallow buried double-line parallel rectangular pipe jacking construction on ground settlement deformation | |
Wang et al. | Mechanical performance of a prefabricated subway station structure constructed by twin closely-spaced rectangular pipe-jacking boxes | |
CN111946357B (en) | Mine method tunnel simulation construction method considering red clay unloading influence | |
Mohammadzadeh et al. | Three-Dimensional Modeling and Analysis of Mechanized Excavation for Tunnel Boring Machines | |
Ma et al. | Displacement characteristics for a “π” shaped double cross-duct excavated by cross diaphragm (CRD) method | |
Liua et al. | Magazine of Civil Engineering | |
Wang et al. | Studies on ground settlement and pre-arching stress of pre-cutting tunnelling method | |
Trushko et al. | Construction of underground and multi-story car parks in high-density urban areas | |
Perminov et al. | Simulation of strain-stress behavior of a tunnel collector in the combined anthropogenic effects conditions | |
Sun et al. | Research on Numerical Simulation of Top‐Down Construction Effect of Diaphragm Wall of Deep and Large Foundation Pit under Different Working Conditions in Complex Stratum | |
Bin et al. | Stability analysis of cross-channel excavation for existing anchor removal project in subway construction | |
Furuya et al. | Construction of Akashi-Kaikyo bridge west anchorage | |
Xie et al. | Numerical analysis on large-section pipe jacking within close distance in soft soil | |
Wang et al. | Study on Stability of shield tunnel excavation face with soft upper and hard lower strata | |
Li et al. | Excavation Effects on Reinforced Concrete Pile Foundations: A Numerical Analysis | |
Zang et al. | Study on the Influence and Control Methods of Shield Tunneling through the Sensitive Buildings | |
Lee et al. | Review and perspective of expressway tunnels in Taiwan, China | |
Zhang et al. | Calculation and Analysis of the Impact of Shield Tunnel Operation on the Vibration of Hangzhou Ancient White Pagoda |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: SHANGHAI TUNNEL ENGINEERING CO LTD Effective date: 20130125 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20130125 Address after: 200444 Baoshan District Road, Shanghai, No. 99 Patentee after: Shanghai University Patentee after: Shanghai Tunnel Engineering Co., Ltd. Address before: 200444 Baoshan District Road, Shanghai, No. 99 Patentee before: Shanghai University |
|
ASS | Succession or assignment of patent right |
Owner name: SHANGHAI TUNNEL ENGINEERING CO., LTD. Free format text: FORMER OWNER: SHANGHAI TUNNEL ENGINEERING CO LTD Effective date: 20150430 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20150430 Address after: 200444 Baoshan District Road, Shanghai, No. 99 Patentee after: Shanghai University Patentee after: SHANGHAI TUNNEL ENGINEERING CO., LTD. Address before: 200444 Baoshan District Road, Shanghai, No. 99 Patentee before: Shanghai University Patentee before: Shanghai Tunnel Engineering Co., Ltd. |