CN105780816B - A kind of water-proofing treatment mode for solving underground position subsiding crack in existed building enlarging construction - Google Patents

A kind of water-proofing treatment mode for solving underground position subsiding crack in existed building enlarging construction Download PDF

Info

Publication number
CN105780816B
CN105780816B CN201610153156.2A CN201610153156A CN105780816B CN 105780816 B CN105780816 B CN 105780816B CN 201610153156 A CN201610153156 A CN 201610153156A CN 105780816 B CN105780816 B CN 105780816B
Authority
CN
China
Prior art keywords
layer
water
coiled material
construction
proofing treatment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610153156.2A
Other languages
Chinese (zh)
Other versions
CN105780816A (en
Inventor
陈春荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI ORIENTAL YUHONG WATERPROOF TECHNOLOGY Co Ltd
Original Assignee
SHANGHAI ORIENTAL YUHONG WATERPROOF TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI ORIENTAL YUHONG WATERPROOF TECHNOLOGY Co Ltd filed Critical SHANGHAI ORIENTAL YUHONG WATERPROOF TECHNOLOGY Co Ltd
Priority to CN201610153156.2A priority Critical patent/CN105780816B/en
Publication of CN105780816A publication Critical patent/CN105780816A/en
Application granted granted Critical
Publication of CN105780816B publication Critical patent/CN105780816B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0203Arrangements for filling cracks or cavities in building constructions

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Building Environments (AREA)
  • Road Paving Structures (AREA)

Abstract

A kind of water-proofing treatment mode for solving underground position subsiding crack in existed building enlarging construction, expansion polyphenyl plate (5) is coated by the second coiled material layer (1), the first coiled material layer (10), bonding layer (9) and nine laminates (6) reject expansion polyphenyl plate (5) and nine laminates (6) and in empty intra-bladder instillation pointing layer (8) afterwards, new waterproof construction is formed, the waterproof guard difficult point and leakage problems for effectively solving the movement joint position brought in enlarging construction.

Description

A kind of water-proofing treatment for solving underground position subsiding crack in existed building enlarging construction Mode
Technical field
The present invention relates to waterproofing work technical field, underground position sinks in particularly a kind of solution existed building enlarging construction The water-proofing treatment mode of seam drops.
Background technology
At present, basement UNICOM road deformation joint waterproof guard is usually taken at the form of waterproofing of movement joints construction Reason, its more method is that the embedding middle buried water stop in portion, system are adapted to by the elasticity of middle buried water stop in the structure The sedimentation and deformation of structure, so as to reach corresponding waterproof guard requirement.The sealing belt construction that inventor passes through different new constructions Situation, the leakage scenarios analysis at many positions, buried water stop is can not be once in real construction process in discovery Property construction in place, it is necessary to handled between being segmented timesharing, cause the waterstop that exsertion part be present to easily cause breakage, and damaged Relative reparation is more difficult afterwards;Simultaneously because of the differential settlement of structure, the defects of early stage constructs, easily cause the breakage at the position, Therefore leakage scenarios are more.
In view of the above-mentioned problems, need a kind of water-proofing treatment side for solving underground position subsiding crack in existed building enlarging construction badly Formula, basement communication channel deformation joint waterproof guard is improved and set up, uncured pitch applies well using creep properties Material carries out waterproof enhancing processing, to adapt to the deformation at the position, while deficiency caused by sealing belt construction is made up, so as to solve The leakage problems at the position.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of existed building that solves and extend underground position sedimentation in construction The water-proofing treatment mode of seam.
A kind of water-proofing treatment mode for solving underground position subsiding crack in existed building enlarging construction, comprises the following steps:
1) existing structure bottom is digged pit;
2) the old corresponding cushion layer structure of structure bottom is rejected, and is cleared up;The protection to place where troops were originally stationed water layer is paid attention to simultaneously;
3) overlap joint processing is carried out with asphalt paint and old structure bottom waterproof layer, forms bonding layer, bonding layer is extended to always Structure base slab top surface;
4) cladding processing is carried out in the overlap joint layer surface with coiled material, forms the first coiled material layer;
5) asphalt water-proof coiled material is buried in bottom at split joint, forms the second coiled material layer, first interim solid after the completion of construction It is scheduled at past harden structure;
6) after the completion of the filling such as soil layer of old structure bottom for excavating step 1), the construction again of new bed course is carried out, after Temporarily fixed second coiled material layer of expansion, and bury a foam spacer rod in the second coiled material layer bottom;
7) expansion polyphenyl plate is laid in the second coiled material layer upper face, expansion polyphenyl plate thickness should combine slit width and nine The THICKNESS CALCULATION of laminate, expansion polyphenyl plate point are bonded on the waterproof layer of old structure;
8) nine laminates are laid in the expansion polyphenyl plate surface, the nine laminates point is bonded on the expansion polyphenyl plate;
9) after the second coiled material layer expansion, overlap joint processing, new bed course position are carried out with the new waterproof layer at new bed course position New waterproof layer on turn to the tops of expansion polyphenyl plate and nine laminates;
10) casting concrete, concrete floor is formed, after concrete floor reaches intensity requirement, precompressed is layered on swollen It is rear to reject expansion polyphenyl plate and nine laminates in new waterproof layer paving to new construction side wall at the top of swollen styrofoam and nine laminates;
11) the corresponding encapsulant of pointing, pointing layer is formed.
Further, step 1) the hole side is inclined-plane
Further, the width in the step 1) hole be 450-550mm, depth 450-550mm.
Further, the lap width of the step 3) bonding layer and old structure bottom waterproof layer is not less than 500mm, continues To old structure base slab top surface at least 300mm.
Further, step 5) the second coiled material layer length is not less than 2m.
Further, step 5) second coiled material layer uses RWB-801 polymer modified bituminous waterproof sheet materials.
Further, nine laminate bottoms are supported using pea gravel concreten described in step 8), on nine laminate Portion can use the waterproof layer at newly-built bed course position to turn over bag processing.
Further, the pointing layer described in step 10) includes uncured rubber asphalt, building asphalt successively by inward at both ends Glue, water expandable waterstop.
Further, side wall additional waterproof course and waterproof layer are set up after step 10), pours top concrete, then another increasing If film and waterproof coiled material extra play.
The beneficial effects of the present invention are effectively solve the waterproof guard difficult point at the movement joint position brought in enlarging construction And leakage problems.
Brief description of the drawings
With reference to the following drawings, many aspects of the present utility model are better understood with.Part in accompanying drawing is not necessarily It is proportional, it is preferred that emphasis is clearly to exemplify principle of the present utility model.
Fig. 1 is that step 9) construction terminates rear structural representation.
Fig. 2 is structural representation after completion.
Embodiment
The embodiment of the present invention is further described with reference to the accompanying drawings and examples, following examples are only used In clearly illustrating technical scheme, and can not be limited the scope of the invention with this.
As shown in Figure 1-2, concrete technical scheme of the present invention is as follows:
A kind of water-proofing treatment mode for solving underground position subsiding crack in existed building enlarging construction, comprises the following steps:
1) hole of oblique angle shape is excavated in portion under an existing structure;The width in the hole is 450-550mm, depth 450- 550mm;
2) the old corresponding cushion layer structure of structure bottom is rejected, and is cleared up;The protection to place where troops were originally stationed water layer is paid attention to simultaneously;
3) overlap joint processing is carried out with asphalt paint and old structure bottom waterproof layer, forms bonding layer 9, bonding layer 9 is extended to Old structure base slab top surface;The lap width of the bonding layer 9 and old structure bottom waterproof layer is not less than 500mm, is extended to old knot Structure plate top surface at least 300mm;
4) cladding processing is carried out on the surface of bonding layer 9 with coiled material, forms the first coiled material layer 10;
5) asphalt water-proof coiled material is buried in bottom at split joint, forms the second coiled material layer 1, first interim solid after the completion of construction It is scheduled at past harden structure, it is stand-by;The length of second coiled material layer 1 is to use RWB- not less than 2m, second coiled material layer 1 801 polymer modified bituminous waterproof sheet materials;
6) after the completion of the filling such as soil layer of old structure bottom for excavating step 1), the construction again of new bed course 31 is carried out, Deploy second coiled material layer 1 fixed temporarily afterwards, and a foam spacer rod 4 is buried in the bottom of the second coiled material layer 1;
7) expansion polyphenyl plate 5 is laid in the upper face of the second coiled material layer 1, the thickness of expansion polyphenyl plate 5 should combine slit width And nine laminate 6 THICKNESS CALCULATION, 5 points of expansion polyphenyl plate is bonded on the waterproof layer of old structure;
8) nine laminates 6 are laid in the plate surface of expansion polyphenyl 5,6 points of nine laminate is bonded at the expansion polyphenyl plate 5 On;The bottom of nine laminate 6 is supported using pea gravel concreten, and the top of nine laminate 6 can use newly-built bed course position Waterproof layer turn over bag processing;
9) after second coiled material layer 1 deploys, overlap joint processing, new bed course are carried out with the new waterproof layer 2 at the new position of bed course 31 The top of the laminate 6 of expansion polyphenyl plate 5 and nine is turned on the new waterproof layer 2 at 31 positions;
10) casting concrete, concrete floor 32 is formed, after concrete floor 32 reaches intensity requirement, precompressed is spread It is rear to reject expansion polyphenyl plate 5 and nine in the paving of new waterproof layer 2 to the new construction side wall at the top of 5 and nine laminate of expansion polyphenyl plate 6 Laminate 6;After set up side wall additional waterproof course and waterproof layer, pour top concrete seven, then separately set up film and added with waterproof coiled material Layer;
11) the corresponding encapsulant of pointing, pointing layer 8 is formed;Described pointing layer 8 is included uncured successively by inward at both ends Rubber asphalt 81, building asphalt glue 82, water expandable waterstop 83.
Described above is only the preferred embodiments of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, some improvements and modifications can also be made, these improvements and modifications Also it should be regarded as protection scope of the present invention.

Claims (9)

  1. A kind of 1. water-proofing treatment mode for solving underground position subsiding crack in existed building enlarging construction, it is characterised in that including Following steps:
    1)Existing structure bottom is digged pit;
    2)The corresponding cushion layer structure of old structure bottom is rejected, and is cleared up;The protection to place where troops were originally stationed water layer is paid attention to simultaneously;
    3)Overlap joint processing is carried out with asphalt paint and old structure bottom waterproof layer, forms bonding layer(9), bonding layer(9)It is extended to Old structure base slab top surface;
    4)With coiled material in the bonding layer(9)Surface carries out cladding processing, forms the first coiled material layer(10);
    5)Asphalt water-proof coiled material is buried in bottom at split joint, forms the second coiled material layer(1), it is first interim fixed after the completion of construction At past harden structure;
    6)By step 1)After the completion of the filling such as soil layer of old structure bottom excavated, new bed course is carried out(31)Construction again, after Temporarily fixed second coiled material layer of expansion(1), and in second coiled material layer(1)Bury a foam spacer rod in bottom (4);
    7)In second coiled material layer(1)Upper face lays expansion polyphenyl plate(5), expansion polyphenyl plate(5)Thickness answers bonding crack Wide and nine laminates(6)THICKNESS CALCULATION, expansion polyphenyl plate(5)Point is bonded on the waterproof layer of old structure;
    8)In the expansion polyphenyl(5)Plate surface lays nine laminates(6), nine laminate(6)Point is bonded at the expansion polyphenyl plate (5)On;
    9)Second coiled material layer(1)After expansion, with new bed course(31)The new waterproof layer at position(2)Overlap joint processing is carried out, new pad Layer(31)The new waterproof layer at position(2)On turn to expansion polyphenyl plate(5)With nine laminates(6)Top;
    10) casting concrete, concrete floor is formed(32), treat concrete floor(32)After reaching intensity requirement, precompressed is spread In expansion polyphenyl plate(5)And nine laminate(6)The new waterproof layer at top(2)In paving to new construction side wall, expansion polyphenyl is rejected afterwards Plate(5)And nine laminate(6);
    11) the corresponding encapsulant of pointing, pointing layer is formed(8).
  2. A kind of 2. water-proofing treatment side for solving underground position subsiding crack in existed building enlarging construction as claimed in claim 1 Formula, it is characterised in that step 1)The hole side is inclined-plane.
  3. A kind of 3. water-proofing treatment side for solving underground position subsiding crack in existed building enlarging construction as claimed in claim 1 Formula, it is characterised in that step 1)The width in the hole is 450-550mm, depth 450-550mm.
  4. A kind of 4. water-proofing treatment side for solving underground position subsiding crack in existed building enlarging construction as claimed in claim 1 Formula, it is characterised in that step 3)The bonding layer(9)It is not less than 500mm with the lap width of old structure bottom waterproof layer, continues To old structure base slab top surface at least 300mm.
  5. A kind of 5. water-proofing treatment side for solving underground position subsiding crack in existed building enlarging construction as claimed in claim 1 Formula, it is characterised in that step 5)Second coiled material layer(1)Length is not less than 2m.
  6. A kind of 6. water-proofing treatment side for solving underground position subsiding crack in existed building enlarging construction as claimed in claim 1 Formula, it is characterised in that step 5)Second coiled material layer(1)Using RWB-801 polymer modified bituminous waterproof sheet materials.
  7. A kind of 7. water-proofing treatment side for solving underground position subsiding crack in existed building enlarging construction as claimed in claim 1 Formula, it is characterised in that step 8)Described in nine laminates(6)Bottom is supported using pea gravel concreten, nine laminate(6) Top bag processing is turned over using the waterproof layer at newly-built bed course position.
  8. A kind of 8. water-proofing treatment side for solving underground position subsiding crack in existed building enlarging construction as claimed in claim 1 Formula, it is characterised in that step 10)Described pointing layer(8)Uncured rubber asphalt is included by inward at both ends successively(81), building Asphalt adhesive(82), water expandable waterstop(83).
  9. A kind of 9. water-proofing treatment side for solving underground position subsiding crack in existed building enlarging construction as claimed in claim 1 Formula, it is characterised in that in step 10)After set up side wall additional waterproof course and waterproof layer, pour top concrete(7), then another increasing If film and waterproof coiled material extra play.
CN201610153156.2A 2016-03-17 2016-03-17 A kind of water-proofing treatment mode for solving underground position subsiding crack in existed building enlarging construction Active CN105780816B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610153156.2A CN105780816B (en) 2016-03-17 2016-03-17 A kind of water-proofing treatment mode for solving underground position subsiding crack in existed building enlarging construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610153156.2A CN105780816B (en) 2016-03-17 2016-03-17 A kind of water-proofing treatment mode for solving underground position subsiding crack in existed building enlarging construction

Publications (2)

Publication Number Publication Date
CN105780816A CN105780816A (en) 2016-07-20
CN105780816B true CN105780816B (en) 2018-02-09

Family

ID=56392837

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610153156.2A Active CN105780816B (en) 2016-03-17 2016-03-17 A kind of water-proofing treatment mode for solving underground position subsiding crack in existed building enlarging construction

Country Status (1)

Country Link
CN (1) CN105780816B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109469102A (en) * 2018-12-27 2019-03-15 中国二冶集团有限公司 Piping lane expansion joint method for waterproofing
CN112726680A (en) * 2020-12-25 2021-04-30 中国建筑第八工程局有限公司 Deformation joint structure of basement wall column corner area and construction method
CN114775697B (en) * 2022-05-16 2024-02-13 中铁十一局集团有限公司 Method for processing deformation joint at joint of new and old structures

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101570973A (en) * 2009-05-31 2009-11-04 武汉一冶建筑安装工程有限责任公司 Internal-bonded water-proof technique for externally-bonded waterstop
KR100934283B1 (en) * 2007-08-09 2009-12-28 김기철 Expansion joint waterproofing and waterproofing method of concrete structure using expansion joint member
CN201943093U (en) * 2011-01-07 2011-08-24 深圳市方佳建筑设计有限公司 Settlement joint water-proof structure for basement with drainage channel
CN103603376A (en) * 2013-12-03 2014-02-26 深圳市城市优筑科技有限公司 Concrete box culvert deformation joint waterproof structure and manufacturing technology thereof
CN104153397A (en) * 2014-08-06 2014-11-19 中国三冶集团有限公司 Concrete wall construction joint waterproof treatment method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100934283B1 (en) * 2007-08-09 2009-12-28 김기철 Expansion joint waterproofing and waterproofing method of concrete structure using expansion joint member
CN101570973A (en) * 2009-05-31 2009-11-04 武汉一冶建筑安装工程有限责任公司 Internal-bonded water-proof technique for externally-bonded waterstop
CN201943093U (en) * 2011-01-07 2011-08-24 深圳市方佳建筑设计有限公司 Settlement joint water-proof structure for basement with drainage channel
CN103603376A (en) * 2013-12-03 2014-02-26 深圳市城市优筑科技有限公司 Concrete box culvert deformation joint waterproof structure and manufacturing technology thereof
CN104153397A (en) * 2014-08-06 2014-11-19 中国三冶集团有限公司 Concrete wall construction joint waterproof treatment method

Also Published As

Publication number Publication date
CN105780816A (en) 2016-07-20

Similar Documents

Publication Publication Date Title
CN110607809B (en) Waterproof construction method for basement of building engineering
CN101914927B (en) Waterproof system for basement bottom board and wall surface and construction method thereof
CN108411939A (en) The spliced prefabricated pipe gallery of one kind and its construction method
CN106120873A (en) A kind of construction method of pile-raft foundation pre-installed and inverted adhered composite high-molecular waterproof roll
CN206545228U (en) A kind of piping lane with waterproof construction
CN105780816B (en) A kind of water-proofing treatment mode for solving underground position subsiding crack in existed building enlarging construction
CN104912119A (en) Close jointing method for pre-paving macromolecular self-adhesion film waterproof roll
CN107190783A (en) A kind of construction method of basement waterproofing structure and its outer wall of basement waterproof construction
CN105887923A (en) Construction method for pre-paving and invertedly adhering waterproof coiled material in large underground waterproof project
CN112252462A (en) Construction method of concrete roof layer waterproof structure
CN104251140A (en) Composite waterproof layer for underground construction and manufacturing and construction method thereof
CN107165290A (en) Basement bottom board prespreading Macromolecular self-adhesive membrane waterproof roll non-bituminous base construction
CN109372024A (en) A kind of sole plate waterproof structure for deformation seams and construction method
CN103321122A (en) Highway, pavement structure and construction method of highway pavement
CN110424556A (en) A kind of basement bottom board water draining plate waterproof construction method
CN107386298A (en) A kind of depth hole composite supporting construction and its construction method with water-proof function
CN104927759B (en) A kind of interface adhesive material and black overlay structure and its construction technology of changing in vain based on the material
CN207647524U (en) A kind of new-old concrete crossover node bottom deformation seam water proof structure
CN105756102A (en) Waterproof structure and process of integrated underground diaphragm wall and basement exterior wall
CN211395218U (en) Cold regeneration basic unit road surface structure of emulsified asphalt plantmix
CN209923991U (en) Vibration isolation structure for building foundation
CN209368894U (en) A kind of sole plate waterproof structure for deformation seams
CN107761783A (en) The method for waterproofing of skyscraper underground pile crown
CN110453884A (en) Complete float builds vibration damping soundproof floor and its construction method
CN213233847U (en) Asphalt-based polyester tire pre-paved waterproof roll and basement bottom plate waterproof structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant