CN104149932B - Ton bulk goods deadwood pre-installs closure workmanship - Google Patents

Ton bulk goods deadwood pre-installs closure workmanship Download PDF

Info

Publication number
CN104149932B
CN104149932B CN201410349380.XA CN201410349380A CN104149932B CN 104149932 B CN104149932 B CN 104149932B CN 201410349380 A CN201410349380 A CN 201410349380A CN 104149932 B CN104149932 B CN 104149932B
Authority
CN
China
Prior art keywords
tail fin
casting
ensured
mark
tailing axle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410349380.XA
Other languages
Chinese (zh)
Other versions
CN104149932A (en
Inventor
刘在良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHOUSHAN XINZHEN SHIP DESIGN CO., LTD.
Original Assignee
Zhoushan Xinzhen Ship Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhoushan Xinzhen Ship Design Co Ltd filed Critical Zhoushan Xinzhen Ship Design Co Ltd
Priority to CN201410349380.XA priority Critical patent/CN104149932B/en
Publication of CN104149932A publication Critical patent/CN104149932A/en
Application granted granted Critical
Publication of CN104149932B publication Critical patent/CN104149932B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Ton bulk goods deadwood pre-installs closure workmanship, and tailing axle steel-casting, and end of freezing are installed in lifting tail fin prelocalization;Casting steel casting tail fin and tailing axle steel-casting will make together, it is ensured that its end connection consistency;The front and back position of tail fin is first determined, and is ensured using rib position mark, in advance the mark line on tail fin and tailing axle steel-casting, as long as alignment front and back position determines that the installation site of tail fin;A tail fin of position level is lifted first, and the data point of theory is measured on correspondence drawing and mark is carried out at theoretical value strong point on tail fin, and measures its numerical value using three-dimensional full battle instrument, it is ensured that be consistent with theoretical value;Installation is compared with angular templet;An other tail fin is lifted again, and the height of every meter of 45 degree of risings is calculated in theory, and every meter of place of tail fin carries out mark, and the positioning that its difference in height ensures its short transverse is measured using three-dimensional full battle instrument;Spot welding is fixed and is fixed with support, and completion is closed up in whole tail fin prepackage.

Description

Ton bulk goods deadwood pre-installs closure workmanship
Technical field
Closure workmanship is pre-installed the present invention relates to ton bulk goods deadwood, belongs to technical field of ships.
Background technology
With the development of modern science and technology, shipping industry is increasingly to high-end development, from original wooden boat to ten thousand tons Level steel vessel development, especially ton bulk freighter, substantially increase the transportation power of ship, the technique for also improving shipbuilding, But also very backward in terms of tail fin prepackage is closed up, the angle or position often installed are uneven, make navigation direction unstable, and Deflecting is unstable, is a urgent problem.
The content of the invention
Closure workmanship is pre-installed it is an object of the invention to provide ton bulk goods deadwood.
The problem to be solved in the present invention is the deficiency that existing tail fin prepackage closure workmanship falls behind.
To realize the purpose of the present invention, the technical solution adopted by the present invention is:
1st, ton bulk goods deadwood prepackage closure workmanship, it is characterised in that:Comprise the following steps
A needs the good tailing axle steel-casting of location and installation, and end of freezing before lifting tail fin;
B when casting steel casting, tail fin and tailing axle steel-casting will together with make, it is ensured that the one of its end connection Cause property;
C first determines the front and back position of tail fin, and is ensured using rib position mark, in advance in tail fin and tailing axle steel-casting subscript Note line is carried out, as long as alignment front and back position has determined that the installation site of tail fin;
D lifts a tail fin of position level first, and the data point of theory is measured on correspondence drawing, and on tail fin Mark is carried out at theoretical value strong point, and its numerical value is measured using three-dimensional full battle instrument, it is ensured that be consistent with theoretical value, it is ensured that coplanarity;
It is compared again with angular templet after e installations;
F lifts an other tail fin again, and the height of every meter of 45 degree of risings is calculated in theory, and is carried out at every meter of place of tail fin Mark, and measure the positioning that its difference in height ensures its short transverse using three-dimensional full battle instrument;
G spot welding is fixed and is fixed with support, and completion is closed up in whole tail fin prepackage.
Advantages of the present invention:Technology is closed up using the tail fin prepackage of this technique, makes navigation direction stable, and assist conversion side To steady, there should be extensive market prospects.
Brief description of the drawings
Fig. 1 is the stereogram that ton bulk goods deadwood of the present invention pre-installs closure workmanship.
Embodiment
Below in conjunction with the accompanying drawings and embodiment the present invention is further illustrated.
By taking 38670DWT bulk goods deadwood prepackage closure workmanship as an example, comprise the following steps:
A needs the good tailing axle steel-casting of location and installation, and end of freezing before lifting tail fin;
B when casting steel casting, tail fin and tailing axle steel-casting will together with make, it is ensured that the one of its end connection Cause property;
C first determines the front and back position of tail fin, and is ensured using rib position mark, in advance in tail fin and tailing axle steel-casting subscript Note line is carried out, as long as alignment front and back position has determined that the installation site of tail fin;
D lifts a tail fin of position level first, and the data point of theory is measured on correspondence drawing, and on tail fin Mark is carried out at theoretical value strong point, and its numerical value is measured using three-dimensional full battle instrument, it is ensured that be consistent with theoretical value, it is ensured that coplanarity;
It is compared again with angular templet after e installations;
F lifts an other tail fin again, and the height of every meter of 45 degree of risings is calculated in theory, and is carried out at every meter of place of tail fin Mark, and measure the positioning that its difference in height ensures its short transverse using three-dimensional full battle instrument;
G spot welding is fixed and is fixed with support, and completion is closed up in whole tail fin prepackage.
The application method of the present invention:The ton bulk freighter that the manufacture of this technique is completed, the accurate nothing of tail fin installation site are installed By mistake, angle adjustment was carried out during navigation by original 1 hour and becomes angle adjustment correction in 3 hours, navigation is got up safer Reliably.

Claims (1)

1. ton bulk goods deadwood pre-installs closure workmanship, it is characterised in that:Comprise the following steps
A needs the good tailing axle steel-casting of location and installation, and end of freezing before lifting tail fin;
B when casting steel casting, tail fin and tailing axle steel-casting will together with make, it is ensured that its end connection it is consistent Property;
C first determines the front and back position of tail fin, and is ensured using rib position mark, in advance will mark on tail fin and tailing axle steel-casting Line is carried out, as long as alignment front and back position has determined that the installation site of tail fin;
D lifts a tail fin of position level first, and the data point of theory is measured on correspondence drawing, and reason on tail fin Mark is carried out by data point, and its numerical value is measured using three-dimensional full battle instrument, it is ensured that be consistent with theoretical value, it is ensured that coplanarity;
It is compared again with angular templet after e installations;
F lifts an other tail fin again, and the height of every meter of 45 degree of risings is calculated in theory, and carries out mark at every meter of place of tail fin Note, and measure the positioning that its difference in height ensures its short transverse using three-dimensional full battle instrument;
G spot welding is fixed and is fixed with support, and completion is closed up in whole tail fin prepackage.
CN201410349380.XA 2014-07-22 2014-07-22 Ton bulk goods deadwood pre-installs closure workmanship Expired - Fee Related CN104149932B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410349380.XA CN104149932B (en) 2014-07-22 2014-07-22 Ton bulk goods deadwood pre-installs closure workmanship

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410349380.XA CN104149932B (en) 2014-07-22 2014-07-22 Ton bulk goods deadwood pre-installs closure workmanship

Publications (2)

Publication Number Publication Date
CN104149932A CN104149932A (en) 2014-11-19
CN104149932B true CN104149932B (en) 2017-09-29

Family

ID=51875613

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410349380.XA Expired - Fee Related CN104149932B (en) 2014-07-22 2014-07-22 Ton bulk goods deadwood pre-installs closure workmanship

Country Status (1)

Country Link
CN (1) CN104149932B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106184607A (en) * 2016-07-11 2016-12-07 广州文冲船厂有限责任公司 A kind of sternpost and the mounting structure of tail fin
CN106184610B (en) * 2016-07-11 2018-06-08 广州文冲船厂有限责任公司 A kind of sternpost and tail fin installation method
CN111252208B (en) * 2020-03-13 2020-11-27 江南造船(集团)有限责任公司 Installation method of stern section energy-saving device
CN111498049B (en) * 2020-04-10 2021-12-21 中船澄西扬州船舶有限公司 Mounting method of energy-saving stator

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU755686A1 (en) * 1977-05-27 1980-08-15 Univ Moskovsk Fin propeller model
CN101058334A (en) * 2007-05-23 2007-10-24 沪东中华造船(集团)有限公司 Method of mounting tail fin end support
CN202295224U (en) * 2011-10-18 2012-07-04 沪东中华造船(集团)有限公司 Embedded bracket tool for positioning and mounting tail fin of ship
CN102431626B (en) * 2011-10-18 2013-11-20 沪东中华造船(集团)有限公司 Installation method of overlong twin-skeg structure segment and shaft bracket dock

Also Published As

Publication number Publication date
CN104149932A (en) 2014-11-19

Similar Documents

Publication Publication Date Title
CN104149932B (en) Ton bulk goods deadwood pre-installs closure workmanship
CN104875847A (en) Method for quickly carrying middle transverse bulkhead of container ship
CN104527922B (en) Accurate positioning method of anchor bolt hole of marine main engine
CN103979073A (en) Installation method for segmented pre-installation of anchor table, anchor mouth and hawse pipe
CN107264724A (en) It is used for the baseline design method that fitting-out piping is installed in the anti-state segmentation of cabin curved surface
PT2436593E (en) Ship and method for transporting and setting up offshore structures
CN103523168B (en) CSS platform connecting bridge area segmentation manufacturing process and special skew moulding bed
CN104724250A (en) Method for drawing hull section margin line
CN203518893U (en) Scale for measuring fitting degrees of joining lines of ship inner and outer housing sheet bodies
CN107640282A (en) A kind of multi-purpose vessel axle, rudder system mounting process
CN104494784A (en) Manufacturing and mounting method of container ship guide frame
CN106882326A (en) A kind of molten stainless steel freighter is segmented Quick carrying localization method
GR1008359B (en) Method for the oscillation decrease in moored or towed ships or in ships fastened to a buoy - application arrangement of same
CN103569313B (en) In a kind of boat segmental manufacture, position baseline draws and docking calculation
CN202703843U (en) Container ship stern post
CN110788822B (en) Method for surveying central line of hull deck
CN101746482A (en) Method of abutting joint of two total segments in shipbuilding process
CN204849720U (en) Marine butt joint platform butt joint location construction structures
CN110171547A (en) A kind of light-tonnage vessel harbour drinking water acquisition methods
CN203544292U (en) Demountable deck for survey vessels
CN110282078A (en) A kind of accuracy control method of self-discharging ship tank top W type segmentation
CN106965909B (en) Double ship submarines haul shipment localization method waterborne
CN109080764A (en) A kind of method of determining stabilizer shaft centre line
CN203921181U (en) Screw shaft of ship nominal endocentric phrase
CN103953043A (en) Floating box type locating tool for piling offshore wind power foundation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20151111

Address after: 316000 Zhejiang Zhoushan Zhoushan comprehensive free trade zone enterprise service center room 301-397

Applicant after: ZHOUSHAN XINZHEN SHIP DESIGN CO., LTD.

Address before: 316000, Zhejiang City, Dinghai District, Lincheng, Zhoushan street, future city, building 5, unit 207, room four, facing south

Applicant before: ZHOUSHAN DEHE SHIP DESIGN CO., LTD.

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170929

Termination date: 20180722

CF01 Termination of patent right due to non-payment of annual fee